Ciwaruga Bandung . Sabtu, 1 Desember 2018
SEMINAR & TALKSHOW KEENERGIAN 2018
FORUM KOMUNIKASI MAHASISWA TEKNIK ENERGI INDONESIA (FKMTEI)
Dede Rukanda, ST. MM
BOILER ASSESSMENT DI UNIT
PEMBANGKIT ENERGI,
METODE DAN STUDI KASUS
Pokok bahasan :
 Pendahuluan :
CFB Boiler
 Metode Assessment Boiler
 Studi Kasus Pada
Assessment Boiler &
Pressure Vessel
BOILER PRESSURE PARTS
KERUSAKAN PRESSURE PARTS
PENDAHULUAN
 Tujuan RLA Boiler
 Komponen-komponen
boiler yang dilakukan
assessment
 Key element diluar
technical guidance
Tujuan RLA Boiler
 Meningkatkan reliability, availability dan
effiency.
 Memperpanjang umur peralatan.
 Mengurangi resiko terjadinya kegagalan
atau kerusakan peralatan.
 Meningkatkan Safety
peralatan.
 Mengurangi lama waktu
padam akibat sering
gangguan.
 Komponen-
komponen boiler
yang dilakukan
assessment
 Metode Assessment Boiler
 Masing-masing komponent boiler
dibuat condition assessment
Roadmap-nya
 Komponen yang mempunyai
kondisi yang paling kritis adalah
yang diambil sebagai batas acuan
dalam pengoperasian boiler di
waktu yang akan datang
Contoh boiler tube failure akibat
corrosion fatigue
FLOW DIAGRAM UNTUK TUBE
SAMPLING SECARA UMUM
DAN RENCANA LIFE
ASSESSMENT TERHADAP
PRESSURE PARTS
Lampiran 01
Studi kasus pada
assessment boiler dan
pressure vessel
Pemeriksaan in-situ pada Superheater S-33, Panel 1, elevasi 2000, tube# 4
Struktur mikro berupa austenitic stadium 1 – 2, batas butir austenit terlihat
jelas. Pada daerah lingkaran ellips terlihat jejak serangan korosi batas butir
ringan, itu bukan creep micro-fissure (bukan retak mikro akibat creep).
Korosi batas butir ini terjadi akibat terpapar flue gas panas yang
mengandung corrodant, misalnya senyawa sulfur hasil pembakaran bahan
bakar batubara namun tidak terlalu dalam, yaitu orde kedalamannya kurang
dari sekitar 0.30 mm selama masa operasinya (17 tahun). Belum terlihat
adanya pembentukan creep void. Kondisi material masih baik.
KESIMPULAN DAN SARAN
• Klasifikasi Kondisi Struktur Mikro Kondisi material masih
bagus , termasuk stadium A sampai B atau stadium 1
sampai 2, belum terjadi perubahan strukturmikro yang
signifikant dan belum terbentuk creep void.
• Secara umum kondisi material komponen boiler S 28, S33,
R10 dan R11 ini masih baik, berdasarkan data empiris
yang diberikan diatas, remaining lifenya berkisar antara
55% sampai 95% dari umur disainnya. Dalam
pemeliharaan mendatang saat shut down, perlu
pemeriksaan visual yang teliti pada komponen-komponen
ini termasuk pemeriksaan diameter tube dan header
untuk mendeteksi bila ada terjadi mulur yang excessive
saja.
Lanjutan....
• Dari sampel pada hasil pemotongan tube, terlihat
bahwa permukaan dalam tube relatif bersih tidak
terbentuk kerak dan tidak terjadi penipisan yang
berarti.
• Jadi bisa disimpulkan bahwa boiler feed water
treatmentnya berlangsung bagussehingga kondisi
tersebut perlu dipertahankan. Perhitungan sisa umur
pakai tube-tube tersebut bila dilakukan berdasarkan
laju penipisan akibat korosi, maka akan diperoleh
umur yang jauh lebih lama dibanding dengan metoda
kwalitatif tersebut diatas.
-oOo-
Kesimpulan
• Kerak berupa oksida Fe dan Cr
• Boiler water diduga kuat diluar spec-nya
termasuk kandungan oksigen yang
diperbolehkan
• SOP start up boiler tidak diikuti sepenuhnya
• Saran: perbaiki kwalitas boiler water dan
perbaiki SOP pengoperasian boiler tersebut
HASIL PEMERIKSAAN
WATER WALL TUBE MENGALAMI RETAK
MEMANJANG DAN GETAS
DI PERMUKAAN DALAM TUBE TERDAPAT KERAK DAN LOCAL
THINNING (Lihat arah anak panah)
ECONOMIZER
Kwalitas sambungan las yang buruk, terlihat void yang lolos deteksi
pada pemeriksaan NDT-nya
B2TKS-BPPT
B2TKS-BPPT
KESIMPULAN DAN SARAN
• Water wall tube mengalami hydrogen damage
dimana kerusakan pada permukaan dalam tube
tersebut irreversible
• Korosi yang terjadi adalah dalam suasana basa
sesuai data air boiler yang ada sehingga
terbentuk kerak.
• Gas hydrogen yang terjadi bereaksi dengan
cementite (Fe3C) membentuk gas methana
(CH4) yang menimbulkan grain boundary
cracking dan dekarburisasi
...Lanjutan
• Kerusakan hydrogen damage yang
