SlideShare a Scribd company logo
1 of 16
Download to read offline
AZMET Technology and Projects (Pty) Ltd specialises in
the supply of professional engineering design and project
management services.  
Our services include but is not limited to:
>>	 Project management
>>	 Project engineering and construction
>>	 Project studies
>>	 Production optimization
>>	 Process plant optimisation and expansions
>>	 Process plant audits
>>	 Project evaluations
>>	 Operations
>>	 Cashflow development and financial modelling
>>	 Testwork management and review
>>	 Modular Gold Desorption and Recovery Plants
>>	 Process Technologies
The main content of this newsletter provides a summary
of work conducted and successfully executed by AZMET
over the past 12 months. Should any of our services be of
interest please do not hesitate to contact us. 
>>From the Directors’ Desk
It’s safe to say that the global mining and metals industry for
2015/2016 has been one of the most volatile ever experienced.
A violent negative ripple effect across the global private sector
was caused by most commodity prices plummeting to record low
trade values resulting in operational closures, budget cuts and
long term stoppages on capital projects. The past 12 months has
seen the unfortunate diminishing and closure of many corporate
engineering firms.
The current global economic crisis is certainly driving profound
changes across the metals and mining industry. Future growth
is recognised through expanded production, with minimal capital
budgets, without losing sight of operational efficiency and cost
optimisation.
This has forced AZMET to pro-actively invest in optimisation
opportunities through engineering innovation and new
technologies and processes that will increase the profitability
of current metallurgical operations.
An AZMET company vision on adding value to our clients was
embedded during the current global recession. This has led
to the development of numerous innovative and cost effective
products and processes that positively impacted on OPEX
and CAPEX for green and brown fields’ projects, converting
uneconomical projects into viable projects.
Working alongside our clients and understanding their needs,
being flexible, timeous and committed to service excellence
made what started out as a year of uncertainty, a year filled
with blessings and growth.
We would like to thank our clients for their support and trust
in AZMET over the past year. We look forward to continue to
add value to your organisations and hopefully will gain more
market share in 2016/17, which by all indications will proof to
be another year filled with challenges.
Regards,
AZMET BOARD OF DIRECTORS
“Excellence through
dedication, motivation and technology
innovation.”
}}
NEWS
AZMET
AZMET’s newsletter
brings you highly targeted
information on project and
process engineering design,
management, technologies
and development
AZMETTECHNOLOGY & PROJECTS
>>Optimising your Operation
Historically most mining companies designed and constructed their
processing facilities with huge safety margins to enable possible
future expansions. However, it is quite a costly exercise to establish
a new mineral processing facility. In today’s recession mining
companies cannot always afford to construct new facilities when
considering significant expansions, but rather investigate ways to
improve on their underutilised processing equipment.
AZMET assist current mining houses to explore expansion
possibilities in their operating processing facilities in the form
of plant evaluations. Once an evaluation has been conducted
AZMET will share its findings and recommendations with the client.
AZMET will then assist in the engineering functions required to
realise these recommendations.
Optimisation Objectives
Major optimisation objectives include but is not limited to:
•	 Minimise Operating Cost (OPEX)
•	 Optimise throughput and/or maximise efficiency
•	 Maximise Recovery
“In Q1, 2015 AZMET was awarded a SMPP contract for the Kibali
operation, in the DRC, to implement the Desliming Cyclone Circuit
which was part of an optimisation project to improve the overall
pumpcell plant recovery. The SMPP contract period ran over
26 weeks, which included procurement, fabrication, shipment,
erection and commissioning. The circuit comprises of two sets
>>Kibali – SMPP Desliming Cyclone Project
of cyclone clusters complete with their respective feed, overflow
and underflow systems. Various modifications and tie-ins were
required to retrofit the circuit in the existing gold processing plant.
Approximately three (3) kilometres of HDPE piping were installed.
AZMET started the erection in Q4, 2015 and handed over the
circuit in the same quarter 2015.”
>>2
AZMETtechnology & projects
“In Q1, 2015 AZMET was awarded a LSTK contract for the
Tongon operation, in the Ivory Coast, to implement a Gold Room
Scrubber System as part of an optimisation project to clean the
fumes generated in the Gold Room. The LSTK contract included
procurement, fabrication, shipment, erection and commissioning.
The circuit comprises of a vertical scrubber unit complete with an
extraction fan and circulating medium pump. The scrubber unit
tied into the gold room via ducting.
>>Tongon – LSTK Gold Room Scrubber System
3 <<
AZMETtechnology & projects
AZMETtechnology & projects
>>Tongon – Quarternary Crusher Upgrade Project
“In Q4, 2015 AZMET was awarded a contract for the Tongon
operation, in the Ivory Coast, to implement a 4th Stage Crushing
Circuit as part of an optimisation project to improve the overall
plant capacity. The contract included procurement, fabrication,
shipment, erection and commissioning. The circuit comprises
of two dewatering screens, a fines transfer tank, a crusher feed
bin and three quarternary cone crushers complete with their
respective feed and discharge conveyors. Two new motor control
centers (MCC’S) were also part of the upgrade project. Various
modifications and tie-ins were required to retrofit the circuit in the
existing crushing plant. AZMET started the erection Q4, 2015 and
completed construction by end of Q1, 2016.”
		
