                                                   OVERVIEW

•Innovate, design and construct exceptional projects adapted to the latest technologies, in the
areas of housing, offices and shopping centers.                   Focused on our values of
responsibility, respect, integrity, cooperation, enthusiasm, we wish to obtain the leadership in the
country and to be globally recognized. All our projects provide the best solution, in functionality
and aesthetics, and always have a good treat with the environment.
IDC-homes             ®
                             DEFINITION OF THE PROJECT

Project: Lawyers’ office building
Client: Rosa A. Fernandez
Rosa A. Fernandez, a client from Santiago de los Caballeros, wants to start her own lawyers buffet
and come to us with the ideal to construct an office building located in Los Jardines, Santiago.

The project has 400 square meters field to work. The client asked for a three floors
building, adapted to future changes and an ecological design. The project needs green areas to
enhance the visuals, a big lobby, four offices, conference room, and administration. The client has
20 million pesos, 20,000,000 $ R.D. , for the first investment of the project.

Already presented the needs and requirements of the project, such as comfort, interior and exterior
spaces, and others, we believe that IDC-homes can easily carry out this project, thanks to our
flexible design, but we feel in the need to subcontract the eco-technology. Finally, focused on the
economy, we can build this project as a simple building, but fully functional and aesthetic.
IDC-homes       ®
                          DESCRIBING THE PROJECT

  Before you enter the building,
  you will see a beautiful
  landscaping work that contains a
  big    and    colorful  garden,
  surrounding the whole building
  with different kinds of flowers
  and trees in every color and
  sizes.
IDC-homes           ®
                                 DESCRIBING THE PROJECT


 Once you enter to the first
 floor, you will contemplate
 our big lobby that is open to
 the views of the garden, so
 you     can     enjoy     the
 landscaping work from the
 outside and the inside.


                                    The lobby has all the last details of the flooring
                                    in a very exotic woodwork, and curtain walls to
                                    close the area. Right in front of the
                                    entrance, in the middle of the lobby, there is a
                                    big electronic panel that gives you all the
                                    information you need, and some details about
                                    the building. Next to the panel, it’s the waiting
                                    area and the secretary assistance.
®
                                                
IDC-homes
                          DESCRIBING THE PROJECT


    If you take a few more
    steps to the left, you will
    access to the stairs for next
    floor, which is the offices
    floor. It has the bathrooms
    in front of the stairs and
    another waiting area right
    next to it. Moreover, the
    whole second floor is full
    of      offices    and      a
    kitchenette.
IDC-homes            ®
                                DESCRIBING THE PROJECT

 If you continue up the stairs, you will access to
 the third floor. It's the administration floor, and
 has a big conference room with beautiful
 woodwork in the walls and roof, and views with
 the smart technology panels. The room is
 designed with special blocks to deals with the
 acoustic. The third floor also has the offices of
 the administrators, and a kitchenette.
Finally, we used the roof area, which has the solar panels and the air conditioning machine, to
any kind of activity that needs an open space. We will also decorate it with a small garden to
clear the views of the machines. We also designed a basement for parking area and warehouse.




DESCRIBING THE PROJECT                                              IDC-homes ®
IDC-homes             ®
                             CODES: FIRE SAFETY SYSTEM

 We will provide protection to avoid and
 mitigate damage to the property, and injury to
 persons, motivated by:

 •Instaling fire alarms.

 •Escape ladders

 •Extinguishing in every floor

 •Intakes for firefighters

 •Emergency exits

 •Using special blocks (Hebel) to reduce the
 burning , increasing the time to leave the
 building
.