menyebar ke seluruh system sirkulasi
boiler harus dipetakan melalui metoda
NDT dan bagian yang telah mengalami
cracking harus diganti
• Boiler harus di-cleaning secara kimiawi
• Diduga kondensornya pernah bocor
sehingga air laut masuk
• Economizer mengalami erosion thinning
dari permukaan luar tube
Lampiran 02
Contoh Aktivitas & Report
RLA di Boiler no 5 75
TPh/34 barg Pabrik Gula
Cilegon
`
KLIK HERE
Lampiran 03
Contoh Tabel & Data
Referensi
Lampiran 04
Contoh RLA di Pressure
Vessel (optional)
ASSESSMENT
OF
LPG SPHERICAL STORAGE TANK
MAKASSAR - INDONESIA
COLUMN INSPECTION
Coloum no. 8, Deformasi pada
Upper Coloum 8.
Coloum no.. 7, Deformasi pada
Upper Coloum 7.
Coloum no.. 3, Kondisi Coloum
normal.
Struktur mikro Coloum no.. 3,
berupa ferit – pearlit dengan
butir halus..
Struktur mikro Coloum no.. 7,
berupa ferit – pearlit dengan
butir sedikit membesar.
Struktur mikro Coloum no.. 8,
berupa ferit – pearlit dengan
butir sedikit membesar.
BRACING INSPECTION
Bracing C -.8, Area konsentrasi
panas pada Bracing - Coloum 8.
Bracing C - 7, Area deformasi
pada Bracing - Coloum 7.
Bracing C - 6, Kondisi Bracing
normal.
Struktur mikro Bracing C -.6,
berupa ferit – pearlit dengan
butir halus..
Bracing C – 7, terjadi
perubahan struktur dari Ferit -
pearlit menjadi ferit – bainit
dengan butir kasar.
Bracing C – 8, terjadi
perubahan struktur dari Ferit -
pearlit menjadi ferit – bainit
dengan butir kasar.
PEMERIKSAAN PELAT TANGKI
Bracing C -.8, Area konsentrasi
panas pada Bracing - Coloum 8.
Bracing C - 7, Area deformasi
pada Bracing - Coloum 7.
Bracing C - 6, Kondisi Bracing
normal.
Struktur mikro Pelat LP -.15,
berupa ferit – pearlit dengan
butir halus..200X
Struktur mikro Pelat LP – 4,
berupa ferit - pearlit dengan
butir sedikit membesar. 200X
Struktur mikro Pelat TP E – 5,
berupa ferit - pearlit dengan
butir sedikit membesar. 200X
Area CW A
Lokasi Pemeriksaan Lasan Circumferensial CW A dengan UT TOFD
Arah scanner
Alat UT TOFD
Root Lasan
Back Wall
Hasil Scaning UT TOFD pada Lokasi CW A, tidak
ditemukan retak
Permukaan luar
/lateral wave
Permukaan
dalam /back wall
Awal scanner
Akhir scanner
Hasil scaning Sectoral Phased Array pada
lokasi CWA tidak ditemukan retak
Pemeriksaan UT TOFD dan Phased Array pada area lasan circumferensial CW B tidak ditemukan retak
Back wall
Permukaan luar
Permukaan dalam
Lokasi retak outside
Lokasi retak Inside
Bracing Cross
Support plate
deformasi
MPI on weld column area C8
. MPI on weld column area C7
MPI on weld column area weld joint
X
Y
Z
6.417
5.022
3.627
2.232
0.837
-0.558
-1.953
-3.348
-4.743
-6.138
-7.533
-8.928
-10.32
-11.72
-13.11
-14.51
-15.9
V1
L1
C1
G2
Output Set: 2copot
Contour: Bar EndBMaxCombStress
Distribusi tegangan kombinasi maksimum pada kolom dan bracing dengan beban Internal Pressure, Live Load dan Dead Load.
Pada kondisi 2 kolom terangkat.
Model Tegangan
pada Shell
(kg/mm2)
Tegangan kombinasi pada
kolom
Keterangan
maksimum minimum
15.60 -2.003 -11.93
Allowable Stress Shell 14.06
kg/mm2
Kolom 18.7 kg/mm2
2 kolom
terangkat
16.84 6.417 -21.59
2 kolom
terangkat +
beban angin
16.85 6.117 -21.73
Tabel 1. Hasil Perhitungan FEM terhadap Struktur Tanki LPG dengan
beban Internal Pressure, Live Load dan Dead Load
KESIMPULAN DAN SARAN
• Kondisi spherical tank masih baik, tidak
ditemukan adanya cacat atau retakan
serta tidak terjadi penurunan kekuatan
secara signifikant
• Pada kondisi saat ini, bila spherical tank
diisi penuh dan beban angin ditambahkan,
maka stress yang timbul pada colomn
akan melebihi allowable stressnya.
.... Lanjutan...
• Struktur colomn yang rusak berikut
struktur betonnya harus segera diperbaiki
dengan mengacu ke welding repair ASME
IX
• Dimonitor pakai strain gauge pada saat
pengisian tangki sampai penuh
Literatures
• Viswanathan, R.; “Damage Mechanisms
and Life assessment of High-Temperature
Components”, ASM International.
• Technical Report, “Boiler Condition
Assessment Guide line”, 4th. Edition,
Electric Power Research Institute, EPRI.
• API 579, Fitness for Service
• API 580 & 581 Risk Base Inspection
• Babcock & Wilcox, Boiler Tube Analysis
TERIMA KASIH