>>Gauteng Fine Carbon Toll Treatment Incineration Project
AZMET was contracted to manage the procurement and installation
of two (2) carbon incinerators for a client in Gauteng. For more
information see article under “Products”.”
>>4
AZMETtechnology & projects
AZMETtechnology & projects
AZMETtechnology & projects
>>LSTK Gold Desorption & Recovery Plant for a plant in Ethiopia
AZMET has been awarded a contract for the design, supply
and commissioning for a 2t Carbon Batch Gold Desorption and
Recovery Plant, incorporating Carbon Loading and Attritioning,
Acid wash including Hydrochloric Acid reagent dosing, Elution
including Caustic reagent dosing, Electrowinning, Goldroom, MCC
& PLC and Security.
Modular Modules were ordered for supply and completed
in Q2, 2016.
For more information see article under “Products” or visit our
website to view the product brochure.
5 <<
AZMETtechnology & projects
AZMETtechnology & projects
>>6
AZMETtechnology & projects
AZMETtechnology & projects
AZMETtechnology & projects
7 <<
“Professional Engineering
Design & Project Management
Services.”
}}
>>LSTK Gold Desorption & Recovery Plant and reagent packages for a
gold mine in Turkey
In Q1,2016 AZMET has been awarded a contract for the
design, supply and commissioning for a 2t Carbon Batch Gold
Desorption and Recovery Plant, incorporating Carbon Loading
and Attritioning, Acid wash, Elution, Electrowinning, Carbon
Regeneration, Mercury Retort, Goldroom (civil design), MCC &
PLC and Security.
Our revolutionary design is of the highest quality and make use
of only reputable mechanical equipment suppliers. AZMET’s
desorption and recovery plants holds numerous CAPEX benefits
which includes, but is not limited to:
In addition to the AZMET DR Plant, modular reagent make-
up and dosing systems formed part of the supply contract,
incorporating Cyanide, Caustic, Lime, Hydrochloric Acid and
Detox (CuSO4 & SMBS).
Modular Modules were ordered for supply with completion
planned for Q4, 2016
For more information see article under “Products” or visit our
website to view the product brochure.
•	 Design cost (EPCM) savings
•	 Reduction in project site establishment and P&G costs
•	 On-site installation and fabrication cost reduction
•	 Overall project schedule reduction
>>8
>>AZMET’s Modular Gold Adsorption, Desorption & Recovery Plant (ADR)
AZMET’s Modular Desorption and Recovery Plant for Gold &
Silver hold numerous advantages for the end user and EPCM
contractor. The total modular plant is assembled and cold
commissioned prior to shipment. Thus, the time to install and
hot commission on site is limited with minimal changes. Design
of supply is flexible and can be adjusted according to the client’s
needs; with a total supply consisting of six (6) independent
modules.
Over the past 12 months AZMET has seen a drastic increase
in the clients’ needs for modular plants across the globe. This
again is confirmation of the benefits and project savings that
can be recognised when procuring our plants.
Current execution projects for respective clients and end users
in Austria, Ethiopia and Turkey.
AZMETtechnology & projects
9 <<
>>Activated carbon incinerator package (fine carbon treatment)
AZMET has identified a need in the gold industry to process
rejected loaded carbon and carbonaceous material. Many a gold
plant has hundreds of tons of rejected loaded carbon.
The reasons for the plant rejecting this carbon can be numerous.
Carbon is often stockpiled due to the fact that a production driven
plant does not always have the spare elution capacity to process
the carbon.
The stockpiled carbon is often stockpiled in the sun and this can
cause the carbon to become extremely brittle.
This potentially brittle carbon cannot be reintroduced into the
normal gold plant carbon circuit due to the risk of gold losses
onto fine carbon within the tails.
AZMET acts as agent for this product and has designed this
product as an addition to the gold desorption and recovery plant.
This product will be able to process this rejected loaded carbon
and carbonaceous material with the following modules:
•	 Attritioning, Grading and Separation Module
•	 Carbon Desorption Module
•	 Carbon Fines Incinerator Module
•	 Goldroom Module
Attritioning, Grading and Separation Module
This module will be used to load the stockpiled carbon from bags
into an attritioning tank where any brittle carbon will be broken
into fine particles.
After attritioning of the carbon, the carbon will be sized on a screen
to separate the carbon into two (2) fractions using a 1mm deck.
The +1mm coarse carbon is then discharged into a bulk bag for
later treatment in the desorption module. The -1mm fine carbon,
which often can contain contaminants like fine silica, is fed to a
spiral to separate the gangue from the carbon. The cleaned -1mm
carbon fines is then discharged into a bulk bag for drying and later
treatment in the carbon fines incinerator.
Carbon Desorption Module
The +1mm coarse carbon is fed from the bulk bags to a
desorption plant where the carbon will be subjected to Acidwash,
Elution and Regeneration. An electrowinning section is also
provided to recover the gold into sludge that can be smelted in
the goldroom module.
The regenerated and sized carbon can then be returned to the
main plant for re-use in the CIP/CIL circuit.
Carbon Fines Incinerator Module
The -1mm fine carbon is sun dried in bulk bags before being fed
into the carbon fines incinerator. The incinerator will be able to
process about 1t/day of carbon fines. The resulting ash from
the incinerator is screw fed to the goldroom module for smelting
in the smelting furnace.
Goldroom Module
Gold sludge from electro-winning is first dried in a calcining
oven before being combined with the ash from the incinerator
for smelting in a smelting furnace.
These combined modules offer an elegant solution to unsightly
large carbon stockpiles that many a mine has to deal with.
These modules have the following benefits:
•	 Recovery of gold lock-up, thus improving plant recovery
•	 Recovery of carbon for re-use in the processing plant, thus
reducing OPEX
•	 Freeing up of precious space on site
•	 Employment opportunity for local labour
Below are a few pictures of the Carbon Incinerator
and Desorption Plant.
AZMETtechnology & projects
AZMETtechnology & projects
>>10
Background
This study was conducted to develop an understanding of the
metallurgical and infrastructure requirements for the retreatment
of flotation tailings dams in Zambia.
Summary
Earlier studies identified direct acid leaching as the flowsheet
of choice for the metallurgical plant. Due to very high acid
consumptions during testwork this flowsheet option was
demonstrated as non feasible when assessed economically.
This study considered various flowsheet options and tested
these in the laboratory to identify the reagent consumptions
and recoveries for each. Throughout the testwork phases
the key consideration was to identify a process flowsheet
which resulted in reduced acid consumption or alternative
reagents but at the same time achieved reasonable recoveries
of both copper and cobalt that resulted in an economic viable
project.
The study looked at methods to reduce the reagent utilisation
by identifying conditions under which lower consumption of
reagents was achieved. This thought process was duly followed
in carrying out further testwork. This resulted in the identification
of a flowsheet with shorter leaching times and in particular the total
acid consumption was reduced down to less than 40kg/t.
The chosen flowsheet is simplistically described as:
•	 The recovery of tailings.
•	 AZMET Reduced Leaching (AZ-RLT) of the recovered tailings
with sulphuric acid.
•	 Separation of cobalt and copper in a solvent extraction plant.
•	 Electrowinning of copper to produce a copper cathode.
•	 Cobalt will be precipitated out separately as a cobalt salt.
AZMET’s proprietary Reduced Leach Technology (AZ-RLT)
was used, which resulted in an economical process on the
samples tested.
For more information view “New Technologies & Develpments”
Cu & Co Tailings Retreatment - Overall Flowsheet
>>Cu & Co Tailings Retreatment - Technical Assessment
“Technical solutions
through innovation.”
}}
11 <<
Background
This Desktop study was conducted to develop an understanding
of the metallurgical requirements for the Treatment of an existing
tailings stockpile in the DRC.
Summary
The establishment of operations for the Stockpile Project is based
upon a simple dry recovery of the tailings from the stockpile using
front end loaders (FEL).
The study assumes that acid leaching will provide the required
dissolutions recovery based on historical sample assay results.
This study considered various flowsheet options which evaluated
conventional direct acid leaching to generate a copper and cobalt
pregnant solution (PLS) that can be sold to the neighbouring
process plants as the base case. Alternative options also
considered a final copper cathode and cobalt precipitate salt to
increase the possible LME value. A high level financial trade-
off resulted in selecting a small plant throughput, with the least
capital cost, but still producing a final copper and cobalt product
for maximum metal revenues.
Different flowsheets were compared. This included the provisional
development of operating and capital costs for each flowsheet as
part of an options study, before a choice was made to take the
preferred flowsheet forward.
>>Cu & Co Stockpile Treatment – Desktop Study
The chosen flowsheet is simplistically described as:
•	 The recovery of material from the stockpile.
•	 Curing and leaching of the recovered stockpile material with
reagents.
•	 Solid/liquid separation.
•	 Separation of copper and cobalt in a solvent extraction plant.
•	 Electrowinning of copper to produce a copper cathode.
•	 Cobalt will be precipitated out separately as a saleable
cobalt salt.
Cu & Co Stockpile Treatment - Overall Flowsheet
“Engineering
solutions for your
requirement.”
}}
AZMET was contracted for the engineering process design, for
the completion of a Refractory Gold Project, Definitive Feasibility
Study (DSF), located in Mozambique.
The Refractory Gold Project process flow consisted of two stage
crushing and ball milling followed by an ultra-fine grind and a
floatation circuit for concentration of the gold.
Flotation concentrate is oxidised through reactors and processed
in a standard gold CIL circuit from where the loaded carbon is
harvested and gold recovered through AZMET’s Modular Gold
Desorption and Recovery Plant.
>>DFS Refractory Gold Project in Mozambique
AZMET’s scope of work included but was not limited to all
process design deliverables to DFS level of accuracy for the
following process unit operations:
•	 Carbon In Leach Circuit (CIL)
•	 AZMET Desorption and Recovery Plant comprising of:
>> Loaded Carbon Handling including Carbon Attritioning
& Transfer
>> Acid wash
>> Elution
>> Electrowinning
>> Goldroom including security
>> Regeneration
>> MCC & PLC
•	 Reagent Packages
>> Lime
>> Cyanide
>> Caustic
>> Hydrochloric Acid
AZMET started the study late Q4 of 2015 and
executed all contractual deliverables early Q1 2016.
M
M M
M M
M M
M M
A
B
C
D
E
F
G
H
Refractory Gold – Overall Flowsheet
DATE DWG NO PROJECT REV
20/04/2016 AZ-XXXX-PR-OFS-00-02 Refractory Gold DFS 0D
SHEET 1 OF 1
D
C
B
A
4 3 2 1
D
C
B
A
4 3 2 1
M
Gravity
Concentrator
M
M
M
M
M
M
M
M
M
M M
M M
To Fine
Grind Mill
Pre-leach
Thickener
M
Gravity Conc
Process Water
Header
TSF
Flotation
CIL
DR Plant
Ball Mill
Crushing
Fine Grind Mill
Leach
Conditioning
Mill Stockpile
M
Concentrate
Thickener
M
Process Water
Fresh Dilution
Water
Refractory Gold Project - Typical flowsheet
“Your partner
in mineral
beneficiation.”
}}
>>12
AZMET has been focused on the development of new processes and technologies specifically within the
Au, Cu and base metal industries. With the downturn in commodity prices the need for alternative process
routes with lower operating costs increases, as well as finding solutions for “difficult to treat” complex ores.
AZMET has developed the following technologies over the past 12 months; two of these are pending patents:
AZMET has developed on a cost effective process methodology
to recover cyanide from the plant tails stream. This process is
based on proven process technologies that have been used in
the industry for over 50 years. The benefit of this process will
include but not be limited to:
OPEX savings:
•	 Recovery of cyanide.
•	 Eliminating costly detox reagent costs.
•	 Environmental benefit on tailings disposal.
Recovery benefits – Increasing plant economics:
•	 Recovery of Copper, if present in tails stream.
•	 Additional gold recovery from tails solution.
>>AZMET Cyanide Recovery Process
(AZ-CRP)
“Cost effective
process
methodologies.”
}}
13 <<
A
B
C
D
E
F
G
H
M
M
M
M
M
M
M
Cyanide Recovery Process - Flowsheet
“Technology that provides
increased recovery and lower
operating costs.”
}}
>>AZMET Basic Leach Technology
(AZ-BLT)
AZMET has developed a cost effective process route to recover
copper from low grade secondary copper minerals utilising a
basic leach process. The process can be used on existing tailings
dumps and on the tails streams of operating flotation plants
treating Supergene ores (secondary or cyanide soluble copper).
This process is based on proven process technologies that have
been used in the industry and has been optimised to provide
lower operating and capital cost requirements. The benefit of
this process will include but not be limited to:
•	 A process circuit for the treatment of both copper and precious
metals.
•	 Simpler mine plan for complex ores (copper with gold and
silver).
•	 OPEX savings.
•	 CAPEX savings.
>>AZMET Reduced Leach
Technology (AZ-RLT)
AZMET has developed an acid leach process for the beneficiation
of base metal complexed ores, using a combination of proven
technologies that has been used in the mining industry for more
than 20 years.
The process which is AZMET’s proprietary process can be tested
in our partner laboratories and holds the following benefits:
•	 Reduced leach retention times compared to conventional
leaching.
•	 Reduction in reagent consumptions which results in the cost
effective processing of “difficult to treat” ore bodies.
•	 Lower CAPEX requirement compared to conventional acid
leaching.
Primary classification inefficiencies should be a problem of
the past!
Ultra-fine screening technology has developed in recent
years and can be successfully installed as a reliable primary
classification processing unit.
Although a larger footprint will be required, the comminution and
recovery benefits to date have shown project CAPEX payback
periods from as little as a couple of months.
In addition, the additional mill capacity created as a result of
improved classification efficiency can be utilised by either a finer
mill product grind or additional ROM throughput.
AZMET has developed an IP test procedure in which the
comparative hydrocyclone vs ultrafine screening testwork can
be conducted. The testwork results together with the client’s
plant operating data is used to conduct trade-off and financial
models which will indicate the possible payback period and NPV
on implementing such a change.
The principal advantages are:
•	 Higher classification efficiency.
•	 Lower maintenance in mill circuit.
•	 Substantial reduction in recirculating load (up to 500%
reduction).
•	 Finer grind achievable through utilisation of available power.
OR
•	 Additional throughput (up to 40% ROM)
•	 Less overgrinding of metal fines resulting in flotation recovery
benefits (up to 9% increase)
•	 Eliminates ultrafine metal medium formation in cyclones
AZMET’s latest test results has shown a considerable increase
in recoveries on base metals.
Contact AZMET should this technology be of immediate interest.
>>Ultra-fine Screening Classification Testwork Procedure (AZ-UFS)
“Primary classification
deficiencies are a
problem of the past.”
}}
>>14
15 <<
>>Azmet Offices
retain the vibrant and professional culture nurtured by AZMET
management.
The new office space also allows for the expected growth of AZMET,
and enables the company to ensure the continued delivery of great
service to their existing and future clients.
The sustained growth of AZMET, has forced the dynamic company
to relocate to new offices mid-2015. The new modern building is
situated close to the R21, in Glen Eagle Office Park, centrally located
between Johannesburg and Pretoria.
Office layout was done in an open plan manner to enable
collaboration and flow of ideas between staff, and in doing so,
AZMETtechnology & projects
AZMETtechnology & projects
>>Business of the Year Award
Azmet was nominated out of 5300 companies as a nominee for
business of the year 2016. Azmet received 1st prize (gold) at
the Business of the Year 2016 Award Ceremony, for the category
“Engineering”
Azmet pride itself in achieving this award which is testament
of our aim to service excellence and providing world class
Engineering and Project Management Services.
AZMETtechnology & projects
>> contact details
tel +27 86 11AZMET (29638) | fax +27 86 628 5610
email	 info@azmet.co.za | ruan@azmet.co.za | web www.azmet.co.za
“Engineering is not a profession,
it’s a PASSION.”
}}

