PROJECT

                     On

            ORGANISATIONAL

                BEHAVIOUR

             Company Visited

Midas Auto Soft Engineers Pvt.Ltd




    From:                  Submitted To:
Group Name: ZENITH        Professor Gauri Parab
 Group Members
   Deepali Dixiit
  Gaurav Ranjan
   Manas Gupta
   Vibha Nagpal
   Deepu Shaw
COMPANY PROFILE
    Midas Auto Soft Engineers Pvt. Ltd.
Midas Autosoft Engineers Pvt. Ltd., Pune which is well established organization for last 8
years with business transactions being carried out in India as well as abroad. The company
deals in total automation solution for process industries including field devices, required
instrumentation and turnkey projects.

The Products Delivered by the company are:
      Industrial Weighing & Batching Systems
         o Tank/Silo/Hopper/bin weighing
         o bag/Drum Filling
         o Platform weighing
         o Weigh feeders / Belt Weighers
         o Level by Weight etc
      Process Instrumentation
         o Temperature measurement and controllers
         o flow measurement and controllers
         o Density measurement
         o Level switches and controllers
         o all types of valves and actuators
         o Vibro feeders/Screw feeders etc
      Process Automation
         o PLC, DCS
      Control Panels
         o Electrical and Instrumentation
      Software related to process automation as per your application.
      Material Handling
         o Vibro- feeder
         o Belt Conveyors/Screw Conveyors/Slat Conveyors
         o Pneumatic Conveyors etc.
      Turnkey Projects

The services offered by the Company are:
      Design Engineering
      After Sales Service
      Spares /Components
      Project Management
      Product Training to Customers



Details Provided By:
    Yogita Bhalero
Executive Account & Administrator
   Ph. No: 8888887113
ORGANISATIONAL STRUCTURE

Organisation Structure consists of activities such as task allocation, coordination and
supervision which directed towards the achievement of organizational goal. It determines the
modes in which it operates and performs.

Types of organizational structure

         Simple structure
            o Simple organizational structures are characterized by a low degree of
                differentiation of subtasks, and the leaders often have a very wide span of
                control. The authority is oftentimes heavily centralized in a single person, who
                will oftentimes be the owner of the company. Formalization will also be low,
                and work will oftentimes be structured through direct control and supervision.
                The simple structure is also often referred to as a "flat structure"
         Bureaucratic structure
            o Bureaucratic structures have a certain degree of standardization. They are
                better suited for more complex or larger scale organizations, usually adopting
                a tall structure. The tension between bureaucratic structures and non-
                bureaucratic is echoed in Burns and Stalker' distinction between mechanistic
                and organic structures.
         Matrix structure
            o The matrix structure groups employees by both function and product. This
                structure can combine the best of both separate structures. A matrix
                organization frequently uses teams of employees to accomplish work, in order
                to take advantage of the strengths, as well as make up for the weaknesses, of
                functional and decentralized forms.

Organisation Structure in MIDAS AUTOSOFT PVT. LTD. -
MIDAS AUTOSOFT PRIVATE LTD. have a simple structure.

It has

         20 administrative employees
         70 manufacturing employees

 Employees works in a group and coordination with the same goal to achieve in the
organization.

Structure of this company is very lean there is very less hierarchy in which there is 3
directors and among them 2 are active and 1 is sleeping.
ORGANIZATIONAL CULTURE
Organizational culture is the collective behaviour of humans that are part of an
organization.

It is also formed by the organization

       Values
       Visions
       Norms
       Working language
       Systems
       Symbols

It includes beliefs and habits It is also the pattern of such collective behaviors and
assumptions that are taught to new organizational members as a way of perceiving, and
even thinking and feeling. Organizational culture affects the way people and groups interact
with each other, with clients, and with stakeholders.


