CASE STUDY: NORTECH, UNITED KINGDOM
NORTECH STREAMLINES PLANT DESIGN WITH
INTERGRAPH
®
CADWORX
®
SOLUTION
Engineering services provider implements Intergraph tools for a
gas plant design project
IDENTIFYING GOALS
Nortech, an award-winning engineering design, project management,
procurement and construction management assistance service provider, was
selected to engineer and design a new plant for Jersey Gas company, a
liquefied petro gas importer owned by International Energy Group. Jersey Gas’
original manufacturing plant could not efficiently operate based on the seasonal
differences in energy demand, and at peak times it was running with minimum
spare capacity. The new plant was required to operate on demand and cover
seasonal differences in energy demand, allowing the existing gas holder to be
withdrawn out of service and the associated land to be sold for further
development. The main drivers for the project were to improve the security of
supply and to remove the need for the gas holder, which was decommissioned
in 2012 and free the land for potential redevelopment.
Nortech was chosen to supply engineering and design services for Jersey Gas’
new plant. Existing plant information was to be retrieved in CloudScan and
Navisworks formats, of which only simplistic data models had been produced.
Intergraph solutions were used for more complex plant and construction design
to ensure the completion of the project according to a tight delivery schedule.
OVERCOMING CHALLENGES
A tight time schedule and the limitations to the available data model affected
the engineering and design process. Nortech needed a solution to ensure
clash-free design with efficient 3D design capabilities, the ability to produce and
revise isometrics, and the ability to create bills of materials.
Nortech chose Intergraph CADWorx Plant Professional and Autodesk
Navisworks for their familiarity and AutoCAD-based 3D design capabilities.
The 3D design began with the creation of piping specifications along with
existing, modified, and new piping catalogues. The piping modelling
commenced after the creation of the specifications.
CADWorx Plant Professional was also used for the structural, civil, and
FACTS AT A GLANCE
Company: Nortech Solutions Group
Ltd.
Website: www.nortech-group.com
Description: Nortech Solutions Group
Ltd. provides professional engineering
design, project and construction
management assistance services to the
oil and gas, process, petrochemical,
chemical, iron, steel and energy
industries both in the UK and
internationally. Nortech works closely
with clients to develop and deliver a
project from Concept Engineering (CE),
Basic Engineering (BE) and Detailed
Engineering (DE) with the production
of Approved For Construction (AFC)
deliverables across a number of market
sectors.
Employees: 76
Industry: Oil & Gas, Chemical &
Petrochemical, Energy, Iron & Steel
Country: United Kingdom
PRODUCTS USED:
•	CADWorx® Plant Professional
•	CAESAR II®
•	ISOGEN®
KEY BENEFITS:
•	Improved 3D design capabilities.
•	High-quality isometric production.
•	Lowered project costs.
•	Enhanced 3D laser scan data
processing.
mechanical design. After this, all the isometric drawings were
produced with ISOGEN, enabling automated isometric creation
tailored to Nortech’s needs. Piping support details and generic
3D design were also created with Intergraph tools. Moreover, the
3D design was transferred into a fully dimensional 2D format for
fabrication purposes.
Intergraph CAESAR II was used for pipe stress analysis through-
out the project. The interoperability of CAESAR II and CADWorx
Plant Professional enabled quick and highly successful informa-
tion transfer between the solutions. This provided an effective
and cost-saving way to easily define a piping system analysis
model.
REALIZING RESULTS
Working with CADWorx Plant Professional and Navisworks gave
Nortech’s engineering department an overall view of the 40+
separate 3D files and helped the team keep track of the design
processes. The models could be easily viewed within Nortech as
well as readily shared with the client.
CADWorx Plant Professional was used to:
• Create piping and structural design in both 3D and 2D formats.
• Automatically generate accurate isometrics.
• Define pipe support details.
• Create layouts and bills of materials.
MOVING FORWARD
Following the successful Jersey Gas project, Nortech has
implemented CADWorx Plant Professional in the majority of its
projects, predominant for piping design. Intergraph tools are
currently used on a wide range of brownfield topside projects,
including caisson replacements, FEED studies, and complete
projects across a number of North Sea offshore facilities.
Intergraph helps the world work smarter. The company’s
software and solutions improve the lives of millions of people
through better facilities, safer communities, and more reliable
operations.
Intergraph Process, Power & Marine (PP&M) is the world’s
leading provider of enterprise engineering software enabling
smarter design and operation of plants, ships, and offshore
facilities. Intergraph Security, Government & Infrastructure (SG&I)
is the leader in smart solutions for emergency response, utilities,
transportation, and other global challenges.
For more information, visit www.intergraph.com.
Intergraph is part of Hexagon (Nordic exchange: HEXA B;
www.hexagon.com), a leading global provider of design,
measurement, and visualization technologies that enable
customers to design, measure, and position objects, and
process and present data.
ABOUT INTERGRAPH
© Intergraph Corporation. All rights reserved. Intergraph is part of Hexagon. Intergraph and the Intergraph logo are registered trademarks of Intergraph
Corporation or its subsidiaries in the United States and in other countries. Other brands and product names are trademarks of their respective owners.
06/2014 PPM - NL- 0258A - ENG