More Related Content

What's hot

PQ Presentation(BADC) - Rev2
PQ Presentation(BADC) - Rev2PQ Presentation(BADC) - Rev2
PQ Presentation(BADC) - Rev2HAIDER YOUNIS
 
Pic booklet screen view 2
Pic booklet   screen view 2Pic booklet   screen view 2
Pic booklet screen view 2Amin Hadjaran
 
Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16Edward Byrne
 
Dean Hamilton Estimating Jan 2017
Dean Hamilton Estimating Jan 2017Dean Hamilton Estimating Jan 2017
Dean Hamilton Estimating Jan 2017Dean Hamilton
 
brochure-oil-gas_en
brochure-oil-gas_enbrochure-oil-gas_en
brochure-oil-gas_enDenis Cremin
 
Norja tänään ja huomenna - vaikuttaako öljyn hinta liiketoimintamahdollisuuks...
Norja tänään ja huomenna - vaikuttaako öljyn hinta liiketoimintamahdollisuuks...Norja tänään ja huomenna - vaikuttaako öljyn hinta liiketoimintamahdollisuuks...
Norja tänään ja huomenna - vaikuttaako öljyn hinta liiketoimintamahdollisuuks...Prizztech
 
curriculum vitae- koshyvarghese dec2015
curriculum vitae- koshyvarghese dec2015curriculum vitae- koshyvarghese dec2015
curriculum vitae- koshyvarghese dec2015KOSHY VARGHESE KOSHY
 
Kokemuksia Norjan markkinoista
Kokemuksia Norjan markkinoistaKokemuksia Norjan markkinoista
Kokemuksia Norjan markkinoistaPrizztech
 
Concept to Commercialization – Navigating Process Development and Scale Up Ch...
Concept to Commercialization – Navigating Process Development and Scale Up Ch...Concept to Commercialization – Navigating Process Development and Scale Up Ch...
Concept to Commercialization – Navigating Process Development and Scale Up Ch...Koch Modular Process Systems, LLC.
 
