SlideShare a Scribd company logo
0001c;vjkf;lgjPage | 1
2012
Yaseen Raza
NED University of
Engineering and Technology
INTERNSHIP REPORT
YASEEN RAZA NED University of Engineering And Technology | 2
INTERNSHIP
REPORT
SUBMITTED TO
MR. Abdul Latif Bhano
MANAGER PRODUCTION
SUBMITTED BY
YASEEN RAZA (MY-50)
NED UNIVERSITY OF ENGINEERING AND TECHNOLOGY
BATCH: 2009~2010
DURATION: 05TH
DECEMBER 2012 TO22ND
DECEMBER 2012
YASEEN RAZA NED University of Engineering And Technology | 3
ACKNOWLEDGMENT
Starting with the name of Allah who is the most merciful and
beneficent
My report work has accomplished under excellent guidance and
supervision of production and management team of Amreli
Steels Limited, SMS Dhabeji. I offer my heartiest gratefulness
to ASL team for its step to step guidance and close supervision
during the conduct of all the period of internship at ASL.
No acknowledgement could ever adequately express my
obligations to my affectionate parentsfor their all inspirations
and guidance which always motivated us to carry ourselves
through the noblest ideas of life and solving all troubles and
boosted my moral to fly high to accomplish our goals.
I convey special thanks to my dear class adviser MR
IFTIKHAR AHMED CHANNA, NED Universityfor his
excellent, efficient, accurate and reliable help to completion of
this internship as well as completed our report.
YASEEN RAZA NED University of Engineering And Technology | 4
I also convey special thanks to
SMS plant Planning & production team
MR Noman Sajjad (Executive Manager)
MR Inayat Ullah Baig (Maintenance Manager)
MR Abdul Latif Bhano (Production Manager)
MR Hammad Ali (Manager Planning& Development)
MR Sohail Mumtaz(Deputy Manager, Mechanical)
MR Abdul Majeed Jagirani (Deputy Manager, Electrical
MR Muhammad Farooq (Assistant Engineer,Mechanical)
MR Zaigham Masood (Shift Incharge IF)
MR Kamran Memon (Shift Incharge LRF)
MR Adnan (Asst Engg Ref)
MR Alam (AsstEnggIF)
MR Naeem Khatti (Shift Incharge CCM)
MR Said Haneef (Incharge QC)
MR Qadeer (Incharge QC)
MR Zubair (InchargeUtility)
MR Sarfaraz (Trainee Engg)
MR Ammar (Trainee Engg)
Mr Zeeshan Moeen (Ass. Engg Vezzani)
Mr Noman Amjad (Trainee. Vezzani)
YASEEN RAZA NED University of Engineering And Technology | 5
INDEX
Sr. No Plant Description PG.NO
1 ASL Process flow chart 6
2 Introduction 7
3 Raw Material
 Types
 Vezzani
8
4 Steel Melt shop (SMS) 9
5 Induction Furnace
 Furnace specification
 Furnace Operation
 Furnace Lining
 Furnace Crucible
 Furnace Control
 Furnace Slag
10-14
6 Ladle Furnace
 Ladle lining
15-16
7 Continuous casting
 Process
 Mold Body
 Operation modes
 Metallurgical Length
 Calculations
 Cooling zones
 Liquidus Temp
 Carbon equivalent
16-20
YASEEN RAZA NED University of Engineering And Technology | 6
8 ASL Grades and Composition 21
9 Slag Processing Area 22
10 Quality Control
 Spectro lab
 Wet Lab
24-25
11 Logistic and Stores 25
12 FES (Fume Exhaust System) 25
13 Reverse Osmosis Plant (RO) 26
YASEEN RAZA NED University of Engineering And Technology | 7
Scrap
Scrap Yard
Vibratory Feeder
Scrap Area
Charging
Vessani Shear
LRF
Transfer trolley
Melting
Spectro Lab
Deslagging
Continuous casting
Billets
Induction Furnace
Shearing of
Oversize scrap
Quality Control
Heat taping
Wet Lab
Slag processing
area
Temperature
check
Billets stock
area
YASEEN RAZA NED University of Engineering And Technology | 8
INTRODUCTION
Company`s Profile
The Company was incorporated in Pakistan as a private limited company under Companies
Ordinance 1984, to take over from partnership firm doing business in the name of Amreliwala
Hardware Industries. Prior to 1984, the Sponsors were operating manual re-rolling mills to
manufacture mild steel bars. These rolling mills were dependent for raw material on sponsor-
owned ship breaking business.
The Sponsors are in steel business for many decades; because of this exposure and experience
the family was able to foresee the advent of strong demand in quantity and quality of steel bars.
To cater to this, all manual rolling mills were scraped in 1984 and fully automatic plant of
Danieli brand was imported and installed with production capacity of 35,000 tons, the capacity
of which over the years was increased to 75,000 tons.
Amreli Steels has been in steel business for decades and have earned a respectable name in the
business world through commitment to its customer by providing the best quality product and
adherence to the corporate and ethical principals in conducting business operations. Amreli
Steels is one of the few steel bar manufacturers that used billets of Pakistan Steel Mills as raw
material for its hot rolling process. Good quality billets and advanced automatic manufacturing
facility with professional and motivated team has given Amreli a competitive edge over its
fellow manufacturers.
This report will cover the areas of
 Induction furnaces (IF)
 Ladle Refining Furnace (LRF)
 Continuous Casting Plant
 Refractory Shop
 Utilities
 QC
Which I learned during the internship.
Amreli steels limited produce
 High strength Xtreme bars conforming to BS 4449:2005
 Hot rolled deformed bars conforming to ASTM A615
Above grade reinforcedsteel bars from high quality billets. These billets are produce through
continuous casting process. Induction furnace is used to melt the scrap, which is the prime raw
material for producing desire melt.
YASEEN RAZA NED University of Engineering And Technology | 9
RAW MATERIAL
Scrap is the prime raw material used for producing quality melt. This scrap is imported from
UAE and India. It is then transferred to scrap yard through containers from port. As per
requirements, different types of scrap are used. They are classifies as
 HMS
Heavy Melting Scrap is a designation for recycled steels. Its size is above 600mm. It is
divided in two categories
HMS-1: Consists of non-galvanized parts, engine blocks, some Aluminum and Copper
parts
HMS-2: Consists of galvanized parts etc.
HMS: Soft scrap like sheets, pipes etc.
 SHREDDED
Consist of small parts, crushed scrap. Size is below 600mm
 BUNDLED
LMS: Light Metal Scrap
UBC: Used Beverages Canes etc
GI: Galvanized sheets or parts are Bundled scrap
20% HMS, 30% shredded, 25% bundled and remaining 25% mix scrap is used. As per
requirement, scrap is transferred from yard to scrap bay through dumpers. Scrap size more than
600m is first shifted to Vezzani shear for shearing than to melt shop.
VEZZANI SHEAR
Vessani shear is used to perform shearing of oversized scrap. Crane is operated manually. Scrap
is charged over a taper plate of vezzani at the end of which there is a ram. Scrap is compressed
first by horizontal ram then by vertical ram and shearing blade shear the scrap to size of
600mmthen the gate is opened. it is then passed over a vibrating conveyer, it consist of a
magnetic drum. It is 1/3rd
magnetic so it attract ferrous scrap and nonferrous scrap like
aluminum, copper etc fell down on debris conveyer belt.
From scrap car it is transferred to furnace floor i.e. vibratory feeder. Vibratory feeder is used to
feed scrap to the furnace crucible at a rate of about 400kg/min. its surface is slightly tapper so as
to allow easy feeding
YASEEN RAZA NED University of Engineering And Technology | 10
SMS- STEEL MELTING SHOP
Steel melt shop consist of:
 Two induction furnaces (IF) each with 2 crucibles
 Ladle Refining Furnace (LRF)
 Continuous Casting Plant
 Ladle Preheating area
 Refractory Shop
 Slag processing Area
INDUCTION FURNACE
Induction furnace is an electrical furnace which utilizes electricity as fuel. Electromagnetic
heating is used to melt the scrap in the crucible. Copper coils are used which acts as primary and
generate low voltage high current in secondary (scrap). Alternating current(A.C) passes through
it and magnetic flux is generated within conductor.The magnetic flux generated eddy current that
enables the heating andmelting process in the crucible.
YASEEN RAZA NED University of Engineering And Technology | 11
FURNACE SPECIFICATION
 Power requirement: 10MW
 Melting transformer: 12 MW
 Sintering transformer: 1.2 MW
 Capacity: 25-30 MT
 Current: 2000A
 Voltage :3670V
 Frequency : 192Hz
 Temperature :960-1620o
c
There are two crucibles for each furnace. One crucible is on melting operation and another is on
sintering operation. Crucible is changed after 12-15 heats
FURNACE LINING
Lining of If is acidic because of acidic slag formed. Quartzite lining also called acid ramming
mass is used as lining material and boric acid as binder.
It consist of
a) SiO2 -98.5%
b) Al2O3 – 0.02%
c) Fe2O3 – 0.02%
d) Boric acid ((H3BO3) 1-1.2%
Preheating is done to 90o
c for removing moisture. 70% grain and 30% powder is mixedin mixing
mill, 1.2% boric acid is added then transferred to bin then to floor. Cooling of furnace is carried
out through blower for about 6 hrs and then lining is breakout in 3 hrs. Pneumatic drills are used
for this purpose, after breaking the lining, furnace is tilt and waste is thrown down in pot.
Mixture is heated to about 90°c.
Former is used to prepare efficient lining. Two types of former are used.
 ASL Former: It is consumable former made of low carbon steel sheet. Lining is
placed layer by layer and rammed through pneumatic hammer. In ASL former 11 layers
of lining are placed because former is melt able and after melting a fine lining surface is
obtained.
 Chinese Former: It is non-consumable former. In Chinese former 24 layers of lining
are placed because former is removed after lining and close accuracy of lining is
required. When it is removed, patching is done.
YASEEN RAZA NED University of Engineering And Technology | 12
Sintering
Sintering is performed after lining so that the binder get hold strongly the acid riming mass and
to induce strength in lining. The greater the time greater will be the strength.
Sintering time (hrs.) Power (KWH) Crucible state
2 125-175 Empty crucible
1 300-450 Filled with scrap
1 500-600
1 650-800
