Braced Cuts and Excavations
L. Prieto-Portar 2008
Deep excavations for large utilities, heavy rail transit lines and deep basements for
buildings typically require the shoring of vertical walls that may be 30 m deep or more.
Underground transportation routes (such as subways) commonly follow existing street
alignments, which permit the use of the cut-and-cover method of construction. In this
method the lateral walls are placed into the ground first (with sheet piling, slurry walls,
soil-cement mixing, etc.) followed by the open excavation of a limited length, say 300 m
long. Shortly after excavation, a roof is placed over the job site that permits the
restoration of traffic on the street above.
For buildings, a method called top-down construction permits the simultaneous work of
building the basements and foundations at the same time that the superstructure is erected.
building the basements and foundations at the same time that the superstructure is erected.
Both methods rely on the ability of engineers to effectively brace the deep walls that
enclose the excavation. That is the subject of this lecture.
Some shallow temporary utility excavations are not anchored or braced.
This temporary excavation is protected
from collapse by a movable earth
shield. Temporary excavations kill
many workers each year, and these
movable shields are becoming very
popular with engineering contractors.
This photo shows a shield in a utility
trench dug to place a drainage
pipe at a depth of 15 feet. The pipe is
corrugated polyethylene 36” diameter.
A larger movable shield wall is used to place a 108” diameter water main.
This is a very
common setup for
deeper temporary
braced cuts.
The walls are steel
sheet piles,
supported with three
rows of horizontal
walers, and laterally
braced with WF
braced with WF
struts.
Lateral Earth Pressures on Deep Walls.
Deep walls with multiple braces deflect differently than shallow un-braced retaining walls,
as illustrated in photos and figures of the next two slides. Retaining walls rotate about the
toe and experience most of their movement at the top. Deep multiply-braced walls
experience increasing movement with depth. This variation is complex, and a function of
many factors, such as depth, soil parameters, speed of construction, etc. Since there is very
little movement at the top of the wall, the lateral earth pressure h is essentially an at-rest o
pressure. Further down, wall movement towards the excavation signifies that the soil
behind the wall enters an increasing active a pressure.
Karl Terzaghi proposed in 1943 a general wedge theory that estimates the total lateral force
Karl Terzaghi proposed in 1943 a general wedge theory that estimates the total lateral force
Fh on the wall by assuming that the failure surface is the arc of a logarithmic spiral, where
the radius r = ro
e( tan ) from the spiral centroid.
The total lateral force F on the wall is located at a distance 0.33H from the toe (from the
bottom of excavation), whereas braced walls total lateral force F may range from 0.3 to 0.6
of H. Their failure modes differ considerably.
Few structures are actually analyzed via Terzaghi's formula, which may however be
suitable for use with a computer code that will test a multitude of wedges to select the Fmax.
A simpler analytical alternative was offered by Ralph Peck in 1969 via three typical
apparent pressure envelopes.
The difference between the failure mechanisms of a retaining wall and a multi-braced wall.
The Terzaghi failure mechanism for a multi-braced wall.
In the event the backfill has layers of both granular and cohesive soils, Peck proposed a
transformation of the granular layers into equivalent single cohesive layer via the formula,
cavg = 0.5H [ sandKaH2sand tan sand + (H – Hsand )n' qu ]
where qu is the unconfined compression strength of clay and n' is a coefficient of progressive
failure (that ranges from 0.5 < n' < 1.0).
A similar calculation for the average unit weight avg is,
avg = 1/H [ sHs + (H - Hs) c]
where c is the saturated unit weight of clay.
Once all the granular layers are transformed to equivalent cohesive layers, the overall value of
cohesion for the entire backfill is found from,
n
Cavg = 1/H (c1H1 + c2H2 + .......... + cnHn) = 1/H ciHi
i
and for the unit weight avg,
n
avg = 1/H ( 1H1 + 2H2 + .......... + nHn) = 1/H iHi
i
Figure 8
A similar calculation for the average unit weight γ
γ
γ
γavg is = 1/H [ γs Hs + (H-Hs) γc]
where γc is the saturated unit weight of the clay.
Once all the granular layer(s) are transformed to the equivalent cohesive layer(s), the overall
value of cohesion for the entire backfill is found from,
cavg = 1/H (c1h1 +c2H2 + ................................... cnHn)
and for the unit weight, avg.
γavg. = 1/H (γ1H1 + γ2H2 + ............................... γnHn)
A typical excavation to bury a utility may require several levels of horizontal struts. When the
soil in back of the wall is a sand, the pressure pa will be uniform from top to bottom, with a value
of pa = 0.65 H Ka.
The Construction of Deep Excavations.
From shallow excavations (for utilities) to very deep (up to 40 m) for tall buildings, it is
required to stabilize the areas immediately around them, against:
1) Lowered bearing capacity;
2) Additional settlements (∆H);