                                                The building was built
                    STEELWORK                   by steel parts
                                                manufactured.
                                                                          C
                    Used materials                  Supported by          O
                                                                          N
               •Stair rod or dipstick
                                                   A
                                                   skeleton,
                                                                 steel
                                                               armed
                                                                          S
               •Steel Beams                        by parts.              T
               •Steel Columns
               •Steel plates
                                                       United by          R
                                                   Welding and unions
                                                                          U
                    Required Tools                 called rivets.         C
                                                                          T
                                                    Assembled by
    Automated           Manual Construction:
                                                                          I
    Construction:       Plumb                        Steel workers        O
    Trucks              Squad
    Cranes              Haksaw                          Finally           N
                        Cuting Machine
                        Welding Machine
                                               we proceed to build
                                               walls, with Hebel blocks
Landscaping                 Green areas        C
                                 were designed
                                by a professional
                                                     O
Used Materials   Manual Tools
                                                     N
                                The land was
                                                     S
   Plants           Scissors
                                cleared     with
                                heavy equipment
                                                     T
  Flowers             Peak      such         as      R
   Wood              Shovel     bulldozers
  Concrete           Truck                           U
   Steel             Closes     Then preceded        T
                                to
                                plant, place, buil   I
                                d all spaces as
                                specified     the    O
                                design               N

Technology within the Project


   This Project will use must technology called smart glass,
   which is employed in information panels found in our loby,
   so the users can explore the edification without walking on
   it, and get a brief information of what each floor separately
   posse.
Technology within the Project
Technology within the Project




Also our reception will use this technology, so all you have to do
with computer and phone will be used through the glass.
Technology within the Project

The conference be formed by sound insulating walls in order to
avoid unwanted noise from outside the room, as well, to avoid
that in this discussion is heard outside.



It also has a lighting that adapts to the use made of the room
without using switches, a proper sound system and a big glass
screen where you can display and / or present what you want,
this will be consist of smart glass also.
Technology within the Project
Why should you hire us?
Here we have several reasons why we should be hired by you to do future projects.


    Experience: We have been a part of this successful construction environment and gained
     knowledge and experience within the industry for the years we have here.

    Competence: We have the skills, ability, confidence, maturity and commitment to perform
     well in this construction role.

    Integrity : We have been closely working with customers in all our previous projects, which
     has helped us develop positive interpersonal relations and learn how to understand what is
     that that they really want and are looking for in a project.

    Inspiration: Because we work out of passion, a love and dedication for what we do, and
     recognize the importance of benefiting others as well as ourselves through that passion.
ILE FOR E&A - FINAL PRESENTANTION

More Related Content

Viewers also liked

082512 us supreme court response (polish)
082512   us supreme court response (polish)082512   us supreme court response (polish)
082512 us supreme court response (polish)VogelDenise
 
092909 EMAIL TO OLYMPIC COMMITTEE (JAPANESE)
092909   EMAIL TO OLYMPIC COMMITTEE (JAPANESE)092909   EMAIL TO OLYMPIC COMMITTEE (JAPANESE)
092909 EMAIL TO OLYMPIC COMMITTEE (JAPANESE)VogelDenise
 
092909 EMAIL TO OLYMPIC COMMITTEE (GUJARATI)
092909   EMAIL TO OLYMPIC COMMITTEE (GUJARATI)092909   EMAIL TO OLYMPIC COMMITTEE (GUJARATI)
092909 EMAIL TO OLYMPIC COMMITTEE (GUJARATI)
VogelDenise
 
050113 fax to judy clarke (boston marathon bombing) - ukrainian
050113   fax to judy clarke (boston marathon bombing) - ukrainian050113   fax to judy clarke (boston marathon bombing) - ukrainian
050113 fax to judy clarke (boston marathon bombing) - ukrainianVogelDenise
 
082512 us supreme court response (thai)
082512   us supreme court response (thai)082512   us supreme court response (thai)
082512 us supreme court response (thai)VogelDenise
 
HEBREW hillary clinton stingers
HEBREW   hillary clinton stingersHEBREW   hillary clinton stingers
HEBREW hillary clinton stingersVogelDenise
 
092812 david addington article (macedonian)
092812   david addington article (macedonian)092812   david addington article (macedonian)
092812 david addington article (macedonian)VogelDenise
 