1 850-900
1 900 or above
FURNACE CRUCIBLE
Induction furnace crucibles are made of highly conductive hollow, rectangular copper tubes. 12
pairs of copper coils i.e. 24 coils are mounted rigidly. Also there are 3 SS coils at the top and 4
SS coils at the bottom to facilitate cooling. SS is used because it has high oxidation-resistance,
corrosion resistance and wears resistance.
Induction Furnace Coil
YASEEN RAZA NED University of Engineering And Technology | 13
This coil is coated with AH60 refractory material in order to protect from moisture etc.
First coil is painted with a special paint. Each copper tube is then wounded with glass tape.
Scandium blocks are place with the gap between the copper tubes. Then finally it is painted with
resin and aluminum coating.It is then dried in air.
FURNACE CONTROL
Total power supplied to ASL is 63MVA
Total power consumption of both furnaces is 25MVA
Generator room, Crucible room and operating room control all operations on IF.
Generator room consists of:
 DC chock: converts AC to DC. Input is 600V x 4 = 2400V, four Converters are used.
Output is 3600V. Inverter convert DC to AC, in this way we can control (inc/dec)
Frequency
 DM unit:
 Capacitor unit: Capacitor bank is usedto maintainpower factor. Eight capacitor are used,
each consistof 2,4 capacitors respectively. if p.f increases above 1, first 8th
capacitor trip
then 7th
and so on to maintain p.f 0.98-0.85
 ITC-control inverter
 Turnover voltage cct – detect problem and trip furnace in case of problem
 Earthling cct, ET-SL, PLC etc. are other controlling units
 Hydraulic power pack: Provide pressure of 6 bar, (single acting cylinders) used for tilting
furnace
 RTT sensor – Shows temperature
 ELC machine: Filters magnetic particles from hydraulic oil.
Operating room controls power flow, current voltage, etc.
FURNACE OPERATION
Initially shredded scrap is charged because it can melt easily, quickly and efficiently and forms a
conductive molten pool of metal. About 15 tons is added initially, after melting of this first
sample is taken from furnace and analyzed for composition. On the basis of this result, further
scrap is added to control compositions of elements. On this basis HMS or bundled etc are added.
If composition is not accurate different alloying additions are made.
SiMn - added to control % of Mnand Si
FeMn- added to control % of Mn
FeSi- added to control % of Si
Main elements in the melt are carbon, silicon, phosphorous, manganese and iron.
Silicon increases fluidity and facilitate for ease of flow in casting.
YASEEN RAZA NED University of Engineering And Technology | 14
Carbon induces strength and hardness as well as reduces ductility (If added in excess quantity).
Manganese induces ductility and wear resistance in the melt.
Deslagging
FURNACE SLAG
Slag of IF is acidic slag, because our lining is acidic. Basic slag will consume acidic lining very
rapidly. This acidic slag consist of
SiO2,Al2O3, FeO, MnO, P2O5
Fe+O2 ----- FeO
C+O2 ----- CO
Si+O2 ----- SiO2
Mn+O2 ----- MnO
2P+5/2O ----- P2O5
Excess of sulphur and phosphorous causes hot shortness and cold shortness respectively.
YASEEN RAZA NED University of Engineering And Technology | 15
LADLE FURNACE
The ladle is a vessel used to transfer and pour molten metal from furnace to desire plant for
casting, refining etc.
Sometimes the ladle acts as a furnace normally used to heat up, and to hold different kinds of
metal melts. Heating is done either by graphite electrodes, Depending on metal, ladle size and
expected heating rate, electrical power of up to several megawatts may be applied.
LADLE FURNACE (top view)
Ladle Refining Furnaces are a proven technology used for producing alloy steel, desulfurizing
liquid steel and for improving the productivity from a steel plant. Ladle Refining is a post-
melting treatment that is after melting in the Induction Melting Furnace Whenever LRF is
installed online, liquid metal is transferred from the main melting source to the LRF at a nominal
tapping temperature and either Argon/Nitrogen is purged from the bottom apart from arcing
(using electrodes) on the top to bring about homogeneity of liquid metal composition and
temperature. Fused lime/CaSi is added to the liquid metal to reduce sulphurup to 0.015% and
bring it within acceptable limits
Ladle Refining of liquid metal is a proven technology to produce high quality steel. Ladle
Refining Furnaces (LRFs) are used to desulphurize steel, remove other impurities and hold the
molten steel for casting operations. Without LRFs, higher tap temperatures are normally required
from steel making furnaces due to heat losses during transfer and casting of liquid metal. LRF
facilitates higher productive time to the melting furnace besides producing better quality of steel
at lower cost.
YASEEN RAZA NED University of Engineering And Technology | 16
When alloying is done in the LRF, the main melting furnace is freed from this activity providing
more productive time to the melting equipment and this external treatment has a few distinct
benefits like reduced alloy consumption, better lining life, excellent homogeneity of chemical
composition & temperature and relatively lower energy cost.
LADLE LINING
The total height of ladle is 2900mm and top, bottom dia are 2400mm, 2090mm respectively.
First lining of ladle is broken after 80 heats aprox. Bottom is prepared by Chrome Magnesite
bricks [chromite (40–50 percent or higher)]. QC well block and porous plug well block are also
placed and adjusted. Asbestos sheet (1000x1000x08mm) is placed. Safety lining of side walls is
done by Chrome Magnesite bricks.
There are for zones in ladle lining. Each zone consists of certain layers of refractory bricks
lining.
ZONE 1: Metal Zone 1-4th
layer using High Alumina bricks(175x154/146x100) and
(175x170/130x100) mm with Doloram as back filling mass
ZONE 2: Metal Zone 5-13th
layer using High Alumina bricks(150x154/146x100) and
(150x165/135x100)mm with Doloram as back filling mass
ZONE 3: Slag Zone 14-18th
layer using Carbon Magnesite (150x154/146x100) and
(150x154/146x100) mm with Doloram as back filling mass
ZONE 4: Free Board 19-22nd
layer using High Alumina bricks (250x150x100) mm
Zone
AH-90 paste (90% Al2O3, 4% CaO, SiO2+FeO) and SRA-95H (High % Al2O3) are used to fill gaps
and inner side of well blocks.
YASEEN RAZA NED University of Engineering And Technology | 17
CONTINUOUS CASTING
Continuous casting is a process in which metal is cast in shape of billet, bloom or slab
continuously. Metal ore or scrap is melted in a furnace and then transferred to ladle. Here
refining, alloying additions if required are carried out. Ladle is then transferred to continuous
casting plant. Tundish dummy bar, mold tube, entry and withdrawal rolls, straightener, crop and
pinch, precutting roller table, discharge roller table, cooling belt, pusher, water spray nozzles,etc
are some of the parts of continuous casting mill.
Products obtained from continuous casting are mainly billet, bloom or slab. Heavy, four-piece
plate molds with rigid backing plates are used to cast large, rectangularslabs, (50-250 mm thick
and 0.5–2.2 m wide), which are rolled into plate or sheet. Similarmolds are used for casting
relatively square blooms, which range up to 400 x 600 mm in crosssection. Single-piece tube
molds are used to cast small, square billets, (100 - 200 mm thick)which are rolled into long
products, such as bars, angles, rails, nails, and axles.
Continuous casting
YASEEN RAZA NED University of Engineering And Technology | 18
PROCESS
Ladle after metal being taped in it and after refining is placed on a stand above tundish. Bottom
of ladle consist of a slider gate assembly, which is operated hydraulically.
The tundish allows a reservoir of metal to feed the casting machine while ladles are switched,
thus acting as a buffer of hot metal, as well as smoothing out flow, regulating metal feed to the
molds and cleaning the metal. Capacity of tundish is 4 tons.
Before starting the casting process, dummy bar is prepared. A bolt is attached along with an
asbestos sheet and metal sheet with the dummy bar. It is used to hold and drawn out cast product
uniformly and accurately from mold. As the mold insert at the bottom, we add steel and iron
chips and some asbestos power for ease of solidification. There is 4 mm gap between mold tube
and jacket of mold for water circulation.
The process is started by plugging the bottom of the mold with a dummy bar. After enough metal
has solidified like a conventional casting onto its head, the dummy bar is then slowly withdrawn
down through the continuous casting machine and steady state conditions evolve. The maximum
casting speed of 1-5 m/min is governed by the allowable length. Once in the mold, the molten
steel freezes against the water-cooled walls of a bottomless copper mold to form a solid shell.
The mold is oscillated vertically in order to discourage sticking of the shell to the mold walls.
Drive rolls lower in the machine continuously withdraw the shell fromthe mold at a rate or
casting speed that matches the flow of incoming metal, so the process ideally runs in steady
state. The liquid flow rate is controlled by restricting the opening in the nozzle according to the
signal fed back from a level sensor in the mold.
Mold Body:-
 B
ase
YASEEN RAZA NED University of Engineering And Technology | 19
plate
 Sincere or detector
 Mold jacket
 Mold tube
 Flanges
 Flange
 Cobalt-60
 Water Outlet
 Oil plate
 Water inlet
 Bottom plate
OPERATION MODES
There are four operation modes
 Test mode: in which equipment`s working like oscillation etc is checked out
 Casting mode: oscillation and withdrawal
 DBI: Dummy Bar Insertion
 Run out
The most critical part of the process is the initial solidification at the meniscus, found at
thejunction where the top of the shell meets the mold, and the liquid surface. This is where the
