SlideShare a Scribd company logo
1 of 5
Download to read offline
Company profile
CompanyIntroduction
AZMET Technology & Projects is a world
class multi-disciplined Engineering Design
and Project Management Company. AZMET’s
Industry knowledge and experience, linked
to sound fundamental understanding of
numerous metallurgical processes, ensures
feasible and economical viable solutions to
our clients. Our capabilities range from PEA’s
through to Project Implementation and beyond.
AZMET has not only successfully completed
studies and projects for some of the world’s
leading mineral producers, but is also
diverse enough to be able to provide cost
effective solutions for junior / artisanal mining
companies.
AZMET distinguishes itself by constantly striving
to provide our clients with the latest process
technologies and designs that will maximize
profit and minimize cost; with an unparalleled
safety and environmental consciousness.
Although AZMET has a team of skilled
engineers across all disciplines that can
execute any metallurgical project, we pride
ourselves to be industry experts in the design
and supply of Gold, Silver, Copper, Cobalt
and Base Metal processing plants. Especially
when beneficiation of complexed ore bodies
is required. AZMET has developed numerous
process technologies to beneficiate “difficult to
treat” ore bodies. We specialize in refractory
ores, VMS, Heap Leach and multi mineral ore
separation and beneficiation.
Vision Statement >> AZMET aims to
be a global leader in specialised design,
optimisation and construction of metallurgical
processes by using the latest technologies
to provide clients with the most feasible and
economical solutions.
Mission Statement >> AZMET’s mission
is to provide professional, environmentally
safe, cost effective metallurgical services to
the global mining sector by utilising specialised
process designs and the latest technologies
to optimise client cashflow through service
excellence underpinned by dedication, integrity
and ethical conduct.
Company
Introduction
Management Team
& Experience
AZMET’s Management Team collectively
have decades of experience in the design
and implementation of mineral processing
plants. Most of the studies and projects
executed were across the African Continent
with geographical footprint expansion into,
but not limited to Turkey, South-America,
Kazakhstan, Russia and Canada.
Our understanding of global standards,
logistics and exports, complement our ability
to successfully and competitively execute
projects across the globe.
The experience, knowledge, accountability
and pro-active nature of AZMET’s
Management Team is paramount to our
growth and testament of the value-added
service delivery to our clients.
ManagementTeam&Experience
»» Morocco
»» Zambia
»» Mozambique
»» Turkey
»» Ethiopia
»» Eritrea
»» Kazakhstan
»» Burkina Faso
»» Mali
»» Namibia
»» Ghana
»» Mali
»» Spain
»» Ivory Coast
»» Central African Republic
»» Guinea
»» DRC
»» South Africa
»» Sierra Leone
»» Senegal
»» Egypt
»» Mauritania
»» Peru
»» Brazil
»» Russia
»» Canada
AZMET’s core business is not exclusively the
provision of Professional Engineering Design
and Project Management Services but extends
to innovative product and process technology
development.
Study and Project commodities include but are not
limited to:
»» Gold	
»» Silver
»» Copper
»» Cobalt
»» Uranium
»» Manganese
»» Zinc & Lead
»» Other Base Metals
The added-value of our products and process
technologies were all developed to increase yield and
reduce project and/or operational CAPEX and OPEX
requirements.
AZMET Cyanide Recovery Process
(AZ-CRP)
AZMET has developed a cost effective process
methodology to recover cyanide from the plant tails
stream. This process is based on proven process
technologies that have been used in the industry for
over 50 years. The benefit of this process will include
but not be limited to:
»» OPEX savings:
•	 Recovery of cyanide
•	 Eliminating costly detox reagent costs
•	 Environmental benefit on tailings disposal
»» Recovery benefits – Increasing plant economics:
•	 Recovery of Copper, if present in tails stream
•	 Additional gold recovery from tails solution
AZMET Basic Leach Technology
(AZ-BLT)
AZMET has developed a cost effective process route
to recover copper from low grade secondary copper
minerals utilising a basic leach process. The process
can be used on existing tailings dumps and on the tails
streams of operating flotation plants treating Supergene
ores (secondary or cyanide soluble copper). This
process is based on proven process technologies that
have been used in the industry and has been optimised
