8 9 11 12 13 14
H
G
E
C
B
A
T2.2 T2.3
T2.1 T2.4
XA
Z2
/
FORCONTINUATIONREFERTO
DWGNO:1M10-B2-03
D
WP
WP
WP
WP
WP
WP
WP
WP
WP
WP
WP
WP WP
WP
WP WP
WP
WP
WP
WP
WP
WP
WP
WP
WP
WP
WP WP
WP
WP
WP
WP
WP
WP
WPWP
WP
WP
WP
WP
WP
WP
WP
WP
WP
WP
FCO
AD
AD
WP F/A
WP F/A
AD
FCO
AD AD
WP F/A
AD
WP F/A
CO
FCO
FFD
FFD
FFD
FFD
FCO
WP F/A
WP F/A
SAND INTERCEPTOR
OIL INTERCEPTOR
SUMP PIT
FCO
FCO
FFD
FFD
FCO
LIFT SUMP PIT
1NO SUBMERSIBLE
PUMP
WP PUMPING LINE
FFD
FFD
FCO
FFD
FFD
FCOWP
WP F/A
AD
AD
AD
WP F/A
WP F/A WP F/A
WP F/A
AD
FCO
WP F/A
FFD
AREA DRAIN (TYP)
F
T3.A
Project
Manager :
Drawn :
Date :
Drawing Title :
Scale :
Project No :
Key Plan :
North:
Client :
Notes :
Stamp:
True
North
DN
Package
No. Originator Plot Bldg. Level Discipline File
BP25-09 NOR A1 01
DWG
Status :
Project Name & Location:
BP25-09-D-00
Plot: A1-SEEF LUSAIL DEVELOPMENT DOHA,QATAR
RESIDENTIAL DEVELOPMENT
AT LUSAIL
Lead Consultant :
Project Manager :
Sub Consultant :
DWG
Dubai, U.A.E.
info.international@norr.com
Tel : 04-3544439
Fax : 04-3544900
ARCHITECTS ENGINEERS PLANNERS
NORR Group Consultants
International Limited
P.O. Box: 53150
P.O. Box: 44387
Abu Dhabi, U.A.E.
info.international@norr.com
Tel : 02-6763360
Fax : 02-6763361
This drawing has been prepared solely for
the use of LUSAIL CITY
and there are no representations of any kind made by
N.G.C.I. Ltd to any party with whom N.G.C.I. Ltd has not
entered into a contract.
1 : 100
3/24/20167:02:53PM
C:RevitLocalFilesFCDB-150123-LUSAILM_FCDB15-0123_LUSAIL_00_sjohn.rvt
100% SCHEMATIC DESIGN
M10-B2-02
15/MAR/16
BASEMENT LEVEL B2 DRAINAGE
LAYOUT SECTOR-02
FCDB150123
M.M
B.M.
B2 MC
No. Issued For Date Checked
A 100% SCHEMATIC DESIGN 24 MAR 16 K.T

M10-B2-02

  • 1.
    8 9 1112 13 14 H G E C B A T2.2 T2.3 T2.1 T2.4 XA Z2 / FORCONTINUATIONREFERTO DWGNO:1M10-B2-03 D WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WP WPWP WP WP WP WP WP WP WP WP WP WP FCO AD AD WP F/A WP F/A AD FCO AD AD WP F/A AD WP F/A CO FCO FFD FFD FFD FFD FCO WP F/A WP F/A SAND INTERCEPTOR OIL INTERCEPTOR SUMP PIT FCO FCO FFD FFD FCO LIFT SUMP PIT 1NO SUBMERSIBLE PUMP WP PUMPING LINE FFD FFD FCO FFD FFD FCOWP WP F/A AD AD AD WP F/A WP F/A WP F/A WP F/A AD FCO WP F/A FFD AREA DRAIN (TYP) F T3.A Project Manager : Drawn : Date : Drawing Title : Scale : Project No : Key Plan : North: Client : Notes : Stamp: True North DN Package No. Originator Plot Bldg. Level Discipline File BP25-09 NOR A1 01 DWG Status : Project Name & Location: BP25-09-D-00 Plot: A1-SEEF LUSAIL DEVELOPMENT DOHA,QATAR RESIDENTIAL DEVELOPMENT AT LUSAIL Lead Consultant : Project Manager : Sub Consultant : DWG Dubai, U.A.E. info.international@norr.com Tel : 04-3544439 Fax : 04-3544900 ARCHITECTS ENGINEERS PLANNERS NORR Group Consultants International Limited P.O. Box: 53150 P.O. Box: 44387 Abu Dhabi, U.A.E. info.international@norr.com Tel : 02-6763360 Fax : 02-6763361 This drawing has been prepared solely for the use of LUSAIL CITY and there are no representations of any kind made by N.G.C.I. Ltd to any party with whom N.G.C.I. Ltd has not entered into a contract. 1 : 100 3/24/20167:02:53PM C:RevitLocalFilesFCDB-150123-LUSAILM_FCDB15-0123_LUSAIL_00_sjohn.rvt 100% SCHEMATIC DESIGN M10-B2-02 15/MAR/16 BASEMENT LEVEL B2 DRAINAGE LAYOUT SECTOR-02 FCDB150123 M.M B.M. B2 MC No. Issued For Date Checked A 100% SCHEMATIC DESIGN 24 MAR 16 K.T