MALCOLM X (Building Bridges – Getting The DEVIL OFF YOUR BACK)-norwegian
MALCOLM X (Building Bridges – Getting The DEVIL OFF YOUR BACK)-norwegianMALCOLM X (Building Bridges – Getting The DEVIL OFF YOUR BACK)-norwegian
MALCOLM X (Building Bridges – Getting The DEVIL OFF YOUR BACK)-norwegianVogelDenise
 
050113 fax to judy clarke (boston marathon bombing) - cebuano
050113   fax to judy clarke (boston marathon bombing) - cebuano050113   fax to judy clarke (boston marathon bombing) - cebuano
050113 fax to judy clarke (boston marathon bombing) - cebuano
VogelDenise
 
Obama read my lips -obama fraudgate (irish)
Obama   read my lips -obama fraudgate (irish)Obama   read my lips -obama fraudgate (irish)
Obama read my lips -obama fraudgate (irish)
VogelDenise
 
082512 us supreme court response (ALBANIAN)
082512   us supreme court response (ALBANIAN)082512   us supreme court response (ALBANIAN)
082512 us supreme court response (ALBANIAN)VogelDenise
 
BAKER DONELSON - Government Positions It Appears To CONTROL/OWN
BAKER DONELSON - Government Positions It Appears To CONTROL/OWNBAKER DONELSON - Government Positions It Appears To CONTROL/OWN
BAKER DONELSON - Government Positions It Appears To CONTROL/OWN
VogelDenise
 
BARACK OBAMA- UNDERSTANDING WILLIE LYNCH (Czech)
BARACK OBAMA- UNDERSTANDING WILLIE LYNCH (Czech)BARACK OBAMA- UNDERSTANDING WILLIE LYNCH (Czech)
BARACK OBAMA- UNDERSTANDING WILLIE LYNCH (Czech)VogelDenise
 
MALCOLM X (Building Bridges – Getting The DEVIL OFF YOUR BACK)-icelandic
MALCOLM X (Building Bridges – Getting The DEVIL OFF YOUR BACK)-icelandicMALCOLM X (Building Bridges – Getting The DEVIL OFF YOUR BACK)-icelandic
MALCOLM X (Building Bridges – Getting The DEVIL OFF YOUR BACK)-icelandicVogelDenise
 
MALCOLM X (Building Bridges – Getting The DEVIL OFF YOUR BACK)-ukrainian
MALCOLM X (Building Bridges – Getting The DEVIL OFF YOUR BACK)-ukrainianMALCOLM X (Building Bridges – Getting The DEVIL OFF YOUR BACK)-ukrainian
MALCOLM X (Building Bridges – Getting The DEVIL OFF YOUR BACK)-ukrainianVogelDenise
 
122312 obama fax (esperanto)
122312   obama fax (esperanto)122312   obama fax (esperanto)
122312 obama fax (esperanto)VogelDenise
 
Polish Right of REVOLUTION & Political CORRUPTION
Polish   Right of REVOLUTION & Political CORRUPTIONPolish   Right of REVOLUTION & Political CORRUPTION
Polish Right of REVOLUTION & Political CORRUPTIONVogelDenise
 
Malcolm x building bridges (getting the devil off your back)-korean
Malcolm x   building bridges (getting the devil off your back)-koreanMalcolm x   building bridges (getting the devil off your back)-korean
Malcolm x building bridges (getting the devil off your back)-koreanVogelDenise
 
Obama read my lips -obama fraudgate (galician)
Obama   read my lips -obama fraudgate (galician)Obama   read my lips -obama fraudgate (galician)
Obama read my lips -obama fraudgate (galician)
VogelDenise
 
MALCOLM X (BUILDING BRIDGES-Getting The DEVIL OFF YOUR BACK)-czech
MALCOLM X (BUILDING BRIDGES-Getting The DEVIL OFF YOUR BACK)-czechMALCOLM X (BUILDING BRIDGES-Getting The DEVIL OFF YOUR BACK)-czech
MALCOLM X (BUILDING BRIDGES-Getting The DEVIL OFF YOUR BACK)-czechVogelDenise
 

