Successfully reported this slideshow.
We use your LinkedIn profile and activity data to personalize ads and to show you more relevant ads. You can change your ad preferences anytime.

Beaufort-Sector1-Charrette-FinalPresentation

1,983 views

Published on

This is the original version of the final presentation, given March 28, 2011 at City Hall Council Chambers.

Published in: Design
  • Be the first to comment

  • Be the first to like this

Beaufort-Sector1-Charrette-FinalPresentation

  1. 14. Downtown & Marina Plan
  2. 15. Spot Improvements to Enhance the Pedestrian Experience
  3. 16. Spot Building Improvements to Add Color and Interest
  4. 17. Conceptual Marina Area Plan
  5. 18. Proposed View of the Future Redevelopment of the Marina
  6. 19. View Looking West Along Bay Street with a Terminating Vista
  7. 20. Proposed Parking Deck and Liner Buildings
  8. 21. Liner Buildings Around the Parking Deck on Craven Street
  9. 22. Parking Deck Liner Buildings Along Craven Street
  10. 23. Parking Deck Liner Buildings Along Port Republic Street
  11. 24. Proposed Infill Along Port Republic Street
  12. 25. Conceptual Redevelopment of the Post Office Block
  13. 26. Waterfront Park Extension Boardwalk
  14. 27. Proposed Boardwalk Along Bay Street at Bladen Street
  15. 28. Waterfront Plan
  16. 29. Whitehall Plan
  17. 30. Conceptual Plan of Whitehall
  18. 31. Mixed Use Infill Carteret St
  19. 32. Façade Improvement for the Von Harten Building
  20. 33. City Hall photo
  21. 34. USCB Plan
  22. 35. Conceptual Build-out of the USC-Beaufort Campus
  23. 36. View of Bellamy Curve Looking Southwest
  24. 37. Small Increment Student Housing in Mansion House Buildings
  25. 38. Cuthbert Street Plans
  26. 39. Conceptual Artist-led Neighborhood in Higgonsonville
  27. 40. Shared Studio/Gallery Space in Artist’s Cluster
  28. 41. National Street Infill
  29. 42. Conceptual Bungalow Court in Pigeon Point & Higgonsonville
  30. 43. Ribaut Road, Piggly Wiggly, and Boundary Street Plans
  31. 44. Conceptual Piggly Wiggly Store Anchoring a Redeveloped Center
  32. 45. Bladen Street Infill
  33. 46. Conceptual Senior Housing and Infill at Bladen and Bay
  34. 47. The Old Jail District
  35. 48. Infill Development around the Old Jail
  36. 49. Existing Urban Fabric
  37. 50. Existing Urban Fabric
  38. 51. Phase 1 Infill and Redevelopment (1-10 Years)
  39. 52. New Infill and Redevelopment (11-30 Years)
  40. 53. Full Build-Out with Green Infrastructure
  41. 54. Green Infrastructure
  42. 55. Existing Urban Fabric
  43. 56. Full Build-Out (30 Year Plan)
  44. 57. Regional Greenway System
  45. 58. Regional Water Taxi System
  46. 59. Regional Rail-Trail
  47. 60. Regional Transit System
  48. 61. Pedestrian and Bicycle Circulation Plan
  49. 62. Pedestrian Intensity Analysis
  50. 63. Proposed Regulating Plan
  51. 64. Typical Transect/Form-Based Code Calibration
  52. 65. Existing Zoning to Form Based Coding
  53. 66. Next Steps <ul><li>Refine the Plans and Drawings </li></ul><ul><li>Focus on implementation, timelines, and responsibility </li></ul><ul><li>Show where public intervention is necessary and where the market can handle things </li></ul><ul><li>Adopt the Form-based Code with our recommended Calibrations </li></ul><ul><li>Advocate, Implement, Assist, and Construct </li></ul>

×