Some of the underground Rapid Transit System (RTS) stations are constructed
                                                                                                                                                                                                                                                              by the “top-down” method. In this method, the underground retaining walls are
03 . Construction                                                       04 . Construction                                                                                                                                                                     first installed. In most cases, these retaining walls are concrete diaphragm walls.
        of Underground                                                             of Underground                                                                                                                                                             This is followed by excavation to just below the roof slab level of the underground
        Structure                                                                  Structure                                                                                                                                                                  structure, with the retaining walls and struts supporting the soil at the sides.
                                Decking                                                                       Decking
                                                                                                                               While noise, dust and other inconveniences                                                                                     The roof slab is then constructed, providing a massive support across the
                                   Roof Opening                                                                 Roof Opening                                                                                                                                  excavation. Access openings on the roof slab are provided so that works thereafter
Strut                                 Roof Slab                         Strut                                      Roof Slab
                                                                                                                               are inevitable during construction, LTA will                                                                                   could proceed downwards to the base slab level of the underground structure.
                                                                                                                                                                                                                                                              Upon completion of the base slab, the side walls are constructed and the
                                                                Strut                                                          work closely with the contractor to keep                                                                                       intermediate struts are progressively removed. The access openings on the roof
                                                                Strut
                                                                                                                                                                                                                                                              slab are then sealed and the ground is subsequently backfilled and reinstated.
                                                                                                                                              them to a minimum.

                                                                                                                                                                                                                                                                            TOP-DOWN
The roof slab is constructed, with access                               The next level of slab is constructed, and                                                                                                                                                          CONSTRUCTION METHOD
openings provided on the slab for works                                 this process progresses downwards till
to proceed downwards. The roof slab                                     the base slab is completed.
                                                                                                                                                                                                                                                                   Construction Site                                                             Hoarding
not only provides a massive support
across the excavation, it also acts as a
                                                                                                                                                                                                                                                                                                                                                  Diverted
noise barrier.                                                                                                                                                                                                                                                                                                                                       Road




05 . Construction                                                       06 . Backfilling &                                                                                                                                                                    Proposed
                                                                                                                                                                                                                                                              Underground

        of Underground                                                             Reinstatement                                                                                                                                                              Structure



        Structure
                                Decking
                                                                                            Reinstated Road
                                                                                                                                                                                                                                               TOP-DOWN
                                                                                                                                                                                                                                                                01 . Installation of                                                 02 . Excavation &
Strut                                 Roof Slab                         Backfill

                                                                                                                                                                                                                                               CONSTRUCTION                 Retaining Wall                                                   Installation of




                                                                                                                                                                                             Designed & produced by C2 Design Studio Pte Ltd
                                            Side Walls
                                                         Completed                                                                                                                                                                                                                                Retaining Wall
                                                                                                                                                                                                                                                                                                                                             Steel Strut
                                                                                                                                                                                                                                                                                                                                     Strut
                                                         Underground
                                                         Structure                                                                                                                                                                                                                                                 Roof Slab to be
                                             Base Slab                                                                                                                                                                                                                                                             Constructed