3) Lateral settlements (∆x and ∆y); and
4) Vibrations that cause damage.
A stabilized excavation has three elements:
1) A wall;
2) A retention system; and
3) A controlling and a monitoring system.
3) A controlling and a monitoring system.
The wall could be built by:
1) Sheet piling (steel, plastic or reinforced concrete).
2) Soldier piles with or without lagging.
3) Drilled in-place piles.
4) Poured in-place concrete panel walls (slurry walls).
The retention system could be:
1) Wales supported by horizontal struts or diagonal rakers.
2) Tiebacks or ground anchors.
3) Compression rings.
Strut spacing is
Wale
Lagging
(2x6,2x8,etc)
Strut Vertical strut
spacing depends
on tolerable
lateral movement
and pile section
Beam or pile
Wales
Lagging
Strut
Plan view for a soldier pile and lagging wall
Strut spacing is
variable depending
on tolerable lateral
movements and
wale strength.
Strut
Wale
Elevation view for a soldier pile and lagging wall
Strut
Wall constructed of
arch web piles.
Strut
Wale
Spacing as for
soldier beams
For shallow
Space as required.
Depth to first raker
depends on the pile
section and tolerable
lateral movements.
Wale
Plan view for a sheet piling wall.
Strut
For shallow
excavations, wales
and rakers may be
omitted.
Elevation view for a sheet piling wall.
Rakers
Peck’s Design Pressure Envelopes.
pa ≈ 0.3 γ
γ
γ
γ H
pa = γ
γ
γ
γ H [1 – 4 c / γ
γ
γ
γ H]
The pressure against the walls in dense sands: pa = 0.65 γ
γ
γ
γ H Ka
where Ka = tan2 (45° - φ/2)
A clay is considered soft to medium if: γ
γ
γ
γ H / c > 4, then
pa = γ
γ
γ
γ H [1 – 4 c / γ
γ
γ
γ H] or 0.3 γ
γ
γ
γ H whichever is greater.
A clay is considered stiff if: γ
γ
γ
γ H / c ≤ 4 , then pa ≈ 0.3 γ
γ
γ
γ H.
When there are several layers of sand and clays, the averaged properties are,
c = 1/(2H) [ γs Ks (Hs)2 tan(φs) + (H - Hs)0.75 q ]
cavg = 1/(2H) [ γs Ks (Hs)2 tan(φs) + (H - Hs)0.75 qu]
γavg = 1/H [γs Hs + (H - Hs) γc]
where γc is the saturated unit weight of the clay layer.
For multiple clay layers
N N
cavg = 1/H (ci Hi) and γ
γ
γ
γavg = 1/H (γ
γ
γ
γi Hi)
i i
Analysis of Strut (or Anchor) Loads.
The minimum vertical spacing for struts (and anchors) is between 2.0 to 3.0 m. The advan-
tages of anchors over struts are (1) they permit to have uncluttered excavations, and (2) struts
are axial and bending load limited by their slenderness ratios l / r. The location of the topmost
brace in cohesive soils (strut or anchor) should be at a distance d1 from the top that is less than
the depth Zc of tensile cracking of the clay soil.
The determination of brace loads is as follows:
1. Establish a pressure envelope on wall;
2. Struts and anchors are assumed to be hinged at the wall, except for topmost and
2. Struts and anchors are assumed to be hinged at the wall, except for topmost and
lowest levels (ie. A and D in Figure);
3. Separate the loads into 2 supported segments, as shown in Figure;
4. Calculate the strut bracing loads via,
FA = A s
FB = (B1 + B2)(s)
FC = (C1 + C2)(s)
FD = D(s)
5. Knowing the bracing loads, prepare a shear and a moment diagram to design the
steel struts or anchors.
Analysis of wales.
If struts are used, their capacity to properly carry the horizontal loads at each level is enhanced
through the use of horizontal steel members against the wall called wales or walers. Their
design is based on an analysis of their maximum bending moments Mmax, such that:
for wales at level A: Mmax = [A s2] / 8
for wales at level B: Mmax = [(B1 + B2) s2] / 8
for wales at level C: Mmax = [(C1 + C2) s2] / 8
for wales at level D: Mmax = [D s2] / 8
From these maximum moments, the section modulii are found for each level from,
From these maximum moments, the section modulii are found for each level from,
S = Mmax / all for steel
Analysis of the Retaining Wall.
Each section of the wall in Figure 32.8 is analyzed to determine its maximum bending
moment Mmax. Depending on the materials of the wall (steel sheet piling, cast-in-place
concrete, drilled shafts, etc.), the section modulus S is then determined and hence the wall
thickness, reinforcement, etc.
Example #1. Analyze and design a wall and a multiple bracing system for the excavation
shown below. Use a spacing s = 10 feet for the horizontal struts.
Clay
φ = 0°
γ = 112 pcf
c = 700 pcf
c = 700 pcf
Sheet piling
Step 1. Select the suitable pressure diagram.
γH/c = (112 lb/ft3)(20ft) / 700 lb/ft2 = 3.2 < 4 ∴ the soil is a stiff clay
∴ pa = 0.3 γ H = 0.3(0.112 k/ft3)(20ft) = 0.672 ksf
Step 2. Determine the loads in each strut.
Draw the pressure diagram along the entire depth of the wall (draw sideways below for
convenience).
Set B = B1 + B2
+ MB1 = 0 therefore -A(7) + 1/2 (5)(0.672)(5+5/3) + (5)(0.672)(5/2) = 0
∴ A = 2.80 kip/ft
Fv = 0 A + B1 = (5)(0.672) + 1/2(5)(0.672)
∴ B1 = 2.24 kips/ft
and by symmetry, B2 = 2.24 kips/ft, and C = 2.80 kips/ft
Therefore, the loads (force) in each strut (spaced at 10 feet center-to-center) is,
Fa = A s = (2.80 k/ft)(10 ft) = 28.0 kips
Fb = (B1 + B2) s = (2)(2.24 k/ft)(10) = 44.8 kips
Fb = (B1 + B2) s = (2)(2.24 k/ft)(10) = 44.8 kips
Fc = C s = (2.80 k/ft)(10 ft) = 28.0 kips
Step 3. Design the struts.
Use the strut at B (the highest load) for the design with kL = 20 feet.
One possible solution is a steel pipe with a 3” diameter and 0.6” thick walls, which provides a