surface of the final product is created, and defects such as surface cracks can form, level
fluctuations can occur. To avoid this, oil or mold powderis added to the steel meniscus, which
flows into the gap between the mold and shell. In addition to lubricating the contact, a mold slag
layer protects the steel from air, provides thermal insulation, and absorbs inclusions.
Water or air mist sprays cool thesurface of the strand between the support rolls. The withdrawal
speed, mold level and water cooling are synchronized. The spray flow rates are adjusted to
control the strand surface temperature with minimal reheating until the molten core is solid.
After the center is completely solid (at the “metallurgical length” of the caster) the strand is cut
with gas torches billets of any desired length.
Gas torches move along the billet and cut at desire length. Fuel gas is LPG along with oxygen at
pressure of 2 bars. Launder pipe is used to open the nozzle, and then tundish is filled metal to
desire level. Tundish has two nozzles for two strands. Dia of nozzle pouring hole is 14mm. it is
made of 95% zirconium to avoid erosion
YASEEN RAZA NED University of Engineering And Technology | 20
Metallurgical length
The length at which core of billet solidifies is called metallurgical length. Metallurgical length
depends upon the rate of cooling and speed of withdrawal or casting speed, temperature and
dimensions of billet. Temperature required for CC is 1510-1550o
c mold level is controlled by
Auto Mold Level Control (AMLC). 6/11 radius ratio is used for this continuous casting. 6 is
bending radius and 11 is unbending radius.
Calculation
Metallurgical length can be calculated by
L= (A2
/4k2
) x V
L = Metallurgical length
A = Crossectional Area
K = Constant
V = Casting Speed
Also it can be calculated by
S = K√ (L/Vc)
For 150 x 150 billet and speed of 1.2 m/min when constant = 30
Metallurgical length = [(150x150)2
/ 4 x (30)2
] x 1.2
Metallurgical length = 8.1 meters
Cooling zones
There are three cooling zones
 Spray ring
 Zone 1: consist of 32 nozzles
 Zone 2
Volume flow rate are different for different nozzles. Nozzle angle is same i.e. 65o
57-65
50-65
35-65
25-65
YASEEN RAZA NED University of Engineering And Technology | 21
Liquidus temperature
Temperature at which steel starts to solidify is called Liquidus temperature. Liquidus
temperature is about 1512o
c. For carbon content (For %C < 0.5) it can be calculated by
Tliq (°C) = 1537 - 73.1%C - 4%Mn - 14%Si - 45%S - 30%P - 1.5%Cr - 2.5%Al - 3.5%Ni - 4%V
- 5%Mo
Carbon Equivalent
Carbon equivalent is a value used to predict the process of treatment to be performed on the
specimen, to predict the weldability etc.
Effect on weldability:
Upto 0.35 excellent
0.35-0.40 Very Good
0.40-0.45 Good
0.45-0.50 Fair
Above 0.50 Poor
Carbon equivalent can be calculated by
CE = %C + (Mn + Si)/6 +(Cr + Mo + V)/5 + (Cu + Ni)/15
YASEEN RAZA NED University of Engineering And Technology | 22
ASL Grades & Composition
ASL Grade Billet
Chemistry(%)
CE Colour
Coding
Bar size to be
Rolled
Mold
Lubrication
BS 4449-3 C 0.20-0.24
Mn 0.55-0.65
Si 0.15-0.30
S <0.05
P <0.05
Max 0.35
For 3/8
Rolling
Yellow
Cut in 6m
905mm Oil/powder
BS 4449-1 C 0.18-0.26
Mn 0.60-0.80
Si 0.15-0.30
S <0.05
P <0.05
0.36-0.380
For Xtreme
Bars upto
25mm
Green
Cut in 6m
12mm, 16mm Mold powder
BS 4449-2 C 0.26-0.30
Mn0.60-0.80
Si 0.15-0.30
S <0.05
P <0.05
0.39-0.44
G-60 Bars
upto 25mm
Blue
Cut in 3m
19/22/25/28/32mm Mold powder
Special
Grade
C 0.22-0.25
Mn1.05-1.15
Si 0.15-0.30
S <0.05
no tolerance
P <0.05
0.41-0.51 To be
confined
40mm Mold powder
Special
Grade with
High
Carbon
C 0.30-0.34
Mn 0.60-0.80
Si 0.15-0.30
S <0.05
P <0.05
0.48-0.51 To be
confined
40mm Mold powder
YASEEN RAZA NED University of Engineering And Technology | 23
Slag Processing Area
The molten oxide by-product obtained during smelting and refining is called slag. Oxides like
SiO2, Al2O3, P2O5 and B2O3 are acidic oxides. They form acidic slag. Oxides like MgO, FeO, and
MnO are basic oxides. They form basic slag
The slag, poured in slag pot is transferred to slag processing area. Here the slag is crushed first
into small size by labours. Then it is transferred to slag crushing area. It is transferred to hopper
then to conveyer belt. It goes to Jaw crusher, from where it goes to 2nd
conveyer belt. A magnetic
screen separates ferrous particles from them. Again it is passed to a roller crusher and crushed
parts are moved on 3rd
conveyer belt. Another magnetic drum separates iron contents and it fell
down. Slag particles transferred to 4th
conveyer belt and at last fell to stock area.
Quality Control
At ASL there are two laboratories for checking the composition of metal and billet, and also the
quality of water, silica sanded. Distilled water also produces here.
 Spectrolab
 Wet lab
Spectroscopy Lab
Spectroscopy is a terms used to refer to the measurement of radiation intensity as a function of
wavelength. Device used to measure the intensity of the radiation emitted is called spectrometer.
The energy of a photon is related to its frequency by
Where is Planck's constant.
Spectroscopy is a method to find out the composition of specimen by generating a spark on the
surface of sample. This spark makes the electrons move in an exited stage as a result they change
their energy. As they move to high energy state they absorb energy and when they come back to
ground state they emit energy in the form of radiations. This principle is used in spectroscopy.
Each element in a sample has its own radiation emission. A magnifying glass is attached which
magnifies these radiations and guide to their respective silts. In this way elements are detected.
Before starting this process, samples grind and polished, Grit size 36 and 60 paper is used.
Sample must be homogenized i.e. no trapped inclusions or slag, and it must be iron base for
proper conductivity.
YASEEN RAZA NED University of Engineering And Technology | 24
Wet lab
Wet lab uses classical method of Volumetric, gravimetric, and instrumental analysis for
analyzing the metal samples, silica samples and water samples. It also produces Demineralize
water by electrical distiller at a rate of 5lit/hr.
Etching is done about 1/2hr for finding defects in billets like pin holes, pipes etc.
Moisture Content is find out by using electrical ovens i.e. %loss in weight after drying.
Loss of ignition (volatile matter, gases) of silica is finding out by using Box furnace. First silica
is heated to about 1000o
c, then cooled about 2-3 min in air then cooled in desigator.
Logistics and stores
At ASL, all the spare parts, extra equipment’s etc. is placed in store. In case of any emergency,
they may be utilized. Different sections are made for each plant. There are Refractory storage,
LRF, IF, FES, CCM etc. sections with their respective spare parts, nuts, bolts, pipes etc.
Whatever the parts are required are first undersigned on a paper by incharge and then give to
store incharge, he then handover the desire part to the worker. All details of store, i.e. item
entered in the inventory, items given, remaining stock, all are managed through ERP- Enterprise
Resource Planning.
Fume Exhaust System (FES)
Fume exhaust system is to exhaust the gases, dust evolving from induction furnaces.Scrubbing
the exhaust air prevents the release of aggressive and harmful vapors into the environmentan
impeller creates suction and transferred to air bags. These bags allow them to pass through but
dust, in which main content is zinc, does not pass through it, it is then transferred to hopper, from
where it is collected in bags.
YASEEN RAZA NED University of Engineering And Technology | 25
Reverse Osmosis Plant (RO)
Reverse osmosis (RO) is a filtration method that removes many types of large molecules and
ions from solutions by applying pressure to the solution when it is on one side of a membrane.
The result is that the solute is retained on the pressurized side of the membrane and the pure
solvent is allowed to pass to the other side
Osmosis is a natural process. When two liquids of different concentration are separated by a
semipermeable membrane, the fluid has a tendency to move from low to high solute
concentrations for chemical potential equilibrium.Formally, reverse osmosis is the process of
forcing a solvent from a region of high solute concentration through a semipermeable membrane
to a region of low solute concentration by applying a pressure.
 There are 5 underground bores, among which 3 are in operation.
 Water is extract from here and transferred to pressurized vessel, which holds it. Some
suspended particles settle down and separated. There are 4 pressurized vessels
 Then it is transferred to multimedia filter tank.
 It filters water, suspended particles.
 Filter size is 30 microns.
 VFD – Variable Frequency Distribution: Controls, change frequency.
 This water is then transferred to Cartage filter in which it separates 5 microns
particles.
 Then membrane is used for final filtration of about0.03 microns. It consists of
biosites, anti scalant which kill bacterial effects. Electromagnetic Dosing pump is
attached along with this.
Suggestions
 Safety precautions are not followed. Therefore many accidents have been occurred.
Safety inspector must be appointed in order to check these precautions by workers,
engineers etc
 There are many health hazards because of evolution of gases, dust. Feeding of charge can
be done through vibratory feeder completely, because open feeding through cranes causes
problems like splashes dust evolution etc
 Training period for trainee engineers can be reduced to 4 months instead of 6 months,
along with their initial salary, which is somehow low.
 Scrap feeding can be done fron scrap yard to transfer trolley directly. It saves time,
because first it is transferred to scrap bay, then by EOT cranes to transfer Trolley.
YASEEN RAZA NED University of Engineering And Technology | 26