The side walls are constructed upwards,                                 After the underground structure is
followed by removal of the intermediate                                 completed, the soil is backfilled to the
struts. The access openings on the roof                                 top strut level before the strut is removed.
slab are then sealed.                                                   This is followed by completely backfilling                                                                                                                                              The underground retaining wall, which is                             The soil is excavated to just below the
                                                                        the top of the underground structure and                                                                             March 2005
                                                                                                                                                                                                                                                                usually a concrete diaphragm wall, is                                roof slab level of the underground
                                                                                                                                    If you have any suggestions or feedback,
                                                                        finally reinstating the surface areas.                                                                                                                                                  installed before excavation commences.                               structure. Struts are installed to support
                                                                                                                                    please call our Customer Service Line: 1800 – CALL LTA
                                                                                                                                                                           1800 – 2255 582                                                                                                                                           the retaining walls, which in turn support
                                                                                                                                                                                                                                                                                                                                     the soil at the sides.
INSTALLATION OF RETAINING WALL                                                                   03.
                                                         02 .                                                                                                                      Safety Measures                                                                                      Inconveniences
- DIAPHRAGM WALL                                                                                                                                                                   The Land Transport Authority (LTA) accords top priority to safety.                                   Noise is generated when the grab/trench cutter excavates the soil
                                                                                                                                                                                   Professional Engineers (PE) and Qualified Persons (QP) are engaged                                   as well as during the panel concreting process. As it is vital that
The following pictorial guide                                                                                                                                                      to carry out stringent checks on the temporary structures to ensure                                  concrete is poured continuously into the panel till the whole panel
illustrates the construction sequence                                                                                                                                              that they are installed correctly and safely before the excavation can                               is completely and homogeneously filled with the concrete, it is
of a typical diaphragm wall. This type
                                                                                                                                                                                   proceed from one level to the next level. In addition, our engineers                                 inevitable that work runs into the night when the panel is concreted
of retaining wall was used for the
construction of Kovan Station on the
                                                                                                                                                                           04 .    monitor the various stress and strain gauges installed on the temporary                              so as not to affect its structural integrity.
North East Line (NEL).                                                                                                                                                             structures on a regular basis so as to be sure that the stresses fall
                                                                                                                                                                                   within acceptable limits set by the design engineers. Likewise,
                                                                                                                                                                                   instruments are extensively installed in the vicinity of the construction
                                                                                                                                                                                   site to monitor vibrations, ground movements etc. This is so that the
                                                                                                                                                                                   engineers are always in the know of the impact of the construction
                                                                                                                                                                                   on the surrounding buildings and structures, thereby ensuring that
                                                                                                                                                                                   they are safe.
                            01 .




01 .                                                                                              02 .                                                            03 .                                                                                                                  05.
Construction of Guide Wall                                                                        Excavation of Panel                                             Installation of Rebar Cage                                                                                            Repetition of Process
                                   Guide Wall
                                                                                                                                                                  The crane lifts up the reinforcement-bar cage                                                                         Process 2 - 4 repeats for the remaining soil in
                                                                                                         Bite                                                     and places it within the panel.                                                                                       between the panels till the entire length of the
                                                                                                         No.3
                                                                                          Bite                                                                                                                                                                                          diaphragm wall construction is completed.
                                                                                                                                                                                                        Concreting Pipe
                                                                                          No.2
                                                                                   Bite                                                                                                                                                                                                                                                                 Moving Off
                                                                                   No.1
                                                                                                                                                                                                                                                                      Panel Wall




                         ~1200mm




                                                                Bentonite Slurry                                                                                                                                                                                                   Completed
                                                                                                                                                                                                                                                                                   Diaphragm Wall

                                                                                                                                                                  Rebar Cage
            ~800 to
                                                                                                                                                Completed Panel
            1000mm
                                                                                                                                                                                                                                                           Concrete




A guide wall is constructed to set out the position of                                                                                                                                                                       04 .
                                                                                                  The grab/trench cutter cuts and removes the soil
the diaphragm wall.
                                                                                                  to form the panel. The excavation is stabilised by
                                                                                                                                                                                                                             Concreting of Panel
                                                                                                  filling it with bentonite slurry to support the wall                                                                       Concrete is poured into the
                                                                                                  of the excavation.                                                                                                         panel to form the panel wall.

