The document discusses soil phase relationships and concepts related to borrow pit volumes. It defines key terms like specific gravity, moisture content, void ratio, porosity, unit weights, and explores relationships between these terms. It also covers volume change factors during excavation and compaction. The borrow pit method for calculating soil volumes is described, involving taking elevation measurements at grid points to determine cut volumes. Example problems demonstrate calculating haul volumes, shrinkage/swell impacts, and number of loads required.