Viewers also liked (20)

082512 us supreme court response (polish)
082512   us supreme court response (polish)082512   us supreme court response (polish)
082512 us supreme court response (polish)
 
092909 EMAIL TO OLYMPIC COMMITTEE (JAPANESE)
092909   EMAIL TO OLYMPIC COMMITTEE (JAPANESE)092909   EMAIL TO OLYMPIC COMMITTEE (JAPANESE)
092909 EMAIL TO OLYMPIC COMMITTEE (JAPANESE)
 
092909 EMAIL TO OLYMPIC COMMITTEE (GUJARATI)
092909   EMAIL TO OLYMPIC COMMITTEE (GUJARATI)092909   EMAIL TO OLYMPIC COMMITTEE (GUJARATI)
092909 EMAIL TO OLYMPIC COMMITTEE (GUJARATI)
 
050113 fax to judy clarke (boston marathon bombing) - ukrainian
050113   fax to judy clarke (boston marathon bombing) - ukrainian050113   fax to judy clarke (boston marathon bombing) - ukrainian
050113 fax to judy clarke (boston marathon bombing) - ukrainian
 
082512 us supreme court response (thai)
082512   us supreme court response (thai)082512   us supreme court response (thai)
082512 us supreme court response (thai)
 
HEBREW hillary clinton stingers
HEBREW   hillary clinton stingersHEBREW   hillary clinton stingers
HEBREW hillary clinton stingers
 
092812 david addington article (macedonian)
092812   david addington article (macedonian)092812   david addington article (macedonian)
092812 david addington article (macedonian)
 
MALCOLM X (Building Bridges – Getting The DEVIL OFF YOUR BACK)-norwegian
MALCOLM X (Building Bridges – Getting The DEVIL OFF YOUR BACK)-norwegianMALCOLM X (Building Bridges – Getting The DEVIL OFF YOUR BACK)-norwegian
MALCOLM X (Building Bridges – Getting The DEVIL OFF YOUR BACK)-norwegian
 
050113 fax to judy clarke (boston marathon bombing) - cebuano
050113   fax to judy clarke (boston marathon bombing) - cebuano050113   fax to judy clarke (boston marathon bombing) - cebuano
050113 fax to judy clarke (boston marathon bombing) - cebuano
 
Obama read my lips -obama fraudgate (irish)
Obama   read my lips -obama fraudgate (irish)Obama   read my lips -obama fraudgate (irish)
Obama read my lips -obama fraudgate (irish)
 
082512 us supreme court response (ALBANIAN)
082512   us supreme court response (ALBANIAN)082512   us supreme court response (ALBANIAN)
082512 us supreme court response (ALBANIAN)
 
BAKER DONELSON - Government Positions It Appears To CONTROL/OWN
BAKER DONELSON - Government Positions It Appears To CONTROL/OWNBAKER DONELSON - Government Positions It Appears To CONTROL/OWN
BAKER DONELSON - Government Positions It Appears To CONTROL/OWN
 
BARACK OBAMA- UNDERSTANDING WILLIE LYNCH (Czech)
BARACK OBAMA- UNDERSTANDING WILLIE LYNCH (Czech)BARACK OBAMA- UNDERSTANDING WILLIE LYNCH (Czech)
BARACK OBAMA- UNDERSTANDING WILLIE LYNCH (Czech)
 
MALCOLM X (Building Bridges – Getting The DEVIL OFF YOUR BACK)-icelandic
MALCOLM X (Building Bridges – Getting The DEVIL OFF YOUR BACK)-icelandicMALCOLM X (Building Bridges – Getting The DEVIL OFF YOUR BACK)-icelandic
MALCOLM X (Building Bridges – Getting The DEVIL OFF YOUR BACK)-icelandic
 
MALCOLM X (Building Bridges – Getting The DEVIL OFF YOUR BACK)-ukrainian
MALCOLM X (Building Bridges – Getting The DEVIL OFF YOUR BACK)-ukrainianMALCOLM X (Building Bridges – Getting The DEVIL OFF YOUR BACK)-ukrainian
MALCOLM X (Building Bridges – Getting The DEVIL OFF YOUR BACK)-ukrainian
 
