SlideShare a Scribd company logo
1 of 2
Download to read offline
Management Sciences 261, Winter 2012
                                             Assignment #1
HAND IN: by 5:30 p.m., Wednesday January 18, in the Management Sciences drop box across from CPH‐2367 (where 
CPH meets E2), in the slot for your section, labeled “MSCI 261‐Fuller‐XXXX,” where XXXX is your lecture time, 8:30 or 
10:30.  Do not put yours into a slot for another Man. Sci. course, or it will get lost!    
LATE POLICY: 20% off if one day late; 50% off if 2 days late; 100% off if 3 or more days late. 
REMINDER from course outline:  You may consult with other students about your written assignments, but the
work that you turn in must be your own. For example, you may discuss with other students how to create a
spreadsheet, in general terms, but you must code the spreadsheet yourself. Do not copy another student’s
spreadsheet file or part of another student’s spreadsheet file. Do not “lend” your spreadsheet file to another
student. Anyone violating these guidelines will be reported to the Associate Dean for Undergraduate Studies;
the typical punishment is 0% on this assignment, and 5% deducted from your course mark.  
------------------------------------------------------------------------------------------------------------------------------
Question 1. (A spreadsheet problem) [80 marks]

          The ABC Oil Company has found an oil deposit, and now they are trying to decide whether to spend more money
to drill “production” wells, to purchase production equipment, and to operate it for 10 years. For the first 3 years of
production, the natural pressure of the oil in the rocks will drive the oil to the surface, and the rate of production of oil will
be constant from one year to the next. However, after the third year, the natural pressure will decline as more and more
oil is taken out, and the rate of production of oil will decline each year compared to the previous. By the end of year 7,
the rate of production will have declined so much that it will be necessary to buy and install equipment to inject carbon
dioxide (CO2) collected from a nearby coal-fired electric power station; the CO2 injection will maintain the pressure such
that the production rate of oil is constant for years 8 to 10, at the year 7 rate. At the end of the 10th year, the cost of
dismantling the old equipment will approximately equal its scrap value, i.e., the “salvage value” is zero. The oil that is
produced will be sold at the world oil price, but this is the most difficult parameter to predict: it has sometimes been
rising, but it has even sometimes been falling in recent years.
          Your task is to prepare a well-documented spreadsheet that calculates the present worth of the proposed
investment in the production well. You will use the spreadsheet for three different assumptions about the world oil price:
slow decline, zero rate of change in price (steady price), and rapid growth in the price, i.e., to calculate three different
present worth values.

Parameter Values
Interest rate that ABC uses for discounting                        = 12% per year
First cost, now, of production well and equipment                  = $2,500,000
Cost of CO2 injection equipment at end of year 7                   = $1,100,000
Operating cost, during years 1, 2, 3, 4, 5, 6, 7                   = $55,000 per year
Oil production amount during years 1, 2, 3                         = 9,000 barrels per year
Oil production during years 4, 5, 6, 7                             = 10% per year less than previous year
Operating cost, during year 8                                      = $85,000 per year
Change in annual operating cost, years 9, 10                       = 6% more than the previous year
Average price of oil in first year                                 = $80 per barrel
         - increasing for the next 9 years at the rate      = -2% per year (from previous year) [slow decline]
                                                            = 0% per year (from previous year) [steady]
                                                            = 3% per year (from previous year) [rapid growth]

Directions to Create the Spreadsheet
 Construct a spreadsheet that will print out on one page (see below for some hints). Your name and UW ID number
   should be at the top. It should contain a section near the top of the spreadsheet with cells for each of the parameters
   (data), together with labels that identify cell contents, and other labels that give the units of measurement. Have just
   one cell for the rate of growth of the oil price; change the value for the three different growth cases. The spreadsheet
   should calculate and display several things for each of the 11 years of drilling (year 0) and operation (years 1 to 10);
   make the year number increase from left to right and show these things in rows:
            o the number of barrels of output each year;
            o the price of oil each year;
o   the sales revenue from oil sales in each year;
              o   the CO2 injection equipment cost at the end of year 7;
              o   the total cost each year from years 0 to year 10;
              o   the net revenue each year (revenue minus costs in that year), before discounting;
              o   the net revenue in each year, after discounting;
              o   the overall present worth of the proposed investment.

   Use the end-of year approximation for discounting of cash flows: assume that all bills, e.g. for operating costs, are
    paid at the end of the year, and that all revenue is received at the end of the year.

