SlideShare a Scribd company logo
FHC
ZCV
FHC
N6 N7 N8 N9 N11
N13
S6 S7 S8 S9 S10
S11
N10 N12
?
IRRIGATION TANKS
GARBAGE ROOM
?
?
STORE
P3
F1
AHU - FAN ROOM
FIRE WATER TANK
230m3
?
DATA
? ?
ELEC
STORE
AHU - FAN ROOM
STORE
STORE STORE STORE STORE STORE ? ? ? ?
ELV
EQUIPMENT
?
/
FORCONTINUATIONREFERTO
DWGNO:1M41-B1-01
FHPFHP
Project
Manager :
Drawn :
Date :
Drawing Title :
Scale :
Project No :
Key Plan :
North:
Notes :
Stamp:
TrueNorth
DN
Project Name & Location:
Lead Consultant :
Dubai, U.A.E.
info.international@norr.com
Tel : 04-3544439
Fax : 04-3544900
ARCHITECTS ENGINEERS PLANNERS
NORR Group Consultants
International Limited
P.O. Box: 53150
P.O. Box: 44387
Abu Dhabi, U.A.E.
info.international@norr.com
Tel : 02-6763360
Fax : 02-6763361
Owner Name:
Local Consultant (Architect of Record) :
A J D A N R E A L E S T A T E
CIVILIZATION ENGINEERING CONSULTING OFFICE
P.O. BOX 3974 Dammam K.S.A.
Telephone: 03 8336991 FAX: 03 8337441
Website: www.civilization.com.sa
AJDAN WATERFRONT
PARCEL ID : A1
PLAN NO. : 356/2
AL KHOBAR
KINGDOM OF SAUDI ARABIA
Project Description :
AJDAN WATERFRONT
PARCEL-A1 DEVELOPMENT
1303 - PA1 - TD
Drawing No. :
1 : 100
2/28/20164:21:39PMC:RevitLocal
FilesFCDB-140052-AJDANM_FCDB14-0052_AJDAN_WATER_FRONT_KSA_mmahalingam.rvt
M41-B1-02
BASEMENT LEVEL B1 FIRE
PROTECTION LAYOUT-SECTOR 2
FCDB150123
Mahendran
B.M.
1 : 100
BASEMENT FIRE
PROTECTION
LAYOUT-SECTOR 21
No. Issued For Date Checked

More Related Content

What's hot

Security system nid gandhinagar
Security system nid gandhinagarSecurity system nid gandhinagar
Security system nid gandhinagar
Subhash Gupta
 
Kanchenjunga Apartments- A Case Study
Kanchenjunga Apartments- A Case StudyKanchenjunga Apartments- A Case Study
Kanchenjunga Apartments- A Case Study
Shivangi Shankar
 
Architecture Thesis Topics List
Architecture Thesis Topics ListArchitecture Thesis Topics List
Architecture Thesis Topics List
Bachelor Thesis
 
Sanskar Kendra casestudy, ahmedabad, india casestudy
Sanskar Kendra casestudy, ahmedabad, india casestudySanskar Kendra casestudy, ahmedabad, india casestudy
Sanskar Kendra casestudy, ahmedabad, india casestudy
manoj chauhan
 
HOUSING AT PARSIK HILL
HOUSING AT PARSIK HILLHOUSING AT PARSIK HILL
HOUSING AT PARSIK HILL
Shreya Mahajan
 
geoffrey bawa
geoffrey bawageoffrey bawa
geoffrey bawa
Abhiram Bathina
 
Performing Arts Centre final
Performing Arts Centre finalPerforming Arts Centre final
Performing Arts Centre final
JYOTSNA MISHRA
 
Shangshad Bhaban
Shangshad BhabanShangshad Bhaban
Shangshad Bhaban
NurjahanBintu
 
High-Rise Iconic Buildings
High-Rise Iconic BuildingsHigh-Rise Iconic Buildings
High-Rise Iconic Buildings
Dania Abdel-aziz
 
