1 | P a g e
MAYAD RAZOOK
Senior Technical Architect
Dubai, United Arab Emirates.
Mobile: +971 56 3208849
Nationality: Syrian
Date of Birth: 01-09-1988
Visa Type: Employer Visa (transportable)
Email: mayadrazook@gmail.com
Website: https://www.behance.net/mayadrazook
LinkedIn: https://www.linkedin.com/in/mayad-razook-2219128a/
OBJECTIVE
I am Senior Technical Architect engineer, more than 10 years’ Experience in UAE
hardworking, traveling, training and developing I see myself as a qualified candidate for
most of Architectural & structural Technical engineering.
QUALIFICATIONS
- Handling and managing shop drawings for Dubai municipality projects, ensuring that
designs and concepts are 100 percent accurate as per client’s needs based on
Authorities’ Rules and Standards (DCD, DEWA, RTA, ADEC, DEWA, Dubai Universal
Code,Dubai Municipality Requirements, etc.
- Prepare and submit material submittal for project as per green building requirements
and follow up with consultant and client up to approval.
- Organize, Administrate, and supervise the design and supervision processes.
- Supervised the project implementation and professionally coached and managed the
execution team on site.
- Liaise with the Authorities, Clients, third parties, and Contractors. - Monitor
implementation of the Project Delivery (MIR).
- Responsible for preparation and day-today implementation and updating of the
Project Execution Plan.
- Coordinate all the design and works related t
othe projects between the different
stakeholders including internal Project Team.
- Prepare various progress reports (quantities) for the Projects Manager's review.
- LEED GA Certificate
2 | P a g e
(WORK EXPERIENCE)
BINLADIN CONTRACTIONG GROUP.
Technical Architect
6th
August 2014-Present
 Prepare details drawings for different shop drawings (block works, tiles. false ceiling,
External Cladding, hardscape and landscape, all details).
 Coordinate between structural, MEP and architectural drawings prepare as built
drawings by visit site, take site measurement, and Solve site mismatch using many
of engineering programs like Revit, Auto Cad, sketch up & others.
 Coordinating site's works and following up QAQC reports for Turner representatives.
• Supervised the project implementation and professionally coached and managed the
1 execution team on site.
• Supervising reinforced steel and molding concrete works.
 Attends meeting with lead designers, subcontractors and suppliers to coordinate
work progress and confirming timetable requirements.
 Site's inspection for major structural / Architectural elements.
 Writing formal letters, RFl's and e-mails.
PROJECTS
1. Project Name: DUBAI SAFARI-SAFARI VILLAGE (2014)
Client Name: DUBAI MUNICIPLITY
Consultant: Alturath Engineering Consultant
location: Al Warqa 5 in Alaweer Road
Dubai Safari Park is 119 hectares of the total area. The project designed and built as per
Green Building requirements.
The project consists of 55 buildings, 25 water bodies, artificial rocks, Moats and multi-
itemsin hard and landscape area.
2. Project Name: DUBAI SAFARI- AFRICAN VILLAGE (2015)
Client Name: DUBAI MUNICIPLITY
Consultant: Alturath Engineering Consultant
The project consists of 58 buildings, 20 water bodies, artificial rocks, Moats and multi-items
inhard and landscape area.
3. Project Name: DUBAI SAFARI-Arabian and Asian village (2016)
Client Name: DUBAI MUNICIPLITY
Consultant: Alturath Engineering Consultant
3 | P a g e
The project consists of 9 buildings, 7 water bodies artificial rocks, Moats and multi-items
inhard and landscape area.
4. Project Name: DUBAI SAFARI- Kids Farm (2016)
Client Name: DUBAI MUNICIPLITY
Consultant: Alturath Engineering Consultant
The project Consist of 10 buildings, 3 water bodies multi items in hard and landscape area.
5. Project Name: DUBAI SAFARI- Wadi Area (2016)
Client Name: DUBAI MUNICIPLITY
Consultant: Alturath Engineering Consultant
The project Consist of three Restaurants (G+1), Pergolas, shades, and multi items in hard and
landscape area.
6. Project Name: DUBAI SAFARI- Main Entrance building (2016-2017)
Client Name: DUBAI MUNICIPLITY
Consultant: Alturath Engineering Consultant
The project Consist of (G+2) Floors, 3 service buildings, water bodies and artificial rocks and
multi-items in hard landscape area.
