Using Archimate in the JISC Enable
Project



Sam Rowley
Learning Development Manager
Staffordshire University
c.s.rowley@staffs.ac.uk
These slides illustrate use of the Archimate® modelling language in the JISC Enable
    project to secure approval for the development of an application to support external
    examiner appointment and reporting processes.
The slides are based on the ones used in the project but have been refactored to make
    them more generic and to use Archimate 2.0. The original slides were presented and
    did not have explanatory text and arrows.
For more information about the Enable project, see
• the project blog http://jiscenable.blogspot.com/
• the project web site http://www.projects.staffs.ac.uk/enable
• the JISC project page
    http://www.jisc.ac.uk/whatwedo/programmes/elearning/curriculumdesign/enable.aspx
We used the free Archi modelling tool
• http://archi.cetis.ac.uk/index.html
and the Archimate 2.0 language
• http://www.archimate.nl/

ArchiMate is a registered trademark of The Open Group in the United States and other countries.
the external examiner appointment process
efficiency of operation is a driver
internal process review identified duplication of effort as a problem
reinforces existing strategic goal
events that trigger the appointment process
high-level process phases
actors and roles
central service has local database and appointment forms
examiner tenure lifecycle is recorded
examiner tenure lifecycle is recorded




                                        documents stored in folders on local network drive
faculty A manages same
Information locally
…as does faculty B
…and faculty C
…and faculty D
resulting in duplication of effort
we want to eliminate this duplication of effort…
…by providing an external examiner application service…
…which enables sharing of data and documents
and removes the need for local solutions
we will develop an application
and integrate a
document management system
to realize this vision
gap analysis:
remove duplication (grey bits)
develop application (green bits)
with approval for development secured,
the external examiner application becomes
a deliverable of the Enable project

More Related Content

What's hot

Archimate Overview
Archimate OverviewArchimate Overview
Archimate Overview
emergingpractices
 
Extracting archimate views from custom ontological ea models
Extracting archimate views from custom ontological ea modelsExtracting archimate views from custom ontological ea models
Extracting archimate views from custom ontological ea modelsMatteo Busanelli
 
Modeling and Evolving a Web Portal with the TOGAF Framework and the ArchiMate...
Modeling and Evolving a Web Portal with the TOGAF Framework and the ArchiMate...Modeling and Evolving a Web Portal with the TOGAF Framework and the ArchiMate...
Modeling and Evolving a Web Portal with the TOGAF Framework and the ArchiMate...
Iver Band
 
3 things about EA that TOGAF doesnt say
3 things about EA that TOGAF doesnt say3 things about EA that TOGAF doesnt say
3 things about EA that TOGAF doesnt say
cccamericas
 
Primavera P6 Enterprise Project Portfolio Management 8 Essentials (1Z0-567) ...
Primavera P6 Enterprise Project Portfolio Management 8  Essentials (1Z0-567) ...Primavera P6 Enterprise Project Portfolio Management 8  Essentials (1Z0-567) ...
Primavera P6 Enterprise Project Portfolio Management 8 Essentials (1Z0-567) ...
p6academy
 
Lean cost planning by Takashi Tanaka at the Lean IT Summit 2013
Lean cost planning by Takashi Tanaka at the Lean IT Summit 2013Lean cost planning by Takashi Tanaka at the Lean IT Summit 2013
Lean cost planning by Takashi Tanaka at the Lean IT Summit 2013
Institut Lean France
 
Agile Automotive (Final)
Agile Automotive (Final)Agile Automotive (Final)
Agile Automotive (Final)James Janisse
 
Modeling the Insurance Enterprise
Modeling the Insurance EnterpriseModeling the Insurance Enterprise
Modeling the Insurance EnterpriseIver Band
 
From push to pull in IT by Faurecia
From push to pull in IT by FaureciaFrom push to pull in IT by Faurecia
From push to pull in IT by Faurecia
Institut Lean France
 
ArchiMate Training, Enterprise Architecture (EA), ArchiMate 3 Certification
ArchiMate Training, Enterprise Architecture (EA), ArchiMate 3 CertificationArchiMate Training, Enterprise Architecture (EA), ArchiMate 3 Certification
ArchiMate Training, Enterprise Architecture (EA), ArchiMate 3 Certification
Bryan Len
 