The organisational culture in Midas Auto soft is as
follows:
       This Organization follows Informal culture throughout its work place.
       There is no formal dress code in MIDAS.
       They organize party for interaction between the employs and for refreshment, which
       leads to coordination in the work place.
        Excess profits made by the organization are given to their employs in form of bonus.
         Lend personal loans to the employs as per their requirement.
       They provide study leave to their employs if they are appearing for any examination.
       Good coordination between trading unit and the manufacturing unit.
       No barriers to communication between the top level, middle level and low level
       employees.
       Coordination between the departments.
       Promote team work and group task.
       No tough and hard rule for fresher’s who all joins the company.
       Grant leave to employees for marriage and other valid purpose.
       Promotions are given as per the performance.
       All the expenses related to organisation are reimbursed.
       Friendly working environment.
       Leadership roles are provided to the employees as per their work experience and
       performance.
Project Schedule

            Week - 1                           Week - 2                         Week - 3

Planned Task        Achieved Task    Planned Task    Achieved Task   Planned Task       Achieved Task
Division Of Tasks   Tasks Divided    Study theory    Company         Prepare            Progress report
among members                        Topics from     choose          progress           made and
                                     Book                            report             submitted to
                                                                                        Gauri Madam
Search about the    Company          Choose          Midas Auto      Made a rough       Rough report
Company             Selected         another         Soft Selected   report             made including
                                     Company                                            all the available
                                                                                        information
Find contacts       Appointment      Scheduled an    7/9/2012        Final report       Final report and
Personally in       Confirmed        Appointed                       and                presentation
organisations                                                        presentation       was prepared
Select a company    Selected Tata    Visit the       Visited the     Print out of the   Print out of the
for the project     Tea Ltd.         Company         company on      report to be       report was
                                     Premises        7/9/2012        taken.             taken.
Took an             Appointment      Interaction     Had
Appointment for     cancelled        with the        conversation
meeting in the                       employee and    with employee
next week                            ask questions   and asked
                                                     questions
Prepare             Questionnaire
questionnaire       prepared.
Contribution by Group Members
      MEMBERS              WEEK - 1               WEEK - 2              WEEK - 3




Vibha Nagpal        -Read theories.        -Theory discussed.    -Summarization of the
                    -Prepared              -Company visit.       conversation.
                    questionnaires.        -Question answers     -Prepare partial report
                                           session with the      & presentation .
                                           employees.            -prepare final report by
                                                                 the combination of
                                                                 above work done with
                                                                 group.
Deepali Dixit       -Read theories.        -Theory discussed.    -Summarization of the
                    -Prepared              -Company visit.       conversation.
                    questionnaires.        -Question answers     -Prepare partial report
                                           session with the      & presentation.
                                           employees.            -prepare final report by
                                                                 the combination of
                                                                 above work done with
                                                                 group.
Gourav Ranjan       -Read theories.        -Theory discussed.    -Summarization of the
                    -Search for company.   -Search for another   conversation.
                    -Took appointment.     company.              -Prepare partial report
                    -Prepared              -Took appointment.    & presentation.
                    questionnaires.        -Company visit.       -prepare final report by
                                           -Question answers     the combination of
                                           session with the      above work done with
                                           employees.            group.
Manas Gupta         -Read theories.        -Theory discussed.    -Summarization of the
                    -Prepared              -Company visit.       conversation.
                    questionnaires.        -Question answers     -Prepare partial report
                                           session with the      & presentation.
                                           employees.            -prepare final report by
                                                                 the combination of
                                                                 above work done with
                                                                 group.
Deepu Shaw          -Read theories.        -Theory discussed.    -Summarization of the
                    -Prepared              -Company visit.       conversation
                    questionnaires.        -Question answer.     -Prepare partial report
                                           Session with the      & presentation
                                           employees.            -prepare final report by
                                                                 the combination of
                                                                 above work done with
                                                                 group.
EVALUATION OF THE GROUP MUMBERS



MEMBERS          WEEK - 1   WEEK - 2    WEEK - 3


DEEPALI DIXIT      60         70            80
VIBHA NAGPAL       60         70            80
GOURAV RANJAN      70         70            80
MANAS GUPTA        40         70            55
DEEPU SHAW         40         70            55
QUESTIONNAIER



1. What are the types of training programmes that are organised by your company to
   your employees?
   All our employees are sending to the manufacturing unit to take field knowledge and
   about the products they deal with as well as they all are availed with a mentor who
   have a well experience on that field.