7. Project Name: LABOUR COURT PROJECT (2017-2019)
Client Name: DUBAI MUNICIPLITY
Consultant: ALGURG Engineering Consultant
Location: Plot No. 8143131, Al Rowaiyah Third, Dubai
Approximate built up area of 40,000 square meter the Project consist of B+G+4+R Floors ,
consisting of Offices, Court hall, Conference room, Library, Cafeteria, Service Blocks,
Interlock paved area for Driveway/Parking/Pedestrian etc.
The project designed and built as per Green Building requirements.
8. Project Name: DEVELOPMENT PUBLIC BUS STATIONS (2019-2020)
Client Name: RTA
Consultant: Golden Square Engineering
Location: AlGhubaiba, Union, ALkifaf, AlQsais, BusinessBay-02, silicon,
International city & Palm Jumeirah Bus stations
Bus Stations Consist of Modern Buildings, Bus, and Taxi Parking’s in different Area and
Different Design.
9. Project Name: Hatta Reservoir water tank (2021-2023)
Client Name: DEWA
Consultant: MEINHARDT Engineering Consultant
Location: Hatta, Dubai
4 | P a g e
10. Project Name: 1133 ENOC Patrol stations (2021-2022)
Client Name: ENOC
Consultant: BHNS Engineering Consultant
Location: AlRumaitha - Sharjah
11. Project Name: 1153 ENOC Patrol stations (2021-2022)
Client Name: ENOC
Consultant: AlGURG Engineering Consultant
Location: Al Butaina – Sharjah
12. Project Name: Meydan Mohamad Bin Rashid city -District one (2021-2022)
Client Name: Mohamad Bin Rashid city
Management Consultant: Turner
Consultant: Parsons Engineering Consultant
Location: Maydan, Dubai
Lines and Dimensions Engineering Consultants, LLC.
Design Architect
18th
December 2012- 6th
August 2014
 In-charge in conceptualizing designs and space planning of residential and
commercial projects.
 Completing Working Drawings,
 3D Modeling Perspectives and Animations
 Conceptualizing Landscape designs
 Setting up and attending meeting with Clients and Contractors;
 Conducting site visits to ensure that Engineers and Contractors are working
according on our design plan.
 Responsible in modifications and revisions of Working Drawings.
 Receiving and sending client-based emails
 BOQ’s
 In-charge in ESTIDAMA working drawings and coordinating with PQP Consultants
 In-charge in checking and uploading of DOT drawings;
 In-charge in Working Drawings of ADCD based on UAE Civil Defense rules and
standards
 In-charge in checking and uploading of working drawings to ADM Systems
 In-charge in helping with MEPs working drawings
 Coordinating with Structural Engineers to maintain every architectural design
standard.
5 | P a g e
PROJECTS
1. Project Name: Al Tharawat National Private School
Client Name: Dr. Almundai Abu Baker Alafifi
Contact No: 0506135150
Contractor: Al Bakri Gen. Contracting and Maintainance LLC
2. Project Name: Residential Villa
Location: Khalifa A, SE 40, Plot 19
Contact No: 050 441 2664
Contractor: Pluto Construction & Building
3. Project Name: Commercial Building
Location: Moh'd Bin Zayed, ME 10, Plot C40
Client Name: Saeed Al Muheri
Contact No.: 050 441 2664
4. Project Name: Residential Villa
Location: Khalifa B, MFW 22, Plot 105
Client Name: Dr. Nawal Al Hosany
Contact No.: 050 668 0768 | 050 723 1311
Contractor: Al Shaden Gen. Cont. LLC
5. Project Name: Al Gurm Retail Centre
Location: Abu Dhabi, W 62, Plot 30
Client Name: Al Dar Al Shafi (Investor)
Contact No. Raj 050 123 3119
Contractor: Annex Shafco Cont. & Gen. Maint.
6. Project Name: Residential Villa
Location: Moh'd Bin Zayed, Z 6, Plot 63
Client Name: Moh'd Jumaa Al Suwaidi
Contact No.: 050 824 5852
Contractor: Yerevan Gen. Cont. & Electromechanical
7. Project Name: Al Mariya Mosque
Location: Khalifa A, SW 3, Plot 1
Client Name: Al Mariya
8. Project Name: Al Sorouh American School
Location: Khalifa B, MFW 21, Plot 1
Contractor: Sarfraz Kbar Ali Gen. Cont.
