Introducing Micro P3 Express, an open source framework giving the smallest change the right pathway to maximise outcomes every time. The Micro P3 Express manual is 34 pages long and gives project professionals the ability to delegate smaller change to non-project professionals to free up capacity to focus on and support more complex change/projects.
Micro P3 Express is designed for micro projects with 1 to 7 team members. It is non-proprietary, open, and free for everyone. It could serve as a standard pathway for small change that could be delivered by non-project professionals looking to deliver change/projects with suitable levels of assurance.
Micro P3 Express is an output from European funded OMIMO (Open Minimalist Modules). OMIMO is a family of modules for the project ecosystem. All modules are designed to be easy to learn, easy to use, and easy to teach.
During this insightful session our speakers will give an introduction to Micro P3 Express. This event aims for you to understand:
What Micro P3 Express is and its background
What the benefits are of Micro P3 Express
The core features of Micro P3 Express
Next steps