Kvaerner corporate brochure
Kvaerner corporate brochureKvaerner corporate brochure
Kvaerner corporate brochureKjell Brataas
 
DominiqueTharandt_July2015_dates
DominiqueTharandt_July2015_datesDominiqueTharandt_July2015_dates
DominiqueTharandt_July2015_datesDominique Tharandt
 
Brochure Services-AFTER
Brochure Services-AFTERBrochure Services-AFTER
Brochure Services-AFTERTina Thomas
 

What's hot (19)

PQ Presentation(BADC) - Rev2
PQ Presentation(BADC) - Rev2PQ Presentation(BADC) - Rev2
PQ Presentation(BADC) - Rev2
 
01_HVAC-R5_Tecni
01_HVAC-R5_Tecni01_HVAC-R5_Tecni
01_HVAC-R5_Tecni
 
Pic booklet screen view 2
Pic booklet   screen view 2Pic booklet   screen view 2
Pic booklet screen view 2
 
Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16
 
CaseStudy-Nortech
CaseStudy-NortechCaseStudy-Nortech
CaseStudy-Nortech
 
Dean Hamilton Estimating Jan 2017
Dean Hamilton Estimating Jan 2017Dean Hamilton Estimating Jan 2017
Dean Hamilton Estimating Jan 2017
 
CV D Schroeder 2016
CV D Schroeder 2016CV D Schroeder 2016
CV D Schroeder 2016
 
Projects Annex
Projects AnnexProjects Annex
Projects Annex
 
brochure-oil-gas_en
brochure-oil-gas_enbrochure-oil-gas_en
brochure-oil-gas_en
 
Norja tänään ja huomenna - vaikuttaako öljyn hinta liiketoimintamahdollisuuks...
Norja tänään ja huomenna - vaikuttaako öljyn hinta liiketoimintamahdollisuuks...Norja tänään ja huomenna - vaikuttaako öljyn hinta liiketoimintamahdollisuuks...
Norja tänään ja huomenna - vaikuttaako öljyn hinta liiketoimintamahdollisuuks...
 
curriculum vitae- koshyvarghese dec2015
curriculum vitae- koshyvarghese dec2015curriculum vitae- koshyvarghese dec2015
curriculum vitae- koshyvarghese dec2015
 
Kokemuksia Norjan markkinoista
Kokemuksia Norjan markkinoistaKokemuksia Norjan markkinoista
Kokemuksia Norjan markkinoista
 
Concept to Commercialization – Navigating Process Development and Scale Up Ch...
Concept to Commercialization – Navigating Process Development and Scale Up Ch...Concept to Commercialization – Navigating Process Development and Scale Up Ch...
Concept to Commercialization – Navigating Process Development and Scale Up Ch...
 
Qa QC SEPL NOV 2017
Qa QC SEPL NOV  2017Qa QC SEPL NOV  2017
Qa QC SEPL NOV 2017
 
FARSANA-CV
FARSANA-CVFARSANA-CV
FARSANA-CV
 
Kvaerner corporate brochure
Kvaerner corporate brochureKvaerner corporate brochure
Kvaerner corporate brochure
 
DominiqueTharandt_July2015_dates
DominiqueTharandt_July2015_datesDominiqueTharandt_July2015_dates
DominiqueTharandt_July2015_dates
 
Krishna kumar cv
Krishna kumar cvKrishna kumar cv
Krishna kumar cv
 
Brochure Services-AFTER
Brochure Services-AFTERBrochure Services-AFTER
Brochure Services-AFTER
 

Viewers also liked

1 trabajo practico aprobado
1 trabajo practico aprobado1 trabajo practico aprobado
1 trabajo practico aprobadoJohana Lucero
 
ปัญหาและกรณีศึกษาการใช้งานสารสนเทศ
ปัญหาและกรณีศึกษาการใช้งานสารสนเทศปัญหาและกรณีศึกษาการใช้งานสารสนเทศ
ปัญหาและกรณีศึกษาการใช้งานสารสนเทศNatthida Suwannarat
 
색다른 섹스를 원한다면【CIA88-COM 】여성최음제,#최음제 판매,#최음제 구입,#최음제 파는곳,#최음제 복용후기,#최음제 사용법,#최음...
색다른 섹스를 원한다면【CIA88-COM 】여성최음제,#최음제 판매,#최음제 구입,#최음제 파는곳,#최음제 복용후기,#최음제 사용법,#최음...색다른 섹스를 원한다면【CIA88-COM 】여성최음제,#최음제 판매,#최음제 구입,#최음제 파는곳,#최음제 복용후기,#최음제 사용법,#최음...
색다른 섹스를 원한다면【CIA88-COM 】여성최음제,#최음제 판매,#최음제 구입,#최음제 파는곳,#최음제 복용후기,#최음제 사용법,#최음...juaknc gaxcvv
 
Presentación de power point para presentar
Presentación de power point para presentarPresentación de power point para presentar
Presentación de power point para presentarrosa yucra mllsc
 
색다른 섹스를 원한다면【CIA88-COM 】여성최음제,#최음제 판매,#최음제 구입,#최음제 파는곳,#최음제 구입방법,#최음제 구입처,#최음...
색다른 섹스를 원한다면【CIA88-COM 】여성최음제,#최음제 판매,#최음제 구입,#최음제 파는곳,#최음제 구입방법,#최음제 구입처,#최음...색다른 섹스를 원한다면【CIA88-COM 】여성최음제,#최음제 판매,#최음제 구입,#최음제 파는곳,#최음제 구입방법,#최음제 구입처,#최음...
색다른 섹스를 원한다면【CIA88-COM 】여성최음제,#최음제 판매,#최음제 구입,#최음제 파는곳,#최음제 구입방법,#최음제 구입처,#최음...juaknc gaxcvv
 
강력 ghb물뽕 구입방법 【CIA88-COM 】#물뽕 판매,#물뽕 구입,#물뽕 파는곳,#물뽕 사기없는곳,#물뽕 데이트 강간약,#물뽕 구조식,
강력 ghb물뽕 구입방법 【CIA88-COM 】#물뽕 판매,#물뽕 구입,#물뽕 파는곳,#물뽕 사기없는곳,#물뽕 데이트 강간약,#물뽕 구조식,강력 ghb물뽕 구입방법 【CIA88-COM 】#물뽕 판매,#물뽕 구입,#물뽕 파는곳,#물뽕 사기없는곳,#물뽕 데이트 강간약,#물뽕 구조식,
강력 ghb물뽕 구입방법 【CIA88-COM 】#물뽕 판매,#물뽕 구입,#물뽕 파는곳,#물뽕 사기없는곳,#물뽕 데이트 강간약,#물뽕 구조식,juaknc gaxcvv
 
강력 ghb물뽕 구입방법 【CIA88-COM 】#물뽕 판매,#물뽕 구입,#물뽕 파는곳,#물뽕 정품약효,#물뽕 구입가격,#물뽕 판매가,#물뽕...
강력 ghb물뽕 구입방법 【CIA88-COM 】#물뽕 판매,#물뽕 구입,#물뽕 파는곳,#물뽕 정품약효,#물뽕 구입가격,#물뽕 판매가,#물뽕...강력 ghb물뽕 구입방법 【CIA88-COM 】#물뽕 판매,#물뽕 구입,#물뽕 파는곳,#물뽕 정품약효,#물뽕 구입가격,#물뽕 판매가,#물뽕...
강력 ghb물뽕 구입방법 【CIA88-COM 】#물뽕 판매,#물뽕 구입,#물뽕 파는곳,#물뽕 정품약효,#물뽕 구입가격,#물뽕 판매가,#물뽕...juaknc gaxcvv
 

Viewers also liked (9)

1 trabajo practico aprobado
1 trabajo practico aprobado1 trabajo practico aprobado
1 trabajo practico aprobado
 
ปัญหาและกรณีศึกษาการใช้งานสารสนเทศ
ปัญหาและกรณีศึกษาการใช้งานสารสนเทศปัญหาและกรณีศึกษาการใช้งานสารสนเทศ
ปัญหาและกรณีศึกษาการใช้งานสารสนเทศ
 
색다른 섹스를 원한다면【CIA88-COM 】여성최음제,#최음제 판매,#최음제 구입,#최음제 파는곳,#최음제 복용후기,#최음제 사용법,#최음...
색다른 섹스를 원한다면【CIA88-COM 】여성최음제,#최음제 판매,#최음제 구입,#최음제 파는곳,#최음제 복용후기,#최음제 사용법,#최음...색다른 섹스를 원한다면【CIA88-COM 】여성최음제,#최음제 판매,#최음제 구입,#최음제 파는곳,#최음제 복용후기,#최음제 사용법,#최음...
색다른 섹스를 원한다면【CIA88-COM 】여성최음제,#최음제 판매,#최음제 구입,#최음제 파는곳,#최음제 복용후기,#최음제 사용법,#최음...
 