   The spreadsheet formulas should contain references to the cells containing the parameters, so that the spreadsheet can
    be used to do the calculations automatically for any values of the data. Your spreadsheet should be documented, i.e.
    brief explanations should be inserted about what calculations are being performed. In the business world, you would
    show your work to your boss, and he/she must be able to understand it, so clarity will count in the marking. Assume
    that your boss knows engineering economics, so you don’t have to explain basic concepts or give standard formulas in
    your brief explanations; a few words will do. See the solution of Example 2-14 from class (posted on LEARN), for
    an illustration.

   Suggestions to make it fit on one page, and be readable:
       o use landscape orientation;
       o use font size 10;
       o make the left and right margins narrow;
       o in the table of revenues and expenses for the 11 years, express all dollar values in thousands of dollars (to
           make narrower columns possible);
       o use italics, or a different font, for cells containing units or explanations.

What You are to Hand In
 A printout of the one-page spreadsheet, for the case of slow decline in the oil price, with the values of all other data as
  given above (under the heading “Parameter Values”), showing values of all calculated cells, as well as all labels for
  cells (i.e. what is described under “Directions to Create the Spreadsheet .”
 A table of values of the present worth under the three different oil price scenarios, as calculated by your spreadsheet;
  i.e., create and fill in a table like this (this part can be handwritten, if you prefer):

    Scenario:                          Slow Decline                       Steady Price                Rapid Growth
    Present Worth:

   For each price scenario, state whether or not the proposed investment is acceptable, under the scenario’s assumption
    about the oil price.

What You are to Upload to LEARN
 Upload your MS-Excel spreadsheet file to LEARN, so that the TA can look at your formulas, if necessary.

------------------------------------------------ end of Question 1 --------------------------------


Question 2. [20 marks]

Draw a cash flow diagram for the cash flows in Question 1, in the steady price scenario (0%/yr. change).
Please show the individual cash flow elements, not the “summary form,” i.e., do it like Figure 2.6 on page 30 of the text,
not like Figure 2.7. Specifically, show revenue, first cost, annual operating costs, and CO2 injection equipment costs with
separate arrows. Label each arrow and show the dollar value associated with each arrow.

More Related Content

Viewers also liked

3 осн здор_бибик_бойченко_2003_рус
3 осн здор_бибик_бойченко_2003_рус3 осн здор_бибик_бойченко_2003_рус
3 осн здор_бибик_бойченко_2003_русAira_Roo
 
Clase 4: Curso Redes Sociales UNED Lugo
Clase 4: Curso Redes Sociales UNED LugoClase 4: Curso Redes Sociales UNED Lugo
Clase 4: Curso Redes Sociales UNED LugoTamara Raposo Injerto
 
Base de datos dff
Base de datos dffBase de datos dff
Base de datos dffestudiante
 
Expresiones típicas de granada
Expresiones típicas de granadaExpresiones típicas de granada
Expresiones típicas de granadafermin86
 
3 русск яз лапшина_зорька_2013_рус
3 русск яз лапшина_зорька_2013_рус3 русск яз лапшина_зорька_2013_рус
3 русск яз лапшина_зорька_2013_русAira_Roo
 
Improve insights by aggregating on farm trial data
Improve insights by aggregating on farm trial dataImprove insights by aggregating on farm trial data
Improve insights by aggregating on farm trial dataXSInc
 
Workbook LO1 WRL
Workbook LO1 WRLWorkbook LO1 WRL
Workbook LO1 WRLBradley Cox
 
Islam mohammed elsayed
Islam mohammed elsayedIslam mohammed elsayed
Islam mohammed elsayedIslam Mohammed
 
Quinto informe de seguimiento para la construcción de la terminal del sitramss
Quinto informe de seguimiento para la construcción de la terminal del sitramssQuinto informe de seguimiento para la construcción de la terminal del sitramss
Quinto informe de seguimiento para la construcción de la terminal del sitramssFunde Comunicaciones
 
Regulamento do Concurso "Jogos Florais"
Regulamento do Concurso "Jogos Florais"Regulamento do Concurso "Jogos Florais"
Regulamento do Concurso "Jogos Florais"Becre Forte da Casa
 

Viewers also liked (15)

LOEX 2016 Recap
LOEX 2016 RecapLOEX 2016 Recap
LOEX 2016 Recap
 
Nomes
NomesNomes
Nomes
 
3 осн здор_бибик_бойченко_2003_рус
3 осн здор_бибик_бойченко_2003_рус3 осн здор_бибик_бойченко_2003_рус
3 осн здор_бибик_бойченко_2003_рус
 
Clase 4: Curso Redes Sociales UNED Lugo
Clase 4: Curso Redes Sociales UNED LugoClase 4: Curso Redes Sociales UNED Lugo
Clase 4: Curso Redes Sociales UNED Lugo
 
Base de datos dff
Base de datos dffBase de datos dff
Base de datos dff
 
20160624 parlamentaria
20160624 parlamentaria20160624 parlamentaria
20160624 parlamentaria
 