More Related Content

What's hot

Foundations and pavements ce367
Foundations and pavements   ce367Foundations and pavements   ce367
Foundations and pavements ce367Saqib Imran
 
Load analysis and structural consideration
Load analysis and structural considerationLoad analysis and structural consideration
Load analysis and structural considerationBee Key Verma
 
Foundations and Introduction
Foundations and IntroductionFoundations and Introduction
Foundations and IntroductionPirpasha Ujede
 
Diaphragmwall test
Diaphragmwall testDiaphragmwall test
Diaphragmwall testjuwes
 
IRJET- Performance of Framed Building with Soft Storey at Different Levels
IRJET- Performance of Framed Building with Soft Storey at Different LevelsIRJET- Performance of Framed Building with Soft Storey at Different Levels
IRJET- Performance of Framed Building with Soft Storey at Different LevelsIRJET Journal
 
Building foundation: Types, Conditions, and Safety Precautions
Building foundation: Types, Conditions, and Safety PrecautionsBuilding foundation: Types, Conditions, and Safety Precautions
Building foundation: Types, Conditions, and Safety PrecautionsJames Tolentino
 
Modena valuzzidietal
Modena valuzzidietalModena valuzzidietal
Modena valuzzidietalJyothi Surya
 
Top down construction
Top down constructionTop down construction
Top down constructionANUPAM TIWARI
 
Temporary Tie Backs in the Building Construction by Bill Morales MSc CCE
Temporary Tie Backs in the Building Construction by Bill Morales MSc CCETemporary Tie Backs in the Building Construction by Bill Morales MSc CCE
Temporary Tie Backs in the Building Construction by Bill Morales MSc CCEBill Morales MSc
 
12 fundamentals for_seismic_design_of_rcc_buildings_by_prof_arya
12 fundamentals for_seismic_design_of_rcc_buildings_by_prof_arya12 fundamentals for_seismic_design_of_rcc_buildings_by_prof_arya
12 fundamentals for_seismic_design_of_rcc_buildings_by_prof_aryaAbdul Khader Shahadaf TH
 
Aerodynamic optimization of building shapes
Aerodynamic optimization of building shapesAerodynamic optimization of building shapes
Aerodynamic optimization of building shapesAglaia Connect
 
Different types of damages that have been observed in masonry buildings durin...
Different types of damages that have been observed in masonry buildings durin...Different types of damages that have been observed in masonry buildings durin...
Different types of damages that have been observed in masonry buildings durin...Nitin Kumar
 
IMPACT OF SUBSIDENCE
IMPACT OF SUBSIDENCEIMPACT OF SUBSIDENCE
IMPACT OF SUBSIDENCEKapil Beniwal
 
Sheet pile and bulkhead (usefulsearch.org) (useful search)
Sheet pile and bulkhead (usefulsearch.org)  (useful search)Sheet pile and bulkhead (usefulsearch.org)  (useful search)
Sheet pile and bulkhead (usefulsearch.org) (useful search)Make Mannan
 
Lecture 2 3 Compression, Condition Assess
Lecture 2 3 Compression, Condition AssessLecture 2 3 Compression, Condition Assess
Lecture 2 3 Compression, Condition AssessTeja Ande
 
Failure of foundation due to earthquake
Failure of foundation due to earthquakeFailure of foundation due to earthquake
Failure of foundation due to earthquakeSatyajit Behera
 

What's hot (20)

Foundations and pavements ce367
Foundations and pavements   ce367Foundations and pavements   ce367
Foundations and pavements ce367
 
Load analysis and structural consideration
Load analysis and structural considerationLoad analysis and structural consideration
Load analysis and structural consideration
 
Foundations and Introduction
Foundations and IntroductionFoundations and Introduction
Foundations and Introduction
 
Diaphragmwall test
Diaphragmwall testDiaphragmwall test
Diaphragmwall test
 
IRJET- Performance of Framed Building with Soft Storey at Different Levels
IRJET- Performance of Framed Building with Soft Storey at Different LevelsIRJET- Performance of Framed Building with Soft Storey at Different Levels
IRJET- Performance of Framed Building with Soft Storey at Different Levels
 
Geotechnical Aspects of EQ Resistant Design
Geotechnical Aspects of EQ Resistant DesignGeotechnical Aspects of EQ Resistant Design
Geotechnical Aspects of EQ Resistant Design
 
Diaphragm Wall Presentation By Gagan
Diaphragm Wall Presentation By GaganDiaphragm Wall Presentation By Gagan
Diaphragm Wall Presentation By Gagan
 