capacity of 60 kips.
Alternatively, a W10 x 33 provides a capacity of 105 kips, therefore FS >2.
Step 4. Design the sheet piles.
To find the location of the maximum moment find where the shear = 0,
x = 2.24 kips / (0.672 k-ft) = 3.33 ft.
Mmax occurs at E = (2.24 k)(3.33 ft) - (0.672 k-ft)(3.33 ft.)(3.33ft/2) = 3.73 k-ft./ft of wall.
The required section modulus of sheet piling S = Mmax/ fall = (3.73 k-ft)(12 in/ft)/(20 k/in2)
= 2.2 in3/ft of wall.
Could choose a PSA28 which provides a S = 2.5 in3/ft of wall.
The PSA28 steel sheet pile cross-section.
Step 5. Design the waler.
At the reaction at B,
Mmax = (B1 +B2)(s2) / 8 = (2)(2.24 k-ft)(10 ft)2 / 8 = 56 kip-ft.
∴ the required section modulus S = M max / fall = (56 k-ft)(12 in/ft) / (20 k/in2) = 33.6 in3.
Suggest the use of a W12 x 36, which provide a S = 46 in3.
Example #2.
Analyze and design a wall and a multiple bracing system for the excavation shown below. Use a
spacing s = 3 m for the horizontal struts.
Step 1. Determine the lateral pressure pa on the wall.
First check the ratio [ H] / c = [18 kN/m3 (7 m)] / 35 kN/m2 = 3.6 < 4
Therefore the soil behaves as a stiff clay, and its "apparent" pressure is,
pa = 0.3 H = 0.3(18 kN/m3)(7 m) = 37.8 kN/m2.
Step 2. Determine the strut loads A, B and C.
MB1 = 0 A(2.5) - 0.5(37.8)(1.75)(1.75 + 1.75/3) - (1.75)(37.8)(1.75/2) = 0
A = 54.0 kN/m = C (by symmetry)
Fy = 0 0.5(1.75)(37.8) + (37.8)(1.75) - A - B1 = 0
↓+
B1 = 45.2 kN/m = B2 (by symmetry)
The loads in the struts,
FA = 54.0 kN/m (3 m) = 162 kN on the A-level struts
FB = 45.2 kN/m (2)(3 m) = 271 kN on the B-level struts
FB = 45.2 kN/m (2)(3 m) = 271 kN on the B-level struts
FC = = 162 kN on the C-level struts
Step 3. Design the struts.
The B-level struts carry the largest loads (271 kN), and have an effective length KL = 6 m.
Refer to AISC's Manual of Steel Construction and select a W250 mm x 49 kg/m for an fy =
248 MN/m2, or a steel pipe with a diameter = 75 mm (and a wall thickness t = 15 mm).
Step 4. Design the steel sheetpiling wall.
Locate the point of zero shear, which corresponds to the location of the maximum moment,
The shear is zero at a distance x from strut B1 (ie. point E in figure),
x = (FB1)/(pa) = (45.2 kN/m)/(37.8 kN/m2) = 1.2 m
The maximum moment occurs at E,
Mmax = - FB1 x + pa (x/2) = - (45.2 kN)(1.2 m) + (37.8 kN/m2)(1/2)(1.2 m)2
= - 54.2 + 27.2 = - 27 kN-m
The section modulus S, of the sheet-piling is,
S = Mmax / all = [27 kN-m]/ [0.6(248 MN/m2)]
S = 18 x 10-5 m3/m of wall
Choose a PMA-22 with S = 29 x 10-5 m3/m.
Step 5. Design the wale at the B-level.
Mmax = [(B1 + B2) S2]/8 = [90.4 kN)(3 m)2]/8 = 101.7 kN-m
The required section modulus S = Mmax / all = [101.7 KN-m]/[0.6(248 MN/m2)
The required section modulus S = Mmax / all = [101.7 KN-m]/[0.6(248 MN/m2)
S = 68 x 10-5 m3/m of wall
The use of a W310 mm x 54 kg/m with Sx = 75 x 10-5 m3/m, shows an un-braced length
Lu = 4.085 m (reference to the AISC Manual).
Notice the two struts
bracing the opening of
this utility tunnel.
A permanent
strut braced
retaining wall
built for the
underground
Alameda
railroad
corridor from
Long Beach
to Los
Angeles.
Anchors versus rakers support soldier pile walls.
This ventilation and access shaft for a transit tunnel shows the large steel compression rings that
brace the steel bulkhead.
A 19 acre landslide in Manoa Valley, Hawaii, is stabilized with 1000 soil anchors, each 100 ft long, and
vertical groundwater drains. The 120 home development was placed over a 10 degree slope, which started
to move during a severe storm in 1988. Water from aquifers and broken water mains worsened the ground
movement. The 100 ft anchors are held at the surface by concrete cap blocks set at 40 and 50 degrees from
the hillside slope to form a Vshape beneath the ground, installed by Schnabel Foundation (CE Sept. 1998).
This retaining wall was placed
underground using the soil mixing
technique. This method was originated
by the Japanese firm Seiko, and has
been modified by the US firms
Howard Baker and Schnabel.
www.schnabel.com
Another example of large steel I-beams used as temporary raker supports of the wall.
An anchored slurry wall nest to the Hudson River, by Hoboken, New Jersey.
This historic industrial plant was preserved and protected against collapse into a new excavation
with a soldier pile and wood lagging wall.
This motorway over the Alps, built from Salzburg to Klagenfurt had serious rock falls and sliding slopes
near Flachau, Austria. It was stabilized by Bauer AG using over 100 anchors, each 60 m deep and
carrying a load of 1,200 kN each. The anchors penetrated rock, gravel, sand, silt and clay strata.
The Stability of Braced Excavations.
Bottom Heave.
Relief of the loads upon deep clay layers during excavation creates large bulging at the center,
and the possibility of “flow” or creep of the clay into the excavation.
The vertical load ”Q” per unit length of cut at the level of the bottom of the cut along the line
bd and af, Q = γH (0.7B) - cH
But, 5.7c(0.7B)
(0.7B)
cN
Q c
ult =
=
cH
-
H(0.7B)
)
7
.
0
(
7
.
5
Q
Q
FS
u
heave)
(against
γ
B
c
=
=
H
cN
FS
Eide
-
Bjerrum
c
γ
=
For long cuts and increases to
0
L
B
≈ 5.14
Nc = 7.60
Nc =
7
7.5
8
8.5
9
Nc
L/B=infinity
L/B=3
L/B=2
L/B=1
5
5.5
6
6.5
0 0.5 1 1
.5 2 2.5 3 3.5 4 4.5 5
H/B
L/B=1