9. Project Name: Al Reem Villa
Location: Al Reem Island, RR 4, Plot 2
Client Name: Reem Developers
6 | P a g e
10. Project Name: Residential Villa
Location: Shamkha, SH 24, Plot 46
Client Name: Hussain Ahmed Ibrahim Salem Al Housany
Contractor: Pluto Construction & Building
11. Project Name: Residential Villa
Client Name: Ahmad Habeeb Taher Al Hashemi
Location: Moh'd Bin Zayed, Z 18, Plot 36b
Contractor: Jamal Al Lail Cont. & Gen. Maint. LLC
12. Project Name: Residential Villa
Location: Khalifa A, SE 25, Plot 31a
Client Name: Farida Al Manzouki
Contractor: Dar Al Manar Gen. Cont. & Maint.
Other Projects: Residential Buildings Family Villas in Local Subdivisions
OBE Architects:
Project Manager
1st
December 2020- 1st
April 2021
• Supervised the project implementation and professionally coached and managed the
execution team on site.
 Prepare work program for whole period of project
 Ensure each item to comply on time.
 Ensure design drawings to match site 100 %.
 Coordinating site's works and following up QAQC reports for Turner representatives.
 Coordinate with all subcontractors to works together and solve their problems
 Release the payments for Subcontractor as per the progress at site.
PROJECTS
13. Project Name: Meatz chicken Restaurant (2021)
14. Client Name: 800 food/ Majid AL Futtaim
Consultant: OBE Architects Consultant
location: Al Zahia city center / 2nd
floor
The project consists a big dining area, kitchen, shopfront and store
7 | P a g e
SOFTWARES
 Autodesk AutoCAD 2022 (2D & 3D)
 Autodesk 3DsMax+vray 2022
 Autodesk REVIT 2022
 Adobe Photoshop CS6
 Lumion Version 11.0 (3D Animation)
 Microsoft Office 2019 ( Excel , word & Power point)
 Microsoft MS Project
EDUCATION
• Bachelor in Architectural Engineering [2012] with aggregate of 71.33 from Aleppo
University.
• Master in Regional Planning from ALEPPO University.
• UAE Driving License. P
• Member in UAE Society Engineering
• Equalized bachelor Degree from Ministry of Education, UAE.
• LEED Green Associate (GA )
Ask when needed.
REFERENCES

MAYAD_RAZOOK_CV__2022.pdf

  • 1.
    1 | Pa g e MAYAD RAZOOK Senior Technical Architect Dubai, United Arab Emirates. Mobile: +971 56 3208849 Nationality: Syrian Date of Birth: 01-09-1988 Visa Type: Employer Visa (transportable) Email: mayadrazook@gmail.com Website: https://www.behance.net/mayadrazook LinkedIn: https://www.linkedin.com/in/mayad-razook-2219128a/ OBJECTIVE I am Senior Technical Architect engineer, more than 10 years’ Experience in UAE hardworking, traveling, training and developing I see myself as a qualified candidate for most of Architectural & structural Technical engineering. QUALIFICATIONS - Handling and managing shop drawings for Dubai municipality projects, ensuring that designs and concepts are 100 percent accurate as per client’s needs based on Authorities’ Rules and Standards (DCD, DEWA, RTA, ADEC, DEWA, Dubai Universal Code,Dubai Municipality Requirements, etc. - Prepare and submit material submittal for project as per green building requirements and follow up with consultant and client up to approval. - Organize, Administrate, and supervise the design and supervision processes. - Supervised the project implementation and professionally coached and managed the execution team on site. - Liaise with the Authorities, Clients, third parties, and Contractors. - Monitor implementation of the Project Delivery (MIR). - Responsible for preparation and day-today implementation and updating of the Project Execution Plan. - Coordinate all the design and works related t othe projects between the different stakeholders including internal Project Team. - Prepare various progress reports (quantities) for the Projects Manager's review. - LEED GA Certificate
  • 2.