to provide lower operating and capital cost requirements.
The benefit of this process will include but not be
limited to:
»» A process circuit for the treatment of both copper
and precious metals
»» Simpler mine plan for complex ores (copper with
gold and silver)
•	 OPEX savings
•	 CAPEX savings
AZMET Reduced Leach
Technology (AZ-RLT)
AZMET has developed an acid leach process for the
beneficiation of base metal complexed ores, using a
combination of proven technologies that has been used
in the mining industry for more than 20 years.
The process which is AZMET’s proprietary process
can be tested in our partner laboratories and holds the
following benefits:
»» Reduced leach retention times compared to
conventional leaching
»» Reduction in reagent consumptions which results in
the cost effective processing of “difficult to treat” ore
bodies
»» Lower CAPEX requirement compared to
conventional acid leaching
AZMET is known for strong organizational ethos rooted
in the same core values as our clients which is based
on accountability, mutual respect, professionalism and
expertise. We are driven by ethical conduct, integrity,
dedication and passion.
AZMET has executed Turnkey and EPCM contracts to
major global mineral producers.
AZMET offer the following services to the global
metallurgical and mining sectors:
»» Project Management
»» Testwork Management and Reviews
»» Project Studies - from Scoping to Bankable
Feasibility Studies
»» Detailed Engineering Designs for any project phase
»» Project Implementation
»» Process Plant Optimisations and Expansions
»» Project Evaluations
»» Operations
»» Innovative Products & Process Technologies
Core Business AZMET Process Technologies
Engineering Design &
Project Management
Services
CoreBusiness&EngineeringServicesAZMETProcessTechnologies
AZMET Products
AZMETProcessTechnologiesAZMETProducts
AZMET Desorption and Recovery Plant
(AZ-DRP)
AZMET’s Modular Desorption and Recovery Plant for Gold &
Silver hold numerous advantages for the end user and EPCM
contractor. The total modular plant is assembled and cold
commissioned prior to shipment. Thus, the time to install and hot
commission on site is limited with minimal changes. Design of
supply is flexible and can be adjusted according to the client’s
needs; with a total supply consisting of six (6) independent
modules.
AZMET Cyclonic Carbonaceous
Concentrator (AZ-CCC)
The cyclonic carbonaceous concentrator is a safe and
affordable alternative, used to concentrate gold from spent
carbonaceous material removed from a gold processing plant.
The concentrator’s ability to accept a wide range of carbonaceous
material with minimum pre-treatment makes it unique in the
market. One of the key benefits of the concentrator is that it only
requires energy at start up and is self-sustaining during operation.
The concentrator is containerized and portable which means gold
bearing material never have to leave the site.
AZMET Gold Room Scrubber (AZ-GRS)
AZMET’s unique goldroom scrubber ensures optimal removal
of both ammonia and mercury to meet environmental emissions
standards. The system can include either one of the scrubbing
systems or both to meet site specific requirements. The ammonia
scrubber has the added benefit of producing an ammonium
sulphate solution which can be sold for used as a fertilizer or
other industrial processes. Spent carbon from the mercury filters
are regenerated in the standard gold plant regeneration kiln and
used in the leaching circuit.
Ultra-fine Screening Classification
Testwork Procedure (AZ-UFS)
Ultra-fine screening technology has developed in recent
years and can be successfully installed as a reliable
primary classification processing unit with short CAPEX
payback periods from as little as a couple of months.
The additional mill capacity created as a result of
improved classification efficiency can be utilised by either
a finer mill product grind or additional ROM throughput.
AZMET has developed an IP test procedure in which the
comparative hydrocyclone vs ultrafine screening testwork
can be conducted. The testwork results together with the
client’s plant operating data is used to conduct trade-
off and financial models which will indicate the possible
payback period and NPV on implementing such a change.
The principal advantages reported on operational case
studies are:
»» Substantial reduction in recirculating load (up to 500%
reduction).
»» Additional throughput (up to 40% ROM)
»» Less overgrinding of metal fines resulting in flotation
recovery benefits (up to 9% increase)
contact details
tel +27 86 11AZMET (29638) fax +27 86 628 5610
email info@azmet.co.za | ruan@azmet.co.za web www.azmet.co.za