More Related Content

Similar to Braced cut excavations design and problems ppt

Diseno de Muros de Contencion.pptx
Diseno de Muros de Contencion.pptxDiseno de Muros de Contencion.pptx
Diseno de Muros de Contencion.pptxCesarAndres80
 
Fe1lecture4
Fe1lecture4Fe1lecture4
Fe1lecture4Ali Shah
 
Unit iii braced_cuts
Unit iii braced_cutsUnit iii braced_cuts
Unit iii braced_cutsGimmick
 
pilefoundation_16th aug.ppt
pilefoundation_16th aug.pptpilefoundation_16th aug.ppt
pilefoundation_16th aug.pptFREELANCER
 
Retaining walls (الجدران الاستنادية)-steel sheet piles - sheet piles wall
Retaining walls (الجدران الاستنادية)-steel sheet piles - sheet piles wallRetaining walls (الجدران الاستنادية)-steel sheet piles - sheet piles wall
Retaining walls (الجدران الاستنادية)-steel sheet piles - sheet piles wallDr.Youssef Hammida
 
lecturenote_1463116827CHAPTER-II-BEARING CAPACITY OF FOUNDATION SOIL.pdf
lecturenote_1463116827CHAPTER-II-BEARING CAPACITY OF FOUNDATION SOIL.pdflecturenote_1463116827CHAPTER-II-BEARING CAPACITY OF FOUNDATION SOIL.pdf
lecturenote_1463116827CHAPTER-II-BEARING CAPACITY OF FOUNDATION SOIL.pdf2cd
 
Gabion walls design guide
Gabion walls design guideGabion walls design guide
Gabion walls design guideScottMeredith1
 
Ch1 introduction (1 14)
Ch1 introduction (1 14)Ch1 introduction (1 14)
Ch1 introduction (1 14)Rafi sulaiman
 
Lecture 1. bearing capacity of soil
Lecture 1. bearing capacity of soilLecture 1. bearing capacity of soil
Lecture 1. bearing capacity of soilhusseinhadi2
 
Retaining wall(الجدران الاستنادية).- Scant Piles
Retaining wall(الجدران الاستنادية).- Scant PilesRetaining wall(الجدران الاستنادية).- Scant Piles
Retaining wall(الجدران الاستنادية).- Scant PilesDr.youssef hamida
 
CVEN 440_540 Classnotes (6) --- Static analysis of pile foundation.pptx
CVEN 440_540 Classnotes (6) --- Static analysis of pile foundation.pptxCVEN 440_540 Classnotes (6) --- Static analysis of pile foundation.pptx
CVEN 440_540 Classnotes (6) --- Static analysis of pile foundation.pptxmoloholo90
 
footing
footingfooting
footingillpa
 

Similar to Braced cut excavations design and problems ppt (20)

Retaining_Wall_UOL.pptx
Retaining_Wall_UOL.pptxRetaining_Wall_UOL.pptx
Retaining_Wall_UOL.pptx
 
Diseno de Muros de Contencion.pptx
Diseno de Muros de Contencion.pptxDiseno de Muros de Contencion.pptx
Diseno de Muros de Contencion.pptx
 
Fe1lecture4
Fe1lecture4Fe1lecture4
Fe1lecture4
 
Cement concrte roads
Cement concrte roadsCement concrte roads
Cement concrte roads
 
Unit iii braced_cuts
Unit iii braced_cutsUnit iii braced_cuts
Unit iii braced_cuts
 
Ch1 introduction
Ch1 introductionCh1 introduction
Ch1 introduction
 
pilefoundation_16th aug.ppt
pilefoundation_16th aug.pptpilefoundation_16th aug.ppt
pilefoundation_16th aug.ppt
 
Geotechnical vertical stress
Geotechnical vertical stressGeotechnical vertical stress
Geotechnical vertical stress
 
ce742lec_8_11.pdf
ce742lec_8_11.pdfce742lec_8_11.pdf
ce742lec_8_11.pdf
 
Retaining walls (الجدران الاستنادية)-steel sheet piles - sheet piles wall
Retaining walls (الجدران الاستنادية)-steel sheet piles - sheet piles wallRetaining walls (الجدران الاستنادية)-steel sheet piles - sheet piles wall
Retaining walls (الجدران الاستنادية)-steel sheet piles - sheet piles wall
 
lecturenote_1463116827CHAPTER-II-BEARING CAPACITY OF FOUNDATION SOIL.pdf
lecturenote_1463116827CHAPTER-II-BEARING CAPACITY OF FOUNDATION SOIL.pdflecturenote_1463116827CHAPTER-II-BEARING CAPACITY OF FOUNDATION SOIL.pdf
lecturenote_1463116827CHAPTER-II-BEARING CAPACITY OF FOUNDATION SOIL.pdf
 
Footing
FootingFooting
Footing
 
Gabion walls design guide
Gabion walls design guideGabion walls design guide
Gabion walls design guide
 
Ch1 introduction (1 14)
Ch1 introduction (1 14)Ch1 introduction (1 14)
Ch1 introduction (1 14)
 
Lecture 1. bearing capacity of soil
Lecture 1. bearing capacity of soilLecture 1. bearing capacity of soil
Lecture 1. bearing capacity of soil
 