Resume
ResumeResume
Resume
 
Presentación de power point para presentar
Presentación de power point para presentarPresentación de power point para presentar
Presentación de power point para presentar
 
색다른 섹스를 원한다면【CIA88-COM 】여성최음제,#최음제 판매,#최음제 구입,#최음제 파는곳,#최음제 구입방법,#최음제 구입처,#최음...
색다른 섹스를 원한다면【CIA88-COM 】여성최음제,#최음제 판매,#최음제 구입,#최음제 파는곳,#최음제 구입방법,#최음제 구입처,#최음...색다른 섹스를 원한다면【CIA88-COM 】여성최음제,#최음제 판매,#최음제 구입,#최음제 파는곳,#최음제 구입방법,#최음제 구입처,#최음...
색다른 섹스를 원한다면【CIA88-COM 】여성최음제,#최음제 판매,#최음제 구입,#최음제 파는곳,#최음제 구입방법,#최음제 구입처,#최음...
 
Tkr revision
Tkr revisionTkr revision
Tkr revision
 
강력 ghb물뽕 구입방법 【CIA88-COM 】#물뽕 판매,#물뽕 구입,#물뽕 파는곳,#물뽕 사기없는곳,#물뽕 데이트 강간약,#물뽕 구조식,
강력 ghb물뽕 구입방법 【CIA88-COM 】#물뽕 판매,#물뽕 구입,#물뽕 파는곳,#물뽕 사기없는곳,#물뽕 데이트 강간약,#물뽕 구조식,강력 ghb물뽕 구입방법 【CIA88-COM 】#물뽕 판매,#물뽕 구입,#물뽕 파는곳,#물뽕 사기없는곳,#물뽕 데이트 강간약,#물뽕 구조식,
강력 ghb물뽕 구입방법 【CIA88-COM 】#물뽕 판매,#물뽕 구입,#물뽕 파는곳,#물뽕 사기없는곳,#물뽕 데이트 강간약,#물뽕 구조식,
 
강력 ghb물뽕 구입방법 【CIA88-COM 】#물뽕 판매,#물뽕 구입,#물뽕 파는곳,#물뽕 정품약효,#물뽕 구입가격,#물뽕 판매가,#물뽕...
강력 ghb물뽕 구입방법 【CIA88-COM 】#물뽕 판매,#물뽕 구입,#물뽕 파는곳,#물뽕 정품약효,#물뽕 구입가격,#물뽕 판매가,#물뽕...강력 ghb물뽕 구입방법 【CIA88-COM 】#물뽕 판매,#물뽕 구입,#물뽕 파는곳,#물뽕 정품약효,#물뽕 구입가격,#물뽕 판매가,#물뽕...
강력 ghb물뽕 구입방법 【CIA88-COM 】#물뽕 판매,#물뽕 구입,#물뽕 파는곳,#물뽕 정품약효,#물뽕 구입가격,#물뽕 판매가,#물뽕...
 

Similar to AZMET-Newsletter 2016 (English)

AMEC Convention 2017 - Driving the next cycle
AMEC Convention 2017 - Driving the next cycleAMEC Convention 2017 - Driving the next cycle
AMEC Convention 2017 - Driving the next cycleAlkane Resources
 
AZMET-Company Profile
AZMET-Company ProfileAZMET-Company Profile
AZMET-Company ProfileRuan Kukard
 
AZMET-Company Profile
AZMET-Company ProfileAZMET-Company Profile
AZMET-Company ProfileBraam Smit
 
Turnkey Company Presentation Feb 2024.pptx
Turnkey Company Presentation Feb 2024.pptxTurnkey Company Presentation Feb 2024.pptx
Turnkey Company Presentation Feb 2024.pptxandre538649
 
A1 Company Profile Secure Supplies 1.pdf
A1 Company Profile Secure Supplies 1.pdfA1 Company Profile Secure Supplies 1.pdf
A1 Company Profile Secure Supplies 1.pdfDaniel Donatelli
 
Arslan Enginery EPC Turnkey Projects and Profile.
Arslan Enginery EPC Turnkey Projects and Profile.Arslan Enginery EPC Turnkey Projects and Profile.
Arslan Enginery EPC Turnkey Projects and Profile.Arbaaz Malik
 
AZMET DR Plant Brochure
AZMET DR Plant BrochureAZMET DR Plant Brochure
AZMET DR Plant BrochureRuan Kukard
 
AZMET-DR Product Brochure
AZMET-DR Product BrochureAZMET-DR Product Brochure
AZMET-DR Product BrochureBarry Beylefeld
 
AZMET DR Plant Brochure
AZMET DR Plant BrochureAZMET DR Plant Brochure
AZMET DR Plant BrochureBraam Smit
 
Citec Group brochure 2016_lowres
Citec Group brochure 2016_lowresCitec Group brochure 2016_lowres
Citec Group brochure 2016_lowresAustin Antony
 
Civil eng.m.sayed c.v & cover letter last
Civil eng.m.sayed c.v & cover letter lastCivil eng.m.sayed c.v & cover letter last
Civil eng.m.sayed c.v & cover letter lastMohamed Sayed
 
AB Minerals Corp. - A New Separation Techmology to Process Tantalite Bearing ...
AB Minerals Corp. - A New Separation Techmology to Process Tantalite Bearing ...AB Minerals Corp. - A New Separation Techmology to Process Tantalite Bearing ...
AB Minerals Corp. - A New Separation Techmology to Process Tantalite Bearing ...Curt Huber
 
Mec Brief 2009
Mec Brief 2009Mec Brief 2009
Mec Brief 2009Ahmed
 
AB MINERALS UPDATED PRESENTATION - A New Separation Technology to Process Tan...
AB MINERALS UPDATED PRESENTATION - A New Separation Technology to Process Tan...AB MINERALS UPDATED PRESENTATION - A New Separation Technology to Process Tan...
AB MINERALS UPDATED PRESENTATION - A New Separation Technology to Process Tan...crwh888
 
Webinar: CCS major project development lessons from the ZeroGen experience
Webinar: CCS major project development lessons from the ZeroGen experienceWebinar: CCS major project development lessons from the ZeroGen experience
Webinar: CCS major project development lessons from the ZeroGen experienceGlobal CCS Institute
 
Petrotech Presenttaion- Punj Lloyd
Petrotech Presenttaion- Punj LloydPetrotech Presenttaion- Punj Lloyd
Petrotech Presenttaion- Punj LloydNitin Sethi
 

Similar to AZMET-Newsletter 2016 (English) (20)

AMEC Convention 2017 - Driving the next cycle
AMEC Convention 2017 - Driving the next cycleAMEC Convention 2017 - Driving the next cycle
AMEC Convention 2017 - Driving the next cycle
 