Mastery Journey Timeline
Mastery Journey Timeline Mastery Journey Timeline
Mastery Journey Timeline
 
Expresiones típicas de granada
Expresiones típicas de granadaExpresiones típicas de granada
Expresiones típicas de granada
 
3 русск яз лапшина_зорька_2013_рус
3 русск яз лапшина_зорька_2013_рус3 русск яз лапшина_зорька_2013_рус
3 русск яз лапшина_зорька_2013_рус
 
Improve insights by aggregating on farm trial data
Improve insights by aggregating on farm trial dataImprove insights by aggregating on farm trial data
Improve insights by aggregating on farm trial data
 
Workbook LO1 WRL
Workbook LO1 WRLWorkbook LO1 WRL
Workbook LO1 WRL
 
Islam mohammed elsayed
Islam mohammed elsayedIslam mohammed elsayed
Islam mohammed elsayed
 
Quinto informe de seguimiento para la construcción de la terminal del sitramss
Quinto informe de seguimiento para la construcción de la terminal del sitramssQuinto informe de seguimiento para la construcción de la terminal del sitramss
Quinto informe de seguimiento para la construcción de la terminal del sitramss
 
Noelis altamar
Noelis altamarNoelis altamar
Noelis altamar
 
Regulamento do Concurso "Jogos Florais"
Regulamento do Concurso "Jogos Florais"Regulamento do Concurso "Jogos Florais"
Regulamento do Concurso "Jogos Florais"
 

Similar to Asst1 ms261-w12

ASSESSMENT CASE PAPER ANALYSIS / TUTORIALOUTLET DOT COM
ASSESSMENT CASE PAPER ANALYSIS / TUTORIALOUTLET DOT COMASSESSMENT CASE PAPER ANALYSIS / TUTORIALOUTLET DOT COM
ASSESSMENT CASE PAPER ANALYSIS / TUTORIALOUTLET DOT COMjorge0048
 
Grading sheet major assignment 2 grading sheetcompetencyrequirement
Grading sheet major assignment 2 grading sheetcompetencyrequirementGrading sheet major assignment 2 grading sheetcompetencyrequirement
Grading sheet major assignment 2 grading sheetcompetencyrequirementoreo10
 
Export summary this document was exported from numbers. each table
Export summary this document was exported from numbers.  each tableExport summary this document was exported from numbers.  each table
Export summary this document was exported from numbers. each tablemodi11
 
Page 1 of 7 Fin516 201830 Assessment 2 Value 30.docx
Page 1 of 7  Fin516 201830 Assessment 2  Value 30.docxPage 1 of 7  Fin516 201830 Assessment 2  Value 30.docx
Page 1 of 7 Fin516 201830 Assessment 2 Value 30.docxkarlhennesey
 
Part ADiscount rate5CommentsPROJECT 1(Insulate OfficeYearTotal1.docx
Part ADiscount rate5CommentsPROJECT 1(Insulate OfficeYearTotal1.docxPart ADiscount rate5CommentsPROJECT 1(Insulate OfficeYearTotal1.docx
Part ADiscount rate5CommentsPROJECT 1(Insulate OfficeYearTotal1.docxherbertwilson5999
 
MASTER OF EARLY CHILDHOOD STUDIESCompetency Based LearningCh.docx
MASTER OF EARLY CHILDHOOD STUDIESCompetency Based LearningCh.docxMASTER OF EARLY CHILDHOOD STUDIESCompetency Based LearningCh.docx
MASTER OF EARLY CHILDHOOD STUDIESCompetency Based LearningCh.docxalfredacavx97
 
MASTER OF EARLY CHILDHOOD STUDIESCompetency Based LearningCh.docx
MASTER OF EARLY CHILDHOOD STUDIESCompetency Based LearningCh.docxMASTER OF EARLY CHILDHOOD STUDIESCompetency Based LearningCh.docx
MASTER OF EARLY CHILDHOOD STUDIESCompetency Based LearningCh.docxendawalling
 
Page 1 of 6 Microsoft Excel Project Purpose Th.docx
Page 1 of 6 Microsoft Excel Project Purpose Th.docxPage 1 of 6 Microsoft Excel Project Purpose Th.docx
Page 1 of 6 Microsoft Excel Project Purpose Th.docxtarifarmarie
 
McGraw-HillIrwin Copyright © 2013 by The McGraw-Hi.docx
McGraw-HillIrwin        Copyright © 2013 by The McGraw-Hi.docxMcGraw-HillIrwin        Copyright © 2013 by The McGraw-Hi.docx
McGraw-HillIrwin Copyright © 2013 by The McGraw-Hi.docxandreecapon
 
