Islam Mohammed Elsayed is an Egyptian program manager with over 12 years of experience in electrical power systems design, modeling and simulation, protection engineering, and power quality analysis for large oil and gas industries and power utilities. He currently works as the Modeling & Simulation Services Manager for Future Technologies Ltd. in Alkhobar, Saudi Arabia, where he conducts ETAP software workshops and manages electrical consulting projects.
Here I am enclosing my resume, describing all my theoretical and
practical capabilities, which would be an asset to theorganization.
I have done Btech Electronics and Communication Engineering.
I have 6 years UAE work experience in Security System & IT field
I hereby offer my experience and skills for esteemed organization .
I have System Engineer License under Dubai Police and Fire & Safety Engineer License under Dubai Civil Defence
I'm holding UAE valid license
Expecting for your favorable response from your end.
I’m electrical & control system engineer with ten years hands-on experience
in electrical, automation, controls and instrumentation fields gained with
various roles across different organizations.
I’m currently working as automation & control systems team leader for one
of leading contracting companies in Saudi Arabia, responsible for
engineering, procurement and execution activities for control systems of
district cooling plants and mega infrastructure projects.
Moreover, I have vast experience in projects’ commissioning, programming
and starting-up that has been proven in many projects as detailed in the
attached resume.
I’m electrical & control system engineer with ten years hands-on experience in electrical, automation, controls and instrumentation fields gained with various roles across different organizations.
I’m currently working as automation & control systems team leader for one of leading contracting companies in Saudi Arabia, responsible for engineering, procurement and execution activities for control systems of district cooling plants and mega infrastructure projects.
Moreover, I have vast experience in projects’ commissioning, programming and starting-up that has been proven in many projects as detailed in the attached resume.
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Dr.Costas Sachpazis
Terzaghi's soil bearing capacity theory, developed by Karl Terzaghi, is a fundamental principle in geotechnical engineering used to determine the bearing capacity of shallow foundations. This theory provides a method to calculate the ultimate bearing capacity of soil, which is the maximum load per unit area that the soil can support without undergoing shear failure. The Calculation HTML Code included.
HEAP SORT ILLUSTRATED WITH HEAPIFY, BUILD HEAP FOR DYNAMIC ARRAYS.
Heap sort is a comparison-based sorting technique based on Binary Heap data structure. It is similar to the selection sort where we first find the minimum element and place the minimum element at the beginning. Repeat the same process for the remaining elements.
Cosmetic shop management system project report.pdfKamal Acharya
Buying new cosmetic products is difficult. It can even be scary for those who have sensitive skin and are prone to skin trouble. The information needed to alleviate this problem is on the back of each product, but it's thought to interpret those ingredient lists unless you have a background in chemistry.
Instead of buying and hoping for the best, we can use data science to help us predict which products may be good fits for us. It includes various function programs to do the above mentioned tasks.
Data file handling has been effectively used in the program.
The automated cosmetic shop management system should deal with the automation of general workflow and administration process of the shop. The main processes of the system focus on customer's request where the system is able to search the most appropriate products and deliver it to the customers. It should help the employees to quickly identify the list of cosmetic product that have reached the minimum quantity and also keep a track of expired date for each cosmetic product. It should help the employees to find the rack number in which the product is placed.It is also Faster and more efficient way.
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesChristina Lin
Traditionally, dealing with real-time data pipelines has involved significant overhead, even for straightforward tasks like data transformation or masking. However, in this talk, we’ll venture into the dynamic realm of WebAssembly (WASM) and discover how it can revolutionize the creation of stateless streaming pipelines within a Kafka (Redpanda) broker. These pipelines are adept at managing low-latency, high-data-volume scenarios.
Using recycled concrete aggregates (RCA) for pavements is crucial to achieving sustainability. Implementing RCA for new pavement can minimize carbon footprint, conserve natural resources, reduce harmful emissions, and lower life cycle costs. Compared to natural aggregate (NA), RCA pavement has fewer comprehensive studies and sustainability assessments.
