This lockout-tagout procedure document provides instructions for locking out and isolating energy sources for equipment at Location 2. It outlines 9 steps for the lockout process including notifying personnel, pressing stop buttons, opening disconnects, verifying isolation of energy, and applying personal locks. It identifies lockout points for various pieces of equipment in MCC-1 and MCC-2, including the deister screen, C-1 pony conveyor, HSI crusher, and 2-4's transfer conveyor. Precautions are provided for working at heights, lifting, use of personal protective equipment. The removal process includes verifying isolation and removal of locks to re-energize equipment.