More Related Content

What's hot

Raw Material In Iron Making
Raw Material In Iron MakingRaw Material In Iron Making
Raw Material In Iron Making
Nirjhar Chakravorti
 
Sinter Plant,Lime & Dolo Plant industrial Training Report
Sinter Plant,Lime & Dolo Plant industrial Training ReportSinter Plant,Lime & Dolo Plant industrial Training Report
Sinter Plant,Lime & Dolo Plant industrial Training Report
Shani Kumar Singh
 
Bhilai steel plant training report /
Bhilai steel plant  training report /Bhilai steel plant  training report /
Bhilai steel plant training report /
Deepash Rajak
 
Report of Pakistan Steel Mill
Report of Pakistan Steel MillReport of Pakistan Steel Mill
Report of Pakistan Steel Mill
Muhammad Ahmed
 
Vocational Training in Steel Authority of India Limited (SAIL)-Bokaro Steel P...
Vocational Training in Steel Authority of India Limited (SAIL)-Bokaro Steel P...Vocational Training in Steel Authority of India Limited (SAIL)-Bokaro Steel P...
Vocational Training in Steel Authority of India Limited (SAIL)-Bokaro Steel P...
Sumit Kumar
 
SAIL SSP IPT report by srm univ
SAIL SSP IPT report by srm univSAIL SSP IPT report by srm univ
SAIL SSP IPT report by srm univ
Aswinkumar R
 
durgapur steel plant
 durgapur steel plant durgapur steel plant
durgapur steel plant
Sonu Das
 
Vacational Trainning at SAIL (DSP)
Vacational Trainning at SAIL (DSP)Vacational Trainning at SAIL (DSP)
Vacational Trainning at SAIL (DSP)
Sukanto Mondal
 