122312 obama fax (esperanto)
122312   obama fax (esperanto)122312   obama fax (esperanto)
122312 obama fax (esperanto)
 
Polish Right of REVOLUTION & Political CORRUPTION
Polish   Right of REVOLUTION & Political CORRUPTIONPolish   Right of REVOLUTION & Political CORRUPTION
Polish Right of REVOLUTION & Political CORRUPTION
 
Malcolm x building bridges (getting the devil off your back)-korean
Malcolm x   building bridges (getting the devil off your back)-koreanMalcolm x   building bridges (getting the devil off your back)-korean
Malcolm x building bridges (getting the devil off your back)-korean
 
Obama read my lips -obama fraudgate (galician)
Obama   read my lips -obama fraudgate (galician)Obama   read my lips -obama fraudgate (galician)
Obama read my lips -obama fraudgate (galician)
 
MALCOLM X (BUILDING BRIDGES-Getting The DEVIL OFF YOUR BACK)-czech
MALCOLM X (BUILDING BRIDGES-Getting The DEVIL OFF YOUR BACK)-czechMALCOLM X (BUILDING BRIDGES-Getting The DEVIL OFF YOUR BACK)-czech
MALCOLM X (BUILDING BRIDGES-Getting The DEVIL OFF YOUR BACK)-czech
 

Recently uploaded

C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptxC1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
mulvey2
 
Wound healing PPT
Wound healing PPTWound healing PPT
Wound healing PPT
Jyoti Chand
 
Film vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movieFilm vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movie
Nicholas Montgomery
 
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective UpskillingYour Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Excellence Foundation for South Sudan
 
BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...
BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...
BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...
Nguyen Thanh Tu Collection
 
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptxNEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
iammrhaywood
 
How to Manage Your Lost Opportunities in Odoo 17 CRM
How to Manage Your Lost Opportunities in Odoo 17 CRMHow to Manage Your Lost Opportunities in Odoo 17 CRM
How to Manage Your Lost Opportunities in Odoo 17 CRM
Celine George
 
Pengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptxPengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptx
Fajar Baskoro
 
คำศัพท์ คำพื้นฐานการอ่าน ภาษาอังกฤษ ระดับชั้น ม.1
คำศัพท์ คำพื้นฐานการอ่าน ภาษาอังกฤษ ระดับชั้น ม.1คำศัพท์ คำพื้นฐานการอ่าน ภาษาอังกฤษ ระดับชั้น ม.1
คำศัพท์ คำพื้นฐานการอ่าน ภาษาอังกฤษ ระดับชั้น ม.1
สมใจ จันสุกสี
 
The Diamonds of 2023-2024 in the IGRA collection
The Diamonds of 2023-2024 in the IGRA collectionThe Diamonds of 2023-2024 in the IGRA collection
The Diamonds of 2023-2024 in the IGRA collection
Israel Genealogy Research Association
 
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptxChapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
Mohd Adib Abd Muin, Senior Lecturer at Universiti Utara Malaysia
 
Liberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdfLiberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdf
WaniBasim
 
Digital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental DesignDigital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental Design
amberjdewit93
 
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
PECB
 
How to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 InventoryHow to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 Inventory
Celine George
 
How to Make a Field Mandatory in Odoo 17
How to Make a Field Mandatory in Odoo 17How to Make a Field Mandatory in Odoo 17
How to Make a Field Mandatory in Odoo 17
Celine George
 
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdfবাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
eBook.com.bd (প্রয়োজনীয় বাংলা বই)
 
Walmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdfWalmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdf
TechSoup
 
The History of Stoke Newington Street Names
The History of Stoke Newington Street NamesThe History of Stoke Newington Street Names
The History of Stoke Newington Street Names
History of Stoke Newington
 
MARY JANE WILSON, A “BOA MÃE” .
MARY JANE WILSON, A “BOA MÃE”           .MARY JANE WILSON, A “BOA MÃE”           .
MARY JANE WILSON, A “BOA MÃE” .
Colégio Santa Teresinha
 

Recently uploaded (20)

C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptxC1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
 
Wound healing PPT
Wound healing PPTWound healing PPT
Wound healing PPT
 
Film vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movieFilm vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movie
 
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective UpskillingYour Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective Upskilling
 
BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...
BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...
BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...
 