AZMET-Company Profile
AZMET-Company ProfileAZMET-Company Profile
AZMET-Company Profile
 
AZMET-Company Profile
AZMET-Company ProfileAZMET-Company Profile
AZMET-Company Profile
 
AZMET-Company Profile
AZMET-Company ProfileAZMET-Company Profile
AZMET-Company Profile
 
AZMET-Company Profile
AZMET-Company ProfileAZMET-Company Profile
AZMET-Company Profile
 
Turnkey Company Presentation Feb 2024.pptx
Turnkey Company Presentation Feb 2024.pptxTurnkey Company Presentation Feb 2024.pptx
Turnkey Company Presentation Feb 2024.pptx
 
A1 Company Profile Secure Supplies 1.pdf
A1 Company Profile Secure Supplies 1.pdfA1 Company Profile Secure Supplies 1.pdf
A1 Company Profile Secure Supplies 1.pdf
 
Jorge luis sousa escandon cv february 2020
Jorge luis sousa escandon cv february 2020Jorge luis sousa escandon cv february 2020
Jorge luis sousa escandon cv february 2020
 
Arslan Enginery EPC Turnkey Projects and Profile.
Arslan Enginery EPC Turnkey Projects and Profile.Arslan Enginery EPC Turnkey Projects and Profile.
Arslan Enginery EPC Turnkey Projects and Profile.
 
AZMET DR Plant Brochure
AZMET DR Plant BrochureAZMET DR Plant Brochure
AZMET DR Plant Brochure
 
AZMET-DR Product Brochure
AZMET-DR Product BrochureAZMET-DR Product Brochure
AZMET-DR Product Brochure
 
AZMET DR Plant Brochure
AZMET DR Plant BrochureAZMET DR Plant Brochure
AZMET DR Plant Brochure
 
OGP Awards 2011
OGP Awards 2011OGP Awards 2011
OGP Awards 2011
 
Citec Group brochure 2016_lowres
Citec Group brochure 2016_lowresCitec Group brochure 2016_lowres
Citec Group brochure 2016_lowres
 
Civil eng.m.sayed c.v & cover letter last
Civil eng.m.sayed c.v & cover letter lastCivil eng.m.sayed c.v & cover letter last
Civil eng.m.sayed c.v & cover letter last
 
AB Minerals Corp. - A New Separation Techmology to Process Tantalite Bearing ...
AB Minerals Corp. - A New Separation Techmology to Process Tantalite Bearing ...AB Minerals Corp. - A New Separation Techmology to Process Tantalite Bearing ...
AB Minerals Corp. - A New Separation Techmology to Process Tantalite Bearing ...
 
Mec Brief 2009
Mec Brief 2009Mec Brief 2009
Mec Brief 2009
 
AB MINERALS UPDATED PRESENTATION - A New Separation Technology to Process Tan...
AB MINERALS UPDATED PRESENTATION - A New Separation Technology to Process Tan...AB MINERALS UPDATED PRESENTATION - A New Separation Technology to Process Tan...
AB MINERALS UPDATED PRESENTATION - A New Separation Technology to Process Tan...
 
Webinar: CCS major project development lessons from the ZeroGen experience
Webinar: CCS major project development lessons from the ZeroGen experienceWebinar: CCS major project development lessons from the ZeroGen experience
Webinar: CCS major project development lessons from the ZeroGen experience
 
Petrotech Presenttaion- Punj Lloyd
Petrotech Presenttaion- Punj LloydPetrotech Presenttaion- Punj Lloyd
Petrotech Presenttaion- Punj Lloyd
 

AZMET-Newsletter 2016 (English)