More Related Content

What's hot

Bahan bakar boiler
Bahan bakar boilerBahan bakar boiler
Bahan bakar boilerReandy Risky
 
Design, Fabrication and Modification of Small VTOL UAV
Design, Fabrication and Modification of  Small VTOL UAVDesign, Fabrication and Modification of  Small VTOL UAV
Design, Fabrication and Modification of Small VTOL UAVAkshat Srivastava
 
Proses Pengolahan Migas dan Petrokim
Proses Pengolahan Migas dan PetrokimProses Pengolahan Migas dan Petrokim
Proses Pengolahan Migas dan PetrokimlombkTBK
 
Understanding Condensate Pumps on a Steam Distribution System
Understanding Condensate Pumps on a Steam Distribution SystemUnderstanding Condensate Pumps on a Steam Distribution System
Understanding Condensate Pumps on a Steam Distribution SystemIves Equipment
 
Identifying Energy Waste in your Plant/Facility Webinar with Fluke
Identifying Energy Waste in your Plant/Facility Webinar with FlukeIdentifying Energy Waste in your Plant/Facility Webinar with Fluke
Identifying Energy Waste in your Plant/Facility Webinar with FlukeTranscat
 
cooling tower, Factors Affecting Cooling Tower Performance,Efficient System O...
cooling tower, Factors Affecting Cooling Tower Performance,Efficient System O...cooling tower, Factors Affecting Cooling Tower Performance,Efficient System O...
cooling tower, Factors Affecting Cooling Tower Performance,Efficient System O...Salman Jailani
 
Ring formation in kilns
Ring formation in kilnsRing formation in kilns
Ring formation in kilnspradeepdeepi
 
Boiler ssasit
Boiler  ssasitBoiler  ssasit
Boiler ssasitlotiyo
 
Pertemuan siklus rankine ideal
Pertemuan siklus rankine idealPertemuan siklus rankine ideal
Pertemuan siklus rankine idealFatlan Yuhendra
 
Boiler thermalpowerplants 12898051220529-phpapp02
Boiler thermalpowerplants 12898051220529-phpapp02Boiler thermalpowerplants 12898051220529-phpapp02
Boiler thermalpowerplants 12898051220529-phpapp02akjshare
 
SAIL ROURKELA SINTER PLANT
SAIL ROURKELA SINTER PLANTSAIL ROURKELA SINTER PLANT
SAIL ROURKELA SINTER PLANTAshish Kholia
 
Thermal power-plant(LANCO) by ved prakash
Thermal power-plant(LANCO) by ved prakashThermal power-plant(LANCO) by ved prakash
Thermal power-plant(LANCO) by ved prakashVed Prakash
 

What's hot (20)

Turbin uap
Turbin uapTurbin uap
Turbin uap
 
Superheater & reheater
Superheater & reheaterSuperheater & reheater
Superheater & reheater
 
Tabel uap
Tabel uapTabel uap
Tabel uap
 
Pembangkit Listrik Tenaga Uap (PLTU)
Pembangkit Listrik Tenaga Uap (PLTU)Pembangkit Listrik Tenaga Uap (PLTU)
Pembangkit Listrik Tenaga Uap (PLTU)
 
ppt Turbin Uap
ppt Turbin Uapppt Turbin Uap
ppt Turbin Uap
 
STEAM TURBINE BASIC
STEAM TURBINE BASIC STEAM TURBINE BASIC
STEAM TURBINE BASIC
 
Bahan bakar boiler
Bahan bakar boilerBahan bakar boiler
Bahan bakar boiler
 
Design, Fabrication and Modification of Small VTOL UAV
Design, Fabrication and Modification of  Small VTOL UAVDesign, Fabrication and Modification of  Small VTOL UAV
Design, Fabrication and Modification of Small VTOL UAV
 
Steam tables
Steam tablesSteam tables
Steam tables
 
Proses Pengolahan Migas dan Petrokim
Proses Pengolahan Migas dan PetrokimProses Pengolahan Migas dan Petrokim
Proses Pengolahan Migas dan Petrokim
 
Understanding Condensate Pumps on a Steam Distribution System
Understanding Condensate Pumps on a Steam Distribution SystemUnderstanding Condensate Pumps on a Steam Distribution System
Understanding Condensate Pumps on a Steam Distribution System
 
Identifying Energy Waste in your Plant/Facility Webinar with Fluke
Identifying Energy Waste in your Plant/Facility Webinar with FlukeIdentifying Energy Waste in your Plant/Facility Webinar with Fluke
Identifying Energy Waste in your Plant/Facility Webinar with Fluke
 
cooling tower, Factors Affecting Cooling Tower Performance,Efficient System O...
cooling tower, Factors Affecting Cooling Tower Performance,Efficient System O...cooling tower, Factors Affecting Cooling Tower Performance,Efficient System O...
cooling tower, Factors Affecting Cooling Tower Performance,Efficient System O...
 
