Party Wall Line
                                                                           Party Wall Line
                            Party Wall Line                                                                      Party Wall Line              Party Wall Line
                                              Double auger
                                              drive unit with
                                               outer casing                                     Casing and                 As casing and
                                              coring through                                   auger drill to             auger are being
                                               the existing                                   required depth                extracted the
                                              brickwork and                                  before installing               concrete is
                                               foundations                                      concrete by                 pumped into
                                                                                             pumping through               the excavated
                                                                                                the system                       pile.
  Existing wall
                                                                                                                                                     Once the concrete has
 foundations to
inside of clients
                                                                                                                                                     been installed then the
    property                                                                                                                                         steel reinforcing can be
                                                                                                                                                    installed. 3-4 days after
                                                                                                                                                     completion excavation
                                                                                                                                                         can commence
                    The Double Auger equipment is specially designed to
                    provide basement walls close to existing structures and
                    maximising the available basement space.
                    The single action of providing one wall without the need for
                    underpinning makes it extremely cost effective and can
                    provide time savings to the project as excavation is
                    continuous with the frames being installed as the excavation
                    deepens.




                                                  Project                                                                Title




                                                  32a Ovington Square - London                                           Sketch of construction sequence for the
                                                  Hard Hard Secant Basement Piled Walls                                  installation of a Secant concrete piled wall
                                                                                                                         through the existing foundations.

Basement wall construction

  • 1.
    Party Wall Line Party Wall Line Party Wall Line Party Wall Line Party Wall Line Double auger drive unit with outer casing Casing and As casing and coring through auger drill to auger are being the existing required depth extracted the brickwork and before installing concrete is foundations concrete by pumped into pumping through the excavated the system pile. Existing wall Once the concrete has foundations to inside of clients been installed then the property steel reinforcing can be installed. 3-4 days after completion excavation can commence The Double Auger equipment is specially designed to provide basement walls close to existing structures and maximising the available basement space. The single action of providing one wall without the need for underpinning makes it extremely cost effective and can provide time savings to the project as excavation is continuous with the frames being installed as the excavation deepens. Project Title 32a Ovington Square - London Sketch of construction sequence for the Hard Hard Secant Basement Piled Walls installation of a Secant concrete piled wall through the existing foundations.