Hierarchical Digital Twin of a Naval Power SystemKerry Sado
A hierarchical digital twin of a Naval DC power system has been developed and experimentally verified. Similar to other state-of-the-art digital twins, this technology creates a digital replica of the physical system executed in real-time or faster, which can modify hardware controls. However, its advantage stems from distributing computational efforts by utilizing a hierarchical structure composed of lower-level digital twin blocks and a higher-level system digital twin. Each digital twin block is associated with a physical subsystem of the hardware and communicates with a singular system digital twin, which creates a system-level response. By extracting information from each level of the hierarchy, power system controls of the hardware were reconfigured autonomously. This hierarchical digital twin development offers several advantages over other digital twins, particularly in the field of naval power systems. The hierarchical structure allows for greater computational efficiency and scalability while the ability to autonomously reconfigure hardware controls offers increased flexibility and responsiveness. The hierarchical decomposition and models utilized were well aligned with the physical twin, as indicated by the maximum deviations between the developed digital twin hierarchy and the hardware.
Understanding Inductive Bias in Machine LearningSUTEJAS
This presentation explores the concept of inductive bias in machine learning. It explains how algorithms come with built-in assumptions and preferences that guide the learning process. You'll learn about the different types of inductive bias and how they can impact the performance and generalizability of machine learning models.
The presentation also covers the positive and negative aspects of inductive bias, along with strategies for mitigating potential drawbacks. We'll explore examples of how bias manifests in algorithms like neural networks and decision trees.
By understanding inductive bias, you can gain valuable insights into how machine learning models work and make informed decisions when building and deploying them.
Immunizing Image Classifiers Against Localized Adversary Attacksgerogepatton
This paper addresses the vulnerability of deep learning models, particularly convolutional neural networks
(CNN)s, to adversarial attacks and presents a proactive training technique designed to counter them. We
introduce a novel volumization algorithm, which transforms 2D images into 3D volumetric representations.
When combined with 3D convolution and deep curriculum learning optimization (CLO), itsignificantly improves
the immunity of models against localized universal attacks by up to 40%. We evaluate our proposed approach
using contemporary CNN architectures and the modified Canadian Institute for Advanced Research (CIFAR-10
and CIFAR-100) and ImageNet Large Scale Visual Recognition Challenge (ILSVRC12) datasets, showcasing
accuracy improvements over previous techniques. The results indicate that the combination of the volumetric
input and curriculum learning holds significant promise for mitigating adversarial attacks without necessitating
adversary training.
Final project report on grocery store management system..pdfKamal Acharya
In today’s fast-changing business environment, it’s extremely important to be able to respond to client needs in the most effective and timely manner. If your customers wish to see your business online and have instant access to your products or services.
Online Grocery Store is an e-commerce website, which retails various grocery products. This project allows viewing various products available enables registered users to purchase desired products instantly using Paytm, UPI payment processor (Instant Pay) and also can place order by using Cash on Delivery (Pay Later) option. This project provides an easy access to Administrators and Managers to view orders placed using Pay Later and Instant Pay options.
In order to develop an e-commerce website, a number of Technologies must be studied and understood. These include multi-tiered architecture, server and client-side scripting techniques, implementation technologies, programming language (such as PHP, HTML, CSS, JavaScript) and MySQL relational databases. This is a project with the objective to develop a basic website where a consumer is provided with a shopping cart website and also to know about the technologies used to develop such a website.
This document will discuss each of the underlying technologies to create and implement an e- commerce website.
We have compiled the most important slides from each speaker's presentation. This year’s compilation, available for free, captures the key insights and contributions shared during the DfMAy 2024 conference.
2. ISLAM MOHAMMED ELSAYED
PROGRAM MANAGER
Page 2 of 6
EXPERIENCE SUMMARY
Since Oct 2010 Till Date Future Technologies Ltd. (FTL) – Alkhobar, KSA.
Modeling & Simulation Services Manager
Progressive Roles
Till Jun’11 Senior Electrical Engineer.
Till Jun’14 Deputy Manager – Modeling & Simulation Services.
Till Date Manager – Modeling & Simulation Services.
Key Responsibilities
Project management from bidding stage through final report submission.
Conduct ETAP workshops (as Instructor).
Training & qualifying engineers for electrical power system analysis on ETAP.
Qualifying & evaluating company engineers to be ETAP workshop instructors.
Jan 2006 – Oct 2010
Integrated Bureau for Engineering & Consultations (IBEC), GE Authorized Representative – Cairo, Egypt.