Ch05 P24 Build a Model Spring 1, 201372212Chapter 5. Ch 05 P24 B.docx
Ch05 P24 Build a Model Spring 1, 201372212Chapter 5. Ch 05 P24 B.docxCh05 P24 Build a Model Spring 1, 201372212Chapter 5. Ch 05 P24 B.docx
Ch05 P24 Build a Model Spring 1, 201372212Chapter 5. Ch 05 P24 B.docxtidwellveronique
 
133chapter092002.ppt
133chapter092002.ppt133chapter092002.ppt
133chapter092002.pptSoujanyaLk1
 
133chapter092002.ppt
133chapter092002.ppt133chapter092002.ppt
133chapter092002.pptSoujanyaLk1
 
WELCOMEFinancial Projections ModelFor Business PlansFran.docx
WELCOMEFinancial Projections ModelFor Business PlansFran.docxWELCOMEFinancial Projections ModelFor Business PlansFran.docx
WELCOMEFinancial Projections ModelFor Business PlansFran.docxalanfhall8953
 
WELCOMEFinancial Projections ModelFor Business PlansFran.docx
WELCOMEFinancial Projections ModelFor Business PlansFran.docxWELCOMEFinancial Projections ModelFor Business PlansFran.docx
WELCOMEFinancial Projections ModelFor Business PlansFran.docxphilipnelson29183
 
Homework chapter-5
Homework chapter-5Homework chapter-5
Homework chapter-5Omar Cesar
 
Compute IRR and NPV in Microsoft Excel 1.IRR Function .docx
Compute IRR and NPV in Microsoft Excel 1.IRR Function .docxCompute IRR and NPV in Microsoft Excel 1.IRR Function .docx
Compute IRR and NPV in Microsoft Excel 1.IRR Function .docxmccormicknadine86
 
Compute IRR and NPV in Microsoft Excel 1.IRR Function .docx
Compute IRR and NPV in Microsoft Excel 1.IRR Function .docxCompute IRR and NPV in Microsoft Excel 1.IRR Function .docx
Compute IRR and NPV in Microsoft Excel 1.IRR Function .docxpatricke8
 
Unit 8 & 9 [122 Payroll Accounting] Page 1 of 3 .docx
Unit 8 & 9      [122 Payroll Accounting]  Page 1 of 3 .docxUnit 8 & 9      [122 Payroll Accounting]  Page 1 of 3 .docx
Unit 8 & 9 [122 Payroll Accounting] Page 1 of 3 .docxdickonsondorris
 

Similar to Asst1 ms261-w12 (20)

ASSESSMENT CASE PAPER ANALYSIS / TUTORIALOUTLET DOT COM
ASSESSMENT CASE PAPER ANALYSIS / TUTORIALOUTLET DOT COMASSESSMENT CASE PAPER ANALYSIS / TUTORIALOUTLET DOT COM
ASSESSMENT CASE PAPER ANALYSIS / TUTORIALOUTLET DOT COM
 
Grading sheet major assignment 2 grading sheetcompetencyrequirement
Grading sheet major assignment 2 grading sheetcompetencyrequirementGrading sheet major assignment 2 grading sheetcompetencyrequirement
Grading sheet major assignment 2 grading sheetcompetencyrequirement
 
Export summary this document was exported from numbers. each table
Export summary this document was exported from numbers.  each tableExport summary this document was exported from numbers.  each table
Export summary this document was exported from numbers. each table
 
Page 1 of 7 Fin516 201830 Assessment 2 Value 30.docx
Page 1 of 7  Fin516 201830 Assessment 2  Value 30.docxPage 1 of 7  Fin516 201830 Assessment 2  Value 30.docx
Page 1 of 7 Fin516 201830 Assessment 2 Value 30.docx
 
Part ADiscount rate5CommentsPROJECT 1(Insulate OfficeYearTotal1.docx
Part ADiscount rate5CommentsPROJECT 1(Insulate OfficeYearTotal1.docxPart ADiscount rate5CommentsPROJECT 1(Insulate OfficeYearTotal1.docx
Part ADiscount rate5CommentsPROJECT 1(Insulate OfficeYearTotal1.docx
 
Chap006
Chap006Chap006
Chap006
 
MASTER OF EARLY CHILDHOOD STUDIESCompetency Based LearningCh.docx
MASTER OF EARLY CHILDHOOD STUDIESCompetency Based LearningCh.docxMASTER OF EARLY CHILDHOOD STUDIESCompetency Based LearningCh.docx
MASTER OF EARLY CHILDHOOD STUDIESCompetency Based LearningCh.docx
 