More Related Content

What's hot

Nuberg Company Profile and Corporate Brochure
Nuberg Company Profile and Corporate BrochureNuberg Company Profile and Corporate Brochure
Nuberg Company Profile and Corporate BrochureAK Tyagi
 
American cladding technologies overview
American cladding technologies overviewAmerican cladding technologies overview
American cladding technologies overviewTeknokraft
 
Mincore Capability and Experience Profile
Mincore Capability and Experience ProfileMincore Capability and Experience Profile
Mincore Capability and Experience ProfileCameron Bain
 
Loadmaster Corporate Brochure 2016
Loadmaster Corporate Brochure 2016Loadmaster Corporate Brochure 2016
Loadmaster Corporate Brochure 2016Jeff Myklebust
 
company Profile_June 2016
company Profile_June 2016company Profile_June 2016
company Profile_June 2016Tony Martini
 
About Hindustan Dorr Oliver.
About Hindustan Dorr Oliver.About Hindustan Dorr Oliver.
About Hindustan Dorr Oliver.Gitanjali Singh
 
Copy of CV sarfaraz khalil bhatti
Copy of CV sarfaraz khalil bhattiCopy of CV sarfaraz khalil bhatti
Copy of CV sarfaraz khalil bhattisarfraz bhatti
 
FDF Energy Services
FDF Energy Services FDF Energy Services
FDF Energy Services Kurt Daigle
 
ESP (ASIA) PVT. LTD., BUSINESS PRESENTATION
ESP (ASIA) PVT. LTD., BUSINESS PRESENTATIONESP (ASIA) PVT. LTD., BUSINESS PRESENTATION
ESP (ASIA) PVT. LTD., BUSINESS PRESENTATIONBalasubrahmanian T
 
Nuberg Wins $35m EPC Contract for Saudi Arabia Chemical Plant
Nuberg Wins $35m EPC Contract for Saudi Arabia Chemical PlantNuberg Wins $35m EPC Contract for Saudi Arabia Chemical Plant
Nuberg Wins $35m EPC Contract for Saudi Arabia Chemical PlantNuberg Engineering
 
Resume shyamal kr sahu-
Resume shyamal kr sahu-Resume shyamal kr sahu-
Resume shyamal kr sahu-Shyamal Sahu
 

What's hot (14)

Nuberg Company Profile
Nuberg Company ProfileNuberg Company Profile
Nuberg Company Profile
 
EPC LSTK Projects Portfolio
EPC LSTK Projects PortfolioEPC LSTK Projects Portfolio
EPC LSTK Projects Portfolio
 
Nuberg Company Profile and Corporate Brochure
Nuberg Company Profile and Corporate BrochureNuberg Company Profile and Corporate Brochure
Nuberg Company Profile and Corporate Brochure
 
American cladding technologies overview
American cladding technologies overviewAmerican cladding technologies overview
American cladding technologies overview
 
Mincore Capability and Experience Profile
Mincore Capability and Experience ProfileMincore Capability and Experience Profile
Mincore Capability and Experience Profile
 
Loadmaster Corporate Brochure 2016
Loadmaster Corporate Brochure 2016Loadmaster Corporate Brochure 2016
Loadmaster Corporate Brochure 2016
 
BTP Palamatic Process
BTP Palamatic ProcessBTP Palamatic Process
BTP Palamatic Process
 
company Profile_June 2016
company Profile_June 2016company Profile_June 2016
company Profile_June 2016
 
About Hindustan Dorr Oliver.
About Hindustan Dorr Oliver.About Hindustan Dorr Oliver.
About Hindustan Dorr Oliver.
 
Copy of CV sarfaraz khalil bhatti
Copy of CV sarfaraz khalil bhattiCopy of CV sarfaraz khalil bhatti
Copy of CV sarfaraz khalil bhatti
 
FDF Energy Services
FDF Energy Services FDF Energy Services
FDF Energy Services
 
ESP (ASIA) PVT. LTD., BUSINESS PRESENTATION
ESP (ASIA) PVT. LTD., BUSINESS PRESENTATIONESP (ASIA) PVT. LTD., BUSINESS PRESENTATION
ESP (ASIA) PVT. LTD., BUSINESS PRESENTATION
 