    2 | Pa g e (WORK EXPERIENCE) BINLADIN CONTRACTIONG GROUP. Technical Architect 6th August 2014-Present  Prepare details drawings for different shop drawings (block works, tiles. false ceiling, External Cladding, hardscape and landscape, all details).  Coordinate between structural, MEP and architectural drawings prepare as built drawings by visit site, take site measurement, and Solve site mismatch using many of engineering programs like Revit, Auto Cad, sketch up & others.  Coordinating site's works and following up QAQC reports for Turner representatives. • Supervised the project implementation and professionally coached and managed the 1 execution team on site. • Supervising reinforced steel and molding concrete works.  Attends meeting with lead designers, subcontractors and suppliers to coordinate work progress and confirming timetable requirements.  Site's inspection for major structural / Architectural elements.  Writing formal letters, RFl's and e-mails. PROJECTS 1. Project Name: DUBAI SAFARI-SAFARI VILLAGE (2014) Client Name: DUBAI MUNICIPLITY Consultant: Alturath Engineering Consultant location: Al Warqa 5 in Alaweer Road Dubai Safari Park is 119 hectares of the total area. The project designed and built as per Green Building requirements. The project consists of 55 buildings, 25 water bodies, artificial rocks, Moats and multi- itemsin hard and landscape area. 2. Project Name: DUBAI SAFARI- AFRICAN VILLAGE (2015) Client Name: DUBAI MUNICIPLITY Consultant: Alturath Engineering Consultant The project consists of 58 buildings, 20 water bodies, artificial rocks, Moats and multi-items inhard and landscape area. 3. Project Name: DUBAI SAFARI-Arabian and Asian village (2016) Client Name: DUBAI MUNICIPLITY Consultant: Alturath Engineering Consultant
  • 3.
    3 | Pa g e The project consists of 9 buildings, 7 water bodies artificial rocks, Moats and multi-items inhard and landscape area. 4. Project Name: DUBAI SAFARI- Kids Farm (2016) Client Name: DUBAI MUNICIPLITY Consultant: Alturath Engineering Consultant The project Consist of 10 buildings, 3 water bodies multi items in hard and landscape area. 5. Project Name: DUBAI SAFARI- Wadi Area (2016) Client Name: DUBAI MUNICIPLITY Consultant: Alturath Engineering Consultant The project Consist of three Restaurants (G+1), Pergolas, shades, and multi items in hard and landscape area. 6. Project Name: DUBAI SAFARI- Main Entrance building (2016-2017) Client Name: DUBAI MUNICIPLITY Consultant: Alturath Engineering Consultant The project Consist of (G+2) Floors, 3 service buildings, water bodies and artificial rocks and multi-items in hard landscape area. 7. Project Name: LABOUR COURT PROJECT (2017-2019) Client Name: DUBAI MUNICIPLITY Consultant: ALGURG Engineering Consultant Location: Plot No. 8143131, Al Rowaiyah Third, Dubai Approximate built up area of 40,000 square meter the Project consist of B+G+4+R Floors , consisting of Offices, Court hall, Conference room, Library, Cafeteria, Service Blocks, Interlock paved area for Driveway/Parking/Pedestrian etc. The project designed and built as per Green Building requirements. 8. Project Name: DEVELOPMENT PUBLIC BUS STATIONS (2019-2020) Client Name: RTA Consultant: Golden Square Engineering Location: AlGhubaiba, Union, ALkifaf, AlQsais, BusinessBay-02, silicon, International city & Palm Jumeirah Bus stations Bus Stations Consist of Modern Buildings, Bus, and Taxi Parking’s in different Area and Different Design. 9. Project Name: Hatta Reservoir water tank (2021-2023) Client Name: DEWA Consultant: MEINHARDT Engineering Consultant Location: Hatta, Dubai
  • 4.
    4 | Pa g e 10. Project Name: 1133 ENOC Patrol stations (2021-2022) Client Name: ENOC Consultant: BHNS Engineering Consultant Location: AlRumaitha - Sharjah 11. Project Name: 1153 ENOC Patrol stations (2021-2022) Client Name: ENOC Consultant: AlGURG Engineering Consultant Location: Al Butaina – Sharjah 12. Project Name: Meydan Mohamad Bin Rashid city -District one (2021-2022) Client Name: Mohamad Bin Rashid city Management Consultant: Turner Consultant: Parsons Engineering Consultant Location: Maydan, Dubai Lines and Dimensions Engineering Consultants, LLC. Design Architect 18th December 2012- 6th August 2014  In-charge in conceptualizing designs and space planning of residential and commercial projects.  Completing Working Drawings,  3D Modeling Perspectives and Animations  Conceptualizing Landscape designs  Setting up and attending meeting with Clients and Contractors;  Conducting site visits to ensure that Engineers and Contractors are working according on our design plan.  Responsible in modifications and revisions of Working Drawings.  Receiving and sending client-based emails  BOQ’s  In-charge in ESTIDAMA working drawings and coordinating with PQP Consultants  In-charge in checking and uploading of DOT drawings;  In-charge in Working Drawings of ADCD based on UAE Civil Defense rules and standards  In-charge in checking and uploading of working drawings to ADM Systems  In-charge in helping with MEPs working drawings  Coordinating with Structural Engineers to maintain every architectural design standard.