Ring formation in kilns
Ring formation in kilnsRing formation in kilns
Ring formation in kilns
 
Boiler ssasit
Boiler  ssasitBoiler  ssasit
Boiler ssasit
 
Boiler pptx
Boiler pptxBoiler pptx
Boiler pptx
 
Pertemuan siklus rankine ideal
Pertemuan siklus rankine idealPertemuan siklus rankine ideal
Pertemuan siklus rankine ideal
 
Boiler thermalpowerplants 12898051220529-phpapp02
Boiler thermalpowerplants 12898051220529-phpapp02Boiler thermalpowerplants 12898051220529-phpapp02
Boiler thermalpowerplants 12898051220529-phpapp02
 
SAIL ROURKELA SINTER PLANT
SAIL ROURKELA SINTER PLANTSAIL ROURKELA SINTER PLANT
SAIL ROURKELA SINTER PLANT
 
Thermal power-plant(LANCO) by ved prakash
Thermal power-plant(LANCO) by ved prakashThermal power-plant(LANCO) by ved prakash
Thermal power-plant(LANCO) by ved prakash
 

Similar to Boiler RLA Seminar 2018

Ship building process & shipyard productivity
Ship building process & shipyard productivityShip building process & shipyard productivity
Ship building process & shipyard productivityFatimatuzzahra Zaza
 
225220932-EP-Electrostatic-Precipitator-Training-4.ppt
225220932-EP-Electrostatic-Precipitator-Training-4.ppt225220932-EP-Electrostatic-Precipitator-Training-4.ppt
225220932-EP-Electrostatic-Precipitator-Training-4.pptDedeMulyaman1
 
Laporan inspeksi pt. stopo lestari jaya
Laporan inspeksi pt. stopo lestari jayaLaporan inspeksi pt. stopo lestari jaya
Laporan inspeksi pt. stopo lestari jayaJohnTarigan
 
Laporan inspeksi pt. stopo lestari jaya
Laporan inspeksi pt. stopo lestari jayaLaporan inspeksi pt. stopo lestari jaya
Laporan inspeksi pt. stopo lestari jayaJohnTarigan
 
2.2.0.2. Turbine Serious Inspection MATERI.pdf
2.2.0.2. Turbine Serious Inspection MATERI.pdf2.2.0.2. Turbine Serious Inspection MATERI.pdf
2.2.0.2. Turbine Serious Inspection MATERI.pdfErikson24
 
Presentasi OJT Kampus Merdeka PT Indonesia Power PLTU Jeranjang OMU - Teknisi...
Presentasi OJT Kampus Merdeka PT Indonesia Power PLTU Jeranjang OMU - Teknisi...Presentasi OJT Kampus Merdeka PT Indonesia Power PLTU Jeranjang OMU - Teknisi...
Presentasi OJT Kampus Merdeka PT Indonesia Power PLTU Jeranjang OMU - Teknisi...Sulthoni Muhyidin
 
Jepri Marpaung Jr. Staff rendal Har Technician Probelm Solver( Air Cooler Rad...
Jepri Marpaung Jr. Staff rendal Har Technician Probelm Solver( Air Cooler Rad...Jepri Marpaung Jr. Staff rendal Har Technician Probelm Solver( Air Cooler Rad...
Jepri Marpaung Jr. Staff rendal Har Technician Probelm Solver( Air Cooler Rad...JepriMarpaung1
 
Jobsheet Overhaul Karburator
Jobsheet Overhaul KarburatorJobsheet Overhaul Karburator
Jobsheet Overhaul KarburatorCharis Muhammad
 
Tugas khusus Cut in PT.Badak LNG
Tugas khusus Cut in PT.Badak LNGTugas khusus Cut in PT.Badak LNG
Tugas khusus Cut in PT.Badak LNGDyah Dyfhaza
 
Perawatan prediktif
Perawatan prediktifPerawatan prediktif
Perawatan prediktifbocah666
 
Lkpd pengapian pegangan guru fix 1 agus budi santoso
Lkpd pengapian pegangan guru fix 1  agus budi santosoLkpd pengapian pegangan guru fix 1  agus budi santoso
Lkpd pengapian pegangan guru fix 1 agus budi santosobudisantoso458
 
182201224-ENGINE-CAN-T-RUNNING-PC-1250-8R-ppt.ppt
182201224-ENGINE-CAN-T-RUNNING-PC-1250-8R-ppt.ppt182201224-ENGINE-CAN-T-RUNNING-PC-1250-8R-ppt.ppt
182201224-ENGINE-CAN-T-RUNNING-PC-1250-8R-ppt.pptNishlovHozeb
 
182201224-ENGINE-CAN-T-RUNNING-PC-1250-8R-ppt.pdf
182201224-ENGINE-CAN-T-RUNNING-PC-1250-8R-ppt.pdf182201224-ENGINE-CAN-T-RUNNING-PC-1250-8R-ppt.pdf
182201224-ENGINE-CAN-T-RUNNING-PC-1250-8R-ppt.pdfNishlovHozeb
 
Analisa Kegagalan pada Tubing Gas Sumur 15 PT. Pertamina EP Field Subang
Analisa Kegagalan pada Tubing Gas Sumur 15 PT. Pertamina EP Field Subang Analisa Kegagalan pada Tubing Gas Sumur 15 PT. Pertamina EP Field Subang
Analisa Kegagalan pada Tubing Gas Sumur 15 PT. Pertamina EP Field Subang UNJANI
 
Jennifer wijaya kel2 parameter gc dan komponen gc ms
Jennifer wijaya kel2 parameter gc dan komponen gc msJennifer wijaya kel2 parameter gc dan komponen gc ms
Jennifer wijaya kel2 parameter gc dan komponen gc msJennifer Wijaya
 

Similar to Boiler RLA Seminar 2018 (20)

4312100026 - Paper
4312100026 - Paper4312100026 - Paper
4312100026 - Paper
 
Ship building process & shipyard productivity
Ship building process & shipyard productivityShip building process & shipyard productivity
Ship building process & shipyard productivity
 