  • 1. AZMET Technology and Projects (Pty) Ltd specialises in the supply of professional engineering design and project management services.   Our services include but is not limited to: >> Project management >> Project engineering and construction >> Project studies >> Production optimization >> Process plant optimisation and expansions >> Process plant audits >> Project evaluations >> Operations >> Cashflow development and financial modelling >> Testwork management and review >> Modular Gold Desorption and Recovery Plants >> Process Technologies The main content of this newsletter provides a summary of work conducted and successfully executed by AZMET over the past 12 months. Should any of our services be of interest please do not hesitate to contact us.  >>From the Directors’ Desk It’s safe to say that the global mining and metals industry for 2015/2016 has been one of the most volatile ever experienced. A violent negative ripple effect across the global private sector was caused by most commodity prices plummeting to record low trade values resulting in operational closures, budget cuts and long term stoppages on capital projects. The past 12 months has seen the unfortunate diminishing and closure of many corporate engineering firms. The current global economic crisis is certainly driving profound changes across the metals and mining industry. Future growth is recognised through expanded production, with minimal capital budgets, without losing sight of operational efficiency and cost optimisation. This has forced AZMET to pro-actively invest in optimisation opportunities through engineering innovation and new technologies and processes that will increase the profitability of current metallurgical operations. An AZMET company vision on adding value to our clients was embedded during the current global recession. This has led to the development of numerous innovative and cost effective products and processes that positively impacted on OPEX and CAPEX for green and brown fields’ projects, converting uneconomical projects into viable projects. Working alongside our clients and understanding their needs, being flexible, timeous and committed to service excellence made what started out as a year of uncertainty, a year filled with blessings and growth. We would like to thank our clients for their support and trust in AZMET over the past year. We look forward to continue to add value to your organisations and hopefully will gain more market share in 2016/17, which by all indications will proof to be another year filled with challenges. Regards, AZMET BOARD OF DIRECTORS “Excellence through dedication, motivation and technology innovation.” }} NEWS AZMET AZMET’s newsletter brings you highly targeted information on project and process engineering design, management, technologies and development AZMETTECHNOLOGY & PROJECTS
  • 2. >>Optimising your Operation Historically most mining companies designed and constructed their processing facilities with huge safety margins to enable possible future expansions. However, it is quite a costly exercise to establish a new mineral processing facility. In today’s recession mining companies cannot always afford to construct new facilities when considering significant expansions, but rather investigate ways to improve on their underutilised processing equipment. AZMET assist current mining houses to explore expansion possibilities in their operating processing facilities in the form of plant evaluations. Once an evaluation has been conducted AZMET will share its findings and recommendations with the client. AZMET will then assist in the engineering functions required to realise these recommendations. Optimisation Objectives Major optimisation objectives include but is not limited to: • Minimise Operating Cost (OPEX) • Optimise throughput and/or maximise efficiency • Maximise Recovery “In Q1, 2015 AZMET was awarded a SMPP contract for the Kibali operation, in the DRC, to implement the Desliming Cyclone Circuit which was part of an optimisation project to improve the overall pumpcell plant recovery. The SMPP contract period ran over 26 weeks, which included procurement, fabrication, shipment, erection and commissioning. The circuit comprises of two sets >>Kibali – SMPP Desliming Cyclone Project of cyclone clusters complete with their respective feed, overflow and underflow systems. Various modifications and tie-ins were required to retrofit the circuit in the existing gold processing plant. Approximately three (3) kilometres of HDPE piping were installed. AZMET started the erection in Q4, 2015 and handed over the circuit in the same quarter 2015.” >>2 AZMETtechnology & projects
  • 3. “In Q1, 2015 AZMET was awarded a LSTK contract for the Tongon operation, in the Ivory Coast, to implement a Gold Room Scrubber System as part of an optimisation project to clean the fumes generated in the Gold Room. The LSTK contract included procurement, fabrication, shipment, erection and commissioning. The circuit comprises of a vertical scrubber unit complete with an extraction fan and circulating medium pump. The scrubber unit tied into the gold room via ducting. >>Tongon – LSTK Gold Room Scrubber System 3 << AZMETtechnology & projects AZMETtechnology & projects
  • 4. >>Tongon – Quarternary Crusher Upgrade Project “In Q4, 2015 AZMET was awarded a contract for the Tongon operation, in the Ivory Coast, to implement a 4th Stage Crushing Circuit as part of an optimisation project to improve the overall plant capacity. The contract included procurement, fabrication, shipment, erection and commissioning. The circuit comprises of two dewatering screens, a fines transfer tank, a crusher feed bin and three quarternary cone crushers complete with their respective feed and discharge conveyors. Two new motor control centers (MCC’S) were also part of the upgrade project. Various modifications and tie-ins were required to retrofit the circuit in the existing crushing plant. AZMET started the erection Q4, 2015 and completed construction by end of Q1, 2016.” >>Gauteng Fine Carbon Toll Treatment Incineration Project AZMET was contracted to manage the procurement and installation of two (2) carbon incinerators for a client in Gauteng. For more information see article under “Products”.” >>4 AZMETtechnology & projects AZMETtechnology & projects AZMETtechnology & projects
  • 5. >>LSTK Gold Desorption & Recovery Plant for a plant in Ethiopia AZMET has been awarded a contract for the design, supply and commissioning for a 2t Carbon Batch Gold Desorption and Recovery Plant, incorporating Carbon Loading and Attritioning, Acid wash including Hydrochloric Acid reagent dosing, Elution including Caustic reagent dosing, Electrowinning, Goldroom, MCC & PLC and Security. Modular Modules were ordered for supply and completed in Q2, 2016. For more information see article under “Products” or visit our website to view the product brochure. 5 << AZMETtechnology & projects AZMETtechnology & projects
  • 6. >>6 AZMETtechnology & projects AZMETtechnology & projects AZMETtechnology & projects
  • 7. 7 << “Professional Engineering Design & Project Management Services.” }} >>LSTK Gold Desorption & Recovery Plant and reagent packages for a gold mine in Turkey In Q1,2016 AZMET has been awarded a contract for the design, supply and commissioning for a 2t Carbon Batch Gold Desorption and Recovery Plant, incorporating Carbon Loading and Attritioning, Acid wash, Elution, Electrowinning, Carbon Regeneration, Mercury Retort, Goldroom (civil design), MCC & PLC and Security. Our revolutionary design is of the highest quality and make use of only reputable mechanical equipment suppliers. AZMET’s desorption and recovery plants holds numerous CAPEX benefits which includes, but is not limited to: In addition to the AZMET DR Plant, modular reagent make- up and dosing systems formed part of the supply contract, incorporating Cyanide, Caustic, Lime, Hydrochloric Acid and Detox (CuSO4 & SMBS). Modular Modules were ordered for supply with completion planned for Q4, 2016 For more information see article under “Products” or visit our website to view the product brochure. • Design cost (EPCM) savings • Reduction in project site establishment and P&G costs • On-site installation and fabrication cost reduction • Overall project schedule reduction
  • 8. >>8 >>AZMET’s Modular Gold Adsorption, Desorption & Recovery Plant (ADR) AZMET’s Modular Desorption and Recovery Plant for Gold & Silver hold numerous advantages for the end user and EPCM contractor. The total modular plant is assembled and cold commissioned prior to shipment. Thus, the time to install and hot commission on site is limited with minimal changes. Design of supply is flexible and can be adjusted according to the client’s needs; with a total supply consisting of six (6) independent modules. Over the past 12 months AZMET has seen a drastic increase in the clients’ needs for modular plants across the globe. This again is confirmation of the benefits and project savings that can be recognised when procuring our plants. Current execution projects for respective clients and end users in Austria, Ethiopia and Turkey. AZMETtechnology & projects
  • 9. 9 << >>Activated carbon incinerator package (fine carbon treatment) AZMET has identified a need in the gold industry to process rejected loaded carbon and carbonaceous material. Many a gold plant has hundreds of tons of rejected loaded carbon. The reasons for the plant rejecting this carbon can be numerous. Carbon is often stockpiled due to the fact that a production driven plant does not always have the spare elution capacity to process the carbon. The stockpiled carbon is often stockpiled in the sun and this can cause the carbon to become extremely brittle. This potentially brittle carbon cannot be reintroduced into the normal gold plant carbon circuit due to the risk of gold losses onto fine carbon within the tails. AZMET acts as agent for this product and has designed this product as an addition to the gold desorption and recovery plant. This product will be able to process this rejected loaded carbon and carbonaceous material with the following modules: • Attritioning, Grading and Separation Module • Carbon Desorption Module • Carbon Fines Incinerator Module • Goldroom Module Attritioning, Grading and Separation Module This module will be used to load the stockpiled carbon from bags into an attritioning tank where any brittle carbon will be broken into fine particles. After attritioning of the carbon, the carbon will be sized on a screen to separate the carbon into two (2) fractions using a 1mm deck. The +1mm coarse carbon is then discharged into a bulk bag for later treatment in the desorption module. The -1mm fine carbon, which often can contain contaminants like fine silica, is fed to a spiral to separate the gangue from the carbon. The cleaned -1mm carbon fines is then discharged into a bulk bag for drying and later treatment in the carbon fines incinerator. Carbon Desorption Module The +1mm coarse carbon is fed from the bulk bags to a desorption plant where the carbon will be subjected to Acidwash, Elution and Regeneration. An electrowinning section is also provided to recover the gold into sludge that can be smelted in the goldroom module. The regenerated and sized carbon can then be returned to the main plant for re-use in the CIP/CIL circuit. Carbon Fines Incinerator Module The -1mm fine carbon is sun dried in bulk bags before being fed into the carbon fines incinerator. The incinerator will be able to process about 1t/day of carbon fines. The resulting ash from the incinerator is screw fed to the goldroom module for smelting in the smelting furnace. Goldroom Module Gold sludge from electro-winning is first dried in a calcining oven before being combined with the ash from the incinerator for smelting in a smelting furnace. These combined modules offer an elegant solution to unsightly large carbon stockpiles that many a mine has to deal with. These modules have the following benefits: • Recovery of gold lock-up, thus improving plant recovery • Recovery of carbon for re-use in the processing plant, thus reducing OPEX • Freeing up of precious space on site • Employment opportunity for local labour Below are a few pictures of the Carbon Incinerator and Desorption Plant. AZMETtechnology & projects AZMETtechnology & projects