MASTER OF EARLY CHILDHOOD STUDIESCompetency Based LearningCh.docx
MASTER OF EARLY CHILDHOOD STUDIESCompetency Based LearningCh.docxMASTER OF EARLY CHILDHOOD STUDIESCompetency Based LearningCh.docx
MASTER OF EARLY CHILDHOOD STUDIESCompetency Based LearningCh.docx
 
Page 1 of 6 Microsoft Excel Project Purpose Th.docx
Page 1 of 6 Microsoft Excel Project Purpose Th.docxPage 1 of 6 Microsoft Excel Project Purpose Th.docx
Page 1 of 6 Microsoft Excel Project Purpose Th.docx
 
McGraw-HillIrwin Copyright © 2013 by The McGraw-Hi.docx
McGraw-HillIrwin        Copyright © 2013 by The McGraw-Hi.docxMcGraw-HillIrwin        Copyright © 2013 by The McGraw-Hi.docx
McGraw-HillIrwin Copyright © 2013 by The McGraw-Hi.docx
 
Ch05 P24 Build a Model Spring 1, 201372212Chapter 5. Ch 05 P24 B.docx
Ch05 P24 Build a Model Spring 1, 201372212Chapter 5. Ch 05 P24 B.docxCh05 P24 Build a Model Spring 1, 201372212Chapter 5. Ch 05 P24 B.docx
Ch05 P24 Build a Model Spring 1, 201372212Chapter 5. Ch 05 P24 B.docx
 
133chapter092002.ppt
133chapter092002.ppt133chapter092002.ppt
133chapter092002.ppt
 
133chapter092002 (1).ppt
133chapter092002 (1).ppt133chapter092002 (1).ppt
133chapter092002 (1).ppt
 
133chapter092002.ppt
133chapter092002.ppt133chapter092002.ppt
133chapter092002.ppt
 
WELCOMEFinancial Projections ModelFor Business PlansFran.docx
WELCOMEFinancial Projections ModelFor Business PlansFran.docxWELCOMEFinancial Projections ModelFor Business PlansFran.docx
WELCOMEFinancial Projections ModelFor Business PlansFran.docx
 
WELCOMEFinancial Projections ModelFor Business PlansFran.docx
WELCOMEFinancial Projections ModelFor Business PlansFran.docxWELCOMEFinancial Projections ModelFor Business PlansFran.docx
WELCOMEFinancial Projections ModelFor Business PlansFran.docx
 
Homework chapter-5
Homework chapter-5Homework chapter-5
Homework chapter-5
 
Compute IRR and NPV in Microsoft Excel 1.IRR Function .docx
Compute IRR and NPV in Microsoft Excel 1.IRR Function .docxCompute IRR and NPV in Microsoft Excel 1.IRR Function .docx
Compute IRR and NPV in Microsoft Excel 1.IRR Function .docx
 
Compute IRR and NPV in Microsoft Excel 1.IRR Function .docx
Compute IRR and NPV in Microsoft Excel 1.IRR Function .docxCompute IRR and NPV in Microsoft Excel 1.IRR Function .docx
Compute IRR and NPV in Microsoft Excel 1.IRR Function .docx
 
Unit 8 & 9 [122 Payroll Accounting] Page 1 of 3 .docx
Unit 8 & 9      [122 Payroll Accounting]  Page 1 of 3 .docxUnit 8 & 9      [122 Payroll Accounting]  Page 1 of 3 .docx
Unit 8 & 9 [122 Payroll Accounting] Page 1 of 3 .docx
 

Recently uploaded

Goal Presentation_NEW EMPLOYEE_NETAPS FOUNDATION.pptx
Goal Presentation_NEW EMPLOYEE_NETAPS FOUNDATION.pptxGoal Presentation_NEW EMPLOYEE_NETAPS FOUNDATION.pptx
Goal Presentation_NEW EMPLOYEE_NETAPS FOUNDATION.pptxNetapsFoundationAdmi
 
#Mtp-Kit Prices » Qatar. Doha (+27737758557) Abortion Pills For Sale In Doha,...
#Mtp-Kit Prices » Qatar. Doha (+27737758557) Abortion Pills For Sale In Doha,...#Mtp-Kit Prices » Qatar. Doha (+27737758557) Abortion Pills For Sale In Doha,...
#Mtp-Kit Prices » Qatar. Doha (+27737758557) Abortion Pills For Sale In Doha,...drm1699
 
What are the differences between an international company, a global company, ...
What are the differences between an international company, a global company, ...What are the differences between an international company, a global company, ...
What are the differences between an international company, a global company, ...AbhishekSharma823325
 
The Art of Decision-Making: Navigating Complexity and Uncertainty
The Art of Decision-Making: Navigating Complexity and UncertaintyThe Art of Decision-Making: Navigating Complexity and Uncertainty
The Art of Decision-Making: Navigating Complexity and Uncertaintycapivisgroup
 