Site analysis presentation board
Site analysis presentation board  Site analysis presentation board
Site analysis presentation board
KohSungJie
 
IUCAA
IUCAAIUCAA
Transitional space presentation
Transitional space presentationTransitional space presentation
Transitional space presentation
You-Wen Liang
 
5.1 Mixed use building
5.1 Mixed use building5.1 Mixed use building
5.1 Mixed use building
shabbirtg
 
Case Study: Sustainable Mixed-Use Development in Historic Urban Areas
Case Study: Sustainable Mixed-Use Development in Historic Urban AreasCase Study: Sustainable Mixed-Use Development in Historic Urban Areas
Case Study: Sustainable Mixed-Use Development in Historic Urban Areas
Sustainable Performance Institute
 
case study of chandigarh college of architecture
case study of chandigarh college of architecturecase study of chandigarh college of architecture
case study of chandigarh college of architecture
Abhishek Tiwari
 
Service core
Service coreService core
Service core
aduiti
 
Long Span Building Construction
Long Span Building ConstructionLong Span Building Construction
Long Span Building Construction
Asz My
 
Amanora Future Towers, Hadapsar, Pune - Case Study
Amanora Future Towers, Hadapsar, Pune - Case StudyAmanora Future Towers, Hadapsar, Pune - Case Study
Amanora Future Towers, Hadapsar, Pune - Case Study
Ajinkya Randive
 
Jewish museum case study
Jewish museum case studyJewish museum case study
Jewish museum case study
Dhanraj Salvi
 
Charles correa
Charles correaCharles correa
Charles correa
Krithika P
 

What's hot (20)

Security system nid gandhinagar
Security system nid gandhinagarSecurity system nid gandhinagar
Security system nid gandhinagar
 
Kanchenjunga Apartments- A Case Study
Kanchenjunga Apartments- A Case StudyKanchenjunga Apartments- A Case Study
Kanchenjunga Apartments- A Case Study
 
Architecture Thesis Topics List
Architecture Thesis Topics ListArchitecture Thesis Topics List
Architecture Thesis Topics List
 
Sanskar Kendra casestudy, ahmedabad, india casestudy
Sanskar Kendra casestudy, ahmedabad, india casestudySanskar Kendra casestudy, ahmedabad, india casestudy
Sanskar Kendra casestudy, ahmedabad, india casestudy
 
HOUSING AT PARSIK HILL
HOUSING AT PARSIK HILLHOUSING AT PARSIK HILL
HOUSING AT PARSIK HILL
 
geoffrey bawa
geoffrey bawageoffrey bawa
geoffrey bawa
 
Performing Arts Centre final
Performing Arts Centre finalPerforming Arts Centre final
Performing Arts Centre final
 
Shangshad Bhaban
Shangshad BhabanShangshad Bhaban
Shangshad Bhaban
 
High-Rise Iconic Buildings
High-Rise Iconic BuildingsHigh-Rise Iconic Buildings
High-Rise Iconic Buildings
 
Site analysis presentation board
Site analysis presentation board  Site analysis presentation board
Site analysis presentation board
 
IUCAA
IUCAAIUCAA
IUCAA
 
Transitional space presentation
Transitional space presentationTransitional space presentation
Transitional space presentation
 
5.1 Mixed use building
5.1 Mixed use building5.1 Mixed use building
5.1 Mixed use building
 
Case Study: Sustainable Mixed-Use Development in Historic Urban Areas
Case Study: Sustainable Mixed-Use Development in Historic Urban AreasCase Study: Sustainable Mixed-Use Development in Historic Urban Areas
Case Study: Sustainable Mixed-Use Development in Historic Urban Areas
 
case study of chandigarh college of architecture
case study of chandigarh college of architecturecase study of chandigarh college of architecture
case study of chandigarh college of architecture
 
Service core
Service coreService core
Service core
 
Long Span Building Construction
Long Span Building ConstructionLong Span Building Construction
Long Span Building Construction
 