Summer Training at JSW
Summer Training at JSWSummer Training at JSW
Summer Training at JSW
Arpan Paul
 
Training report on bokaro steel plant
Training report on bokaro steel plantTraining report on bokaro steel plant
Training report on bokaro steel plant
Prashant Kumar
 
JSW Summer Internship Report 2017
JSW Summer Internship Report  2017JSW Summer Internship Report  2017
JSW Summer Internship Report 2017
ASHISH JAISWAL
 
Industrial Training Report on Blast Furnace
Industrial Training Report on Blast FurnaceIndustrial Training Report on Blast Furnace
Industrial Training Report on Blast Furnace
Shani Kumar Singh
 
plate mill presentation of b.s.p
 plate mill presentation of b.s.p plate mill presentation of b.s.p
plate mill presentation of b.s.p
Surendra Kumar Dewangan
 
Mudgun and Mudgun column assembly major project in MARS2 in BHILAI STEEL PLANT
Mudgun and Mudgun column assembly major project in MARS2 in BHILAI STEEL PLANTMudgun and Mudgun column assembly major project in MARS2 in BHILAI STEEL PLANT
Mudgun and Mudgun column assembly major project in MARS2 in BHILAI STEEL PLANT
Basant Kumar Sahu
 
A VOCATIONAL TRAINNING REPORT_aman
A  VOCATIONAL TRAINNING REPORT_amanA  VOCATIONAL TRAINNING REPORT_aman
A VOCATIONAL TRAINNING REPORT_aman
AMAN KESARI
 
Visakhapatnam steel plant
Visakhapatnam steel plantVisakhapatnam steel plant
Visakhapatnam steel plant
Venkata Swamy
 
Vocational Training on Bhilai Steel Plant
Vocational Training on Bhilai Steel PlantVocational Training on Bhilai Steel Plant
Vocational Training on Bhilai Steel Plant
Piyush Verma
 
VOCATIONAL TRAINING REPORT
VOCATIONAL TRAINING REPORTVOCATIONAL TRAINING REPORT
VOCATIONAL TRAINING REPORT
Gunjesh Jha
 
Sintering plant at a glance
Sintering plant at a glanceSintering plant at a glance
Sintering plant at a glance
Rahul5694
 
Industrial Training Report on Plate Mill
Industrial Training Report on Plate MillIndustrial Training Report on Plate Mill
Industrial Training Report on Plate Mill
Shani Kumar Singh
 

What's hot (20)

Raw Material In Iron Making
Raw Material In Iron MakingRaw Material In Iron Making
Raw Material In Iron Making
 
Sinter Plant,Lime & Dolo Plant industrial Training Report
Sinter Plant,Lime & Dolo Plant industrial Training ReportSinter Plant,Lime & Dolo Plant industrial Training Report
Sinter Plant,Lime & Dolo Plant industrial Training Report
 
Bhilai steel plant training report /
Bhilai steel plant  training report /Bhilai steel plant  training report /
Bhilai steel plant training report /
 
Report of Pakistan Steel Mill
Report of Pakistan Steel MillReport of Pakistan Steel Mill
Report of Pakistan Steel Mill
 
Vocational Training in Steel Authority of India Limited (SAIL)-Bokaro Steel P...
Vocational Training in Steel Authority of India Limited (SAIL)-Bokaro Steel P...Vocational Training in Steel Authority of India Limited (SAIL)-Bokaro Steel P...
Vocational Training in Steel Authority of India Limited (SAIL)-Bokaro Steel P...
 
SAIL SSP IPT report by srm univ
SAIL SSP IPT report by srm univSAIL SSP IPT report by srm univ
SAIL SSP IPT report by srm univ
 
durgapur steel plant
 durgapur steel plant durgapur steel plant
durgapur steel plant
 
Vacational Trainning at SAIL (DSP)
Vacational Trainning at SAIL (DSP)Vacational Trainning at SAIL (DSP)
Vacational Trainning at SAIL (DSP)
 
Summer Training at JSW
Summer Training at JSWSummer Training at JSW
Summer Training at JSW
 
Training report on bokaro steel plant
Training report on bokaro steel plantTraining report on bokaro steel plant
Training report on bokaro steel plant
 
JSW Summer Internship Report 2017
JSW Summer Internship Report  2017JSW Summer Internship Report  2017
JSW Summer Internship Report 2017
 
Industrial Training Report on Blast Furnace
Industrial Training Report on Blast FurnaceIndustrial Training Report on Blast Furnace
Industrial Training Report on Blast Furnace
 
plate mill presentation of b.s.p
 plate mill presentation of b.s.p plate mill presentation of b.s.p
plate mill presentation of b.s.p
 
Mudgun and Mudgun column assembly major project in MARS2 in BHILAI STEEL PLANT
Mudgun and Mudgun column assembly major project in MARS2 in BHILAI STEEL PLANTMudgun and Mudgun column assembly major project in MARS2 in BHILAI STEEL PLANT
Mudgun and Mudgun column assembly major project in MARS2 in BHILAI STEEL PLANT
 
A VOCATIONAL TRAINNING REPORT_aman
A  VOCATIONAL TRAINNING REPORT_amanA  VOCATIONAL TRAINNING REPORT_aman
A VOCATIONAL TRAINNING REPORT_aman
 
Visakhapatnam steel plant
Visakhapatnam steel plantVisakhapatnam steel plant
Visakhapatnam steel plant
 
Vocational Training on Bhilai Steel Plant
Vocational Training on Bhilai Steel PlantVocational Training on Bhilai Steel Plant
Vocational Training on Bhilai Steel Plant
 
VOCATIONAL TRAINING REPORT
VOCATIONAL TRAINING REPORTVOCATIONAL TRAINING REPORT
VOCATIONAL TRAINING REPORT
 
Sintering plant at a glance
Sintering plant at a glanceSintering plant at a glance
Sintering plant at a glance
 
Industrial Training Report on Plate Mill
Industrial Training Report on Plate MillIndustrial Training Report on Plate Mill
Industrial Training Report on Plate Mill
 

Viewers also liked

Internship Report
Internship ReportInternship Report
Internship Report
Amar Upadhyay
 
Final internship presentation doucet_t
Final internship presentation doucet_tFinal internship presentation doucet_t
Final internship presentation doucet_t
thibault_doucet
 
PLC (programmable logic controllers) RTD and CNC PPT- powerpoint presentation...
PLC (programmable logic controllers) RTD and CNC PPT- powerpoint presentation...PLC (programmable logic controllers) RTD and CNC PPT- powerpoint presentation...
PLC (programmable logic controllers) RTD and CNC PPT- powerpoint presentation...
Aman Gupta
 
INTERNSHIP REPORT ps
INTERNSHIP REPORT psINTERNSHIP REPORT ps
INTERNSHIP REPORT ps
Tarab Wasi
 
PLC (programmable logic controllers) & CNC (COMPUTER NUMERIC CONTROL) Interns...
PLC (programmable logic controllers) & CNC (COMPUTER NUMERIC CONTROL) Interns...PLC (programmable logic controllers) & CNC (COMPUTER NUMERIC CONTROL) Interns...
PLC (programmable logic controllers) & CNC (COMPUTER NUMERIC CONTROL) Interns...
Aman Gupta
 
Summer internship report L&T
Summer internship report L&TSummer internship report L&T
Summer internship report L&T
Umed Paliwal
 
Internship Report on Building Construction
Internship Report on Building ConstructionInternship Report on Building Construction
Internship Report on Building Construction
Esmael Aragaw
 

Viewers also liked (7)

Internship Report
Internship ReportInternship Report
Internship Report
 
Final internship presentation doucet_t
Final internship presentation doucet_tFinal internship presentation doucet_t
Final internship presentation doucet_t
 
PLC (programmable logic controllers) RTD and CNC PPT- powerpoint presentation...
PLC (programmable logic controllers) RTD and CNC PPT- powerpoint presentation...PLC (programmable logic controllers) RTD and CNC PPT- powerpoint presentation...
PLC (programmable logic controllers) RTD and CNC PPT- powerpoint presentation...
 