Pitch Deck Teardown: Goodcarbon's $5.5m Seed deck
Pitch Deck Teardown: Goodcarbon's $5.5m Seed deckPitch Deck Teardown: Goodcarbon's $5.5m Seed deck
Pitch Deck Teardown: Goodcarbon's $5.5m Seed deckHajeJanKamps
 
Shots fired Budget Presentation.pdf12312
Shots fired Budget Presentation.pdf12312Shots fired Budget Presentation.pdf12312
Shots fired Budget Presentation.pdf12312LR1709MUSIC
 
Thompson_Taylor_MBBS_PB1_2024-03 (1)- Project & Portfolio 2.pptx
Thompson_Taylor_MBBS_PB1_2024-03 (1)- Project & Portfolio 2.pptxThompson_Taylor_MBBS_PB1_2024-03 (1)- Project & Portfolio 2.pptx
Thompson_Taylor_MBBS_PB1_2024-03 (1)- Project & Portfolio 2.pptxtmthompson1
 
Should Law Firms Outsource their Bookkeeping
Should Law Firms Outsource their BookkeepingShould Law Firms Outsource their Bookkeeping
Should Law Firms Outsource their BookkeepingYourLegal Accounting
 
Mastering The Art Of 'Closing The Sale'.
Mastering The Art Of 'Closing The Sale'.Mastering The Art Of 'Closing The Sale'.
Mastering The Art Of 'Closing The Sale'.SNSW group8
 
Beyond Numbers A Holistic Approach to Forensic Accounting
Beyond Numbers A Holistic Approach to Forensic AccountingBeyond Numbers A Holistic Approach to Forensic Accounting
Beyond Numbers A Holistic Approach to Forensic AccountingYourLegal Accounting
 
Progress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdf
Progress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdfProgress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdf
Progress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdfHolger Mueller
 
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![© ر
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![©  ر00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![©  ر
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![© رnafizanafzal
 
Space Tech Expo Exhibitor List 2024 - Exhibitors Data
Space Tech Expo Exhibitor List 2024 - Exhibitors DataSpace Tech Expo Exhibitor List 2024 - Exhibitors Data
Space Tech Expo Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.
Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.
Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.daisycvs
 
SCI9-Q4-MOD8.1.pdfjttstwjwetw55k5wwtwrjw
SCI9-Q4-MOD8.1.pdfjttstwjwetw55k5wwtwrjwSCI9-Q4-MOD8.1.pdfjttstwjwetw55k5wwtwrjw
SCI9-Q4-MOD8.1.pdfjttstwjwetw55k5wwtwrjwadimosmejiaslendon
 
Elevate Your Online Presence with SEO Services
Elevate Your Online Presence with SEO ServicesElevate Your Online Presence with SEO Services
Elevate Your Online Presence with SEO ServicesHaseebBashir5
 
如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证ogawka
 

Recently uploaded (20)

Goal Presentation_NEW EMPLOYEE_NETAPS FOUNDATION.pptx
Goal Presentation_NEW EMPLOYEE_NETAPS FOUNDATION.pptxGoal Presentation_NEW EMPLOYEE_NETAPS FOUNDATION.pptx
Goal Presentation_NEW EMPLOYEE_NETAPS FOUNDATION.pptx
 
#Mtp-Kit Prices » Qatar. Doha (+27737758557) Abortion Pills For Sale In Doha,...
#Mtp-Kit Prices » Qatar. Doha (+27737758557) Abortion Pills For Sale In Doha,...#Mtp-Kit Prices » Qatar. Doha (+27737758557) Abortion Pills For Sale In Doha,...
#Mtp-Kit Prices » Qatar. Doha (+27737758557) Abortion Pills For Sale In Doha,...
 
What are the differences between an international company, a global company, ...
What are the differences between an international company, a global company, ...What are the differences between an international company, a global company, ...
What are the differences between an international company, a global company, ...
 
The Art of Decision-Making: Navigating Complexity and Uncertainty
The Art of Decision-Making: Navigating Complexity and UncertaintyThe Art of Decision-Making: Navigating Complexity and Uncertainty
The Art of Decision-Making: Navigating Complexity and Uncertainty
 
Pitch Deck Teardown: Goodcarbon's $5.5m Seed deck
Pitch Deck Teardown: Goodcarbon's $5.5m Seed deckPitch Deck Teardown: Goodcarbon's $5.5m Seed deck
Pitch Deck Teardown: Goodcarbon's $5.5m Seed deck
 
Obat Aborsi Depok 0851\7696\3835 Jual Obat Cytotec Di Depok
Obat Aborsi Depok 0851\7696\3835 Jual Obat Cytotec Di DepokObat Aborsi Depok 0851\7696\3835 Jual Obat Cytotec Di Depok
Obat Aborsi Depok 0851\7696\3835 Jual Obat Cytotec Di Depok
 
Contact +971581248768 for 100% original and safe abortion pills available for...
Contact +971581248768 for 100% original and safe abortion pills available for...Contact +971581248768 for 100% original and safe abortion pills available for...
Contact +971581248768 for 100% original and safe abortion pills available for...
 