Amanora Future Towers, Hadapsar, Pune - Case Study
Amanora Future Towers, Hadapsar, Pune - Case StudyAmanora Future Towers, Hadapsar, Pune - Case Study
Amanora Future Towers, Hadapsar, Pune - Case Study
 
Jewish museum case study
Jewish museum case studyJewish museum case study
Jewish museum case study
 
Charles correa
Charles correaCharles correa
Charles correa
 

Viewers also liked

Clifford & Snell - Manual Call Point, Hazardous Area (ATEX) - Yodalex MCP
Clifford & Snell - Manual Call Point, Hazardous Area (ATEX) - Yodalex MCPClifford & Snell - Manual Call Point, Hazardous Area (ATEX) - Yodalex MCP
Clifford & Snell - Manual Call Point, Hazardous Area (ATEX) - Yodalex MCP
Thorne & Derrick International
 
2.5 suppression.sprinklers.wk12b
2.5 suppression.sprinklers.wk12b2.5 suppression.sprinklers.wk12b
2.5 suppression.sprinklers.wk12b
SUNY Rockland Community College
 
Novec 1230
Novec 1230Novec 1230
Novec 1230
Vinod Kumar Nehta
 
Fm 200 schematic
Fm 200 schematicFm 200 schematic
Fm 200 schematic
Prasad Bansod
 
Presentation on Waterproofing of Basement (Omar Faruqe Hamim,L2/T1,BUET)
Presentation on Waterproofing of Basement  (Omar Faruqe Hamim,L2/T1,BUET) Presentation on Waterproofing of Basement  (Omar Faruqe Hamim,L2/T1,BUET)
Presentation on Waterproofing of Basement (Omar Faruqe Hamim,L2/T1,BUET)
Omar Hamim
 
Fire Alarm Control Panel Operations
Fire Alarm Control Panel OperationsFire Alarm Control Panel Operations
Fire Alarm Control Panel Operations
Newport Fire Department
 
presentation on the literature and case study of cricket stadium
presentation on the literature and case study of cricket stadium presentation on the literature and case study of cricket stadium
presentation on the literature and case study of cricket stadium
Kathmandu Engineering College
 
Everything about Elite Fire.
Everything about Elite Fire. Everything about Elite Fire.
Everything about Elite Fire.
Mahmoud Abdel Aziz
 
Structural glazing
Structural glazingStructural glazing
Structural glazing
Siddharth Gupta
 
Building Services
Building ServicesBuilding Services
Building Services
Radhika Munshi
 
Sprinkler design
Sprinkler designSprinkler design
Sprinkler design
physics101
 
CURTAIN WALL
CURTAIN WALLCURTAIN WALL
CURTAIN WALL
Chandarani Saste
 
Chapter 05
Chapter 05Chapter 05
Chapter 05
snoshoesam
 
Basic Fire Alarm Systems
Basic Fire Alarm SystemsBasic Fire Alarm Systems
Basic Fire Alarm Systems
malcolmfd
 
Fire alarm system
Fire alarm system Fire alarm system
Fire alarm system
Md Emran Saidi
 
Fire detection & alarm system
Fire detection & alarm systemFire detection & alarm system
Fire detection & alarm system
Politeknik Sultan Haji Ahmad Shah
 
Sprinkler system
Sprinkler systemSprinkler system
Sprinkler system
محمد طه أحمد
 
Fire Alarm, Smoke Detector and Automatic Sprinkle System
Fire Alarm, Smoke Detector and Automatic Sprinkle SystemFire Alarm, Smoke Detector and Automatic Sprinkle System
Fire Alarm, Smoke Detector and Automatic Sprinkle System
Khairul Azhar
 
fire detection and alarm system
fire detection and alarm systemfire detection and alarm system
fire detection and alarm system
singh1515
 
Fire Detection and Alarm Systems
Fire Detection and Alarm SystemsFire Detection and Alarm Systems
Fire Detection and Alarm Systems
J.T.A.JONES
 

Viewers also liked (20)