Deputy Manager
Progressive Roles
Till Jan’08 Electrical Design and Protection Engineer.
Jan’08 – Jan’09 Project Manager–Faults & Coordination Studies.
Jan’09 – Oct’10 Group Manager & Vice Company Manager.
During 2010
Center for Management Developing – Egypt.
Part Time Electrical Courses Preparer & Instructor
Jan 2005 – Jan 2006 Modern International Plastics Company ‐ Qwesna, Egypt.
Electrical Engineer
Progressive Roles
Electrical & Mechanical Maintenance of forming machines.
Periodic Maintenance of on‐site Diesel Generators.
EDUCATION & PROFESSIONAL DEVELOPMENT
B.Sc. in Electrical Power and Machines Engineering, Zagazig University, Faculty of Engineering, Egypt, May 2004.
Training/Courses/Certificates
Internal Electrical Safety Training ‐ IBEC's Office, Cairo, Egypt ‐ January 2009.
GE MULTILIN Training Course on Protective Relaying ‐ Spain ‐ May 2009.
ETAP Basic Workshop by OTI ‐ KHOBAR, KSA ‐ October 2010.
SABIC, Saudi KAYAN safety orientation training – Jubail, KSA ‐ October 2010.
IEEE ENERGYCON 2010 ‐ Arc Flash Mitigation & Calculations ‐ Bahrain.
ETAP 293 Real‐Time Workshop by OTI ‐ Mumbai, India ‐ March 2011.
ETAP 215 Advanced Workshop by OTI ‐ KHOBAR, KSA ‐ April 2011.
Exhibitor to OTI in WEPOWER Conference and Exhibition ‐ Dammam, KSA ‐ May 2011.
ETAP 273 Dynamic & Stability Analysis II ‐ KHOBAR, KSA ‐ June 2012.
Saudi ARAMCO safety orientation training (SAOO) – North Gawarh, KSA ‐ December 2012.
ETAP 184 OSPAS Real‐Time training with ARAMCO ‐ KHOBAR, KSA ‐ April 2013.
12 professional development units training program on “Project Management Fundamentals” – FTL Office – May 2013.
ETAP 183, Real‐Time Integrator Training, 3‐Day Workshop ‐ Irvine, California, USA ‐ May 2014.
35 professional development units training program on “Project Management Fundamentals” ‐ KHOBAR, KSA ‐ January 2015.
SIPCHEM (Saudi International Petrochemical Company) safety orientation ‐ Jubail, KSA ‐ April 2015.
SABIC, Sharq safety orientation training ‐ Jubail, KSA ‐ October 2015.
Problem‐solving and decision‐making ‐ Massive open online course (MOOC) – Edraak ‐ June 2016.
Time Management Courseware – Online Course – Expert Rating Inc. – June 206.
Professional Memberships
Member of the Egyptian Syndicate of Engineers (54/08055).
Member of the Saudi Council of Engineers as professional engineer (173880).
Member of the Project Management Institute (PMI), ID 4560168.