225220932-EP-Electrostatic-Precipitator-Training-4.ppt
225220932-EP-Electrostatic-Precipitator-Training-4.ppt225220932-EP-Electrostatic-Precipitator-Training-4.ppt
225220932-EP-Electrostatic-Precipitator-Training-4.ppt
 
Laporan inspeksi pt. stopo lestari jaya
Laporan inspeksi pt. stopo lestari jayaLaporan inspeksi pt. stopo lestari jaya
Laporan inspeksi pt. stopo lestari jaya
 
Laporan inspeksi pt. stopo lestari jaya
Laporan inspeksi pt. stopo lestari jayaLaporan inspeksi pt. stopo lestari jaya
Laporan inspeksi pt. stopo lestari jaya
 
2.2.0.2. Turbine Serious Inspection MATERI.pdf
2.2.0.2. Turbine Serious Inspection MATERI.pdf2.2.0.2. Turbine Serious Inspection MATERI.pdf
2.2.0.2. Turbine Serious Inspection MATERI.pdf
 
Presentasi OJT Kampus Merdeka PT Indonesia Power PLTU Jeranjang OMU - Teknisi...
Presentasi OJT Kampus Merdeka PT Indonesia Power PLTU Jeranjang OMU - Teknisi...Presentasi OJT Kampus Merdeka PT Indonesia Power PLTU Jeranjang OMU - Teknisi...
Presentasi OJT Kampus Merdeka PT Indonesia Power PLTU Jeranjang OMU - Teknisi...
 
Jepri Marpaung Jr. Staff rendal Har Technician Probelm Solver( Air Cooler Rad...
Jepri Marpaung Jr. Staff rendal Har Technician Probelm Solver( Air Cooler Rad...Jepri Marpaung Jr. Staff rendal Har Technician Probelm Solver( Air Cooler Rad...
Jepri Marpaung Jr. Staff rendal Har Technician Probelm Solver( Air Cooler Rad...
 
Jobsheet Overhaul Karburator
Jobsheet Overhaul KarburatorJobsheet Overhaul Karburator
Jobsheet Overhaul Karburator
 
4312100026 - Presentasi
4312100026 - Presentasi4312100026 - Presentasi
4312100026 - Presentasi
 
Ppt PLI Gardu induk
Ppt PLI Gardu indukPpt PLI Gardu induk
Ppt PLI Gardu induk
 
Tugas khusus Cut in PT.Badak LNG
Tugas khusus Cut in PT.Badak LNGTugas khusus Cut in PT.Badak LNG
Tugas khusus Cut in PT.Badak LNG
 
Perawatan prediktif
Perawatan prediktifPerawatan prediktif
Perawatan prediktif
 
Lkpd pengapian pegangan guru fix 1 agus budi santoso
Lkpd pengapian pegangan guru fix 1  agus budi santosoLkpd pengapian pegangan guru fix 1  agus budi santoso
Lkpd pengapian pegangan guru fix 1 agus budi santoso
 
Proposal tugas akhir hendra
Proposal tugas akhir hendraProposal tugas akhir hendra
Proposal tugas akhir hendra
 
PKP
PKPPKP
PKP
 
182201224-ENGINE-CAN-T-RUNNING-PC-1250-8R-ppt.ppt
182201224-ENGINE-CAN-T-RUNNING-PC-1250-8R-ppt.ppt182201224-ENGINE-CAN-T-RUNNING-PC-1250-8R-ppt.ppt
182201224-ENGINE-CAN-T-RUNNING-PC-1250-8R-ppt.ppt
 
182201224-ENGINE-CAN-T-RUNNING-PC-1250-8R-ppt.pdf
182201224-ENGINE-CAN-T-RUNNING-PC-1250-8R-ppt.pdf182201224-ENGINE-CAN-T-RUNNING-PC-1250-8R-ppt.pdf
182201224-ENGINE-CAN-T-RUNNING-PC-1250-8R-ppt.pdf
 
Analisa Kegagalan pada Tubing Gas Sumur 15 PT. Pertamina EP Field Subang
Analisa Kegagalan pada Tubing Gas Sumur 15 PT. Pertamina EP Field Subang Analisa Kegagalan pada Tubing Gas Sumur 15 PT. Pertamina EP Field Subang
Analisa Kegagalan pada Tubing Gas Sumur 15 PT. Pertamina EP Field Subang
 
Jennifer wijaya kel2 parameter gc dan komponen gc ms
Jennifer wijaya kel2 parameter gc dan komponen gc msJennifer wijaya kel2 parameter gc dan komponen gc ms
Jennifer wijaya kel2 parameter gc dan komponen gc ms
 

Recently uploaded

MAteri:Penggunaan fungsi pada pemrograman c++
MAteri:Penggunaan fungsi pada pemrograman c++MAteri:Penggunaan fungsi pada pemrograman c++
MAteri:Penggunaan fungsi pada pemrograman c++FujiAdam
 
001. Ringkasan Lampiran Juknis DAK 2024_PAUD.pptx
001. Ringkasan Lampiran Juknis DAK 2024_PAUD.pptx001. Ringkasan Lampiran Juknis DAK 2024_PAUD.pptx
001. Ringkasan Lampiran Juknis DAK 2024_PAUD.pptxMuhararAhmad
 
rekayasa struktur beton prategang - 2_compressed (1).pdf
rekayasa struktur beton prategang - 2_compressed (1).pdfrekayasa struktur beton prategang - 2_compressed (1).pdf
rekayasa struktur beton prategang - 2_compressed (1).pdfssuser40d8e3
 