Clifford & Snell - Manual Call Point, Hazardous Area (ATEX) - Yodalex MCP
Clifford & Snell - Manual Call Point, Hazardous Area (ATEX) - Yodalex MCPClifford & Snell - Manual Call Point, Hazardous Area (ATEX) - Yodalex MCP
Clifford & Snell - Manual Call Point, Hazardous Area (ATEX) - Yodalex MCP
 
2.5 suppression.sprinklers.wk12b
2.5 suppression.sprinklers.wk12b2.5 suppression.sprinklers.wk12b
2.5 suppression.sprinklers.wk12b
 
Novec 1230
Novec 1230Novec 1230
Novec 1230
 
Fm 200 schematic
Fm 200 schematicFm 200 schematic
Fm 200 schematic
 
Presentation on Waterproofing of Basement (Omar Faruqe Hamim,L2/T1,BUET)
Presentation on Waterproofing of Basement  (Omar Faruqe Hamim,L2/T1,BUET) Presentation on Waterproofing of Basement  (Omar Faruqe Hamim,L2/T1,BUET)
Presentation on Waterproofing of Basement (Omar Faruqe Hamim,L2/T1,BUET)
 
Fire Alarm Control Panel Operations
Fire Alarm Control Panel OperationsFire Alarm Control Panel Operations
Fire Alarm Control Panel Operations
 
presentation on the literature and case study of cricket stadium
presentation on the literature and case study of cricket stadium presentation on the literature and case study of cricket stadium
presentation on the literature and case study of cricket stadium
 
Everything about Elite Fire.
Everything about Elite Fire. Everything about Elite Fire.
Everything about Elite Fire.
 
Structural glazing
Structural glazingStructural glazing
Structural glazing
 
Building Services
Building ServicesBuilding Services
Building Services
 
Sprinkler design
Sprinkler designSprinkler design
Sprinkler design
 
CURTAIN WALL
CURTAIN WALLCURTAIN WALL
CURTAIN WALL
 
Chapter 05
Chapter 05Chapter 05
Chapter 05
 
Basic Fire Alarm Systems
Basic Fire Alarm SystemsBasic Fire Alarm Systems
Basic Fire Alarm Systems
 
Fire alarm system
Fire alarm system Fire alarm system
Fire alarm system
 
Fire detection & alarm system
Fire detection & alarm systemFire detection & alarm system
Fire detection & alarm system
 
Sprinkler system
Sprinkler systemSprinkler system
Sprinkler system
 
Fire Alarm, Smoke Detector and Automatic Sprinkle System
Fire Alarm, Smoke Detector and Automatic Sprinkle SystemFire Alarm, Smoke Detector and Automatic Sprinkle System
Fire Alarm, Smoke Detector and Automatic Sprinkle System
 
fire detection and alarm system
fire detection and alarm systemfire detection and alarm system
fire detection and alarm system
 
Fire Detection and Alarm Systems
Fire Detection and Alarm SystemsFire Detection and Alarm Systems
Fire Detection and Alarm Systems
 

Similar to BASEMENT FIRE PROTECTION LAYOUT-SECTOR-2

5th FLOOR HVAC LAYOUT-SECTOR-2
5th FLOOR HVAC LAYOUT-SECTOR-25th FLOOR HVAC LAYOUT-SECTOR-2
5th FLOOR HVAC LAYOUT-SECTOR-2
MAHENDRAN Mahalingam
 
5th FLOOR HVAC LAYOUT-SECTOR 1
5th FLOOR HVAC LAYOUT-SECTOR 15th FLOOR HVAC LAYOUT-SECTOR 1
5th FLOOR HVAC LAYOUT-SECTOR 1
MAHENDRAN Mahalingam
 
BASEMENT DRAINAGE LAYOUT-SECTOR-2
BASEMENT DRAINAGE LAYOUT-SECTOR-2BASEMENT DRAINAGE LAYOUT-SECTOR-2
BASEMENT DRAINAGE LAYOUT-SECTOR-2
MAHENDRAN Mahalingam
 
House Shaw Floorplan Final 03
House Shaw Floorplan Final 03House Shaw Floorplan Final 03
House Shaw Floorplan Final 03
Terence Botha
 