PECB Webinar: Aligning a PRINCE2 Project with TOGAF ADM While Complying with ...
PECB Webinar: Aligning a PRINCE2 Project with TOGAF ADM While Complying with ...PECB Webinar: Aligning a PRINCE2 Project with TOGAF ADM While Complying with ...
PECB Webinar: Aligning a PRINCE2 Project with TOGAF ADM While Complying with ...
PECB
 
Systems engineering met Polarion
Systems engineering met PolarionSystems engineering met Polarion
Systems engineering met Polarion
Harry Julsing
 
Inflectra 2017 Boston, MA, USA User Summit
Inflectra 2017 Boston, MA, USA User SummitInflectra 2017 Boston, MA, USA User Summit
Inflectra 2017 Boston, MA, USA User Summit
Adam Sandman
 
Share point premium learning program slideshare v1.1
Share point premium learning program slideshare v1.1Share point premium learning program slideshare v1.1
Share point premium learning program slideshare v1.1
eduvercity
 
Na15 agl01 leading construction industry to lean-agile (leagile) project ma...
Na15 agl01   leading construction industry to lean-agile (leagile) project ma...Na15 agl01   leading construction industry to lean-agile (leagile) project ma...
Na15 agl01 leading construction industry to lean-agile (leagile) project ma...
Iram hasan
 
IS delivering value to the business by Hakan Borglund Toyota MHE
IS delivering value to the business by Hakan Borglund Toyota MHEIS delivering value to the business by Hakan Borglund Toyota MHE
IS delivering value to the business by Hakan Borglund Toyota MHE
Institut Lean France
 
Balanced Measurement Sets - Criteria for Improving Project Management Practices
Balanced Measurement Sets - Criteria for Improving Project Management PracticesBalanced Measurement Sets - Criteria for Improving Project Management Practices
Balanced Measurement Sets - Criteria for Improving Project Management Practices
SpagoWorld
 
Discovering New Product Introduction using Autodesk PLM 360 – Rodney Coffey, ...
Discovering New Product Introduction using Autodesk PLM 360 – Rodney Coffey, ...Discovering New Product Introduction using Autodesk PLM 360 – Rodney Coffey, ...
Discovering New Product Introduction using Autodesk PLM 360 – Rodney Coffey, ...
Synergis Engineering Design Solutions
 
Inflectra Enterprise Agile Planning Briefing 2016
Inflectra Enterprise Agile Planning Briefing 2016Inflectra Enterprise Agile Planning Briefing 2016
Inflectra Enterprise Agile Planning Briefing 2016
Adam Sandman
 
Primavera p6 eppm r8 enhancements you don't want to miss apr8
Primavera p6 eppm r8 enhancements you don't want to miss apr8Primavera p6 eppm r8 enhancements you don't want to miss apr8
Primavera p6 eppm r8 enhancements you don't want to miss apr8
p6academy
 

What's hot (20)

Archimate Overview
Archimate OverviewArchimate Overview
Archimate Overview
 
Extracting archimate views from custom ontological ea models
Extracting archimate views from custom ontological ea modelsExtracting archimate views from custom ontological ea models
Extracting archimate views from custom ontological ea models
 
Modeling and Evolving a Web Portal with the TOGAF Framework and the ArchiMate...
Modeling and Evolving a Web Portal with the TOGAF Framework and the ArchiMate...Modeling and Evolving a Web Portal with the TOGAF Framework and the ArchiMate...
Modeling and Evolving a Web Portal with the TOGAF Framework and the ArchiMate...
 
3 things about EA that TOGAF doesnt say
3 things about EA that TOGAF doesnt say3 things about EA that TOGAF doesnt say
3 things about EA that TOGAF doesnt say
 
Primavera P6 Enterprise Project Portfolio Management 8 Essentials (1Z0-567) ...
Primavera P6 Enterprise Project Portfolio Management 8  Essentials (1Z0-567) ...Primavera P6 Enterprise Project Portfolio Management 8  Essentials (1Z0-567) ...
Primavera P6 Enterprise Project Portfolio Management 8 Essentials (1Z0-567) ...
 