Slide Transformasi dan Load Data Menggunakan Talend Open Studio
Slide Transformasi dan Load Data Menggunakan Talend Open StudioSlide Transformasi dan Load Data Menggunakan Talend Open Studio
Slide Transformasi dan Load Data Menggunakan Talend Open Studiossuser52d6bf
 
05 Sistem Perencanaan Pembangunan Nasional.ppt
05 Sistem Perencanaan Pembangunan Nasional.ppt05 Sistem Perencanaan Pembangunan Nasional.ppt
05 Sistem Perencanaan Pembangunan Nasional.pptSonyGobang1
 
2021 - 12 - 10 PAPARAN AKHIR LEGGER JALAN.pptx
2021 - 12 - 10 PAPARAN AKHIR LEGGER JALAN.pptx2021 - 12 - 10 PAPARAN AKHIR LEGGER JALAN.pptx
2021 - 12 - 10 PAPARAN AKHIR LEGGER JALAN.pptxAnnisaNurHasanah27
 
Pembangkit Listrik Tenaga Nuklir Kelompok 1.pptx
Pembangkit Listrik Tenaga Nuklir Kelompok 1.pptxPembangkit Listrik Tenaga Nuklir Kelompok 1.pptx
Pembangkit Listrik Tenaga Nuklir Kelompok 1.pptxmuhammadrizky331164
 
Strategi Pengembangan Agribisnis di Indonesia
Strategi Pengembangan Agribisnis di IndonesiaStrategi Pengembangan Agribisnis di Indonesia
Strategi Pengembangan Agribisnis di IndonesiaRenaYunita2
 
2021 - 10 - 03 PAPARAN PENDAHULUAN LEGGER JALAN.pptx
2021 - 10 - 03 PAPARAN PENDAHULUAN LEGGER JALAN.pptx2021 - 10 - 03 PAPARAN PENDAHULUAN LEGGER JALAN.pptx
2021 - 10 - 03 PAPARAN PENDAHULUAN LEGGER JALAN.pptxAnnisaNurHasanah27
 

Recently uploaded (9)

MAteri:Penggunaan fungsi pada pemrograman c++
MAteri:Penggunaan fungsi pada pemrograman c++MAteri:Penggunaan fungsi pada pemrograman c++
MAteri:Penggunaan fungsi pada pemrograman c++
 
001. Ringkasan Lampiran Juknis DAK 2024_PAUD.pptx
001. Ringkasan Lampiran Juknis DAK 2024_PAUD.pptx001. Ringkasan Lampiran Juknis DAK 2024_PAUD.pptx
001. Ringkasan Lampiran Juknis DAK 2024_PAUD.pptx
 
rekayasa struktur beton prategang - 2_compressed (1).pdf
rekayasa struktur beton prategang - 2_compressed (1).pdfrekayasa struktur beton prategang - 2_compressed (1).pdf
rekayasa struktur beton prategang - 2_compressed (1).pdf
 
Slide Transformasi dan Load Data Menggunakan Talend Open Studio
Slide Transformasi dan Load Data Menggunakan Talend Open StudioSlide Transformasi dan Load Data Menggunakan Talend Open Studio
Slide Transformasi dan Load Data Menggunakan Talend Open Studio
 
05 Sistem Perencanaan Pembangunan Nasional.ppt
05 Sistem Perencanaan Pembangunan Nasional.ppt05 Sistem Perencanaan Pembangunan Nasional.ppt
05 Sistem Perencanaan Pembangunan Nasional.ppt
 
2021 - 12 - 10 PAPARAN AKHIR LEGGER JALAN.pptx
2021 - 12 - 10 PAPARAN AKHIR LEGGER JALAN.pptx2021 - 12 - 10 PAPARAN AKHIR LEGGER JALAN.pptx
2021 - 12 - 10 PAPARAN AKHIR LEGGER JALAN.pptx
 
Pembangkit Listrik Tenaga Nuklir Kelompok 1.pptx
Pembangkit Listrik Tenaga Nuklir Kelompok 1.pptxPembangkit Listrik Tenaga Nuklir Kelompok 1.pptx
Pembangkit Listrik Tenaga Nuklir Kelompok 1.pptx
 
Strategi Pengembangan Agribisnis di Indonesia
Strategi Pengembangan Agribisnis di IndonesiaStrategi Pengembangan Agribisnis di Indonesia
Strategi Pengembangan Agribisnis di Indonesia
 
2021 - 10 - 03 PAPARAN PENDAHULUAN LEGGER JALAN.pptx
2021 - 10 - 03 PAPARAN PENDAHULUAN LEGGER JALAN.pptx2021 - 10 - 03 PAPARAN PENDAHULUAN LEGGER JALAN.pptx
2021 - 10 - 03 PAPARAN PENDAHULUAN LEGGER JALAN.pptx
 