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptxNEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
 
How to Manage Your Lost Opportunities in Odoo 17 CRM
How to Manage Your Lost Opportunities in Odoo 17 CRMHow to Manage Your Lost Opportunities in Odoo 17 CRM
How to Manage Your Lost Opportunities in Odoo 17 CRM
 
Pengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptxPengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptx
 
คำศัพท์ คำพื้นฐานการอ่าน ภาษาอังกฤษ ระดับชั้น ม.1
คำศัพท์ คำพื้นฐานการอ่าน ภาษาอังกฤษ ระดับชั้น ม.1คำศัพท์ คำพื้นฐานการอ่าน ภาษาอังกฤษ ระดับชั้น ม.1
คำศัพท์ คำพื้นฐานการอ่าน ภาษาอังกฤษ ระดับชั้น ม.1
 
The Diamonds of 2023-2024 in the IGRA collection
The Diamonds of 2023-2024 in the IGRA collectionThe Diamonds of 2023-2024 in the IGRA collection
The Diamonds of 2023-2024 in the IGRA collection
 
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptxChapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
 
Liberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdfLiberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdf
 
Digital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental DesignDigital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental Design
 
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
 
How to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 InventoryHow to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 Inventory
 
How to Make a Field Mandatory in Odoo 17
How to Make a Field Mandatory in Odoo 17How to Make a Field Mandatory in Odoo 17
How to Make a Field Mandatory in Odoo 17
 
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdfবাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
 
Walmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdfWalmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdf
 
The History of Stoke Newington Street Names
The History of Stoke Newington Street NamesThe History of Stoke Newington Street Names
The History of Stoke Newington Street Names
 
MARY JANE WILSON, A “BOA MÃE” .
MARY JANE WILSON, A “BOA MÃE”           .MARY JANE WILSON, A “BOA MÃE”           .
MARY JANE WILSON, A “BOA MÃE” .
 