Nuberg Wins $35m EPC Contract for Saudi Arabia Chemical Plant
Nuberg Wins $35m EPC Contract for Saudi Arabia Chemical PlantNuberg Wins $35m EPC Contract for Saudi Arabia Chemical Plant
Nuberg Wins $35m EPC Contract for Saudi Arabia Chemical Plant
 
Resume shyamal kr sahu-
Resume shyamal kr sahu-Resume shyamal kr sahu-
Resume shyamal kr sahu-
 

Viewers also liked

Viewers also liked (16)

Africa - SOYSAL v.2.1
Africa - SOYSAL v.2.1Africa - SOYSAL v.2.1
Africa - SOYSAL v.2.1
 
Finance opportunities offered by the Commission
Finance opportunities offered by the CommissionFinance opportunities offered by the Commission
Finance opportunities offered by the Commission
 
FA Wales
FA WalesFA Wales
FA Wales
 
#16171
#16171#16171
#16171
 
Inspiracja - opis działań Wojewódzkiej i Naukowej Biblioteki Publicznej w Dni...
Inspiracja - opis działań Wojewódzkiej i Naukowej Biblioteki Publicznej w Dni...Inspiracja - opis działań Wojewódzkiej i Naukowej Biblioteki Publicznej w Dni...
Inspiracja - opis działań Wojewódzkiej i Naukowej Biblioteki Publicznej w Dni...
 
Cingol x1plus
Cingol x1plusCingol x1plus
Cingol x1plus
 
Jcl presentation
Jcl presentationJcl presentation
Jcl presentation
 
Recorrido en asia
Recorrido en asiaRecorrido en asia
Recorrido en asia
 
أشهر المنحنيات والمجسمات
أشهر المنحنيات والمجسماتأشهر المنحنيات والمجسمات
أشهر المنحنيات والمجسمات
 
1995 Annual Student Field Day
1995 Annual Student Field Day1995 Annual Student Field Day
1995 Annual Student Field Day
 
Cled 7 lesson 9 second quarter
Cled 7 lesson 9 second quarterCled 7 lesson 9 second quarter
Cled 7 lesson 9 second quarter
 
Media Presentation (Jun 09)
Media Presentation (Jun 09)Media Presentation (Jun 09)
Media Presentation (Jun 09)
 
Organizing a marathon
Organizing a marathonOrganizing a marathon
Organizing a marathon
 
Cambio climático - Tsegaye
Cambio climático - TsegayeCambio climático - Tsegaye
Cambio climático - Tsegaye
 
Student data base 25
Student data base 25Student data base 25
Student data base 25
 
Reflexión Final Seguridad Social (Andreina Machado)
Reflexión Final Seguridad Social (Andreina Machado)Reflexión Final Seguridad Social (Andreina Machado)
Reflexión Final Seguridad Social (Andreina Machado)
 

Similar to AZMET-Company Profile

AZMET DR Plant Brochure
AZMET DR Plant BrochureAZMET DR Plant Brochure
AZMET DR Plant BrochureRuan Kukard
 
AZMET-DR Product Brochure
AZMET-DR Product BrochureAZMET-DR Product Brochure
AZMET-DR Product BrochureBarry Beylefeld
 
AZMET DR Plant Brochure
AZMET DR Plant BrochureAZMET DR Plant Brochure
AZMET DR Plant BrochureBraam Smit
 
AZMET-Newsletter 2016-17
AZMET-Newsletter 2016-17AZMET-Newsletter 2016-17
AZMET-Newsletter 2016-17Charl Du Preez
 
AZMET-Newsletter 2016 (English)
AZMET-Newsletter 2016 (English)AZMET-Newsletter 2016 (English)
AZMET-Newsletter 2016 (English)Ruan Kukard
 
Development of Tight Gas Fields
Development of Tight Gas FieldsDevelopment of Tight Gas Fields
Development of Tight Gas FieldsNeil Barnard
 
CoreMet_Company Presentation_04
CoreMet_Company Presentation_04CoreMet_Company Presentation_04
CoreMet_Company Presentation_04Willie Hefer
 
Building Industry Palamatic Process
Building Industry Palamatic ProcessBuilding Industry Palamatic Process
Building Industry Palamatic ProcessPalamaticProcess
 
Zindzi Mining & Engineering Company Profile
Zindzi Mining & Engineering Company ProfileZindzi Mining & Engineering Company Profile
Zindzi Mining & Engineering Company ProfileShamima Mulla
 