INTERNSHIP REPORT ps
INTERNSHIP REPORT psINTERNSHIP REPORT ps
INTERNSHIP REPORT ps
 
PLC (programmable logic controllers) & CNC (COMPUTER NUMERIC CONTROL) Interns...
PLC (programmable logic controllers) & CNC (COMPUTER NUMERIC CONTROL) Interns...PLC (programmable logic controllers) & CNC (COMPUTER NUMERIC CONTROL) Interns...
PLC (programmable logic controllers) & CNC (COMPUTER NUMERIC CONTROL) Interns...
 
Summer internship report L&T
Summer internship report L&TSummer internship report L&T
Summer internship report L&T
 
Internship Report on Building Construction
Internship Report on Building ConstructionInternship Report on Building Construction
Internship Report on Building Construction
 

Similar to Amreli Steel-Internship Report-Yaseen Raza

SMS PROJECT
SMS PROJECTSMS PROJECT
SMS PROJECT
Deepak Patel
 
Summertraining dlw harshit irwri
Summertraining dlw harshit irwriSummertraining dlw harshit irwri
Summertraining dlw harshit irwri
Harshit Mishra
 
Industrial Training Report on Rolling Mill
Industrial Training Report on Rolling MillIndustrial Training Report on Rolling Mill
Industrial Training Report on Rolling Mill
Shani Kumar Singh
 
PPE Demo Report by Tuan Afaham Burah
PPE Demo Report by Tuan Afaham BurahPPE Demo Report by Tuan Afaham Burah
PPE Demo Report by Tuan Afaham Burah
Tuan Afaham Burah
 
EFFECT OF CASTING PARAMETERS ON MACROSTRUCTURE OF STEEL
EFFECT OF CASTING PARAMETERS ON MACROSTRUCTURE OF STEELEFFECT OF CASTING PARAMETERS ON MACROSTRUCTURE OF STEEL
EFFECT OF CASTING PARAMETERS ON MACROSTRUCTURE OF STEEL
Surya Teja Botu
 
PPT ON METAL AND STEEL FACTORY, ISHAPORE, (WEST BENGAL)
PPT ON METAL AND STEEL FACTORY, ISHAPORE, (WEST BENGAL)PPT ON METAL AND STEEL FACTORY, ISHAPORE, (WEST BENGAL)
PPT ON METAL AND STEEL FACTORY, ISHAPORE, (WEST BENGAL)
MD SHAHID JAMIL
 
Sharjah exhibition tube mill ppt
Sharjah exhibition tube mill pptSharjah exhibition tube mill ppt
Sharjah exhibition tube mill ppt
nirtube
 
Final power point teckno profile
Final power point teckno profileFinal power point teckno profile
Final power point teckno profile
Janakbhatt
 
Salem Steel Plant Industrial Training Report
Salem Steel Plant Industrial Training ReportSalem Steel Plant Industrial Training Report
Salem Steel Plant Industrial Training Report
Raghunath Veeramani
 
Rautomead Newsletter issue 01
Rautomead Newsletter issue 01  Rautomead Newsletter issue 01
Rautomead Newsletter issue 01
Rautomead Limited
 
Tap hole mass & castable for iron runner
Tap hole mass & castable for iron runnerTap hole mass & castable for iron runner
Tap hole mass & castable for iron runner
Harvey Yang
 
Industrial visit report uttam transformers
Industrial visit report  uttam transformersIndustrial visit report  uttam transformers
Industrial visit report uttam transformers
MahipalSoni4
 
Seminar-II
Seminar-IISeminar-II
Seminar-II
Trishu Dey
 
Copper Mould
Copper MouldCopper Mould
Copper Mould
Cameron KL
 
Scl Ppt
Scl PptScl Ppt
Scl Ppt
SPS CHADHA
 
RAUTOMEAD TECHNOLOGY FOR CONTINUOUS CASTING OF OXYGEN-FREE COPPER AND DILUTE...
RAUTOMEAD  TECHNOLOGY FOR CONTINUOUS CASTING OF OXYGEN-FREE COPPER AND DILUTE...RAUTOMEAD  TECHNOLOGY FOR CONTINUOUS CASTING OF OXYGEN-FREE COPPER AND DILUTE...
RAUTOMEAD TECHNOLOGY FOR CONTINUOUS CASTING OF OXYGEN-FREE COPPER AND DILUTE...
Rautomead Limited
 
An Industrial Visit to Amreli Steels .docx
An Industrial Visit to Amreli Steels .docxAn Industrial Visit to Amreli Steels .docx
An Industrial Visit to Amreli Steels .docx
Anas Ahmed
 
Vocational training report format
Vocational training report formatVocational training report format
Vocational training report format
Ankit Namdev
 
TAYO PROJECT FINAL
TAYO PROJECT FINALTAYO PROJECT FINAL
TAYO PROJECT FINAL
Prabhat Kumar
 
Design And Fabrication Of Iron Ore Sintering Machine
Design And Fabrication Of Iron Ore Sintering MachineDesign And Fabrication Of Iron Ore Sintering Machine
Design And Fabrication Of Iron Ore Sintering Machine
Albin Cherian
 

Similar to Amreli Steel-Internship Report-Yaseen Raza (20)

SMS PROJECT
SMS PROJECTSMS PROJECT
SMS PROJECT
 
Summertraining dlw harshit irwri
Summertraining dlw harshit irwriSummertraining dlw harshit irwri
Summertraining dlw harshit irwri
 
Industrial Training Report on Rolling Mill
Industrial Training Report on Rolling MillIndustrial Training Report on Rolling Mill
Industrial Training Report on Rolling Mill
 
PPE Demo Report by Tuan Afaham Burah
PPE Demo Report by Tuan Afaham BurahPPE Demo Report by Tuan Afaham Burah
PPE Demo Report by Tuan Afaham Burah
 
EFFECT OF CASTING PARAMETERS ON MACROSTRUCTURE OF STEEL
EFFECT OF CASTING PARAMETERS ON MACROSTRUCTURE OF STEELEFFECT OF CASTING PARAMETERS ON MACROSTRUCTURE OF STEEL
EFFECT OF CASTING PARAMETERS ON MACROSTRUCTURE OF STEEL
 
PPT ON METAL AND STEEL FACTORY, ISHAPORE, (WEST BENGAL)
PPT ON METAL AND STEEL FACTORY, ISHAPORE, (WEST BENGAL)PPT ON METAL AND STEEL FACTORY, ISHAPORE, (WEST BENGAL)
PPT ON METAL AND STEEL FACTORY, ISHAPORE, (WEST BENGAL)
 
Sharjah exhibition tube mill ppt
Sharjah exhibition tube mill pptSharjah exhibition tube mill ppt
Sharjah exhibition tube mill ppt
 
Final power point teckno profile
Final power point teckno profileFinal power point teckno profile
Final power point teckno profile
 
Salem Steel Plant Industrial Training Report
Salem Steel Plant Industrial Training ReportSalem Steel Plant Industrial Training Report
Salem Steel Plant Industrial Training Report
 
Rautomead Newsletter issue 01
Rautomead Newsletter issue 01  Rautomead Newsletter issue 01
Rautomead Newsletter issue 01
 
Tap hole mass & castable for iron runner
Tap hole mass & castable for iron runnerTap hole mass & castable for iron runner
Tap hole mass & castable for iron runner
 
Industrial visit report uttam transformers
Industrial visit report  uttam transformersIndustrial visit report  uttam transformers
Industrial visit report uttam transformers
 
Seminar-II
Seminar-IISeminar-II
Seminar-II
 
Copper Mould
Copper MouldCopper Mould
Copper Mould
 
Scl Ppt
Scl PptScl Ppt
Scl Ppt
 
RAUTOMEAD TECHNOLOGY FOR CONTINUOUS CASTING OF OXYGEN-FREE COPPER AND DILUTE...
RAUTOMEAD  TECHNOLOGY FOR CONTINUOUS CASTING OF OXYGEN-FREE COPPER AND DILUTE...RAUTOMEAD  TECHNOLOGY FOR CONTINUOUS CASTING OF OXYGEN-FREE COPPER AND DILUTE...
RAUTOMEAD TECHNOLOGY FOR CONTINUOUS CASTING OF OXYGEN-FREE COPPER AND DILUTE...
 