2. What are the awards and rewards which are given by your company to the
   employees for their performance?
   Bonus;
   Excellence award at the end of every year to the best employee.

3. Do you have trade union in your company?
   No, we don’t have any trade union.


4. What type of monitory and non- monetary benefits availed by your company to the
   employees?
   Loans for marriage;
   Travelling allowances;
   Overtime allowances.

5. What type of communication channel do you have in your organisation?
   Informal channel of communication.


6. Does your company conduct any safety programme to the employees?
   Yes, we give visual knowledge about the work place where our employees have to
   go to setup the machine. Also our experts give them a detailed knowledge about the
   safety measure to be taken while setting up the machine.

7. Do you get regular feedback by your senior about your performance?
   Yes we get regular feedback from our senior about our performance in a weekly
   meeting.

8. What kind of communication do you have with your Senior?
   There is no barrier between the seniors and the juniors in our organisation.
   We feel free to say anything to our senior if we have any difficulty in the work place.

9. Are you feeling comfortable to give your views and opinion to your employees?
   Yes I feel totally free and comfortable to put up my opinion wit seniors and juniors if
   there will be any confusion or difficulty.

10. What kind of organisation structure do you have?
    Simple and short organisational structure.
11. Are employees allotted work as per their work specialisation?
    Yes, this is one of the toughest rule of our organisation that everyone gets work as
    per their specialisation only.


12. Is there a proper communication channel and coordination between different
   departments?
   Yes, we have proper and good communication channel as well as coordination
   between every departments and units.

13. Do you have conflict management team over here?
    Yes, we have conflict management team in our company which is very active cell of
    our company.

14. Do you get increment on your salary as per the increment on your performance?
    Yes, our salary increases as per the raise in the performance.

15. Are the employees over here works in group? If yes in what way?
    Yes, every employees over here works in group in the work place to archive the
    organisational targets.

16. What type of work culture do you follow here?
    Our company follows informal culture in the work place.

17. What are the points considered before giving promotion?
    Working experience;
    Quality of work done;
    Education qualification(if required);

18. Are the branches of Midas over the India are centralizes or decentralized?
    All the branches of Midas are centralized and our head office is in Pune only.


19. Are you happy and satisfied with your work and the work place?
    Yes I am too much happy and satisfied from my work as well as from the work place
    over here. The freedom and experience which I had got while working over here from
    the last 10 years is outstanding.