CEDA Brochure All Service Lines_2014
CEDA Brochure All Service Lines_2014CEDA Brochure All Service Lines_2014
CEDA Brochure All Service Lines_2014Paul Morrell, CD
 
What is the Future for Magnetite Projects in Australia
What is the Future for Magnetite Projects in AustraliaWhat is the Future for Magnetite Projects in Australia
What is the Future for Magnetite Projects in AustraliaMidas Engineering Group
 
TIG GROUP | TOTAL SITE SOLUTIONS
TIG GROUP | TOTAL SITE SOLUTIONSTIG GROUP | TOTAL SITE SOLUTIONS
TIG GROUP | TOTAL SITE SOLUTIONStigmena
 
Arslan Enginery EPC Turnkey Projects and Profile.
Arslan Enginery EPC Turnkey Projects and Profile.Arslan Enginery EPC Turnkey Projects and Profile.
Arslan Enginery EPC Turnkey Projects and Profile.Arbaaz Malik
 
electrical-solutions-for-motors-and-generators-mersen
electrical-solutions-for-motors-and-generators-mersenelectrical-solutions-for-motors-and-generators-mersen
electrical-solutions-for-motors-and-generators-mersenJohn Becke
 
MERCC-Generic-Profile-Dec18.pdf MINING CONSULTANT
MERCC-Generic-Profile-Dec18.pdf MINING CONSULTANTMERCC-Generic-Profile-Dec18.pdf MINING CONSULTANT
MERCC-Generic-Profile-Dec18.pdf MINING CONSULTANTtmglobalresources
 

Similar to AZMET-Company Profile (20)

AZMET DR Plant Brochure
AZMET DR Plant BrochureAZMET DR Plant Brochure
AZMET DR Plant Brochure
 
AZMET-DR Product Brochure
AZMET-DR Product BrochureAZMET-DR Product Brochure
AZMET-DR Product Brochure
 
AZMET DR Plant Brochure
AZMET DR Plant BrochureAZMET DR Plant Brochure
AZMET DR Plant Brochure
 
AZMET-Newsletter 2016-17
AZMET-Newsletter 2016-17AZMET-Newsletter 2016-17
AZMET-Newsletter 2016-17
 
AZMET-Newsletter 2016 (English)
AZMET-Newsletter 2016 (English)AZMET-Newsletter 2016 (English)
AZMET-Newsletter 2016 (English)
 
MOCVD Brochure.PDF
MOCVD Brochure.PDFMOCVD Brochure.PDF
MOCVD Brochure.PDF
 
Development of Tight Gas Fields
Development of Tight Gas FieldsDevelopment of Tight Gas Fields
Development of Tight Gas Fields
 
CoreMet_Company Presentation_04
CoreMet_Company Presentation_04CoreMet_Company Presentation_04
CoreMet_Company Presentation_04
 
Building Industry Palamatic Process
Building Industry Palamatic ProcessBuilding Industry Palamatic Process
Building Industry Palamatic Process
 
Zindzi Mining & Engineering Company Profile
Zindzi Mining & Engineering Company ProfileZindzi Mining & Engineering Company Profile
Zindzi Mining & Engineering Company Profile
 
CR Middle East
CR Middle EastCR Middle East
CR Middle East
 
CEDA Brochure All Service Lines_2014
CEDA Brochure All Service Lines_2014CEDA Brochure All Service Lines_2014
CEDA Brochure All Service Lines_2014
 
What is the Future for Magnetite Projects in Australia
What is the Future for Magnetite Projects in AustraliaWhat is the Future for Magnetite Projects in Australia
What is the Future for Magnetite Projects in Australia
 
TIG GROUP | TOTAL SITE SOLUTIONS
TIG GROUP | TOTAL SITE SOLUTIONSTIG GROUP | TOTAL SITE SOLUTIONS
TIG GROUP | TOTAL SITE SOLUTIONS
 
Fraser Uniquip
Fraser UniquipFraser Uniquip
Fraser Uniquip
 
Arslan Enginery EPC Turnkey Projects and Profile.
Arslan Enginery EPC Turnkey Projects and Profile.Arslan Enginery EPC Turnkey Projects and Profile.
Arslan Enginery EPC Turnkey Projects and Profile.
 