883-4-S10-P10S-CN12-RCC-SH-TYP-MF-04-1010_01
883-4-S10-P10S-CN12-RCC-SH-TYP-MF-04-1010_01883-4-S10-P10S-CN12-RCC-SH-TYP-MF-04-1010_01
883-4-S10-P10S-CN12-RCC-SH-TYP-MF-04-1010_01
Sherif Azab
 
883-4-S09-S03Z-CN12-RCC-SH-UTC-MF-05-3020-(1-3)-SR7A FIRE TANK
883-4-S09-S03Z-CN12-RCC-SH-UTC-MF-05-3020-(1-3)-SR7A FIRE TANK883-4-S09-S03Z-CN12-RCC-SH-UTC-MF-05-3020-(1-3)-SR7A FIRE TANK
883-4-S09-S03Z-CN12-RCC-SH-UTC-MF-05-3020-(1-3)-SR7A FIRE TANK
Sherif Azab
 
883-4-S09-S03Z-CN12-RCC-SH-UTC-MF-05-3020-(2-3)-SR7A FIRE TANK
883-4-S09-S03Z-CN12-RCC-SH-UTC-MF-05-3020-(2-3)-SR7A FIRE TANK883-4-S09-S03Z-CN12-RCC-SH-UTC-MF-05-3020-(2-3)-SR7A FIRE TANK
883-4-S09-S03Z-CN12-RCC-SH-UTC-MF-05-3020-(2-3)-SR7A FIRE TANK
Sherif Azab
 
M10-B2-03
M10-B2-03M10-B2-03
Document Transmittal form of a construction
Document Transmittal form of a constructionDocument Transmittal form of a construction
Document Transmittal form of a construction
ZumraOzdemir
 
Qais Abbas
Qais AbbasQais Abbas
Qais Abbas
Qais Abbas
 
CV Ahmed Site
CV Ahmed SiteCV Ahmed Site
CV Ahmed Site
Ahmed Shaheen
 
SCHEMATIC DESIGN_JAFARI_02.26.2014
SCHEMATIC DESIGN_JAFARI_02.26.2014SCHEMATIC DESIGN_JAFARI_02.26.2014
SCHEMATIC DESIGN_JAFARI_02.26.2014
Morales, Juan R.
 
Eduardo updated NEW CV
Eduardo updated NEW CVEduardo updated NEW CV
Eduardo updated NEW CV
Eduardo Macrohon
 
Detailed resume
Detailed resumeDetailed resume
Detailed resume
chandan kumar
 
At of modern building which create abvolated view
At of modern building which create abvolated viewAt of modern building which create abvolated view
At of modern building which create abvolated view
dreem073
 
CV - HV-1
CV - HV-1CV - HV-1
CV - HV-1
Herman Victor
 
NASHAT_CV updated FOR NOORS
NASHAT_CV updated FOR NOORSNASHAT_CV updated FOR NOORS
NASHAT_CV updated FOR NOORS
Nshaat Hafez
 
Oberoi Hotel
Oberoi HotelOberoi Hotel
Oberoi Hotel
Scott Campbell
 
MAYAD_RAZOOK_CV__2022.pdf
MAYAD_RAZOOK_CV__2022.pdfMAYAD_RAZOOK_CV__2022.pdf
MAYAD_RAZOOK_CV__2022.pdf
mayadrazook1
 
04-2016
04-201604-2016

Similar to BASEMENT FIRE PROTECTION LAYOUT-SECTOR-2 (20)

5th FLOOR HVAC LAYOUT-SECTOR-2
5th FLOOR HVAC LAYOUT-SECTOR-25th FLOOR HVAC LAYOUT-SECTOR-2
5th FLOOR HVAC LAYOUT-SECTOR-2
 
5th FLOOR HVAC LAYOUT-SECTOR 1
5th FLOOR HVAC LAYOUT-SECTOR 15th FLOOR HVAC LAYOUT-SECTOR 1
5th FLOOR HVAC LAYOUT-SECTOR 1
 