Home Furnishings Ecommerce Platform Short Pitch 2024
Home Furnishings Ecommerce Platform Short Pitch 2024Home Furnishings Ecommerce Platform Short Pitch 2024
Home Furnishings Ecommerce Platform Short Pitch 2024
 
Shots fired Budget Presentation.pdf12312
Shots fired Budget Presentation.pdf12312Shots fired Budget Presentation.pdf12312
Shots fired Budget Presentation.pdf12312
 
Thompson_Taylor_MBBS_PB1_2024-03 (1)- Project & Portfolio 2.pptx
Thompson_Taylor_MBBS_PB1_2024-03 (1)- Project & Portfolio 2.pptxThompson_Taylor_MBBS_PB1_2024-03 (1)- Project & Portfolio 2.pptx
Thompson_Taylor_MBBS_PB1_2024-03 (1)- Project & Portfolio 2.pptx
 
Should Law Firms Outsource their Bookkeeping
Should Law Firms Outsource their BookkeepingShould Law Firms Outsource their Bookkeeping
Should Law Firms Outsource their Bookkeeping
 
Mastering The Art Of 'Closing The Sale'.
Mastering The Art Of 'Closing The Sale'.Mastering The Art Of 'Closing The Sale'.
Mastering The Art Of 'Closing The Sale'.
 
Beyond Numbers A Holistic Approach to Forensic Accounting
Beyond Numbers A Holistic Approach to Forensic AccountingBeyond Numbers A Holistic Approach to Forensic Accounting
Beyond Numbers A Holistic Approach to Forensic Accounting
 
Progress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdf
Progress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdfProgress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdf
Progress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdf
 
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![© ر
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![©  ر00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![©  ر
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![© ر
 
Space Tech Expo Exhibitor List 2024 - Exhibitors Data
Space Tech Expo Exhibitor List 2024 - Exhibitors DataSpace Tech Expo Exhibitor List 2024 - Exhibitors Data
Space Tech Expo Exhibitor List 2024 - Exhibitors Data
 
Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.
Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.
Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.
 
SCI9-Q4-MOD8.1.pdfjttstwjwetw55k5wwtwrjw
SCI9-Q4-MOD8.1.pdfjttstwjwetw55k5wwtwrjwSCI9-Q4-MOD8.1.pdfjttstwjwetw55k5wwtwrjw
SCI9-Q4-MOD8.1.pdfjttstwjwetw55k5wwtwrjw
 
Elevate Your Online Presence with SEO Services
Elevate Your Online Presence with SEO ServicesElevate Your Online Presence with SEO Services
Elevate Your Online Presence with SEO Services
 