Tega Losugen
Tega LosugenTega Losugen
Tega Losugen
 
Tega Industries - Losugen
Tega Industries - LosugenTega Industries - Losugen
Tega Industries - Losugen
 
electrical-solutions-for-motors-and-generators-mersen
electrical-solutions-for-motors-and-generators-mersenelectrical-solutions-for-motors-and-generators-mersen
electrical-solutions-for-motors-and-generators-mersen
 
MERCC-Generic-Profile-Dec18.pdf MINING CONSULTANT
MERCC-Generic-Profile-Dec18.pdf MINING CONSULTANTMERCC-Generic-Profile-Dec18.pdf MINING CONSULTANT
MERCC-Generic-Profile-Dec18.pdf MINING CONSULTANT
 

AZMET-Company Profile

  • 2. CompanyIntroduction AZMET Technology & Projects is a world class multi-disciplined Engineering Design and Project Management Company. AZMET’s Industry knowledge and experience, linked to sound fundamental understanding of numerous metallurgical processes, ensures feasible and economical viable solutions to our clients. Our capabilities range from PEA’s through to Project Implementation and beyond. AZMET has not only successfully completed studies and projects for some of the world’s leading mineral producers, but is also diverse enough to be able to provide cost effective solutions for junior / artisanal mining companies. AZMET distinguishes itself by constantly striving to provide our clients with the latest process technologies and designs that will maximize profit and minimize cost; with an unparalleled safety and environmental consciousness. Although AZMET has a team of skilled engineers across all disciplines that can execute any metallurgical project, we pride ourselves to be industry experts in the design and supply of Gold, Silver, Copper, Cobalt and Base Metal processing plants. Especially when beneficiation of complexed ore bodies is required. AZMET has developed numerous process technologies to beneficiate “difficult to treat” ore bodies. We specialize in refractory ores, VMS, Heap Leach and multi mineral ore separation and beneficiation. Vision Statement >> AZMET aims to be a global leader in specialised design, optimisation and construction of metallurgical processes by using the latest technologies to provide clients with the most feasible and economical solutions. Mission Statement >> AZMET’s mission is to provide professional, environmentally safe, cost effective metallurgical services to the global mining sector by utilising specialised process designs and the latest technologies to optimise client cashflow through service excellence underpinned by dedication, integrity and ethical conduct. Company Introduction Management Team & Experience AZMET’s Management Team collectively have decades of experience in the design and implementation of mineral processing plants. Most of the studies and projects executed were across the African Continent with geographical footprint expansion into, but not limited to Turkey, South-America, Kazakhstan, Russia and Canada. Our understanding of global standards, logistics and exports, complement our ability to successfully and competitively execute projects across the globe. The experience, knowledge, accountability and pro-active nature of AZMET’s Management Team is paramount to our growth and testament of the value-added service delivery to our clients. ManagementTeam&Experience »» Morocco »» Zambia »» Mozambique »» Turkey »» Ethiopia »» Eritrea »» Kazakhstan »» Burkina Faso »» Mali »» Namibia »» Ghana »» Mali »» Spain »» Ivory Coast »» Central African Republic »» Guinea »» DRC »» South Africa »» Sierra Leone »» Senegal »» Egypt »» Mauritania »» Peru »» Brazil »» Russia »» Canada
  • 3. AZMET’s core business is not exclusively the provision of Professional Engineering Design and Project Management Services but extends to innovative product and process technology development. Study and Project commodities include but are not limited to: »» Gold »» Silver »» Copper »» Cobalt »» Uranium »» Manganese »» Zinc & Lead »» Other Base Metals The added-value of our products and process technologies were all developed to increase yield and reduce project and/or operational CAPEX and OPEX requirements. AZMET Cyanide Recovery Process (AZ-CRP) AZMET has developed a cost effective process methodology to recover cyanide from the plant tails stream. This process is based on proven process technologies that have been used in the industry for over 50 years. The benefit of this process will include but not be limited to: »» OPEX savings: • Recovery of cyanide • Eliminating costly detox reagent costs • Environmental benefit on tailings disposal »» Recovery benefits – Increasing plant economics: • Recovery of Copper, if present in tails stream • Additional gold recovery from tails solution AZMET Basic Leach Technology (AZ-BLT) AZMET has developed a cost effective process route to recover copper from low grade secondary copper minerals utilising a basic leach process. The process can be used on existing tailings