Retaining wall(الجدران الاستنادية).- Scant Piles
Retaining wall(الجدران الاستنادية).- Scant PilesRetaining wall(الجدران الاستنادية).- Scant Piles
Retaining wall(الجدران الاستنادية).- Scant Piles
 
Deep Foundations
Deep FoundationsDeep Foundations
Deep Foundations
 
CVEN 440_540 Classnotes (6) --- Static analysis of pile foundation.pptx
CVEN 440_540 Classnotes (6) --- Static analysis of pile foundation.pptxCVEN 440_540 Classnotes (6) --- Static analysis of pile foundation.pptx
CVEN 440_540 Classnotes (6) --- Static analysis of pile foundation.pptx
 
Chapter 13
Chapter 13Chapter 13
Chapter 13
 
footing
footingfooting
footing
 

More from RoshiyaFathima

MODULE 2 -ISE. FULL.pdfnnjjkkkkkllllllllllklllllllllll
MODULE 2 -ISE. FULL.pdfnnjjkkkkkllllllllllklllllllllllMODULE 2 -ISE. FULL.pdfnnjjkkkkkllllllllllklllllllllll
MODULE 2 -ISE. FULL.pdfnnjjkkkkkllllllllllklllllllllllRoshiyaFathima
 
MODULE 5_CSM.pptxvvvbhjjkvhhuuihhgguiiiiioiiiiokoolkkk
MODULE 5_CSM.pptxvvvbhjjkvhhuuihhgguiiiiioiiiiokoolkkkMODULE 5_CSM.pptxvvvbhjjkvhhuuihhgguiiiiioiiiiokoolkkk
MODULE 5_CSM.pptxvvvbhjjkvhhuuihhgguiiiiioiiiiokoolkkkRoshiyaFathima
 
Bridge bridgeDOC-20180812f pontooonnnnnn
Bridge bridgeDOC-20180812f pontooonnnnnnBridge bridgeDOC-20180812f pontooonnnnnn
Bridge bridgeDOC-20180812f pontooonnnnnnRoshiyaFathima
 
bio-enzyme stabilized lateritic soil as highway material ppt.pptx
bio-enzyme stabilized lateritic soil as highway material ppt.pptxbio-enzyme stabilized lateritic soil as highway material ppt.pptx
bio-enzyme stabilized lateritic soil as highway material ppt.pptxRoshiyaFathima
 
Application and innovation of geophysics
Application and innovation of geophysicsApplication and innovation of geophysics
Application and innovation of geophysicsRoshiyaFathima
 
DocScanner 27-Mar-2024 10-36 am.pdf docscanner 27 mar 2024 10 36 am
DocScanner 27-Mar-2024 10-36 am.pdf docscanner 27 mar 2024 10 36 amDocScanner 27-Mar-2024 10-36 am.pdf docscanner 27 mar 2024 10 36 am
DocScanner 27-Mar-2024 10-36 am.pdf docscanner 27 mar 2024 10 36 amRoshiyaFathima
 

More from RoshiyaFathima (6)

MODULE 2 -ISE. FULL.pdfnnjjkkkkkllllllllllklllllllllll
MODULE 2 -ISE. FULL.pdfnnjjkkkkkllllllllllklllllllllllMODULE 2 -ISE. FULL.pdfnnjjkkkkkllllllllllklllllllllll
MODULE 2 -ISE. FULL.pdfnnjjkkkkkllllllllllklllllllllll
 
MODULE 5_CSM.pptxvvvbhjjkvhhuuihhgguiiiiioiiiiokoolkkk
MODULE 5_CSM.pptxvvvbhjjkvhhuuihhgguiiiiioiiiiokoolkkkMODULE 5_CSM.pptxvvvbhjjkvhhuuihhgguiiiiioiiiiokoolkkk
MODULE 5_CSM.pptxvvvbhjjkvhhuuihhgguiiiiioiiiiokoolkkk
 
Bridge bridgeDOC-20180812f pontooonnnnnn
Bridge bridgeDOC-20180812f pontooonnnnnnBridge bridgeDOC-20180812f pontooonnnnnn
Bridge bridgeDOC-20180812f pontooonnnnnn
 
bio-enzyme stabilized lateritic soil as highway material ppt.pptx
bio-enzyme stabilized lateritic soil as highway material ppt.pptxbio-enzyme stabilized lateritic soil as highway material ppt.pptx
bio-enzyme stabilized lateritic soil as highway material ppt.pptx
 
Application and innovation of geophysics
Application and innovation of geophysicsApplication and innovation of geophysics
Application and innovation of geophysics
 
DocScanner 27-Mar-2024 10-36 am.pdf docscanner 27 mar 2024 10 36 am
DocScanner 27-Mar-2024 10-36 am.pdf docscanner 27 mar 2024 10 36 amDocScanner 27-Mar-2024 10-36 am.pdf docscanner 27 mar 2024 10 36 am
DocScanner 27-Mar-2024 10-36 am.pdf docscanner 27 mar 2024 10 36 am
 

Recently uploaded

Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.MaryamAhmad92
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin ClassesCeline George
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfAyushMahapatra5
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...Nguyen Thanh Tu Collection
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxVishalSingh1417
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Shubhangi Sonawane
 
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-IIFood Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-IIShubhangi Sonawane
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...christianmathematics
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxVishalSingh1417
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDThiyagu K
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibitjbellavia9
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701bronxfugly43
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17Celine George
 

Recently uploaded (20)

Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
 
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-IIFood Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701
 
Asian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptxAsian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptx
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 