Boiler RLA Seminar 2018

  • 1. Boiler Remaining Life Assesment (RLA) Ciwaruga Bandung . Sabtu, 1 Desember 2018 SEMINAR & TALKSHOW KEENERGIAN 2018 FORUM KOMUNIKASI MAHASISWA TEKNIK ENERGI INDONESIA (FKMTEI) Dede Rukanda, ST. MM
  • 2.
  • 3. BOILER ASSESSMENT DI UNIT PEMBANGKIT ENERGI, METODE DAN STUDI KASUS
  • 4. Pokok bahasan :  Pendahuluan : CFB Boiler  Metode Assessment Boiler  Studi Kasus Pada Assessment Boiler & Pressure Vessel
  • 5.
  • 6.
  • 8.
  • 9.
  • 10.
  • 11.
  • 12.
  • 14.
  • 15.
  • 16.
  • 17.
  • 18. PENDAHULUAN  Tujuan RLA Boiler  Komponen-komponen boiler yang dilakukan assessment  Key element diluar technical guidance
  • 19. Tujuan RLA Boiler  Meningkatkan reliability, availability dan effiency.  Memperpanjang umur peralatan.  Mengurangi resiko terjadinya kegagalan atau kerusakan peralatan.
  • 20.  Meningkatkan Safety peralatan.  Mengurangi lama waktu padam akibat sering gangguan.
  • 21.  Komponen- komponen boiler yang dilakukan assessment
  • 22.
  • 23.
  • 25.  Masing-masing komponent boiler dibuat condition assessment Roadmap-nya  Komponen yang mempunyai kondisi yang paling kritis adalah yang diambil sebagai batas acuan dalam pengoperasian boiler di waktu yang akan datang
  • 26. Contoh boiler tube failure akibat corrosion fatigue
  • 27. FLOW DIAGRAM UNTUK TUBE SAMPLING SECARA UMUM DAN RENCANA LIFE ASSESSMENT TERHADAP PRESSURE PARTS
  • 28.
  • 29.
  • 30.
  • 31. Lampiran 01 Studi kasus pada assessment boiler dan pressure vessel
  • 32. Pemeriksaan in-situ pada Superheater S-33, Panel 1, elevasi 2000, tube# 4 Struktur mikro berupa austenitic stadium 1 – 2, batas butir austenit terlihat jelas. Pada daerah lingkaran ellips terlihat jejak serangan korosi batas butir ringan, itu bukan creep micro-fissure (bukan retak mikro akibat creep). Korosi batas butir ini terjadi akibat terpapar flue gas panas yang mengandung corrodant, misalnya senyawa sulfur hasil pembakaran bahan bakar batubara namun tidak terlalu dalam, yaitu orde kedalamannya kurang dari sekitar 0.30 mm selama masa operasinya (17 tahun). Belum terlihat adanya pembentukan creep void. Kondisi material masih baik.
  • 33. KESIMPULAN DAN SARAN • Klasifikasi Kondisi Struktur Mikro Kondisi material masih bagus , termasuk stadium A sampai B atau stadium 1 sampai 2, belum terjadi perubahan strukturmikro yang signifikant dan belum terbentuk creep void. • Secara umum kondisi material komponen boiler S 28, S33, R10 dan R11 ini masih baik, berdasarkan data empiris yang diberikan diatas, remaining lifenya berkisar antara 55% sampai 95% dari umur disainnya. Dalam pemeliharaan mendatang saat shut down, perlu pemeriksaan visual yang teliti pada komponen-komponen ini termasuk pemeriksaan diameter tube dan header untuk mendeteksi bila ada terjadi mulur yang excessive saja.
  • 34. Lanjutan.... • Dari sampel pada hasil pemotongan tube, terlihat bahwa permukaan dalam tube relatif bersih tidak terbentuk kerak dan tidak terjadi penipisan yang berarti. • Jadi bisa disimpulkan bahwa boiler feed water treatmentnya berlangsung bagussehingga kondisi tersebut perlu dipertahankan. Perhitungan sisa umur pakai tube-tube tersebut bila dilakukan berdasarkan laju penipisan akibat korosi, maka akan diperoleh umur yang jauh lebih lama dibanding dengan metoda kwalitatif tersebut diatas. -oOo-
  • 35.
  • 36.
  • 37.
  • 38.
  • 39.
  • 40. Kesimpulan • Kerak berupa oksida Fe dan Cr • Boiler water diduga kuat diluar spec-nya termasuk kandungan oksigen yang diperbolehkan • SOP start up boiler tidak diikuti sepenuhnya • Saran: perbaiki kwalitas boiler water dan perbaiki SOP pengoperasian boiler tersebut
  • 41. HASIL PEMERIKSAAN WATER WALL TUBE MENGALAMI RETAK MEMANJANG DAN GETAS
  • 42. DI PERMUKAAN DALAM TUBE TERDAPAT KERAK DAN LOCAL THINNING (Lihat arah anak panah)
  • 43.
  • 44.
  • 46. Kwalitas sambungan las yang buruk, terlihat void yang lolos deteksi pada pemeriksaan NDT-nya
  • 49. KESIMPULAN DAN SARAN • Water wall tube mengalami hydrogen damage dimana kerusakan pada permukaan dalam tube tersebut irreversible • Korosi yang terjadi adalah dalam suasana basa sesuai data air boiler yang ada sehingga terbentuk kerak. • Gas hydrogen yang terjadi bereaksi dengan cementite (Fe3C) membentuk gas methana (CH4) yang menimbulkan grain boundary cracking dan dekarburisasi