dumps and on the tails streams of operating flotation plants treating Supergene ores (secondary or cyanide soluble copper). This process is based on proven process technologies that have been used in the industry and has been optimised to provide lower operating and capital cost requirements. The benefit of this process will include but not be limited to: »» A process circuit for the treatment of both copper and precious metals »» Simpler mine plan for complex ores (copper with gold and silver) • OPEX savings • CAPEX savings AZMET Reduced Leach Technology (AZ-RLT) AZMET has developed an acid leach process for the beneficiation of base metal complexed ores, using a combination of proven technologies that has been used in the mining industry for more than 20 years. The process which is AZMET’s proprietary process can be tested in our partner laboratories and holds the following benefits: »» Reduced leach retention times compared to conventional leaching »» Reduction in reagent consumptions which results in the cost effective processing of “difficult to treat” ore bodies »» Lower CAPEX requirement compared to conventional acid leaching AZMET is known for strong organizational ethos rooted in the same core values as our clients which is based on accountability, mutual respect, professionalism and expertise. We are driven by ethical conduct, integrity, dedication and passion. AZMET has executed Turnkey and EPCM contracts to major global mineral producers. AZMET offer the following services to the global metallurgical and mining sectors: »» Project Management »» Testwork Management and Reviews »» Project Studies - from Scoping to Bankable Feasibility Studies »» Detailed Engineering Designs for any project phase »» Project Implementation »» Process Plant Optimisations and Expansions »» Project Evaluations »» Operations »» Innovative Products & Process Technologies Core Business AZMET Process Technologies Engineering Design & Project Management Services CoreBusiness&EngineeringServicesAZMETProcessTechnologies
  • 4. AZMET Products AZMETProcessTechnologiesAZMETProducts AZMET Desorption and Recovery Plant (AZ-DRP) AZMET’s Modular Desorption and Recovery Plant for Gold & Silver hold numerous advantages for the end user and EPCM contractor. The total modular plant is assembled and cold commissioned prior to shipment. Thus, the time to install and hot commission on site is limited with minimal changes. Design of supply is flexible and can be adjusted according to the client’s needs; with a total supply consisting of six (6) independent modules. AZMET Cyclonic Carbonaceous Concentrator (AZ-CCC) The cyclonic carbonaceous concentrator is a safe and affordable alternative, used to concentrate gold from spent carbonaceous material removed from a gold processing plant. The concentrator’s ability to accept a wide range of carbonaceous material with minimum pre-treatment makes it unique in the market. One of the key benefits of the concentrator is that it only requires energy at start up and is self-sustaining during operation. The concentrator is containerized and portable which means gold bearing material never have to leave the site. AZMET Gold Room Scrubber (AZ-GRS) AZMET’s unique goldroom scrubber ensures optimal removal of both ammonia and mercury to meet environmental emissions standards. The system can include either one of the scrubbing systems or both to meet site specific requirements. The ammonia scrubber has the added benefit of producing an ammonium sulphate solution which can be sold for used as a fertilizer or other industrial processes. Spent carbon from the mercury filters are regenerated in the standard gold plant regeneration kiln and used in the leaching circuit. Ultra-fine Screening Classification Testwork Procedure (AZ-UFS) Ultra-fine screening technology has developed in recent years and can be successfully installed as a reliable primary classification processing unit with short CAPEX payback periods from as little as a couple of months. The additional mill capacity created as a result of improved classification efficiency can be utilised by either a finer mill product grind or additional ROM throughput. AZMET has developed an IP test procedure in which the comparative hydrocyclone vs ultrafine screening testwork can be conducted. The testwork results together with the client’s plant operating data is used to conduct trade- off and financial models which will indicate the possible payback period and NPV on implementing such a change. The principal advantages reported on operational case studies are: »» Substantial reduction in recirculating load (up to 500% reduction). »» Additional throughput (up to 40% ROM) »» Less overgrinding of metal fines resulting in flotation recovery benefits (up to 9% increase)
  • 5. contact details tel +27 86 11AZMET (29638) fax +27 86 628 5610 email info@azmet.co.za | ruan@azmet.co.za web www.azmet.co.za