Building foundation: Types, Conditions, and Safety Precautions
Building foundation: Types, Conditions, and Safety PrecautionsBuilding foundation: Types, Conditions, and Safety Precautions
Building foundation: Types, Conditions, and Safety Precautions
 
Modena valuzzidietal
Modena valuzzidietalModena valuzzidietal
Modena valuzzidietal
 
Top down construction
Top down constructionTop down construction
Top down construction
 
Types of foundation
Types of foundationTypes of foundation
Types of foundation
 
Temporary Tie Backs in the Building Construction by Bill Morales MSc CCE
Temporary Tie Backs in the Building Construction by Bill Morales MSc CCETemporary Tie Backs in the Building Construction by Bill Morales MSc CCE
Temporary Tie Backs in the Building Construction by Bill Morales MSc CCE
 
12 fundamentals for_seismic_design_of_rcc_buildings_by_prof_arya
12 fundamentals for_seismic_design_of_rcc_buildings_by_prof_arya12 fundamentals for_seismic_design_of_rcc_buildings_by_prof_arya
12 fundamentals for_seismic_design_of_rcc_buildings_by_prof_arya
 
Aerodynamic optimization of building shapes
Aerodynamic optimization of building shapesAerodynamic optimization of building shapes
Aerodynamic optimization of building shapes
 
Different types of damages that have been observed in masonry buildings durin...
Different types of damages that have been observed in masonry buildings durin...Different types of damages that have been observed in masonry buildings durin...
Different types of damages that have been observed in masonry buildings durin...
 
IMPACT OF SUBSIDENCE
IMPACT OF SUBSIDENCEIMPACT OF SUBSIDENCE
IMPACT OF SUBSIDENCE
 
Sheet pile and bulkhead (usefulsearch.org) (useful search)
Sheet pile and bulkhead (usefulsearch.org)  (useful search)Sheet pile and bulkhead (usefulsearch.org)  (useful search)
Sheet pile and bulkhead (usefulsearch.org) (useful search)
 
Lecture 2 3 Compression, Condition Assess
Lecture 2 3 Compression, Condition AssessLecture 2 3 Compression, Condition Assess
Lecture 2 3 Compression, Condition Assess
 
Failure of foundation due to earthquake
Failure of foundation due to earthquakeFailure of foundation due to earthquake
Failure of foundation due to earthquake
 
Bulk active
Bulk activeBulk active
Bulk active
 

Viewers also liked

Top down construction
Top down constructionTop down construction
Top down constructionAmulya Kansal
 
Diaphragm wall: Construction and Design
Diaphragm wall: Construction and DesignDiaphragm wall: Construction and Design
Diaphragm wall: Construction and DesignUmer Farooq
 
Secant piled walls dsign - تصميم خوازيق الجدران الساندة - ميكرو بايل
Secant piled walls  dsign - تصميم خوازيق الجدران الساندة - ميكرو بايلSecant piled walls  dsign - تصميم خوازيق الجدران الساندة - ميكرو بايل
Secant piled walls dsign - تصميم خوازيق الجدران الساندة - ميكرو بايلDr.youssef hamida
 
Productivity Improvement Study
Productivity Improvement StudyProductivity Improvement Study
Productivity Improvement Studysaranshshah
 
Retaining wall(الجدران الاستنادية).- Scant Piles
Retaining wall(الجدران الاستنادية).- Scant PilesRetaining wall(الجدران الاستنادية).- Scant Piles
Retaining wall(الجدران الاستنادية).- Scant PilesDr.youssef hamida
 
Top down construction by Sai Towers P Ltd.
Top down construction by Sai Towers P Ltd.Top down construction by Sai Towers P Ltd.
Top down construction by Sai Towers P Ltd.Sai Towers P Ltd.
 