Braced cut excavations design and problems ppt

  • 1. Foundation Engineering Foundation Engineering Lecture # Lecture #31 31 Braced Cuts and Excavations L. Prieto-Portar 2008
  • 2. Deep excavations for large utilities, heavy rail transit lines and deep basements for buildings typically require the shoring of vertical walls that may be 30 m deep or more. Underground transportation routes (such as subways) commonly follow existing street alignments, which permit the use of the cut-and-cover method of construction. In this method the lateral walls are placed into the ground first (with sheet piling, slurry walls, soil-cement mixing, etc.) followed by the open excavation of a limited length, say 300 m long. Shortly after excavation, a roof is placed over the job site that permits the restoration of traffic on the street above. For buildings, a method called top-down construction permits the simultaneous work of building the basements and foundations at the same time that the superstructure is erected. building the basements and foundations at the same time that the superstructure is erected. Both methods rely on the ability of engineers to effectively brace the deep walls that enclose the excavation. That is the subject of this lecture.
  • 3. Some shallow temporary utility excavations are not anchored or braced.
  • 4. This temporary excavation is protected from collapse by a movable earth shield. Temporary excavations kill many workers each year, and these movable shields are becoming very popular with engineering contractors. This photo shows a shield in a utility trench dug to place a drainage pipe at a depth of 15 feet. The pipe is corrugated polyethylene 36” diameter.
  • 5. A larger movable shield wall is used to place a 108” diameter water main.
  • 6. This is a very common setup for deeper temporary braced cuts. The walls are steel sheet piles, supported with three rows of horizontal walers, and laterally braced with WF braced with WF struts.
  • 7. Lateral Earth Pressures on Deep Walls. Deep walls with multiple braces deflect differently than shallow un-braced retaining walls, as illustrated in photos and figures of the next two slides. Retaining walls rotate about the toe and experience most of their movement at the top. Deep multiply-braced walls experience increasing movement with depth. This variation is complex, and a function of many factors, such as depth, soil parameters, speed of construction, etc. Since there is very little movement at the top of the wall, the lateral earth pressure h is essentially an at-rest o pressure. Further down, wall movement towards the excavation signifies that the soil behind the wall enters an increasing active a pressure. Karl Terzaghi proposed in 1943 a general wedge theory that estimates the total lateral force Karl Terzaghi proposed in 1943 a general wedge theory that estimates the total lateral force Fh on the wall by assuming that the failure surface is the arc of a logarithmic spiral, where the radius r = ro e( tan ) from the spiral centroid. The total lateral force F on the wall is located at a distance 0.33H from the toe (from the bottom of excavation), whereas braced walls total lateral force F may range from 0.3 to 0.6 of H. Their failure modes differ considerably. Few structures are actually analyzed via Terzaghi's formula, which may however be suitable for use with a computer code that will test a multitude of wedges to select the Fmax. A simpler analytical alternative was offered by Ralph Peck in 1969 via three typical apparent pressure envelopes.
  • 8. The difference between the failure mechanisms of a retaining wall and a multi-braced wall.
  • 9. The Terzaghi failure mechanism for a multi-braced wall.
  • 10. In the event the backfill has layers of both granular and cohesive soils, Peck proposed a transformation of the granular layers into equivalent single cohesive layer via the formula, cavg = 0.5H [ sandKaH2sand tan sand + (H – Hsand )n' qu ] where qu is the unconfined compression strength of clay and n' is a coefficient of progressive failure (that ranges from 0.5 < n' < 1.0). A similar calculation for the average unit weight avg is, avg = 1/H [ sHs + (H - Hs) c] where c is the saturated unit weight of clay. Once all the granular layers are transformed to equivalent cohesive layers, the overall value of cohesion for the entire backfill is found from, n Cavg = 1/H (c1H1 + c2H2 + .......... + cnHn) = 1/H ciHi i and for the unit weight avg, n avg = 1/H ( 1H1 + 2H2 + .......... + nHn) = 1/H iHi i
  • 11. Figure 8 A similar calculation for the average unit weight γ γ γ γavg is = 1/H [ γs Hs + (H-Hs) γc] where γc is the saturated unit weight of the clay.
  • 12. Once all the granular layer(s) are transformed to the equivalent cohesive layer(s), the overall value of cohesion for the entire backfill is found from, cavg = 1/H (c1h1 +c2H2 + ................................... cnHn) and for the unit weight, avg. γavg. = 1/H (γ1H1 + γ2H2 + ............................... γnHn)
  • 13. A typical excavation to bury a utility may require several levels of horizontal struts. When the soil in back of the wall is a sand, the pressure pa will be uniform from top to bottom, with a value of pa = 0.65 H Ka.