Lean cost planning by Takashi Tanaka at the Lean IT Summit 2013
Lean cost planning by Takashi Tanaka at the Lean IT Summit 2013Lean cost planning by Takashi Tanaka at the Lean IT Summit 2013
Lean cost planning by Takashi Tanaka at the Lean IT Summit 2013
 
Agile Automotive (Final)
Agile Automotive (Final)Agile Automotive (Final)
Agile Automotive (Final)
 
Modeling the Insurance Enterprise
Modeling the Insurance EnterpriseModeling the Insurance Enterprise
Modeling the Insurance Enterprise
 
From push to pull in IT by Faurecia
From push to pull in IT by FaureciaFrom push to pull in IT by Faurecia
From push to pull in IT by Faurecia
 
ArchiMate Training, Enterprise Architecture (EA), ArchiMate 3 Certification
ArchiMate Training, Enterprise Architecture (EA), ArchiMate 3 CertificationArchiMate Training, Enterprise Architecture (EA), ArchiMate 3 Certification
ArchiMate Training, Enterprise Architecture (EA), ArchiMate 3 Certification
 
PECB Webinar: Aligning a PRINCE2 Project with TOGAF ADM While Complying with ...
PECB Webinar: Aligning a PRINCE2 Project with TOGAF ADM While Complying with ...PECB Webinar: Aligning a PRINCE2 Project with TOGAF ADM While Complying with ...
PECB Webinar: Aligning a PRINCE2 Project with TOGAF ADM While Complying with ...
 
Systems engineering met Polarion
Systems engineering met PolarionSystems engineering met Polarion
Systems engineering met Polarion
 
Inflectra 2017 Boston, MA, USA User Summit
Inflectra 2017 Boston, MA, USA User SummitInflectra 2017 Boston, MA, USA User Summit
Inflectra 2017 Boston, MA, USA User Summit
 
Share point premium learning program slideshare v1.1
Share point premium learning program slideshare v1.1Share point premium learning program slideshare v1.1
Share point premium learning program slideshare v1.1
 
Na15 agl01 leading construction industry to lean-agile (leagile) project ma...
Na15 agl01   leading construction industry to lean-agile (leagile) project ma...Na15 agl01   leading construction industry to lean-agile (leagile) project ma...
Na15 agl01 leading construction industry to lean-agile (leagile) project ma...
 
IS delivering value to the business by Hakan Borglund Toyota MHE
IS delivering value to the business by Hakan Borglund Toyota MHEIS delivering value to the business by Hakan Borglund Toyota MHE
IS delivering value to the business by Hakan Borglund Toyota MHE
 
Balanced Measurement Sets - Criteria for Improving Project Management Practices
Balanced Measurement Sets - Criteria for Improving Project Management PracticesBalanced Measurement Sets - Criteria for Improving Project Management Practices
Balanced Measurement Sets - Criteria for Improving Project Management Practices
 
Discovering New Product Introduction using Autodesk PLM 360 – Rodney Coffey, ...
Discovering New Product Introduction using Autodesk PLM 360 – Rodney Coffey, ...Discovering New Product Introduction using Autodesk PLM 360 – Rodney Coffey, ...
Discovering New Product Introduction using Autodesk PLM 360 – Rodney Coffey, ...
 
Inflectra Enterprise Agile Planning Briefing 2016
Inflectra Enterprise Agile Planning Briefing 2016Inflectra Enterprise Agile Planning Briefing 2016
Inflectra Enterprise Agile Planning Briefing 2016
 
Primavera p6 eppm r8 enhancements you don't want to miss apr8
Primavera p6 eppm r8 enhancements you don't want to miss apr8Primavera p6 eppm r8 enhancements you don't want to miss apr8
Primavera p6 eppm r8 enhancements you don't want to miss apr8
 

Similar to Archimate in the JISC Enable Project

What Jisc Wants 10.12.08
What Jisc Wants 10.12.08What Jisc Wants 10.12.08
What Jisc Wants 10.12.08Heather Price
 
Digital transforming business processes to further student success
Digital transforming business processes to further student successDigital transforming business processes to further student success
Digital transforming business processes to further student success
Max Tsai
 
Resume charles vermette
Resume   charles vermetteResume   charles vermette
Resume charles vermette
Charles Vermette
 
Resume charles vermette
Resume   charles vermetteResume   charles vermette
Resume charles vermette
Charles Vermette
 
2004 Team Center Training Presentation On Project
2004 Team Center Training Presentation On Project2004 Team Center Training Presentation On Project
2004 Team Center Training Presentation On ProjectSam Ha
 
Preliminry report
 Preliminry report Preliminry report
Preliminry reportJiten Ahuja
 