More Related Content

What's hot

Resume Waqas Farooq (Project Engineer)
Resume Waqas Farooq (Project Engineer)Resume Waqas Farooq (Project Engineer)
Resume Waqas Farooq (Project Engineer)Waqas Farooq, PMP®
 
Reducing the Cost of Project Change by Peter Timler, West-Cascadia Consultants
Reducing the Cost of Project Change by Peter Timler, West-Cascadia ConsultantsReducing the Cost of Project Change by Peter Timler, West-Cascadia Consultants
Reducing the Cost of Project Change by Peter Timler, West-Cascadia ConsultantsAVEVA Group plc
 
Cadison world-issue-01-2013
Cadison world-issue-01-2013Cadison world-issue-01-2013
Cadison world-issue-01-2013CADISON
 
Commissioned Caustic Soda Plant
Commissioned Caustic Soda PlantCommissioned Caustic Soda Plant
Commissioned Caustic Soda PlantNuberg Engineering
 
Utilization of AVEVA Marine for Front End Loading by Yasushi Miura, Japan Ma...
Utilization of AVEVA Marine for Front End Loading by Yasushi Miura, Japan Ma...Utilization of AVEVA Marine for Front End Loading by Yasushi Miura, Japan Ma...
Utilization of AVEVA Marine for Front End Loading by Yasushi Miura, Japan Ma...AVEVA Group plc
 
Q4 2014 survey of projects no univ
Q4 2014 survey of projects no univQ4 2014 survey of projects no univ
Q4 2014 survey of projects no univnowosad88
 
Chlor Alkali Plant - SARL SASKO, Algeria
Chlor Alkali Plant - SARL SASKO, AlgeriaChlor Alkali Plant - SARL SASKO, Algeria
Chlor Alkali Plant - SARL SASKO, AlgeriaNuberg Engineering
 
Nuberg Wins $35m EPC Contract for Saudi Arabia Chemical Plant
Nuberg Wins $35m EPC Contract for Saudi Arabia Chemical PlantNuberg Wins $35m EPC Contract for Saudi Arabia Chemical Plant
Nuberg Wins $35m EPC Contract for Saudi Arabia Chemical PlantNuberg Engineering
 
Global Tct Sector Interview
Global Tct Sector InterviewGlobal Tct Sector Interview
Global Tct Sector InterviewRichardPike
 
Chlor Alkali Plant - SACHLO, Saudi Arabia
Chlor Alkali Plant - SACHLO, Saudi ArabiaChlor Alkali Plant - SACHLO, Saudi Arabia
Chlor Alkali Plant - SACHLO, Saudi ArabiaNuberg Engineering
 
Template Design for SAGD
Template Design for SAGDTemplate Design for SAGD
Template Design for SAGDAVEVA Group plc
 
Plant abu dhabi chlor alkali chemical plant
Plant abu dhabi chlor alkali chemical plantPlant abu dhabi chlor alkali chemical plant
Plant abu dhabi chlor alkali chemical plantSachin Tyagi
 