3. ISLAM MOHAMMED ELSAYED
PROGRAM MANAGER
Page 3 of 6
ANNEXURE 1 ‐ TRAININGS COURSES CONDUCTED AS INSTRUCTOR
1. Part time instructor at Center for Management Development (CMD) ‐ Egypt.
2. ETAP 115 Onsite Training ‐ 5 Days Workshop ‐ GEDAC Electric ‐ Jeddah, KSA ‐ November 2010.
3. Supporting in ETAP Training ‐ 5 Days Workshop ‐ Saudi ARAMCO ‐ December 2010.
4. ETAP 113 Onsite Training – 3 Days Workshop ‐ GPIC, Bahrain ‐ January 2011.
5. ETAP 115 Onsite Training – 5 Days Workshop ‐ Schneider Electric, Riyadh ‐ March 2011.
6. ETAP Star Training – 1 Day Workshop ‐ ATWAAR AL‐HANDASIA Est. ‐ April 2011.
7. Supporting OTI in ETAP Advanced – 5 Days Training ‐ KHOBAR, KSA ‐ April 2011.
8. ETAP 115 Onsite Training – 5 Days Workshop ‐ Prince Mohammad Bin Fahd University ‐ May 2012.
9. Sharing in ETAP Training – 5 Days Workshop ‐ KHOBAR, KSA ‐ June 2012.
10. ETAP 114 Training – 4 Days Workshop ‐ Riyadh, KSA ‐ February 2013.
11. ETAP 115 Training – 5 Days Workshop ‐ KHOBAR, KSA ‐ September 2013.
12. ETAP Onsite Training – 3 Days Workshop ‐ Fluor Company ‐ KHOBAR, KSA ‐ November 2013.
13. ETAP 115 Training – 5 Days Workshop ‐ KHOBAR, KSA ‐ December 2013.
14. ETAP 114 Training – 4 Days Workshop ‐ Jeddah, KSA ‐ February 2014.
15. ETAP Cables Systems Training ‐ 3 Days Workshop ‐ Saudi Electricity Company ‐ Jeddah, KSA ‐ February 2014.
16. ETAP 115 Training ‐ 5 Days Workshop ‐ KHOBAR, KSA ‐ June 2014.
17. ETAP 115 Training – 5 Days Workshop ‐ KHOBAR, KSA ‐ September 2014.
18. ETAP Onsite Training – 3 Days Workshop ‐ ABB Company ‐ Riyadh, KSA ‐ September 2014.
19. ETAP Onsite Training – 3 Days Workshop ‐ KFUPM ‐ KHOBAR, KSA ‐ December 2014.
20. ETAP 115 Training – 5 Days Workshop ‐ KHOBAR, KSA ‐ December 2014.
21. ETAP Onsite Training – 5 Days Workshop ‐ ARAMCO, Khursaniyah Gas Plant, KSA ‐ January 2015.
22. ETAP Onsite Training – 3 Days Workshop ‐ Saudi Diesel Company ‐ KHOBAR, KSA ‐ January 2015.
23. ETAP 114SA Training – 4 Days Workshop ‐ Riyadh, KSA ‐ February 2015.
24. ETAP 115 Training – 5 Days Workshop ‐ KHOBAR, KSA ‐ March 2015.
25. ETAP Onsite Training – 2 Days Workshop ‐ KFUPM ‐ KHOBAR, KSA ‐ April 2015.
26. ETAP Onsite Training – 5 Days Workshop ‐ JIC (Jubail Industrial College) ‐ Jubail, KSA – May 2015.
27. ETAP 115 Training – 5 Days Workshop ‐ KHOBAR, KSA ‐ June 2015.
28. ETAP 115 Training – 5 Days Workshop ‐ KHOBAR, KSA ‐ September 2015.
29. ETAP Onsite Training – 3 Days Workshop ‐ KFUPM ‐ KHOBAR, KSA ‐ October 2015.
30. ETAP Onsite Training – 3 Days Workshop ‐ KFUPM ‐ KHOBAR, KSA ‐ November 2015.
31. ETAP 115 Training – 5 Days Workshop ‐ KHOBAR, KSA ‐ December 2015.
32. ETAP Onsite Training – 3 Days Workshop ‐ KFUPM ‐ KHOBAR, KSA – February 2016.
33. ETAP 115 Training – 5 Days Workshop – SADARA, KSA – February 2016.
ANNEXURE 2 ‐ PROJECTS HANDLED
Electrical Design Projects
Procter & Gamble (P&G)
Procter & Gamble, Cairo Plant, Warehouse 6000.
Procter & Gamble, New Headquarters, Nile City, Cairo ‐ Illumination design & electrical supply lines.
Procter & Gamble, New Headquarters cafeteria, Cairo (Only Design).
Procter & Gamble, Cairo Plant, Boiler House Panel.
Procter & Gamble, Cairo Plant, New Multilane Machines (Packing Line).
Procter & Gamble, Cairo Plant, PSG Leaders Office Panel ‐ Data retrieval, data management & supervision on the design team.
Procter & Gamble, Cairo Plant ‐ F&HC Power Capacity Increase ‐ Electrical Engineering Study for MV Loop Modification and MLVDB
Design ‐ Load analysis for the new F&HC capacity increase ‐ Load analysis for moving papers MV cables to the new SWG ‐ Transformer
specs, new RMU specs & design of MLVDB ‐ Design of MV working cables ‐ Scenario for the contractor working procedures.