  • 10. >>10 Background This study was conducted to develop an understanding of the metallurgical and infrastructure requirements for the retreatment of flotation tailings dams in Zambia. Summary Earlier studies identified direct acid leaching as the flowsheet of choice for the metallurgical plant. Due to very high acid consumptions during testwork this flowsheet option was demonstrated as non feasible when assessed economically. This study considered various flowsheet options and tested these in the laboratory to identify the reagent consumptions and recoveries for each. Throughout the testwork phases the key consideration was to identify a process flowsheet which resulted in reduced acid consumption or alternative reagents but at the same time achieved reasonable recoveries of both copper and cobalt that resulted in an economic viable project. The study looked at methods to reduce the reagent utilisation by identifying conditions under which lower consumption of reagents was achieved. This thought process was duly followed in carrying out further testwork. This resulted in the identification of a flowsheet with shorter leaching times and in particular the total acid consumption was reduced down to less than 40kg/t. The chosen flowsheet is simplistically described as: • The recovery of tailings. • AZMET Reduced Leaching (AZ-RLT) of the recovered tailings with sulphuric acid. • Separation of cobalt and copper in a solvent extraction plant. • Electrowinning of copper to produce a copper cathode. • Cobalt will be precipitated out separately as a cobalt salt. AZMET’s proprietary Reduced Leach Technology (AZ-RLT) was used, which resulted in an economical process on the samples tested. For more information view “New Technologies & Develpments” Cu & Co Tailings Retreatment - Overall Flowsheet >>Cu & Co Tailings Retreatment - Technical Assessment “Technical solutions through innovation.” }}
  • 11. 11 << Background This Desktop study was conducted to develop an understanding of the metallurgical requirements for the Treatment of an existing tailings stockpile in the DRC. Summary The establishment of operations for the Stockpile Project is based upon a simple dry recovery of the tailings from the stockpile using front end loaders (FEL). The study assumes that acid leaching will provide the required dissolutions recovery based on historical sample assay results. This study considered various flowsheet options which evaluated conventional direct acid leaching to generate a copper and cobalt pregnant solution (PLS) that can be sold to the neighbouring process plants as the base case. Alternative options also considered a final copper cathode and cobalt precipitate salt to increase the possible LME value. A high level financial trade- off resulted in selecting a small plant throughput, with the least capital cost, but still producing a final copper and cobalt product for maximum metal revenues. Different flowsheets were compared. This included the provisional development of operating and capital costs for each flowsheet as part of an options study, before a choice was made to take the preferred flowsheet forward. >>Cu & Co Stockpile Treatment – Desktop Study The chosen flowsheet is simplistically described as: • The recovery of material from the stockpile. • Curing and leaching of the recovered stockpile material with reagents. • Solid/liquid separation. • Separation of copper and cobalt in a solvent extraction plant. • Electrowinning of copper to produce a copper cathode. • Cobalt will be precipitated out separately as a saleable cobalt salt. Cu & Co Stockpile Treatment - Overall Flowsheet “Engineering solutions for your requirement.” }}
  • 12. AZMET was contracted for the engineering process design, for the completion of a Refractory Gold Project, Definitive Feasibility Study (DSF), located in Mozambique. The Refractory Gold Project process flow consisted of two stage crushing and ball milling followed by an ultra-fine grind and a floatation circuit for concentration of the gold. Flotation concentrate is oxidised through reactors and processed in a standard gold CIL circuit from where the loaded carbon is harvested and gold recovered through AZMET’s Modular Gold Desorption and Recovery Plant. >>DFS Refractory Gold Project in Mozambique AZMET’s scope of work included but was not limited to all process design deliverables to DFS level of accuracy for the following process unit operations: • Carbon In Leach Circuit (CIL) • AZMET Desorption and Recovery Plant comprising of: >> Loaded Carbon Handling including Carbon Attritioning & Transfer >> Acid wash >> Elution >> Electrowinning >> Goldroom including security >> Regeneration >> MCC & PLC • Reagent Packages >> Lime >> Cyanide >> Caustic >> Hydrochloric Acid AZMET started the study late Q4 of 2015 and executed all contractual deliverables early Q1 2016. M M M M M M M M M A B C D E F G H Refractory Gold – Overall Flowsheet DATE DWG NO PROJECT REV 20/04/2016 AZ-XXXX-PR-OFS-00-02 Refractory Gold DFS 0D SHEET 1 OF 1 D C B A 4 3 2 1 D C B A 4 3 2 1 M Gravity Concentrator M M M M M M M M M M M M M To Fine Grind Mill Pre-leach Thickener M Gravity Conc Process Water Header TSF Flotation CIL DR Plant Ball Mill Crushing Fine Grind Mill Leach Conditioning Mill Stockpile M Concentrate Thickener M Process Water Fresh Dilution Water Refractory Gold Project - Typical flowsheet “Your partner in mineral beneficiation.” }} >>12
  • 13. AZMET has been focused on the development of new processes and technologies specifically within the Au, Cu and base metal industries. With the downturn in commodity prices the need for alternative process routes with lower operating costs increases, as well as finding solutions for “difficult to treat” complex ores. AZMET has developed the following technologies over the past 12 months; two of these are pending patents: AZMET has developed on a cost effective process methodology to recover cyanide from the plant tails stream. This process is based on proven process technologies that have been used in the industry for over 50 years. The benefit of this process will include but not be limited to: OPEX savings: • Recovery of cyanide. • Eliminating costly detox reagent costs. • Environmental benefit on tailings disposal. Recovery benefits – Increasing plant economics: • Recovery of Copper, if present in tails stream. • Additional gold recovery from tails solution. >>AZMET Cyanide Recovery Process (AZ-CRP) “Cost effective process methodologies.” }} 13 << A B C D E F G H M M M M M M M Cyanide Recovery Process - Flowsheet
  • 14. “Technology that provides increased recovery and lower operating costs.” }} >>AZMET Basic Leach Technology (AZ-BLT) AZMET has developed a cost effective process route to recover copper from low grade secondary copper minerals utilising a basic leach process. The process can be used on existing tailings dumps and on the tails streams of operating flotation plants treating Supergene ores (secondary or cyanide soluble copper). This process is based on proven process technologies that have been used in the industry and has been optimised to provide lower operating and capital cost requirements. The benefit of this process will include but not be limited to: • A process circuit for the treatment of both copper and precious metals. • Simpler mine plan for complex ores (copper with gold and silver). • OPEX savings. • CAPEX savings. >>AZMET Reduced Leach Technology (AZ-RLT) AZMET has developed an acid leach process for the beneficiation of base metal complexed ores, using a combination of proven technologies that has been used in the mining industry for more than 20 years. The process which is AZMET’s proprietary process can be tested in our partner laboratories and holds the following benefits: • Reduced leach retention times compared to conventional leaching. • Reduction in reagent consumptions which results in the cost effective processing of “difficult to treat” ore bodies. • Lower CAPEX requirement compared to conventional acid leaching. Primary classification inefficiencies should be a problem of the past! Ultra-fine screening technology has developed in recent years and can be successfully installed as a reliable primary classification processing unit. Although a larger footprint will be required, the comminution and recovery benefits to date have shown project CAPEX payback periods from as little as a couple of months. In addition, the additional mill capacity created as a result of improved classification efficiency can be utilised by either a finer mill product grind or additional ROM throughput. AZMET has developed an IP test procedure in which the comparative hydrocyclone vs ultrafine screening testwork can be conducted. The testwork results together with the client’s plant operating data is used to conduct trade-off and financial models which will indicate the possible payback period and NPV on implementing such a change. The principal advantages are: • Higher classification efficiency. • Lower maintenance in mill circuit. • Substantial reduction in recirculating load (up to 500% reduction). • Finer grind achievable through utilisation of available power. OR • Additional throughput (up to 40% ROM) • Less overgrinding of metal fines resulting in flotation recovery benefits (up to 9% increase) • Eliminates ultrafine metal medium formation in cyclones AZMET’s latest test results has shown a considerable increase in recoveries on base metals. Contact AZMET should this technology be of immediate interest. >>Ultra-fine Screening Classification Testwork Procedure (AZ-UFS) “Primary classification deficiencies are a problem of the past.” }} >>14
  • 15. 15 << >>Azmet Offices retain the vibrant and professional culture nurtured by AZMET management. The new office space also allows for the expected growth of AZMET, and enables the company to ensure the continued delivery of great service to their existing and future clients. The sustained growth of AZMET, has forced the dynamic company to relocate to new offices mid-2015. The new modern building is situated close to the R21, in Glen Eagle Office Park, centrally located between Johannesburg and Pretoria. Office layout was done in an open plan manner to enable collaboration and flow of ideas between staff, and in doing so, AZMETtechnology & projects AZMETtechnology & projects
  • 16. >>Business of the Year Award Azmet was nominated out of 5300 companies as a nominee for business of the year 2016. Azmet received 1st prize (gold) at the Business of the Year 2016 Award Ceremony, for the category “Engineering” Azmet pride itself in achieving this award which is testament of our aim to service excellence and providing world class Engineering and Project Management Services. AZMETtechnology & projects >> contact details tel +27 86 11AZMET (29638) | fax +27 86 628 5610 email info@azmet.co.za | ruan@azmet.co.za | web www.azmet.co.za “Engineering is not a profession, it’s a PASSION.” }}