employees satisfication

  • 1.
    PROJECT On ORGANISATIONAL BEHAVIOUR Company Visited Midas Auto Soft Engineers Pvt.Ltd From: Submitted To: Group Name: ZENITH Professor Gauri Parab Group Members Deepali Dixiit Gaurav Ranjan Manas Gupta Vibha Nagpal Deepu Shaw
  • 2.
    COMPANY PROFILE Midas Auto Soft Engineers Pvt. Ltd. Midas Autosoft Engineers Pvt. Ltd., Pune which is well established organization for last 8 years with business transactions being carried out in India as well as abroad. The company deals in total automation solution for process industries including field devices, required instrumentation and turnkey projects. The Products Delivered by the company are: Industrial Weighing & Batching Systems o Tank/Silo/Hopper/bin weighing o bag/Drum Filling o Platform weighing o Weigh feeders / Belt Weighers o Level by Weight etc Process Instrumentation o Temperature measurement and controllers o flow measurement and controllers o Density measurement o Level switches and controllers o all types of valves and actuators o Vibro feeders/Screw feeders etc Process Automation o PLC, DCS Control Panels o Electrical and Instrumentation Software related to process automation as per your application. Material Handling o Vibro- feeder o Belt Conveyors/Screw Conveyors/Slat Conveyors o Pneumatic Conveyors etc. Turnkey Projects The services offered by the Company are: Design Engineering After Sales Service Spares /Components Project Management Product Training to Customers Details Provided By: Yogita Bhalero Executive Account & Administrator Ph. No: 8888887113
  • 3.
    ORGANISATIONAL STRUCTURE Organisation Structureconsists of activities such as task allocation, coordination and supervision which directed towards the achievement of organizational goal. It determines the modes in which it operates and performs. Types of organizational structure Simple structure o Simple organizational structures are characterized by a low degree of differentiation of subtasks, and the leaders often have a very wide span of control. The authority is oftentimes heavily centralized in a single person, who will oftentimes be the owner of the company. Formalization will also be low, and work will oftentimes be structured through direct control and supervision. The simple structure is also often referred to as a "flat structure" Bureaucratic structure o Bureaucratic structures have a certain degree of standardization. They are better suited for more complex or larger scale organizations, usually adopting a tall structure. The tension between bureaucratic structures and non- bureaucratic is echoed in Burns and Stalker' distinction between mechanistic and organic structures. Matrix structure o The matrix structure groups employees by both function and product. This structure can combine the best of both separate structures. A matrix organization frequently uses teams of employees to accomplish work, in order to take advantage of the strengths, as well as make up for the weaknesses, of functional and decentralized forms. Organisation Structure in MIDAS AUTOSOFT PVT. LTD. - MIDAS AUTOSOFT PRIVATE LTD. have a simple structure. It has 20 administrative employees 70 manufacturing employees Employees works in a group and coordination with the same goal to achieve in the organization. Structure of this company is very lean there is very less hierarchy in which there is 3 directors and among them 2 are active and 1 is sleeping.
  • 4.
    ORGANIZATIONAL CULTURE Organizational cultureis the collective behaviour of humans that are part of an organization. It is also formed by the organization Values Visions Norms Working language Systems Symbols It includes beliefs and habits It is also the pattern of such collective behaviors and assumptions that are taught to new organizational members as a way of perceiving, and even thinking and feeling. Organizational culture affects the way people and groups interact with each other, with clients, and with stakeholders. The organisational culture in Midas Auto soft is as follows: This Organization follows Informal culture throughout its work place. There is no formal dress code in MIDAS. They organize party for interaction between the employs and for refreshment, which leads to coordination in the work place. Excess profits made by the organization are given to their employs in form of bonus. Lend personal loans to the employs as per their requirement. They provide study leave to their employs if they are appearing for any examination. Good coordination between trading unit and the manufacturing unit. No barriers to communication between the top level, middle level and low level employees. Coordination between the departments. Promote team work and group task. No tough and hard rule for fresher’s who all joins the company. Grant leave to employees for marriage and other valid purpose. Promotions are given as per the performance. All the expenses related to organisation are reimbursed. Friendly working environment. Leadership roles are provided to the employees as per their work experience and performance.
  • 5.
    Project Schedule Week - 1 Week - 2 Week - 3 Planned Task Achieved Task Planned Task Achieved Task Planned Task Achieved Task Division Of Tasks Tasks Divided Study theory Company Prepare Progress report among members Topics from choose progress made and Book report submitted to Gauri Madam Search about the Company Choose Midas Auto Made a rough Rough report Company Selected another Soft Selected report made including Company all the available information Find contacts Appointment Scheduled an 7/9/2012 Final report Final report and Personally in Confirmed Appointed and presentation organisations presentation was prepared Select a company Selected Tata Visit the Visited the Print out of the Print out of the for the project Tea Ltd. Company company on report to be report was Premises 7/9/2012 taken. taken. Took an Appointment Interaction Had Appointment for cancelled with the conversation meeting in the employee and with employee next week ask questions and asked questions Prepare Questionnaire questionnaire prepared.