Power System Studies
Procter & Gamble (P&G)
Site power circuits’ data collection & developing as built drawings ‐ Short circuit, PDs coordination, arc flash studies with
recommendations
Egypt, Cairo Plant, Egypt ‐ Always #4 production line.
Nigeria ‐ CWH & HCF Plants.
4. ISLAM MOHAMMED ELSAYED
PROGRAM MANAGER
Page 4 of 6
Nigeria ‐ F&HC Plant.
Nigeria ‐ CWH & HCF Plants (Complete Study Update).
Egypt, Cairo Plant ‐ JOA1 & JOA2.
Developing as built drawings ‐ Short circuit, PDs coordination, arc flash studies with recommendations
Egypt, Cairo Plant ‐ MIELE Machines (Arc flash study only).
Egypt, Cairo Plant ‐ Substation of transformer #14.
Egypt, Cairo Plant ‐ Substation of transformer #15.
Egypt, Cairo Plant ‐ Substation of transformer #1.
KSA, Jeddah Plant ‐ 11 Substations.
Pakistan, Port QASIM Plant ‐ Design review included.
Pakistan, Port QASIM Plant ‐ Complete Study Update.
KSA, Jeddah Plant ‐ 5 Substations.
South Africa ‐ Johannesburg Plant.
Egypt, 6th October ‐ New Pampers Site ‐ 4 Substations.
Nigeria ‐ Ibadan Plant ‐ New JOA Lines.
Nigeria ‐ Ibadan Plant ‐ New JOA Lines ‐ Complete Study Update.
Reviewing & reporting the electrical Safety Studies done by other engineers
KSA ‐ Dammam Plant ‐ Cornflake.
Egypt ‐ Cairo Plant ‐ Cornflake ‐ Substation of transformers 1 & 2.
Egypt ‐ Cairo Plant ‐ Bar Soap ‐ Substation of transformers 19 & 20.
Schneider Electric Egypt
Short circuit, PDs coordination studies with recommendations
Sheraton Heliopolis Extension, Cairo, Egypt.
Nakheel Hotel, East Africa, Djibouti.
Nasr Petroleum Company, Suez, Egypt (11/6.6 KV System).
Suez Canal Container Terminal, Egypt (66/22 KV System).
Suez Canal Container Terminal, Egypt (Complete study update)
Schneider Electric Saudi Arabia
ETAP Load Flow, short circuit, PDs coordination & arc flash studies
Petro Rabigh ‐ Department Manager at FTL
Italcementi Group
Short circuit & PDs coordination studies with recommendations
Suez Cement Company, Suez II Line, Suez, Egypt (245/11KV System)
Tourah Cement II, Helwan, Egypt (66/6.3 KV System)
Air Liquide Arabia (ALAR)
New Nitrogen plant at Qurayyah Air Separation Plant ‐ Study review & reporting for load flow, short circuit & motor acceleration studies
done by Air Liquide Arabia (ALAR).
New Nitrogen plant at Qurayyah Air Separation Plant ‐ Supervising on the verification for all ETAP model electrical data ‐ Supervising on
the load flow, short circuit, coordination & motor acceleration studies.
New Nitrogen plant at Qurayyah Air Separation Plant – Department Manager at FTL ‐ Load Flow, short circuit Motor acceleration studies.
Saudi Aramco
Jauymah Tank Farm (JTF) ‐ Arc flash study using hand calculations ‐ Subcontractor for EPC
Jauymah Tank Farm (JTF) ‐ ETAP PDs coordination & arc flash studies ‐ Subcontractor for EPC
Safaniya Plant ‐ ETAP PDs coordination & arc flash studies ‐ Subcontractor for EPC
Jeddah Marine Terminal Facility ‐ ETAP short circuit, PDs coordination & arc flash studies ‐ Subcontractor for KBR‐AMCDE
Jeddah Refinery ‐ ETAP PDs coordination & arc flash studies for 16 substations.
Jeddah Refinery ‐ ETAP short circuit, PDs coordination & arc flash studies for 38 substations.
North Park Solar System, Dhahran, KSA ‐ Protective devices coordination study.