  • 5.
    5 | Pa g e PROJECTS 1. Project Name: Al Tharawat National Private School Client Name: Dr. Almundai Abu Baker Alafifi Contact No: 0506135150 Contractor: Al Bakri Gen. Contracting and Maintainance LLC 2. Project Name: Residential Villa Location: Khalifa A, SE 40, Plot 19 Contact No: 050 441 2664 Contractor: Pluto Construction & Building 3. Project Name: Commercial Building Location: Moh'd Bin Zayed, ME 10, Plot C40 Client Name: Saeed Al Muheri Contact No.: 050 441 2664 4. Project Name: Residential Villa Location: Khalifa B, MFW 22, Plot 105 Client Name: Dr. Nawal Al Hosany Contact No.: 050 668 0768 | 050 723 1311 Contractor: Al Shaden Gen. Cont. LLC 5. Project Name: Al Gurm Retail Centre Location: Abu Dhabi, W 62, Plot 30 Client Name: Al Dar Al Shafi (Investor) Contact No. Raj 050 123 3119 Contractor: Annex Shafco Cont. & Gen. Maint. 6. Project Name: Residential Villa Location: Moh'd Bin Zayed, Z 6, Plot 63 Client Name: Moh'd Jumaa Al Suwaidi Contact No.: 050 824 5852 Contractor: Yerevan Gen. Cont. & Electromechanical 7. Project Name: Al Mariya Mosque Location: Khalifa A, SW 3, Plot 1 Client Name: Al Mariya 8. Project Name: Al Sorouh American School Location: Khalifa B, MFW 21, Plot 1 Contractor: Sarfraz Kbar Ali Gen. Cont. 9. Project Name: Al Reem Villa Location: Al Reem Island, RR 4, Plot 2 Client Name: Reem Developers
  • 6.
    6 | Pa g e 10. Project Name: Residential Villa Location: Shamkha, SH 24, Plot 46 Client Name: Hussain Ahmed Ibrahim Salem Al Housany Contractor: Pluto Construction & Building 11. Project Name: Residential Villa Client Name: Ahmad Habeeb Taher Al Hashemi Location: Moh'd Bin Zayed, Z 18, Plot 36b Contractor: Jamal Al Lail Cont. & Gen. Maint. LLC 12. Project Name: Residential Villa Location: Khalifa A, SE 25, Plot 31a Client Name: Farida Al Manzouki Contractor: Dar Al Manar Gen. Cont. & Maint. Other Projects: Residential Buildings Family Villas in Local Subdivisions OBE Architects: Project Manager 1st December 2020- 1st April 2021 • Supervised the project implementation and professionally coached and managed the execution team on site.  Prepare work program for whole period of project  Ensure each item to comply on time.  Ensure design drawings to match site 100 %.  Coordinating site's works and following up QAQC reports for Turner representatives.  Coordinate with all subcontractors to works together and solve their problems  Release the payments for Subcontractor as per the progress at site. PROJECTS 13. Project Name: Meatz chicken Restaurant (2021) 14. Client Name: 800 food/ Majid AL Futtaim Consultant: OBE Architects Consultant location: Al Zahia city center / 2nd floor The project consists a big dining area, kitchen, shopfront and store
  • 7.
    7 | Pa g e SOFTWARES  Autodesk AutoCAD 2022 (2D & 3D)  Autodesk 3DsMax+vray 2022  Autodesk REVIT 2022  Adobe Photoshop CS6  Lumion Version 11.0 (3D Animation)  Microsoft Office 2019 ( Excel , word & Power point)  Microsoft MS Project EDUCATION • Bachelor in Architectural Engineering [2012] with aggregate of 71.33 from Aleppo University. • Master in Regional Planning from ALEPPO University. • UAE Driving License. P • Member in UAE Society Engineering • Equalized bachelor Degree from Ministry of Education, UAE. • LEED Green Associate (GA ) Ask when needed. REFERENCES