Plant saudi arabia chlor alkali chemical plant
Plant saudi arabia chlor alkali chemical plantPlant saudi arabia chlor alkali chemical plant
Plant saudi arabia chlor alkali chemical plantSachin Tyagi
 
Al Ghaith Industries Caustic Soda Plant
Al Ghaith Industries Caustic Soda PlantAl Ghaith Industries Caustic Soda Plant
Al Ghaith Industries Caustic Soda PlantNuberg Engineering
 
Why 3D Laser Scanning Technology Lowers Brownfield Capital Construction Costs
Why 3D Laser Scanning Technology Lowers Brownfield Capital Construction CostsWhy 3D Laser Scanning Technology Lowers Brownfield Capital Construction Costs
Why 3D Laser Scanning Technology Lowers Brownfield Capital Construction CostsAVEVA Group plc
 

What's hot (19)

Resume Waqas Farooq (Project Engineer)
Resume Waqas Farooq (Project Engineer)Resume Waqas Farooq (Project Engineer)
Resume Waqas Farooq (Project Engineer)
 
Reducing the Cost of Project Change by Peter Timler, West-Cascadia Consultants
Reducing the Cost of Project Change by Peter Timler, West-Cascadia ConsultantsReducing the Cost of Project Change by Peter Timler, West-Cascadia Consultants
Reducing the Cost of Project Change by Peter Timler, West-Cascadia Consultants
 
Cadison world-issue-01-2013
Cadison world-issue-01-2013Cadison world-issue-01-2013
Cadison world-issue-01-2013
 
Commissioned Caustic Soda Plant
Commissioned Caustic Soda PlantCommissioned Caustic Soda Plant
Commissioned Caustic Soda Plant
 
Utilization of AVEVA Marine for Front End Loading by Yasushi Miura, Japan Ma...
Utilization of AVEVA Marine for Front End Loading by Yasushi Miura, Japan Ma...Utilization of AVEVA Marine for Front End Loading by Yasushi Miura, Japan Ma...
Utilization of AVEVA Marine for Front End Loading by Yasushi Miura, Japan Ma...
 
Q4 2014 survey of projects no univ
Q4 2014 survey of projects no univQ4 2014 survey of projects no univ
Q4 2014 survey of projects no univ
 
CaseStudy-ECOFOXl
CaseStudy-ECOFOXlCaseStudy-ECOFOXl
CaseStudy-ECOFOXl
 
Chlor Alkali Plant - SARL SASKO, Algeria
Chlor Alkali Plant - SARL SASKO, AlgeriaChlor Alkali Plant - SARL SASKO, Algeria
Chlor Alkali Plant - SARL SASKO, Algeria
 
Nuberg Wins $35m EPC Contract for Saudi Arabia Chemical Plant
Nuberg Wins $35m EPC Contract for Saudi Arabia Chemical PlantNuberg Wins $35m EPC Contract for Saudi Arabia Chemical Plant
Nuberg Wins $35m EPC Contract for Saudi Arabia Chemical Plant
 
Global Tct Sector Interview
Global Tct Sector InterviewGlobal Tct Sector Interview
Global Tct Sector Interview
 
Chlor Alkali Plant - SACHLO, Saudi Arabia
Chlor Alkali Plant - SACHLO, Saudi ArabiaChlor Alkali Plant - SACHLO, Saudi Arabia
Chlor Alkali Plant - SACHLO, Saudi Arabia
 
Template Design for SAGD
Template Design for SAGDTemplate Design for SAGD
Template Design for SAGD
 
Plant abu dhabi chlor alkali chemical plant
Plant abu dhabi chlor alkali chemical plantPlant abu dhabi chlor alkali chemical plant
Plant abu dhabi chlor alkali chemical plant
 
Plant saudi arabia chlor alkali chemical plant
Plant saudi arabia chlor alkali chemical plantPlant saudi arabia chlor alkali chemical plant
Plant saudi arabia chlor alkali chemical plant
 