An Industrial Visit to Amreli Steels .docx
An Industrial Visit to Amreli Steels .docxAn Industrial Visit to Amreli Steels .docx
An Industrial Visit to Amreli Steels .docx
 
Vocational training report format
Vocational training report formatVocational training report format
Vocational training report format
 
TAYO PROJECT FINAL
TAYO PROJECT FINALTAYO PROJECT FINAL
TAYO PROJECT FINAL
 
Design And Fabrication Of Iron Ore Sintering Machine
Design And Fabrication Of Iron Ore Sintering MachineDesign And Fabrication Of Iron Ore Sintering Machine
Design And Fabrication Of Iron Ore Sintering Machine
 

Amreli Steel-Internship Report-Yaseen Raza

  • 1. 0001c;vjkf;lgjPage | 1 2012 Yaseen Raza NED University of Engineering and Technology INTERNSHIP REPORT
  • 2. YASEEN RAZA NED University of Engineering And Technology | 2 INTERNSHIP REPORT SUBMITTED TO MR. Abdul Latif Bhano MANAGER PRODUCTION SUBMITTED BY YASEEN RAZA (MY-50) NED UNIVERSITY OF ENGINEERING AND TECHNOLOGY BATCH: 2009~2010 DURATION: 05TH DECEMBER 2012 TO22ND DECEMBER 2012
  • 3. YASEEN RAZA NED University of Engineering And Technology | 3 ACKNOWLEDGMENT Starting with the name of Allah who is the most merciful and beneficent My report work has accomplished under excellent guidance and supervision of production and management team of Amreli Steels Limited, SMS Dhabeji. I offer my heartiest gratefulness to ASL team for its step to step guidance and close supervision during the conduct of all the period of internship at ASL. No acknowledgement could ever adequately express my obligations to my affectionate parentsfor their all inspirations and guidance which always motivated us to carry ourselves through the noblest ideas of life and solving all troubles and boosted my moral to fly high to accomplish our goals. I convey special thanks to my dear class adviser MR IFTIKHAR AHMED CHANNA, NED Universityfor his excellent, efficient, accurate and reliable help to completion of this internship as well as completed our report.
  • 4. YASEEN RAZA NED University of Engineering And Technology | 4 I also convey special thanks to SMS plant Planning & production team MR Noman Sajjad (Executive Manager) MR Inayat Ullah Baig (Maintenance Manager) MR Abdul Latif Bhano (Production Manager) MR Hammad Ali (Manager Planning& Development) MR Sohail Mumtaz(Deputy Manager, Mechanical) MR Abdul Majeed Jagirani (Deputy Manager, Electrical MR Muhammad Farooq (Assistant Engineer,Mechanical) MR Zaigham Masood (Shift Incharge IF) MR Kamran Memon (Shift Incharge LRF) MR Adnan (Asst Engg Ref) MR Alam (AsstEnggIF) MR Naeem Khatti (Shift Incharge CCM) MR Said Haneef (Incharge QC) MR Qadeer (Incharge QC) MR Zubair (InchargeUtility) MR Sarfaraz (Trainee Engg) MR Ammar (Trainee Engg) Mr Zeeshan Moeen (Ass. Engg Vezzani) Mr Noman Amjad (Trainee. Vezzani)
  • 5. YASEEN RAZA NED University of Engineering And Technology | 5 INDEX Sr. No Plant Description PG.NO 1 ASL Process flow chart 6 2 Introduction 7 3 Raw Material  Types  Vezzani 8 4 Steel Melt shop (SMS) 9 5 Induction Furnace  Furnace specification  Furnace Operation  Furnace Lining  Furnace Crucible  Furnace Control  Furnace Slag 10-14 6 Ladle Furnace  Ladle lining 15-16 7 Continuous casting  Process  Mold Body  Operation modes  Metallurgical Length  Calculations  Cooling zones  Liquidus Temp  Carbon equivalent 16-20
  • 6. YASEEN RAZA NED University of Engineering And Technology | 6 8 ASL Grades and Composition 21 9 Slag Processing Area 22 10 Quality Control  Spectro lab  Wet Lab 24-25 11 Logistic and Stores 25 12 FES (Fume Exhaust System) 25 13 Reverse Osmosis Plant (RO) 26
  • 7. YASEEN RAZA NED University of Engineering And Technology | 7 Scrap Scrap Yard Vibratory Feeder Scrap Area Charging Vessani Shear LRF Transfer trolley Melting Spectro Lab Deslagging Continuous casting Billets Induction Furnace Shearing of Oversize scrap Quality Control Heat taping Wet Lab Slag processing area Temperature check Billets stock area
  • 8. YASEEN RAZA NED University of Engineering And Technology | 8 INTRODUCTION Company`s Profile The Company was incorporated in Pakistan as a private limited company under Companies Ordinance 1984, to take over from partnership firm doing business in the name of Amreliwala Hardware Industries. Prior to 1984, the Sponsors were operating manual re-rolling mills to manufacture mild steel bars. These rolling mills were dependent for raw material on sponsor- owned ship breaking business. The Sponsors are in steel business for many decades; because of this exposure and experience the family was able to foresee the advent of strong demand in quantity and quality of steel bars. To cater to this, all manual rolling mills were scraped in 1984 and fully automatic plant of Danieli brand was imported and installed with production capacity of 35,000 tons, the capacity of which over the years was increased to 75,000 tons. Amreli Steels has been in steel business for decades and have earned a respectable name in the business world through commitment to its customer by providing the best quality product and adherence to the corporate and ethical principals in conducting business operations. Amreli Steels is one of the few steel bar manufacturers that used billets of Pakistan Steel Mills as raw material for its hot rolling process. Good quality billets and advanced automatic manufacturing facility with professional and motivated team has given Amreli a competitive edge over its fellow manufacturers. This report will cover the areas of  Induction furnaces (IF)  Ladle Refining Furnace (LRF)  Continuous Casting Plant  Refractory Shop  Utilities  QC Which I learned during the internship. Amreli steels limited produce  High strength Xtreme bars conforming to BS 4449:2005  Hot rolled deformed bars conforming to ASTM A615 Above grade reinforcedsteel bars from high quality billets. These billets are produce through continuous casting process. Induction furnace is used to melt the scrap, which is the prime raw material for producing desire melt.
  • 9. YASEEN RAZA NED University of Engineering And Technology | 9 RAW MATERIAL Scrap is the prime raw material used for producing quality melt. This scrap is imported from UAE and India. It is then transferred to scrap yard through containers from port. As per requirements, different types of scrap are used. They are classifies as  HMS Heavy Melting Scrap is a designation for recycled steels. Its size is above 600mm. It is divided in two categories HMS-1: Consists of non-galvanized parts, engine blocks, some Aluminum and Copper parts HMS-2: Consists of galvanized parts etc. HMS: Soft scrap like sheets, pipes etc.  SHREDDED Consist of small parts, crushed scrap. Size is below 600mm  BUNDLED LMS: Light Metal Scrap UBC: Used Beverages Canes etc GI: Galvanized sheets or parts are Bundled scrap 20% HMS, 30% shredded, 25% bundled and remaining 25% mix scrap is used. As per requirement, scrap is transferred from yard to scrap bay through dumpers. Scrap size more than 600m is first shifted to Vezzani shear for shearing than to melt shop. VEZZANI SHEAR Vessani shear is used to perform shearing of oversized scrap. Crane is operated manually. Scrap is charged over a taper plate of vezzani at the end of which there is a ram. Scrap is compressed first by horizontal ram then by vertical ram and shearing blade shear the scrap to size of 600mmthen the gate is opened. it is then passed over a vibrating conveyer, it consist of a magnetic drum. It is 1/3rd magnetic so it attract ferrous scrap and nonferrous scrap like aluminum, copper etc fell down on debris conveyer belt. From scrap car it is transferred to furnace floor i.e. vibratory feeder. Vibratory feeder is used to feed scrap to the furnace crucible at a rate of about 400kg/min. its surface is slightly tapper so as to allow easy feeding