  • 6.
    Contribution by GroupMembers MEMBERS WEEK - 1 WEEK - 2 WEEK - 3 Vibha Nagpal -Read theories. -Theory discussed. -Summarization of the -Prepared -Company visit. conversation. questionnaires. -Question answers -Prepare partial report session with the & presentation . employees. -prepare final report by the combination of above work done with group. Deepali Dixit -Read theories. -Theory discussed. -Summarization of the -Prepared -Company visit. conversation. questionnaires. -Question answers -Prepare partial report session with the & presentation. employees. -prepare final report by the combination of above work done with group. Gourav Ranjan -Read theories. -Theory discussed. -Summarization of the -Search for company. -Search for another conversation. -Took appointment. company. -Prepare partial report -Prepared -Took appointment. & presentation. questionnaires. -Company visit. -prepare final report by -Question answers the combination of session with the above work done with employees. group. Manas Gupta -Read theories. -Theory discussed. -Summarization of the -Prepared -Company visit. conversation. questionnaires. -Question answers -Prepare partial report session with the & presentation. employees. -prepare final report by the combination of above work done with group. Deepu Shaw -Read theories. -Theory discussed. -Summarization of the -Prepared -Company visit. conversation questionnaires. -Question answer. -Prepare partial report Session with the & presentation employees. -prepare final report by the combination of above work done with group.
  • 7.
    EVALUATION OF THEGROUP MUMBERS MEMBERS WEEK - 1 WEEK - 2 WEEK - 3 DEEPALI DIXIT 60 70 80 VIBHA NAGPAL 60 70 80 GOURAV RANJAN 70 70 80 MANAS GUPTA 40 70 55 DEEPU SHAW 40 70 55
  • 8.
    QUESTIONNAIER 1. What arethe types of training programmes that are organised by your company to your employees? All our employees are sending to the manufacturing unit to take field knowledge and about the products they deal with as well as they all are availed with a mentor who have a well experience on that field. 2. What are the awards and rewards which are given by your company to the employees for their performance? Bonus; Excellence award at the end of every year to the best employee. 3. Do you have trade union in your company? No, we don’t have any trade union. 4. What type of monitory and non- monetary benefits availed by your company to the employees? Loans for marriage; Travelling allowances; Overtime allowances. 5. What type of communication channel do you have in your organisation? Informal channel of communication. 6. Does your company conduct any safety programme to the employees? Yes, we give visual knowledge about the work place where our employees have to go to setup the machine. Also our experts give them a detailed knowledge about the safety measure to be taken while setting up the machine. 7. Do you get regular feedback by your senior about your performance? Yes we get regular feedback from our senior about our performance in a weekly meeting. 8. What kind of communication do you have with your Senior? There is no barrier between the seniors and the juniors in our organisation. We feel free to say anything to our senior if we have any difficulty in the work place. 9. Are you feeling comfortable to give your views and opinion to your employees? Yes I feel totally free and comfortable to put up my opinion wit seniors and juniors if there will be any confusion or difficulty. 10. What kind of organisation structure do you have? Simple and short organisational structure.
  • 9.
    11. Are employeesallotted work as per their work specialisation? Yes, this is one of the toughest rule of our organisation that everyone gets work as per their specialisation only. 12. Is there a proper communication channel and coordination between different departments? Yes, we have proper and good communication channel as well as coordination between every departments and units. 13. Do you have conflict management team over here? Yes, we have conflict management team in our company which is very active cell of our company. 14. Do you get increment on your salary as per the increment on your performance? Yes, our salary increases as per the raise in the performance. 15. Are the employees over here works in group? If yes in what way? Yes, every employees over here works in group in the work place to archive the organisational targets. 16. What type of work culture do you follow here? Our company follows informal culture in the work place. 17. What are the points considered before giving promotion? Working experience; Quality of work done; Education qualification(if required); 18. Are the branches of Midas over the India are centralizes or decentralized? All the branches of Midas are centralized and our head office is in Pune only. 19. Are you happy and satisfied with your work and the work place? Yes I am too much happy and satisfied from my work as well as from the work place over here. The freedom and experience which I had got while working over here from the last 10 years is outstanding.