Al Ghaith Industries Caustic Soda Plant
Al Ghaith Industries Caustic Soda PlantAl Ghaith Industries Caustic Soda Plant
Al Ghaith Industries Caustic Soda Plant
 
GNK Aerospace 2014
GNK Aerospace 2014GNK Aerospace 2014
GNK Aerospace 2014
 
Hydrogen Peroxide Plants
Hydrogen Peroxide PlantsHydrogen Peroxide Plants
Hydrogen Peroxide Plants
 
Optimisation in Aerospace
Optimisation in AerospaceOptimisation in Aerospace
Optimisation in Aerospace
 
Why 3D Laser Scanning Technology Lowers Brownfield Capital Construction Costs
Why 3D Laser Scanning Technology Lowers Brownfield Capital Construction CostsWhy 3D Laser Scanning Technology Lowers Brownfield Capital Construction Costs
Why 3D Laser Scanning Technology Lowers Brownfield Capital Construction Costs
 

Similar to CaseStudy-Nortech

CaseStudy - STI Engineering
CaseStudy - STI EngineeringCaseStudy - STI Engineering
CaseStudy - STI EngineeringMaurizio Sirica
 
Field Engineering & 3D Modeling For 105MW Tarakhil Power Plant In Kabul
Field Engineering & 3D Modeling For 105MW Tarakhil Power Plant In KabulField Engineering & 3D Modeling For 105MW Tarakhil Power Plant In Kabul
Field Engineering & 3D Modeling For 105MW Tarakhil Power Plant In KabulRishabh Engineering Services
 
Intergraph CADWorx & Analysis Flyer
Intergraph CADWorx & Analysis FlyerIntergraph CADWorx & Analysis Flyer
Intergraph CADWorx & Analysis FlyerNicole Brlek
 
Intergraph cad worx_analysis_flyer_2012
Intergraph cad worx_analysis_flyer_2012Intergraph cad worx_analysis_flyer_2012
Intergraph cad worx_analysis_flyer_2012Nicole Brlek
 
CaseStudy - MARSON 3D-ISAGRO
CaseStudy - MARSON 3D-ISAGROCaseStudy - MARSON 3D-ISAGRO
CaseStudy - MARSON 3D-ISAGROMaurizio Sirica
 
CaseStudy- Gelsia_FINAL-
CaseStudy- Gelsia_FINAL-CaseStudy- Gelsia_FINAL-
CaseStudy- Gelsia_FINAL-Maurizio Sirica
 
DOD USES SMARTPLANT ® MATERIALS TO IMPROVE PROCUREMENT EFFICIENCY
DOD USES SMARTPLANT ® MATERIALS TO IMPROVE PROCUREMENT EFFICIENCY DOD USES SMARTPLANT ® MATERIALS TO IMPROVE PROCUREMENT EFFICIENCY
DOD USES SMARTPLANT ® MATERIALS TO IMPROVE PROCUREMENT EFFICIENCY raghunathan janarthanan
 
Gas Liquid Engineering - Presentation Brazil
Gas Liquid Engineering - Presentation BrazilGas Liquid Engineering - Presentation Brazil
Gas Liquid Engineering - Presentation BrazilSistema FIEB
 
BQ-Engg Design Services 2012
BQ-Engg Design Services 2012BQ-Engg Design Services 2012
BQ-Engg Design Services 2012NEERAJ SRIVASTAVA
 
CADWorx Plant Professional
CADWorx Plant ProfessionalCADWorx Plant Professional
CADWorx Plant ProfessionalPaul Howard
 
Cadac Corporate Folder English
Cadac Corporate Folder EnglishCadac Corporate Folder English
Cadac Corporate Folder EnglishTauladan
 

Similar to CaseStudy-Nortech (20)

CaseStudy - STI Engineering
CaseStudy - STI EngineeringCaseStudy - STI Engineering
CaseStudy - STI Engineering
 
Field Engineering & 3D Modeling For 105MW Tarakhil Power Plant In Kabul
Field Engineering & 3D Modeling For 105MW Tarakhil Power Plant In KabulField Engineering & 3D Modeling For 105MW Tarakhil Power Plant In Kabul
Field Engineering & 3D Modeling For 105MW Tarakhil Power Plant In Kabul
 