SRS for Ph.D. Student Portal (C.S.E.D., Thapar University)
SRS for Ph.D. Student Portal (C.S.E.D., Thapar University)SRS for Ph.D. Student Portal (C.S.E.D., Thapar University)
SRS for Ph.D. Student Portal (C.S.E.D., Thapar University)
Akshit Arora
 
Bixby, Robert 09.04-PM.2015
Bixby, Robert 09.04-PM.2015Bixby, Robert 09.04-PM.2015
Bixby, Robert 09.04-PM.2015Robert Bixby
 
Assignment 3 Project PerformanceDue Week 8 and worth 150 .docx
Assignment 3 Project PerformanceDue Week 8 and worth 150 .docxAssignment 3 Project PerformanceDue Week 8 and worth 150 .docx
Assignment 3 Project PerformanceDue Week 8 and worth 150 .docx
braycarissa250
 
01 bim project_execution_planning_guide_v2.1
01 bim project_execution_planning_guide_v2.101 bim project_execution_planning_guide_v2.1
01 bim project_execution_planning_guide_v2.1
Khalidh Mohamed
 
IRJET- Online Programming Assessment and Evaluation Platform in Education System
IRJET- Online Programming Assessment and Evaluation Platform in Education SystemIRJET- Online Programming Assessment and Evaluation Platform in Education System
IRJET- Online Programming Assessment and Evaluation Platform in Education System
IRJET Journal
 
Electronic Document Management Case Study
Electronic Document Management Case StudyElectronic Document Management Case Study
Electronic Document Management Case Study
DougWinning
 
A project plan is a document created at the beginning of the proje.docx
A project plan is a document created at the beginning of the proje.docxA project plan is a document created at the beginning of the proje.docx
A project plan is a document created at the beginning of the proje.docx
blondellchancy
 
TECHNICAL RESOURCE PORTAL_JUHI
TECHNICAL RESOURCE PORTAL_JUHITECHNICAL RESOURCE PORTAL_JUHI
TECHNICAL RESOURCE PORTAL_JUHIJuhi Sharma
 
PBS&J Program Control Services
PBS&J Program Control ServicesPBS&J Program Control Services
PBS&J Program Control Services
GAguila
 
Final project se
Final project seFinal project se
Final project se
nadeem shahzad
 
Project Report
 Project Report Project Report
Project Report
KrishanKantGupta5
 
Skype for business deployment pw v.06
Skype for business deployment pw v.06Skype for business deployment pw v.06
Skype for business deployment pw v.06
Federica Ventolini
 

Similar to Archimate in the JISC Enable Project (20)

What Jisc Wants 10.12.08
What Jisc Wants 10.12.08What Jisc Wants 10.12.08
What Jisc Wants 10.12.08
 
Digital transforming business processes to further student success
Digital transforming business processes to further student successDigital transforming business processes to further student success
Digital transforming business processes to further student success
 
Resume charles vermette
Resume   charles vermetteResume   charles vermette
Resume charles vermette
 
Resume charles vermette
Resume   charles vermetteResume   charles vermette
Resume charles vermette
 
2004 Team Center Training Presentation On Project
2004 Team Center Training Presentation On Project2004 Team Center Training Presentation On Project
2004 Team Center Training Presentation On Project
 
Preliminry report
 Preliminry report Preliminry report
Preliminry report
 
SRS for Ph.D. Student Portal (C.S.E.D., Thapar University)
SRS for Ph.D. Student Portal (C.S.E.D., Thapar University)SRS for Ph.D. Student Portal (C.S.E.D., Thapar University)
SRS for Ph.D. Student Portal (C.S.E.D., Thapar University)
 
Bixby, Robert 09.04-PM.2015
Bixby, Robert 09.04-PM.2015Bixby, Robert 09.04-PM.2015
Bixby, Robert 09.04-PM.2015
 
OEP PPT 1
OEP PPT 1OEP PPT 1
OEP PPT 1
 
Assignment 3 Project PerformanceDue Week 8 and worth 150 .docx
Assignment 3 Project PerformanceDue Week 8 and worth 150 .docxAssignment 3 Project PerformanceDue Week 8 and worth 150 .docx
Assignment 3 Project PerformanceDue Week 8 and worth 150 .docx
 
SurajResume
SurajResumeSurajResume
SurajResume
 
01 bim project_execution_planning_guide_v2.1
01 bim project_execution_planning_guide_v2.101 bim project_execution_planning_guide_v2.1
01 bim project_execution_planning_guide_v2.1
 