ILE FOR E&A - FINAL PRESENTANTION

  • 1. PONTIFICIA UNIVERSIDAD CATOLICA MADRE Y MAESTRA. English for ARC/CI ST-ILE-494-T-001 FINAL PRESENTATION Professor: Manuel A. Peralta V. Presented by: Eduardo J. González V. 2009-1558 Sergio A. Peña G. 2009- 0272 APRIL 11 / 2013
  • 2.
  • 3. IDC-homes ® OVERVIEW •Innovate, design and construct exceptional projects adapted to the latest technologies, in the areas of housing, offices and shopping centers. Focused on our values of responsibility, respect, integrity, cooperation, enthusiasm, we wish to obtain the leadership in the country and to be globally recognized. All our projects provide the best solution, in functionality and aesthetics, and always have a good treat with the environment.
  • 4. IDC-homes ® DEFINITION OF THE PROJECT Project: Lawyers’ office building Client: Rosa A. Fernandez Rosa A. Fernandez, a client from Santiago de los Caballeros, wants to start her own lawyers buffet and come to us with the ideal to construct an office building located in Los Jardines, Santiago. The project has 400 square meters field to work. The client asked for a three floors building, adapted to future changes and an ecological design. The project needs green areas to enhance the visuals, a big lobby, four offices, conference room, and administration. The client has 20 million pesos, 20,000,000 $ R.D. , for the first investment of the project. Already presented the needs and requirements of the project, such as comfort, interior and exterior spaces, and others, we believe that IDC-homes can easily carry out this project, thanks to our flexible design, but we feel in the need to subcontract the eco-technology. Finally, focused on the economy, we can build this project as a simple building, but fully functional and aesthetic.
  • 5. IDC-homes ® DESCRIBING THE PROJECT Before you enter the building, you will see a beautiful landscaping work that contains a big and colorful garden, surrounding the whole building with different kinds of flowers and trees in every color and sizes.
  • 6. IDC-homes ® DESCRIBING THE PROJECT Once you enter to the first floor, you will contemplate our big lobby that is open to the views of the garden, so you can enjoy the landscaping work from the outside and the inside. The lobby has all the last details of the flooring in a very exotic woodwork, and curtain walls to close the area. Right in front of the entrance, in the middle of the lobby, there is a big electronic panel that gives you all the information you need, and some details about the building. Next to the panel, it’s the waiting area and the secretary assistance.
  • 7. ®  IDC-homes DESCRIBING THE PROJECT If you take a few more steps to the left, you will access to the stairs for next floor, which is the offices floor. It has the bathrooms in front of the stairs and another waiting area right next to it. Moreover, the whole second floor is full of offices and a kitchenette.
  • 8. IDC-homes ® DESCRIBING THE PROJECT If you continue up the stairs, you will access to the third floor. It's the administration floor, and has a big conference room with beautiful woodwork in the walls and roof, and views with the smart technology panels. The room is designed with special blocks to deals with the acoustic. The third floor also has the offices of the administrators, and a kitchenette.
  • 9. Finally, we used the roof area, which has the solar panels and the air conditioning machine, to any kind of activity that needs an open space. We will also decorate it with a small garden to clear the views of the machines. We also designed a basement for parking area and warehouse. DESCRIBING THE PROJECT IDC-homes ®
  • 10. IDC-homes ® CODES: FIRE SAFETY SYSTEM We will provide protection to avoid and mitigate damage to the property, and injury to persons, motivated by: •Instaling fire alarms. •Escape ladders •Extinguishing in every floor •Intakes for firefighters •Emergency exits •Using special blocks (Hebel) to reduce the burning , increasing the time to leave the building
  • 11. . The building was built STEELWORK by steel parts manufactured. C Used materials Supported by O N •Stair rod or dipstick A skeleton, steel armed S •Steel Beams by parts. T •Steel Columns •Steel plates United by R Welding and unions U Required Tools called rivets. C T Assembled by Automated Manual Construction: I Construction: Plumb Steel workers O Trucks Squad Cranes Haksaw Finally N Cuting Machine Welding Machine we proceed to build walls, with Hebel blocks
  • 12. Landscaping Green areas C were designed by a professional O Used Materials Manual Tools N The land was S Plants Scissors cleared with heavy equipment T Flowers Peak such as R Wood Shovel bulldozers Concrete Truck U Steel Closes Then preceded T to plant, place, buil I d all spaces as specified the O design N
  • 13.  Technology within the Project This Project will use must technology called smart glass, which is employed in information panels found in our loby, so the users can explore the edification without walking on it, and get a brief information of what each floor separately posse.
  • 15. Technology within the Project Also our reception will use this technology, so all you have to do with computer and phone will be used through the glass.
  • 16. Technology within the Project The conference be formed by sound insulating walls in order to avoid unwanted noise from outside the room, as well, to avoid that in this discussion is heard outside. It also has a lighting that adapts to the use made of the room without using switches, a proper sound system and a big glass screen where you can display and / or present what you want, this will be consist of smart glass also.
  • 18. Why should you hire us? Here we have several reasons why we should be hired by you to do future projects.  Experience: We have been a part of this successful construction environment and gained knowledge and experience within the industry for the years we have here.  Competence: We have the skills, ability, confidence, maturity and commitment to perform well in this construction role.  Integrity : We have been closely working with customers in all our previous projects, which has helped us develop positive interpersonal relations and learn how to understand what is that that they really want and are looking for in a project.  Inspiration: Because we work out of passion, a love and dedication for what we do, and recognize the importance of benefiting others as well as ourselves through that passion.