  • 14. The Construction of Deep Excavations. From shallow excavations (for utilities) to very deep (up to 40 m) for tall buildings, it is required to stabilize the areas immediately around them, against: 1) Lowered bearing capacity; 2) Additional settlements (∆H); 3) Lateral settlements (∆x and ∆y); and 4) Vibrations that cause damage. A stabilized excavation has three elements: 1) A wall; 2) A retention system; and 3) A controlling and a monitoring system. 3) A controlling and a monitoring system. The wall could be built by: 1) Sheet piling (steel, plastic or reinforced concrete). 2) Soldier piles with or without lagging. 3) Drilled in-place piles. 4) Poured in-place concrete panel walls (slurry walls). The retention system could be: 1) Wales supported by horizontal struts or diagonal rakers. 2) Tiebacks or ground anchors. 3) Compression rings.
  • 15. Strut spacing is Wale Lagging (2x6,2x8,etc) Strut Vertical strut spacing depends on tolerable lateral movement and pile section Beam or pile Wales Lagging Strut Plan view for a soldier pile and lagging wall Strut spacing is variable depending on tolerable lateral movements and wale strength. Strut Wale Elevation view for a soldier pile and lagging wall Strut
  • 16.
  • 17. Wall constructed of arch web piles. Strut Wale Spacing as for soldier beams For shallow Space as required. Depth to first raker depends on the pile section and tolerable lateral movements. Wale Plan view for a sheet piling wall. Strut For shallow excavations, wales and rakers may be omitted. Elevation view for a sheet piling wall. Rakers
  • 18.
  • 19. Peck’s Design Pressure Envelopes. pa ≈ 0.3 γ γ γ γ H pa = γ γ γ γ H [1 – 4 c / γ γ γ γ H]
  • 20. The pressure against the walls in dense sands: pa = 0.65 γ γ γ γ H Ka where Ka = tan2 (45° - φ/2) A clay is considered soft to medium if: γ γ γ γ H / c > 4, then pa = γ γ γ γ H [1 – 4 c / γ γ γ γ H] or 0.3 γ γ γ γ H whichever is greater. A clay is considered stiff if: γ γ γ γ H / c ≤ 4 , then pa ≈ 0.3 γ γ γ γ H. When there are several layers of sand and clays, the averaged properties are, c = 1/(2H) [ γs Ks (Hs)2 tan(φs) + (H - Hs)0.75 q ] cavg = 1/(2H) [ γs Ks (Hs)2 tan(φs) + (H - Hs)0.75 qu] γavg = 1/H [γs Hs + (H - Hs) γc] where γc is the saturated unit weight of the clay layer. For multiple clay layers N N cavg = 1/H (ci Hi) and γ γ γ γavg = 1/H (γ γ γ γi Hi) i i
  • 21. Analysis of Strut (or Anchor) Loads. The minimum vertical spacing for struts (and anchors) is between 2.0 to 3.0 m. The advan- tages of anchors over struts are (1) they permit to have uncluttered excavations, and (2) struts are axial and bending load limited by their slenderness ratios l / r. The location of the topmost brace in cohesive soils (strut or anchor) should be at a distance d1 from the top that is less than the depth Zc of tensile cracking of the clay soil. The determination of brace loads is as follows: 1. Establish a pressure envelope on wall; 2. Struts and anchors are assumed to be hinged at the wall, except for topmost and 2. Struts and anchors are assumed to be hinged at the wall, except for topmost and lowest levels (ie. A and D in Figure); 3. Separate the loads into 2 supported segments, as shown in Figure; 4. Calculate the strut bracing loads via, FA = A s FB = (B1 + B2)(s) FC = (C1 + C2)(s) FD = D(s) 5. Knowing the bracing loads, prepare a shear and a moment diagram to design the steel struts or anchors.
  • 22. Analysis of wales. If struts are used, their capacity to properly carry the horizontal loads at each level is enhanced through the use of horizontal steel members against the wall called wales or walers. Their design is based on an analysis of their maximum bending moments Mmax, such that: for wales at level A: Mmax = [A s2] / 8 for wales at level B: Mmax = [(B1 + B2) s2] / 8 for wales at level C: Mmax = [(C1 + C2) s2] / 8 for wales at level D: Mmax = [D s2] / 8 From these maximum moments, the section modulii are found for each level from, From these maximum moments, the section modulii are found for each level from, S = Mmax / all for steel Analysis of the Retaining Wall. Each section of the wall in Figure 32.8 is analyzed to determine its maximum bending moment Mmax. Depending on the materials of the wall (steel sheet piling, cast-in-place concrete, drilled shafts, etc.), the section modulus S is then determined and hence the wall thickness, reinforcement, etc.
  • 23. Example #1. Analyze and design a wall and a multiple bracing system for the excavation shown below. Use a spacing s = 10 feet for the horizontal struts. Clay φ = 0° γ = 112 pcf c = 700 pcf c = 700 pcf Sheet piling
  • 24. Step 1. Select the suitable pressure diagram. γH/c = (112 lb/ft3)(20ft) / 700 lb/ft2 = 3.2 < 4 ∴ the soil is a stiff clay ∴ pa = 0.3 γ H = 0.3(0.112 k/ft3)(20ft) = 0.672 ksf Step 2. Determine the loads in each strut. Draw the pressure diagram along the entire depth of the wall (draw sideways below for convenience). Set B = B1 + B2
  • 25. + MB1 = 0 therefore -A(7) + 1/2 (5)(0.672)(5+5/3) + (5)(0.672)(5/2) = 0 ∴ A = 2.80 kip/ft Fv = 0 A + B1 = (5)(0.672) + 1/2(5)(0.672) ∴ B1 = 2.24 kips/ft and by symmetry, B2 = 2.24 kips/ft, and C = 2.80 kips/ft Therefore, the loads (force) in each strut (spaced at 10 feet center-to-center) is, Fa = A s = (2.80 k/ft)(10 ft) = 28.0 kips Fb = (B1 + B2) s = (2)(2.24 k/ft)(10) = 44.8 kips Fb = (B1 + B2) s = (2)(2.24 k/ft)(10) = 44.8 kips Fc = C s = (2.80 k/ft)(10 ft) = 28.0 kips Step 3. Design the struts. Use the strut at B (the highest load) for the design with kL = 20 feet. One possible solution is a steel pipe with a 3” diameter and 0.6” thick walls, which provides a capacity of 60 kips. Alternatively, a W10 x 33 provides a capacity of 105 kips, therefore FS >2.