CaseStudy_OnLine_Design
CaseStudy_OnLine_DesignCaseStudy_OnLine_Design
CaseStudy_OnLine_Design
 
CaseStudy_Ludan_Engineering
CaseStudy_Ludan_EngineeringCaseStudy_Ludan_Engineering
CaseStudy_Ludan_Engineering
 
Intergraph CADWorx & Analysis Flyer
Intergraph CADWorx & Analysis FlyerIntergraph CADWorx & Analysis Flyer
Intergraph CADWorx & Analysis Flyer
 
Intergraph cad worx_analysis_flyer_2012
Intergraph cad worx_analysis_flyer_2012Intergraph cad worx_analysis_flyer_2012
Intergraph cad worx_analysis_flyer_2012
 
CaseStudy - MARSON 3D-ISAGRO
CaseStudy - MARSON 3D-ISAGROCaseStudy - MARSON 3D-ISAGRO
CaseStudy - MARSON 3D-ISAGRO
 
CaseStudy- Gelsia_FINAL-
CaseStudy- Gelsia_FINAL-CaseStudy- Gelsia_FINAL-
CaseStudy- Gelsia_FINAL-
 
Infotech oiland gas brochure 13
Infotech oiland gas brochure 13Infotech oiland gas brochure 13
Infotech oiland gas brochure 13
 
Prime Design Project
Prime Design ProjectPrime Design Project
Prime Design Project
 
DOD USES SMARTPLANT ® MATERIALS TO IMPROVE PROCUREMENT EFFICIENCY
DOD USES SMARTPLANT ® MATERIALS TO IMPROVE PROCUREMENT EFFICIENCY DOD USES SMARTPLANT ® MATERIALS TO IMPROVE PROCUREMENT EFFICIENCY
DOD USES SMARTPLANT ® MATERIALS TO IMPROVE PROCUREMENT EFFICIENCY
 
Gas Liquid Engineering - Presentation Brazil
Gas Liquid Engineering - Presentation BrazilGas Liquid Engineering - Presentation Brazil
Gas Liquid Engineering - Presentation Brazil
 
Derek Pattison CV1
Derek Pattison CV1Derek Pattison CV1
Derek Pattison CV1
 
4 YEARS EXP RESUME
4 YEARS EXP RESUME4 YEARS EXP RESUME
4 YEARS EXP RESUME
 
PV Elite
PV ElitePV Elite
PV Elite
 
BQ-Engg Design Services 2012
BQ-Engg Design Services 2012BQ-Engg Design Services 2012
BQ-Engg Design Services 2012
 
Mpds4 brochure en
Mpds4 brochure enMpds4 brochure en
Mpds4 brochure en
 
CADWorx Plant Professional
CADWorx Plant ProfessionalCADWorx Plant Professional
CADWorx Plant Professional
 
Cadac Corporate Folder English
Cadac Corporate Folder EnglishCadac Corporate Folder English
Cadac Corporate Folder English
 