BASEMENT DRAINAGE LAYOUT-SECTOR-2
BASEMENT DRAINAGE LAYOUT-SECTOR-2BASEMENT DRAINAGE LAYOUT-SECTOR-2
BASEMENT DRAINAGE LAYOUT-SECTOR-2
 
House Shaw Floorplan Final 03
House Shaw Floorplan Final 03House Shaw Floorplan Final 03
House Shaw Floorplan Final 03
 
883-4-S10-P10S-CN12-RCC-SH-TYP-MF-04-1010_01
883-4-S10-P10S-CN12-RCC-SH-TYP-MF-04-1010_01883-4-S10-P10S-CN12-RCC-SH-TYP-MF-04-1010_01
883-4-S10-P10S-CN12-RCC-SH-TYP-MF-04-1010_01
 
883-4-S09-S03Z-CN12-RCC-SH-UTC-MF-05-3020-(1-3)-SR7A FIRE TANK
883-4-S09-S03Z-CN12-RCC-SH-UTC-MF-05-3020-(1-3)-SR7A FIRE TANK883-4-S09-S03Z-CN12-RCC-SH-UTC-MF-05-3020-(1-3)-SR7A FIRE TANK
883-4-S09-S03Z-CN12-RCC-SH-UTC-MF-05-3020-(1-3)-SR7A FIRE TANK
 
883-4-S09-S03Z-CN12-RCC-SH-UTC-MF-05-3020-(2-3)-SR7A FIRE TANK
883-4-S09-S03Z-CN12-RCC-SH-UTC-MF-05-3020-(2-3)-SR7A FIRE TANK883-4-S09-S03Z-CN12-RCC-SH-UTC-MF-05-3020-(2-3)-SR7A FIRE TANK
883-4-S09-S03Z-CN12-RCC-SH-UTC-MF-05-3020-(2-3)-SR7A FIRE TANK
 
M10-B2-03
M10-B2-03M10-B2-03
M10-B2-03
 
Document Transmittal form of a construction
Document Transmittal form of a constructionDocument Transmittal form of a construction
Document Transmittal form of a construction
 
Qais Abbas
Qais AbbasQais Abbas
Qais Abbas
 
CV Ahmed Site
CV Ahmed SiteCV Ahmed Site
CV Ahmed Site
 
SCHEMATIC DESIGN_JAFARI_02.26.2014
SCHEMATIC DESIGN_JAFARI_02.26.2014SCHEMATIC DESIGN_JAFARI_02.26.2014
SCHEMATIC DESIGN_JAFARI_02.26.2014
 
Eduardo updated NEW CV
Eduardo updated NEW CVEduardo updated NEW CV
Eduardo updated NEW CV
 
Detailed resume
Detailed resumeDetailed resume
Detailed resume
 
At of modern building which create abvolated view
At of modern building which create abvolated viewAt of modern building which create abvolated view
At of modern building which create abvolated view
 
CV - HV-1
CV - HV-1CV - HV-1
CV - HV-1
 
NASHAT_CV updated FOR NOORS
NASHAT_CV updated FOR NOORSNASHAT_CV updated FOR NOORS
NASHAT_CV updated FOR NOORS
 
Oberoi Hotel
Oberoi HotelOberoi Hotel
Oberoi Hotel
 
MAYAD_RAZOOK_CV__2022.pdf
MAYAD_RAZOOK_CV__2022.pdfMAYAD_RAZOOK_CV__2022.pdf
MAYAD_RAZOOK_CV__2022.pdf
 
04-2016
04-201604-2016
04-2016
 

More from MAHENDRAN Mahalingam

M10-B2-02
M10-B2-02M10-B2-02
M10-B2-01
M10-B2-01M10-B2-01
M10-T1-01-Layout1
M10-T1-01-Layout1M10-T1-01-Layout1
M10-T1-01-Layout1
MAHENDRAN Mahalingam
 