DMRC (METRO TRAINING REPORT)
DMRC (METRO TRAINING REPORT)DMRC (METRO TRAINING REPORT)
DMRC (METRO TRAINING REPORT)Sukhdarshan Singh
 
Groundwater Control Techniques for Tunnelling and Shaft Sinking
Groundwater Control Techniques for Tunnelling and Shaft SinkingGroundwater Control Techniques for Tunnelling and Shaft Sinking
Groundwater Control Techniques for Tunnelling and Shaft SinkingMartin Preene
 
Reading Models and Schema Theory
Reading Models and Schema TheoryReading Models and Schema Theory
Reading Models and Schema TheoryAbbie Laudato
 
Underground construction Techniques civil final year seminar
Underground construction Techniques civil final year seminarUnderground construction Techniques civil final year seminar
Underground construction Techniques civil final year seminarPavan Kumar N
 

Viewers also liked (20)

slurywall
slurywallslurywall
slurywall
 
Diaphragm wall
Diaphragm wallDiaphragm wall
Diaphragm wall
 
Top down construction
Top down constructionTop down construction
Top down construction
 
Top down construction presentation
Top down construction presentationTop down construction presentation
Top down construction presentation
 
Diaphragm wall: Construction and Design
Diaphragm wall: Construction and DesignDiaphragm wall: Construction and Design
Diaphragm wall: Construction and Design
 
Sgp final
Sgp finalSgp final
Sgp final
 
Slab
SlabSlab
Slab
 
Secant piled walls dsign - تصميم خوازيق الجدران الساندة - ميكرو بايل
Secant piled walls  dsign - تصميم خوازيق الجدران الساندة - ميكرو بايلSecant piled walls  dsign - تصميم خوازيق الجدران الساندة - ميكرو بايل
Secant piled walls dsign - تصميم خوازيق الجدران الساندة - ميكرو بايل
 
Productivity Improvement Study
Productivity Improvement StudyProductivity Improvement Study
Productivity Improvement Study
 
Retaining wall(الجدران الاستنادية).- Scant Piles
Retaining wall(الجدران الاستنادية).- Scant PilesRetaining wall(الجدران الاستنادية).- Scant Piles
Retaining wall(الجدران الاستنادية).- Scant Piles
 
Top down construction by Sai Towers P Ltd.
Top down construction by Sai Towers P Ltd.Top down construction by Sai Towers P Ltd.
Top down construction by Sai Towers P Ltd.
 
Retaining wall
Retaining wallRetaining wall
Retaining wall
 
DMRC (METRO TRAINING REPORT)
DMRC (METRO TRAINING REPORT)DMRC (METRO TRAINING REPORT)
DMRC (METRO TRAINING REPORT)
 
Groundwater Control Techniques for Tunnelling and Shaft Sinking
Groundwater Control Techniques for Tunnelling and Shaft SinkingGroundwater Control Techniques for Tunnelling and Shaft Sinking
Groundwater Control Techniques for Tunnelling and Shaft Sinking
 
Top Down Construction Presentation.
Top Down Construction Presentation.Top Down Construction Presentation.
Top Down Construction Presentation.
 
Reading Models and Schema Theory
Reading Models and Schema TheoryReading Models and Schema Theory
Reading Models and Schema Theory
 
Bottom up & top down tutorial 2
Bottom up & top down tutorial 2Bottom up & top down tutorial 2
Bottom up & top down tutorial 2
 
Underground construction Techniques civil final year seminar
Underground construction Techniques civil final year seminarUnderground construction Techniques civil final year seminar
Underground construction Techniques civil final year seminar
 
Concrete
ConcreteConcrete
Concrete
 
PreCast Construction
PreCast ConstructionPreCast Construction
PreCast Construction
 