Yanbu Crude Oil, YCOT & AMT Plants ‐ ETAP short circuit, PDs coordination & arc flash studies.
Jeddah Refinery ‐ Updating ETAP PDs coordination & arc flash studies for 9 substations.
HAWIYAH NGL Recovery Plant ‐ ETAP short circuit, PDs coordination & arc flash studies for 13 substations.
KHURSANIYAH Gas Plant (KGP) ‐ ETAP short circuit, PDs coordination & arc flash studies for 18 substations.
(NGPD) North Gawar Producing Department Plants ‐ Modeling & Simulation Team Leader‐ETAP short circuit, PDs coordination & arc
flash studies for 8 substations.
(SGPD) South Gawar Producing Department Plants ‐ Manager at FTL ‐ Modeling & Simulation Team Leader ‐ ETAP short circuit, PDs
coordination & arc flash studies for 18 substations.
(UGP) Uthmaniyah Gas Plant‐Department Manager ‐ ETAP short circuit, PDs coordination & arc flash studies for 28 substations.
(HDGP) Harad Gas Plant ‐ Department Manager at FTL ‐ ETAP short circuit, PDs coordination & arc flash studies for 14 substations.
5. ISLAM MOHAMMED ELSAYED
PROGRAM MANAGER
Page 5 of 6
(SOFPD) Safaniyah, Zuluf & Marjan Plants ‐ Department Manager at FTL ‐ ETAP short circuit, PDs coordination & arc flash studies for 10
substations.
Qurayah Plant ‐ Department Manager at FTL ‐ ETAP short circuit, PDs coordination & arc flash studies for 18 substations.
(RR) Riyadh Refinery ‐ Department Manager at FTL ‐ ETAP short circuit, PDs coordination & arc flash studies for 25 substations.
KAPSARC ‐ Department Manager at FTL ‐ ETAP short circuit, PDs coordination & arc flash studies for 9 substations.
Khurais Plant ‐ Department Manager at FTL ‐ ETAP short circuit, PDs coordination & arc flash studies for 23 substations.
(CRDD) Central Regional Distribution Department at FTL – ETAP short circuit, PDs coordination & arc flash studies for 6 substations.
KACWC Mosque ‐ Department Manager at FTL ‐ ETAP arc flash study.
(NGPD) North Gawarh Producing Department Plants – Department Manager at FTL ‐ Simulation engineer ‐ Arc flash Mitigation study.
SABIC – KSA
Saudi Kayan Petrochemical Company, Al‐Jubail industrial city, KSA ‐ ETAP protective devices coordination study for 22 substations.
GAS (National Industrial Gases Company) – 3 substations ‐ Site Power Circuits As‐Built Data Collection ‐ ETAP power system modeling ‐
Supervision on ETAP load flow & short circuit studies ‐ ETAP protective devices coordination & arc flash studies.
Saudi Specialty Chemicals Company ‐ 3 substations ‐ Subcontractor for Coperion (Germany) ‐ Supervision on ETAP power system
modeling ‐ ETAP protective devices coordination study.
SHARQ (Eastern Petrochemical Company), Al‐Jubail industrial city, KSA – 6 substations ‐ Subcontractor for Saudi SIEMENS ‐ Supervision
on ETAP power system modeling ‐ Supervision on ETAP load flow & short circuit studies ‐ ETAP protective devices coordination study.
YANSAB, Yanbu National Petrochemical Company, Yanbu industrial city, KSA – 15 substations ‐ ETAP Protective Devices Coordination &
Arc Flash Studies.
KEMYA, Jubail Petrochemical Company ‐ Al‐Jubail industrial city ‐ ETAP short circuit, protective devices coordination & arc flash studies.
KEMYA, Jubail Petrochemical Company ‐ Al‐Jubail industrial city ‐ Department Manager at FTL ‐ ETAP Power System Studies.
YANPET, Yanbu Petrochemical Company ‐ Yanbu industrial city – Department Manager at FTL ‐ ETAP Power System Studies.
SADAF, Saudi Petrochemical Company ‐ Al‐Jubail industrial city ‐ Subcontractor for ABB Norway – Department Manager at FTL ‐ ETAP
Power System Studies.