Mahendran CV
Mahendran CVMahendran CV
Mahendran CV
MAHENDRAN Mahalingam
 
BASEMENT PLUMBING LAYOUT-SECTOR-2
BASEMENT PLUMBING LAYOUT-SECTOR-2BASEMENT PLUMBING LAYOUT-SECTOR-2
BASEMENT PLUMBING LAYOUT-SECTOR-2
MAHENDRAN Mahalingam
 
BASEMENT PLUMBING LAYOUT-SECTOR 1
BASEMENT PLUMBING LAYOUT-SECTOR 1BASEMENT PLUMBING LAYOUT-SECTOR 1
BASEMENT PLUMBING LAYOUT-SECTOR 1
MAHENDRAN Mahalingam
 
Mahendran cv
Mahendran cvMahendran cv
Mahendran cv
MAHENDRAN Mahalingam
 

More from MAHENDRAN Mahalingam (7)

M10-B2-02
M10-B2-02M10-B2-02
M10-B2-02
 
M10-B2-01
M10-B2-01M10-B2-01
M10-B2-01
 
M10-T1-01-Layout1
M10-T1-01-Layout1M10-T1-01-Layout1
M10-T1-01-Layout1
 
Mahendran CV
Mahendran CVMahendran CV
Mahendran CV
 
BASEMENT PLUMBING LAYOUT-SECTOR-2
BASEMENT PLUMBING LAYOUT-SECTOR-2BASEMENT PLUMBING LAYOUT-SECTOR-2
BASEMENT PLUMBING LAYOUT-SECTOR-2
 
BASEMENT PLUMBING LAYOUT-SECTOR 1
BASEMENT PLUMBING LAYOUT-SECTOR 1BASEMENT PLUMBING LAYOUT-SECTOR 1
BASEMENT PLUMBING LAYOUT-SECTOR 1
 
Mahendran cv
Mahendran cvMahendran cv
Mahendran cv
 

BASEMENT FIRE PROTECTION LAYOUT-SECTOR-2

  • 1. FHC ZCV FHC N6 N7 N8 N9 N11 N13 S6 S7 S8 S9 S10 S11 N10 N12 ? IRRIGATION TANKS GARBAGE ROOM ? ? STORE P3 F1 AHU - FAN ROOM FIRE WATER TANK 230m3 ? DATA ? ? ELEC STORE AHU - FAN ROOM STORE STORE STORE STORE STORE STORE ? ? ? ? ELV EQUIPMENT ? / FORCONTINUATIONREFERTO DWGNO:1M41-B1-01 FHPFHP Project Manager : Drawn : Date : Drawing Title : Scale : Project No : Key Plan : North: Notes : Stamp: TrueNorth DN Project Name & Location: Lead Consultant : Dubai, U.A.E. info.international@norr.com Tel : 04-3544439 Fax : 04-3544900 ARCHITECTS ENGINEERS PLANNERS NORR Group Consultants International Limited P.O. Box: 53150 P.O. Box: 44387 Abu Dhabi, U.A.E. info.international@norr.com Tel : 02-6763360 Fax : 02-6763361 Owner Name: Local Consultant (Architect of Record) : A J D A N R E A L E S T A T E CIVILIZATION ENGINEERING CONSULTING OFFICE P.O. BOX 3974 Dammam K.S.A. Telephone: 03 8336991 FAX: 03 8337441 Website: www.civilization.com.sa AJDAN WATERFRONT PARCEL ID : A1 PLAN NO. : 356/2 AL KHOBAR KINGDOM OF SAUDI ARABIA Project Description : AJDAN WATERFRONT PARCEL-A1 DEVELOPMENT 1303 - PA1 - TD Drawing No. : 1 : 100 2/28/20164:21:39PMC:RevitLocal FilesFCDB-140052-AJDANM_FCDB14-0052_AJDAN_WATER_FRONT_KSA_mmahalingam.rvt M41-B1-02 BASEMENT LEVEL B1 FIRE PROTECTION LAYOUT-SECTOR 2 FCDB150123 Mahendran B.M. 1 : 100 BASEMENT FIRE PROTECTION LAYOUT-SECTOR 21 No. Issued For Date Checked