Underground Station Construction Top-Down

  • 1. Some of the underground Rapid Transit System (RTS) stations are constructed by the “top-down” method. In this method, the underground retaining walls are 03 . Construction 04 . Construction first installed. In most cases, these retaining walls are concrete diaphragm walls. of Underground of Underground This is followed by excavation to just below the roof slab level of the underground Structure Structure structure, with the retaining walls and struts supporting the soil at the sides. Decking Decking While noise, dust and other inconveniences The roof slab is then constructed, providing a massive support across the Roof Opening Roof Opening excavation. Access openings on the roof slab are provided so that works thereafter Strut Roof Slab Strut Roof Slab are inevitable during construction, LTA will could proceed downwards to the base slab level of the underground structure. Upon completion of the base slab, the side walls are constructed and the Strut work closely with the contractor to keep intermediate struts are progressively removed. The access openings on the roof Strut slab are then sealed and the ground is subsequently backfilled and reinstated. them to a minimum. TOP-DOWN The roof slab is constructed, with access The next level of slab is constructed, and CONSTRUCTION METHOD openings provided on the slab for works this process progresses downwards till to proceed downwards. The roof slab the base slab is completed. Construction Site Hoarding not only provides a massive support across the excavation, it also acts as a Diverted noise barrier. Road 05 . Construction 06 . Backfilling & Proposed Underground of Underground Reinstatement Structure Structure Decking Reinstated Road TOP-DOWN 01 . Installation of 02 . Excavation & Strut Roof Slab Backfill CONSTRUCTION Retaining Wall Installation of Designed & produced by C2 Design Studio Pte Ltd Side Walls Completed Retaining Wall Steel Strut Strut Underground Structure Roof Slab to be Base Slab Constructed The side walls are constructed upwards, After the underground structure is followed by removal of the intermediate completed, the soil is backfilled to the struts. The access openings on the roof top strut level before the strut is removed. slab are then sealed. This is followed by completely backfilling The underground retaining wall, which is The soil is excavated to just below the the top of the underground structure and March 2005 usually a concrete diaphragm wall, is roof slab level of the underground If you have any suggestions or feedback, finally reinstating the surface areas. installed before excavation commences. structure. Struts are installed to support please call our Customer Service Line: 1800 – CALL LTA 1800 – 2255 582 the retaining walls, which in turn support the soil at the sides.
  • 2. INSTALLATION OF RETAINING WALL 03. 02 . Safety Measures Inconveniences - DIAPHRAGM WALL The Land Transport Authority (LTA) accords top priority to safety. Noise is generated when the grab/trench cutter excavates the soil Professional Engineers (PE) and Qualified Persons (QP) are engaged as well as during the panel concreting process. As it is vital that The following pictorial guide to carry out stringent checks on the temporary structures to ensure concrete is poured continuously into the panel till the whole panel illustrates the construction sequence that they are installed correctly and safely before the excavation can is completely and homogeneously filled with the concrete, it is of a typical diaphragm wall. This type proceed from one level to the next level. In addition, our engineers inevitable that work runs into the night when the panel is concreted of retaining wall was used for the construction of Kovan Station on the 04 . monitor the various stress and strain gauges installed on the temporary so as not to affect its structural integrity. North East Line (NEL). structures on a regular basis so as to be sure that the stresses fall within acceptable limits set by the design engineers. Likewise, instruments are extensively installed in the vicinity of the construction site to monitor vibrations, ground movements etc. This is so that the engineers are always in the know of the impact of the construction on the surrounding buildings and structures, thereby ensuring that they are safe. 01 . 01 . 02 . 03 . 05. Construction of Guide Wall Excavation of Panel Installation of Rebar Cage Repetition of Process Guide Wall The crane lifts up the reinforcement-bar cage Process 2 - 4 repeats for the remaining soil in Bite and places it within the panel. between the panels till the entire length of the No.3 Bite diaphragm wall construction is completed. Concreting Pipe No.2 Bite Moving Off No.1 Panel Wall ~1200mm Bentonite Slurry Completed Diaphragm Wall Rebar Cage ~800 to Completed Panel 1000mm Concrete A guide wall is constructed to set out the position of 04 . The grab/trench cutter cuts and removes the soil the diaphragm wall. to form the panel. The excavation is stabilised by Concreting of Panel filling it with bentonite slurry to support the wall Concrete is poured into the of the excavation. panel to form the panel wall.