  • 26. Step 4. Design the sheet piles. To find the location of the maximum moment find where the shear = 0, x = 2.24 kips / (0.672 k-ft) = 3.33 ft. Mmax occurs at E = (2.24 k)(3.33 ft) - (0.672 k-ft)(3.33 ft.)(3.33ft/2) = 3.73 k-ft./ft of wall. The required section modulus of sheet piling S = Mmax/ fall = (3.73 k-ft)(12 in/ft)/(20 k/in2) = 2.2 in3/ft of wall. Could choose a PSA28 which provides a S = 2.5 in3/ft of wall.
  • 27. The PSA28 steel sheet pile cross-section. Step 5. Design the waler. At the reaction at B, Mmax = (B1 +B2)(s2) / 8 = (2)(2.24 k-ft)(10 ft)2 / 8 = 56 kip-ft. ∴ the required section modulus S = M max / fall = (56 k-ft)(12 in/ft) / (20 k/in2) = 33.6 in3. Suggest the use of a W12 x 36, which provide a S = 46 in3.
  • 28. Example #2. Analyze and design a wall and a multiple bracing system for the excavation shown below. Use a spacing s = 3 m for the horizontal struts.
  • 29. Step 1. Determine the lateral pressure pa on the wall. First check the ratio [ H] / c = [18 kN/m3 (7 m)] / 35 kN/m2 = 3.6 < 4 Therefore the soil behaves as a stiff clay, and its "apparent" pressure is, pa = 0.3 H = 0.3(18 kN/m3)(7 m) = 37.8 kN/m2. Step 2. Determine the strut loads A, B and C.
  • 30. MB1 = 0 A(2.5) - 0.5(37.8)(1.75)(1.75 + 1.75/3) - (1.75)(37.8)(1.75/2) = 0 A = 54.0 kN/m = C (by symmetry) Fy = 0 0.5(1.75)(37.8) + (37.8)(1.75) - A - B1 = 0 ↓+ B1 = 45.2 kN/m = B2 (by symmetry) The loads in the struts, FA = 54.0 kN/m (3 m) = 162 kN on the A-level struts FB = 45.2 kN/m (2)(3 m) = 271 kN on the B-level struts FB = 45.2 kN/m (2)(3 m) = 271 kN on the B-level struts FC = = 162 kN on the C-level struts Step 3. Design the struts. The B-level struts carry the largest loads (271 kN), and have an effective length KL = 6 m. Refer to AISC's Manual of Steel Construction and select a W250 mm x 49 kg/m for an fy = 248 MN/m2, or a steel pipe with a diameter = 75 mm (and a wall thickness t = 15 mm).
  • 31. Step 4. Design the steel sheetpiling wall. Locate the point of zero shear, which corresponds to the location of the maximum moment, The shear is zero at a distance x from strut B1 (ie. point E in figure), x = (FB1)/(pa) = (45.2 kN/m)/(37.8 kN/m2) = 1.2 m The maximum moment occurs at E, Mmax = - FB1 x + pa (x/2) = - (45.2 kN)(1.2 m) + (37.8 kN/m2)(1/2)(1.2 m)2 = - 54.2 + 27.2 = - 27 kN-m
  • 32. The section modulus S, of the sheet-piling is, S = Mmax / all = [27 kN-m]/ [0.6(248 MN/m2)] S = 18 x 10-5 m3/m of wall Choose a PMA-22 with S = 29 x 10-5 m3/m. Step 5. Design the wale at the B-level. Mmax = [(B1 + B2) S2]/8 = [90.4 kN)(3 m)2]/8 = 101.7 kN-m The required section modulus S = Mmax / all = [101.7 KN-m]/[0.6(248 MN/m2) The required section modulus S = Mmax / all = [101.7 KN-m]/[0.6(248 MN/m2) S = 68 x 10-5 m3/m of wall The use of a W310 mm x 54 kg/m with Sx = 75 x 10-5 m3/m, shows an un-braced length Lu = 4.085 m (reference to the AISC Manual).
  • 33. Notice the two struts bracing the opening of this utility tunnel.
  • 34. A permanent strut braced retaining wall built for the underground Alameda railroad corridor from Long Beach to Los Angeles.
  • 35. Anchors versus rakers support soldier pile walls.
  • 36. This ventilation and access shaft for a transit tunnel shows the large steel compression rings that brace the steel bulkhead.
  • 37. A 19 acre landslide in Manoa Valley, Hawaii, is stabilized with 1000 soil anchors, each 100 ft long, and vertical groundwater drains. The 120 home development was placed over a 10 degree slope, which started to move during a severe storm in 1988. Water from aquifers and broken water mains worsened the ground movement. The 100 ft anchors are held at the surface by concrete cap blocks set at 40 and 50 degrees from the hillside slope to form a Vshape beneath the ground, installed by Schnabel Foundation (CE Sept. 1998).
  • 38. This retaining wall was placed underground using the soil mixing technique. This method was originated by the Japanese firm Seiko, and has been modified by the US firms Howard Baker and Schnabel. www.schnabel.com
  • 39. Another example of large steel I-beams used as temporary raker supports of the wall.
  • 40. An anchored slurry wall nest to the Hudson River, by Hoboken, New Jersey.
  • 41. This historic industrial plant was preserved and protected against collapse into a new excavation with a soldier pile and wood lagging wall.
  • 42.
  • 43.
  • 44. This motorway over the Alps, built from Salzburg to Klagenfurt had serious rock falls and sliding slopes near Flachau, Austria. It was stabilized by Bauer AG using over 100 anchors, each 60 m deep and carrying a load of 1,200 kN each. The anchors penetrated rock, gravel, sand, silt and clay strata.
  • 45. The Stability of Braced Excavations. Bottom Heave. Relief of the loads upon deep clay layers during excavation creates large bulging at the center, and the possibility of “flow” or creep of the clay into the excavation.
  • 46. The vertical load ”Q” per unit length of cut at the level of the bottom of the cut along the line bd and af, Q = γH (0.7B) - cH But, 5.7c(0.7B) (0.7B) cN Q c ult = = cH - H(0.7B) ) 7 . 0 ( 7 . 5 Q Q FS u heave) (against γ B c = = H cN FS Eide - Bjerrum c γ = For long cuts and increases to 0 L B ≈ 5.14 Nc = 7.60 Nc =