IRJET- Online Programming Assessment and Evaluation Platform in Education System
IRJET- Online Programming Assessment and Evaluation Platform in Education SystemIRJET- Online Programming Assessment and Evaluation Platform in Education System
IRJET- Online Programming Assessment and Evaluation Platform in Education System
 
Electronic Document Management Case Study
Electronic Document Management Case StudyElectronic Document Management Case Study
Electronic Document Management Case Study
 
A project plan is a document created at the beginning of the proje.docx
A project plan is a document created at the beginning of the proje.docxA project plan is a document created at the beginning of the proje.docx
A project plan is a document created at the beginning of the proje.docx
 
TECHNICAL RESOURCE PORTAL_JUHI
TECHNICAL RESOURCE PORTAL_JUHITECHNICAL RESOURCE PORTAL_JUHI
TECHNICAL RESOURCE PORTAL_JUHI
 
PBS&J Program Control Services
PBS&J Program Control ServicesPBS&J Program Control Services
PBS&J Program Control Services
 
Final project se
Final project seFinal project se
Final project se
 
Project Report
 Project Report Project Report
Project Report
 
Skype for business deployment pw v.06
Skype for business deployment pw v.06Skype for business deployment pw v.06
Skype for business deployment pw v.06
 

Recently uploaded

Digital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and ResearchDigital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and Research
Vikramjit Singh
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Thiyagu K
 
Synthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptxSynthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptx
Pavel ( NSTU)
 
A Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in EducationA Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in Education
Peter Windle
 
The basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptxThe basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptx
heathfieldcps1
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
Thiyagu K
 
Francesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptxFrancesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptx
EduSkills OECD
 
Azure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHatAzure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHat
Scholarhat
 
"Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe..."Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe...
SACHIN R KONDAGURI
 
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Dr. Vinod Kumar Kanvaria
 
CACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdfCACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdf
camakaiclarkmusic
 
1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx
JosvitaDsouza2
 
The Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptxThe Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptx
DhatriParmar
 
Natural birth techniques - Mrs.Akanksha Trivedi Rama University
Natural birth techniques - Mrs.Akanksha Trivedi Rama UniversityNatural birth techniques - Mrs.Akanksha Trivedi Rama University
Natural birth techniques - Mrs.Akanksha Trivedi Rama University
Akanksha trivedi rama nursing college kanpur.
 
Language Across the Curriculm LAC B.Ed.
Language Across the  Curriculm LAC B.Ed.Language Across the  Curriculm LAC B.Ed.
Language Across the Curriculm LAC B.Ed.
Atul Kumar Singh
 
Embracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic ImperativeEmbracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic Imperative
Peter Windle
 
Thesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.pptThesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.ppt
EverAndrsGuerraGuerr
 
Multithreading_in_C++ - std::thread, race condition
Multithreading_in_C++ - std::thread, race conditionMultithreading_in_C++ - std::thread, race condition
Multithreading_in_C++ - std::thread, race condition
Mohammed Sikander
 
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
Levi Shapiro
 
Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
Mohd Adib Abd Muin, Senior Lecturer at Universiti Utara Malaysia
 

Recently uploaded (20)

Digital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and ResearchDigital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and Research
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
 
Synthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptxSynthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptx
 
A Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in EducationA Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in Education
 
The basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptxThe basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptx
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
 
Francesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptxFrancesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptx
 
Azure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHatAzure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHat
 
"Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe..."Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe...
 
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
 
CACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdfCACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdf
 
1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx
 
The Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptxThe Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptx
 
Natural birth techniques - Mrs.Akanksha Trivedi Rama University
Natural birth techniques - Mrs.Akanksha Trivedi Rama UniversityNatural birth techniques - Mrs.Akanksha Trivedi Rama University
Natural birth techniques - Mrs.Akanksha Trivedi Rama University
 
Language Across the Curriculm LAC B.Ed.
Language Across the  Curriculm LAC B.Ed.Language Across the  Curriculm LAC B.Ed.
Language Across the Curriculm LAC B.Ed.
 
Embracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic ImperativeEmbracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic Imperative
 
Thesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.pptThesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.ppt
 
Multithreading_in_C++ - std::thread, race condition
Multithreading_in_C++ - std::thread, race conditionMultithreading_in_C++ - std::thread, race condition
Multithreading_in_C++ - std::thread, race condition
 
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
 
Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
 

Archimate in the JISC Enable Project