  • 50. ...Lanjutan • Kerusakan hydrogen damage yang menyebar ke seluruh system sirkulasi boiler harus dipetakan melalui metoda NDT dan bagian yang telah mengalami cracking harus diganti • Boiler harus di-cleaning secara kimiawi • Diduga kondensornya pernah bocor sehingga air laut masuk • Economizer mengalami erosion thinning dari permukaan luar tube
  • 51.
  • 52. Lampiran 02 Contoh Aktivitas & Report RLA di Boiler no 5 75 TPh/34 barg Pabrik Gula Cilegon ` KLIK HERE
  • 53.
  • 54.
  • 55.
  • 56.
  • 57.
  • 58.
  • 59.
  • 60.
  • 61.
  • 62.
  • 63.
  • 64.
  • 65. Lampiran 03 Contoh Tabel & Data Referensi
  • 66.
  • 67.
  • 68.
  • 69.
  • 70.
  • 71.
  • 72.
  • 73.
  • 74. Lampiran 04 Contoh RLA di Pressure Vessel (optional)
  • 75. ASSESSMENT OF LPG SPHERICAL STORAGE TANK MAKASSAR - INDONESIA
  • 76. COLUMN INSPECTION Coloum no. 8, Deformasi pada Upper Coloum 8. Coloum no.. 7, Deformasi pada Upper Coloum 7. Coloum no.. 3, Kondisi Coloum normal. Struktur mikro Coloum no.. 3, berupa ferit – pearlit dengan butir halus.. Struktur mikro Coloum no.. 7, berupa ferit – pearlit dengan butir sedikit membesar. Struktur mikro Coloum no.. 8, berupa ferit – pearlit dengan butir sedikit membesar.
  • 77. BRACING INSPECTION Bracing C -.8, Area konsentrasi panas pada Bracing - Coloum 8. Bracing C - 7, Area deformasi pada Bracing - Coloum 7. Bracing C - 6, Kondisi Bracing normal. Struktur mikro Bracing C -.6, berupa ferit – pearlit dengan butir halus.. Bracing C – 7, terjadi perubahan struktur dari Ferit - pearlit menjadi ferit – bainit dengan butir kasar. Bracing C – 8, terjadi perubahan struktur dari Ferit - pearlit menjadi ferit – bainit dengan butir kasar.
  • 78. PEMERIKSAAN PELAT TANGKI Bracing C -.8, Area konsentrasi panas pada Bracing - Coloum 8. Bracing C - 7, Area deformasi pada Bracing - Coloum 7. Bracing C - 6, Kondisi Bracing normal. Struktur mikro Pelat LP -.15, berupa ferit – pearlit dengan butir halus..200X Struktur mikro Pelat LP – 4, berupa ferit - pearlit dengan butir sedikit membesar. 200X Struktur mikro Pelat TP E – 5, berupa ferit - pearlit dengan butir sedikit membesar. 200X
  • 79. Area CW A Lokasi Pemeriksaan Lasan Circumferensial CW A dengan UT TOFD Arah scanner Alat UT TOFD
  • 80. Root Lasan Back Wall Hasil Scaning UT TOFD pada Lokasi CW A, tidak ditemukan retak Permukaan luar /lateral wave Permukaan dalam /back wall Awal scanner Akhir scanner Hasil scaning Sectoral Phased Array pada lokasi CWA tidak ditemukan retak
  • 81. Pemeriksaan UT TOFD dan Phased Array pada area lasan circumferensial CW B tidak ditemukan retak Back wall Permukaan luar Permukaan dalam
  • 82. Lokasi retak outside Lokasi retak Inside Bracing Cross Support plate
  • 83. deformasi MPI on weld column area C8 . MPI on weld column area C7 MPI on weld column area weld joint
  • 84. X Y Z 6.417 5.022 3.627 2.232 0.837 -0.558 -1.953 -3.348 -4.743 -6.138 -7.533 -8.928 -10.32 -11.72 -13.11 -14.51 -15.9 V1 L1 C1 G2 Output Set: 2copot Contour: Bar EndBMaxCombStress Distribusi tegangan kombinasi maksimum pada kolom dan bracing dengan beban Internal Pressure, Live Load dan Dead Load. Pada kondisi 2 kolom terangkat.
  • 85. Model Tegangan pada Shell (kg/mm2) Tegangan kombinasi pada kolom Keterangan maksimum minimum 15.60 -2.003 -11.93 Allowable Stress Shell 14.06 kg/mm2 Kolom 18.7 kg/mm2 2 kolom terangkat 16.84 6.417 -21.59 2 kolom terangkat + beban angin 16.85 6.117 -21.73 Tabel 1. Hasil Perhitungan FEM terhadap Struktur Tanki LPG dengan beban Internal Pressure, Live Load dan Dead Load
  • 86. KESIMPULAN DAN SARAN • Kondisi spherical tank masih baik, tidak ditemukan adanya cacat atau retakan serta tidak terjadi penurunan kekuatan secara signifikant • Pada kondisi saat ini, bila spherical tank diisi penuh dan beban angin ditambahkan, maka stress yang timbul pada colomn akan melebihi allowable stressnya.
  • 87. .... Lanjutan... • Struktur colomn yang rusak berikut struktur betonnya harus segera diperbaiki dengan mengacu ke welding repair ASME IX • Dimonitor pakai strain gauge pada saat pengisian tangki sampai penuh
  • 88. Literatures • Viswanathan, R.; “Damage Mechanisms and Life assessment of High-Temperature Components”, ASM International. • Technical Report, “Boiler Condition Assessment Guide line”, 4th. Edition, Electric Power Research Institute, EPRI. • API 579, Fitness for Service • API 580 & 581 Risk Base Inspection • Babcock & Wilcox, Boiler Tube Analysis
  • 89.