SHARQ (Eastern Petrochemical Company) ‐ Al‐Jubail industrial city, KSA ‐ Department Manager at FTL ‐ Field measurements ‐ ETAP Load
Flow, Short Circuit, PDs Coordination, Motor Acceleration, Harmonics, Arc Flash, PF improvement, capacitor placement studies.
AlBayroni, Al‐Jubail industrial city, KSA – Department Manager at FTL ‐ Third Party on SOFCON and L&T – ETAP model, Load Flow, Short
Circuit, PDs Coordination review & evaluate.
GAS, Jubail industrial city – Department Manager at FTL ‐ ETAP Power System Studies.
SAFCO, Jubail industrial city – Department Manager at FTL ‐ ETAP Power System Studies.
Pertokemya, Jubail industrial city, KSA – Department Manager at FTL ‐ Third Party on ISCOSA – ETAP model, Load Flow, Short Circuit, PDs
Coordination review & evaluate.
KSU (King Saud University)
Third Party on Schneider Electric KSA – Department Manager at FTL ‐ ETAP modeling & Power System Studies.
Al‐Tasnee
12 Substation ‐ Department Manager at FTL ‐ Project Protection Engineer at FTL ‐ ETAP Power System studies.
Al‐Muhaidib Contracting
KAUST Research Park/ARAMCO ‐ Department Manager at FTL ‐ ETAP Shot Circuit, PDs Coordination & Arc Flash studies.
KASC (King Abdullah Sports City) ‐ Department Manager at FTL ‐ ETAP Short Circuit study.
SIPCHEM (Saudi International Petrochemical Company)
IGC Plant ‐ Department Manager at FTL – Field Measurements ‐ ETAP Power System studies.
IPC Plant ‐ Department Manager at FTL – Field Measurements ‐ ETAP Power System studies.
IGC Plant ‐ Department Manager at FTL – ETAP Power System studies.
ISCOSA Saudi Arabia (A Siemens Company)
Petrokemya/SABIC ‐ Department Manager at FTL ‐ ETAP Motor Starting & Harmonics studies.
ETAP Real‐time Projects
Saudi Aramco
OSPAS, Saudi Aramco Centralized Monitoring System.
Supporting OTI with the ETAP Real‐Time OSPAS system maintenance.
GE MULTIIN Projects
Technical support & commissioning for MIFII relays as GE Sales Representative.
Power Capacity Analysis
MobiNil (The Egyptian Company for Mobile Services), recent is “Orange” since 2016.
Supervision and monitor installation ‐ Data retrieval and data management ‐ Data plotting, data documenting and developing
recommendations
6. ISLAM MOHAMMED ELSAYED
PROGRAM MANAGER
Page 6 of 6
Al‐HOUSSARY Switch, 6th of October City.
2 Main Supply at First Service Site.
Al‐Sawwah Switch, Cairo City.
Al‐Obour Switch, Al‐Obour City.
Heliopolis1 Switch, Cairo City.
Semoha Switch, Alexandria City.
MSC6 & MSC14 of Al‐Sawwah, Cairo.
MSC12, 13 & SS5 of First Service Site.
Generator Testing
Orascom Telecom
The Egyptian Company for Mobile Services (MobiNil).
Mobi‐Factory (An Orascom Telecom Company).
MENA Submarine Cable Systems (An Orascom Telecom Company).
Power Quality & Harmonics Studies
Supervision of monitor installation ‐ Data retrieval and data management ‐ Data plotting and documenting ‐ Data analysis and power
quality evaluation
Procter & Gamble, Cairo Plant ‐ Two of the Main Power Transformers, E‐Lite2, Main Incoming, Transformer #11.
MobiNil, Al‐Houssary Switch, 6th October City.
Miscellaneous Projects
Reef Oasis Beach Resort, Sharm EL Sheikh, South Sinai, Egypt & Procter & Gamble, Cairo Plant (5 Substations) ‐ Power circuits data
collection & developing single line diagram
MENA Submarine Cable Systems, Suez, Egypt ‐Supervision on charging the Emerson batteries with equalization voltage.
Modern Plastic Company, Spuntex Site, Egypt ‐ Final receipt for the site electrical installation.
Procter & Gamble, Cairo Plant ‐ Developing tender & construction package for the new MV switchgear room.
End of File