如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证
 

Asst1 ms261-w12

  • 1. Management Sciences 261, Winter 2012 Assignment #1 HAND IN: by 5:30 p.m., Wednesday January 18, in the Management Sciences drop box across from CPH‐2367 (where  CPH meets E2), in the slot for your section, labeled “MSCI 261‐Fuller‐XXXX,” where XXXX is your lecture time, 8:30 or  10:30.  Do not put yours into a slot for another Man. Sci. course, or it will get lost!     LATE POLICY: 20% off if one day late; 50% off if 2 days late; 100% off if 3 or more days late.  REMINDER from course outline:  You may consult with other students about your written assignments, but the work that you turn in must be your own. For example, you may discuss with other students how to create a spreadsheet, in general terms, but you must code the spreadsheet yourself. Do not copy another student’s spreadsheet file or part of another student’s spreadsheet file. Do not “lend” your spreadsheet file to another student. Anyone violating these guidelines will be reported to the Associate Dean for Undergraduate Studies; the typical punishment is 0% on this assignment, and 5% deducted from your course mark.   ------------------------------------------------------------------------------------------------------------------------------ Question 1. (A spreadsheet problem) [80 marks] The ABC Oil Company has found an oil deposit, and now they are trying to decide whether to spend more money to drill “production” wells, to purchase production equipment, and to operate it for 10 years. For the first 3 years of production, the natural pressure of the oil in the rocks will drive the oil to the surface, and the rate of production of oil will be constant from one year to the next. However, after the third year, the natural pressure will decline as more and more oil is taken out, and the rate of production of oil will decline each year compared to the previous. By the end of year 7, the rate of production will have declined so much that it will be necessary to buy and install equipment to inject carbon dioxide (CO2) collected from a nearby coal-fired electric power station; the CO2 injection will maintain the pressure such that the production rate of oil is constant for years 8 to 10, at the year 7 rate. At the end of the 10th year, the cost of dismantling the old equipment will approximately equal its scrap value, i.e., the “salvage value” is zero. The oil that is produced will be sold at the world oil price, but this is the most difficult parameter to predict: it has sometimes been rising, but it has even sometimes been falling in recent years. Your task is to prepare a well-documented spreadsheet that calculates the present worth of the proposed investment in the production well. You will use the spreadsheet for three different assumptions about the world oil price: slow decline, zero rate of change in price (steady price), and rapid growth in the price, i.e., to calculate three different present worth values. Parameter Values Interest rate that ABC uses for discounting = 12% per year First cost, now, of production well and equipment = $2,500,000 Cost of CO2 injection equipment at end of year 7 = $1,100,000 Operating cost, during years 1, 2, 3, 4, 5, 6, 7 = $55,000 per year Oil production amount during years 1, 2, 3 = 9,000 barrels per year Oil production during years 4, 5, 6, 7 = 10% per year less than previous year Operating cost, during year 8 = $85,000 per year Change in annual operating cost, years 9, 10 = 6% more than the previous year Average price of oil in first year = $80 per barrel - increasing for the next 9 years at the rate = -2% per year (from previous year) [slow decline] = 0% per year (from previous year) [steady] = 3% per year (from previous year) [rapid growth] Directions to Create the Spreadsheet  Construct a spreadsheet that will print out on one page (see below for some hints). Your name and UW ID number should be at the top. It should contain a section near the top of the spreadsheet with cells for each of the parameters (data), together with labels that identify cell contents, and other labels that give the units of measurement. Have just one cell for the rate of growth of the oil price; change the value for the three different growth cases. The spreadsheet should calculate and display several things for each of the 11 years of drilling (year 0) and operation (years 1 to 10); make the year number increase from left to right and show these things in rows: o the number of barrels of output each year; o the price of oil each year;
  • 2. o the sales revenue from oil sales in each year; o the CO2 injection equipment cost at the end of year 7; o the total cost each year from years 0 to year 10; o the net revenue each year (revenue minus costs in that year), before discounting; o the net revenue in each year, after discounting; o the overall present worth of the proposed investment.  Use the end-of year approximation for discounting of cash flows: assume that all bills, e.g. for operating costs, are paid at the end of the year, and that all revenue is received at the end of the year.  The spreadsheet formulas should contain references to the cells containing the parameters, so that the spreadsheet can be used to do the calculations automatically for any values of the data. Your spreadsheet should be documented, i.e. brief explanations should be inserted about what calculations are being performed. In the business world, you would show your work to your boss, and he/she must be able to understand it, so clarity will count in the marking. Assume that your boss knows engineering economics, so you don’t have to explain basic concepts or give standard formulas in your brief explanations; a few words will do. See the solution of Example 2-14 from class (posted on LEARN), for an illustration.  Suggestions to make it fit on one page, and be readable: o use landscape orientation; o use font size 10; o make the left and right margins narrow; o in the table of revenues and expenses for the 11 years, express all dollar values in thousands of dollars (to make narrower columns possible); o use italics, or a different font, for cells containing units or explanations. What You are to Hand In  A printout of the one-page spreadsheet, for the case of slow decline in the oil price, with the values of all other data as given above (under the heading “Parameter Values”), showing values of all calculated cells, as well as all labels for cells (i.e. what is described under “Directions to Create the Spreadsheet .”  A table of values of the present worth under the three different oil price scenarios, as calculated by your spreadsheet; i.e., create and fill in a table like this (this part can be handwritten, if you prefer): Scenario: Slow Decline Steady Price Rapid Growth Present Worth:  For each price scenario, state whether or not the proposed investment is acceptable, under the scenario’s assumption about the oil price. What You are to Upload to LEARN  Upload your MS-Excel spreadsheet file to LEARN, so that the TA can look at your formulas, if necessary. ------------------------------------------------ end of Question 1 -------------------------------- Question 2. [20 marks] Draw a cash flow diagram for the cash flows in Question 1, in the steady price scenario (0%/yr. change). Please show the individual cash flow elements, not the “summary form,” i.e., do it like Figure 2.6 on page 30 of the text, not like Figure 2.7. Specifically, show revenue, first cost, annual operating costs, and CO2 injection equipment costs with separate arrows. Label each arrow and show the dollar value associated with each arrow.