Burgasneftoproekt
BurgasneftoproektBurgasneftoproekt
Burgasneftoproekt
 

CaseStudy-Nortech

  • 1. CASE STUDY: NORTECH, UNITED KINGDOM NORTECH STREAMLINES PLANT DESIGN WITH INTERGRAPH ® CADWORX ® SOLUTION Engineering services provider implements Intergraph tools for a gas plant design project IDENTIFYING GOALS Nortech, an award-winning engineering design, project management, procurement and construction management assistance service provider, was selected to engineer and design a new plant for Jersey Gas company, a liquefied petro gas importer owned by International Energy Group. Jersey Gas’ original manufacturing plant could not efficiently operate based on the seasonal differences in energy demand, and at peak times it was running with minimum spare capacity. The new plant was required to operate on demand and cover seasonal differences in energy demand, allowing the existing gas holder to be withdrawn out of service and the associated land to be sold for further development. The main drivers for the project were to improve the security of supply and to remove the need for the gas holder, which was decommissioned in 2012 and free the land for potential redevelopment. Nortech was chosen to supply engineering and design services for Jersey Gas’ new plant. Existing plant information was to be retrieved in CloudScan and Navisworks formats, of which only simplistic data models had been produced. Intergraph solutions were used for more complex plant and construction design to ensure the completion of the project according to a tight delivery schedule. OVERCOMING CHALLENGES A tight time schedule and the limitations to the available data model affected the engineering and design process. Nortech needed a solution to ensure clash-free design with efficient 3D design capabilities, the ability to produce and revise isometrics, and the ability to create bills of materials. Nortech chose Intergraph CADWorx Plant Professional and Autodesk Navisworks for their familiarity and AutoCAD-based 3D design capabilities. The 3D design began with the creation of piping specifications along with existing, modified, and new piping catalogues. The piping modelling commenced after the creation of the specifications. CADWorx Plant Professional was also used for the structural, civil, and FACTS AT A GLANCE Company: Nortech Solutions Group Ltd. Website: www.nortech-group.com Description: Nortech Solutions Group Ltd. provides professional engineering design, project and construction management assistance services to the oil and gas, process, petrochemical, chemical, iron, steel and energy industries both in the UK and internationally. Nortech works closely with clients to develop and deliver a project from Concept Engineering (CE), Basic Engineering (BE) and Detailed Engineering (DE) with the production of Approved For Construction (AFC) deliverables across a number of market sectors. Employees: 76 Industry: Oil & Gas, Chemical & Petrochemical, Energy, Iron & Steel Country: United Kingdom PRODUCTS USED: • CADWorx® Plant Professional • CAESAR II® • ISOGEN® KEY BENEFITS: • Improved 3D design capabilities. • High-quality isometric production. • Lowered project costs. • Enhanced 3D laser scan data processing.
  • 2. mechanical design. After this, all the isometric drawings were produced with ISOGEN, enabling automated isometric creation tailored to Nortech’s needs. Piping support details and generic 3D design were also created with Intergraph tools. Moreover, the 3D design was transferred into a fully dimensional 2D format for fabrication purposes. Intergraph CAESAR II was used for pipe stress analysis through- out the project. The interoperability of CAESAR II and CADWorx Plant Professional enabled quick and highly successful informa- tion transfer between the solutions. This provided an effective and cost-saving way to easily define a piping system analysis model. REALIZING RESULTS Working with CADWorx Plant Professional and Navisworks gave Nortech’s engineering department an overall view of the 40+ separate 3D files and helped the team keep track of the design processes. The models could be easily viewed within Nortech as well as readily shared with the client. CADWorx Plant Professional was used to: • Create piping and structural design in both 3D and 2D formats. • Automatically generate accurate isometrics. • Define pipe support details. • Create layouts and bills of materials. MOVING FORWARD Following the successful Jersey Gas project, Nortech has implemented CADWorx Plant Professional in the majority of its projects, predominant for piping design. Intergraph tools are currently used on a wide range of brownfield topside projects, including caisson replacements, FEED studies, and complete projects across a number of North Sea offshore facilities. Intergraph helps the world work smarter. The company’s software and solutions improve the lives of millions of people through better facilities, safer communities, and more reliable operations. Intergraph Process, Power & Marine (PP&M) is the world’s leading provider of enterprise engineering software enabling smarter design and operation of plants, ships, and offshore facilities. Intergraph Security, Government & Infrastructure (SG&I) is the leader in smart solutions for emergency response, utilities, transportation, and other global challenges. For more information, visit www.intergraph.com. Intergraph is part of Hexagon (Nordic exchange: HEXA B; www.hexagon.com), a leading global provider of design, measurement, and visualization technologies that enable customers to design, measure, and position objects, and process and present data. ABOUT INTERGRAPH © Intergraph Corporation. All rights reserved. Intergraph is part of Hexagon. Intergraph and the Intergraph logo are registered trademarks of Intergraph Corporation or its subsidiaries in the United States and in other countries. Other brands and product names are trademarks of their respective owners. 06/2014 PPM - NL- 0258A - ENG