  • 10. YASEEN RAZA NED University of Engineering And Technology | 10 SMS- STEEL MELTING SHOP Steel melt shop consist of:  Two induction furnaces (IF) each with 2 crucibles  Ladle Refining Furnace (LRF)  Continuous Casting Plant  Ladle Preheating area  Refractory Shop  Slag processing Area INDUCTION FURNACE Induction furnace is an electrical furnace which utilizes electricity as fuel. Electromagnetic heating is used to melt the scrap in the crucible. Copper coils are used which acts as primary and generate low voltage high current in secondary (scrap). Alternating current(A.C) passes through it and magnetic flux is generated within conductor.The magnetic flux generated eddy current that enables the heating andmelting process in the crucible.
  • 11. YASEEN RAZA NED University of Engineering And Technology | 11 FURNACE SPECIFICATION  Power requirement: 10MW  Melting transformer: 12 MW  Sintering transformer: 1.2 MW  Capacity: 25-30 MT  Current: 2000A  Voltage :3670V  Frequency : 192Hz  Temperature :960-1620o c There are two crucibles for each furnace. One crucible is on melting operation and another is on sintering operation. Crucible is changed after 12-15 heats FURNACE LINING Lining of If is acidic because of acidic slag formed. Quartzite lining also called acid ramming mass is used as lining material and boric acid as binder. It consist of a) SiO2 -98.5% b) Al2O3 – 0.02% c) Fe2O3 – 0.02% d) Boric acid ((H3BO3) 1-1.2% Preheating is done to 90o c for removing moisture. 70% grain and 30% powder is mixedin mixing mill, 1.2% boric acid is added then transferred to bin then to floor. Cooling of furnace is carried out through blower for about 6 hrs and then lining is breakout in 3 hrs. Pneumatic drills are used for this purpose, after breaking the lining, furnace is tilt and waste is thrown down in pot. Mixture is heated to about 90°c. Former is used to prepare efficient lining. Two types of former are used.  ASL Former: It is consumable former made of low carbon steel sheet. Lining is placed layer by layer and rammed through pneumatic hammer. In ASL former 11 layers of lining are placed because former is melt able and after melting a fine lining surface is obtained.  Chinese Former: It is non-consumable former. In Chinese former 24 layers of lining are placed because former is removed after lining and close accuracy of lining is required. When it is removed, patching is done.
  • 12. YASEEN RAZA NED University of Engineering And Technology | 12 Sintering Sintering is performed after lining so that the binder get hold strongly the acid riming mass and to induce strength in lining. The greater the time greater will be the strength. Sintering time (hrs.) Power (KWH) Crucible state 2 125-175 Empty crucible 1 300-450 Filled with scrap 1 500-600 1 650-800 1 850-900 1 900 or above FURNACE CRUCIBLE Induction furnace crucibles are made of highly conductive hollow, rectangular copper tubes. 12 pairs of copper coils i.e. 24 coils are mounted rigidly. Also there are 3 SS coils at the top and 4 SS coils at the bottom to facilitate cooling. SS is used because it has high oxidation-resistance, corrosion resistance and wears resistance. Induction Furnace Coil
  • 13. YASEEN RAZA NED University of Engineering And Technology | 13 This coil is coated with AH60 refractory material in order to protect from moisture etc. First coil is painted with a special paint. Each copper tube is then wounded with glass tape. Scandium blocks are place with the gap between the copper tubes. Then finally it is painted with resin and aluminum coating.It is then dried in air. FURNACE CONTROL Total power supplied to ASL is 63MVA Total power consumption of both furnaces is 25MVA Generator room, Crucible room and operating room control all operations on IF. Generator room consists of:  DC chock: converts AC to DC. Input is 600V x 4 = 2400V, four Converters are used. Output is 3600V. Inverter convert DC to AC, in this way we can control (inc/dec) Frequency  DM unit:  Capacitor unit: Capacitor bank is usedto maintainpower factor. Eight capacitor are used, each consistof 2,4 capacitors respectively. if p.f increases above 1, first 8th capacitor trip then 7th and so on to maintain p.f 0.98-0.85  ITC-control inverter  Turnover voltage cct – detect problem and trip furnace in case of problem  Earthling cct, ET-SL, PLC etc. are other controlling units  Hydraulic power pack: Provide pressure of 6 bar, (single acting cylinders) used for tilting furnace  RTT sensor – Shows temperature  ELC machine: Filters magnetic particles from hydraulic oil. Operating room controls power flow, current voltage, etc. FURNACE OPERATION Initially shredded scrap is charged because it can melt easily, quickly and efficiently and forms a conductive molten pool of metal. About 15 tons is added initially, after melting of this first sample is taken from furnace and analyzed for composition. On the basis of this result, further scrap is added to control compositions of elements. On this basis HMS or bundled etc are added. If composition is not accurate different alloying additions are made. SiMn - added to control % of Mnand Si FeMn- added to control % of Mn FeSi- added to control % of Si Main elements in the melt are carbon, silicon, phosphorous, manganese and iron. Silicon increases fluidity and facilitate for ease of flow in casting.
  • 14. YASEEN RAZA NED University of Engineering And Technology | 14 Carbon induces strength and hardness as well as reduces ductility (If added in excess quantity). Manganese induces ductility and wear resistance in the melt. Deslagging FURNACE SLAG Slag of IF is acidic slag, because our lining is acidic. Basic slag will consume acidic lining very rapidly. This acidic slag consist of SiO2,Al2O3, FeO, MnO, P2O5 Fe+O2 ----- FeO C+O2 ----- CO Si+O2 ----- SiO2 Mn+O2 ----- MnO 2P+5/2O ----- P2O5 Excess of sulphur and phosphorous causes hot shortness and cold shortness respectively.
  • 15. YASEEN RAZA NED University of Engineering And Technology | 15 LADLE FURNACE The ladle is a vessel used to transfer and pour molten metal from furnace to desire plant for casting, refining etc. Sometimes the ladle acts as a furnace normally used to heat up, and to hold different kinds of metal melts. Heating is done either by graphite electrodes, Depending on metal, ladle size and expected heating rate, electrical power of up to several megawatts may be applied. LADLE FURNACE (top view) Ladle Refining Furnaces are a proven technology used for producing alloy steel, desulfurizing liquid steel and for improving the productivity from a steel plant. Ladle Refining is a post- melting treatment that is after melting in the Induction Melting Furnace Whenever LRF is installed online, liquid metal is transferred from the main melting source to the LRF at a nominal tapping temperature and either Argon/Nitrogen is purged from the bottom apart from arcing (using electrodes) on the top to bring about homogeneity of liquid metal composition and temperature. Fused lime/CaSi is added to the liquid metal to reduce sulphurup to 0.015% and bring it within acceptable limits Ladle Refining of liquid metal is a proven technology to produce high quality steel. Ladle Refining Furnaces (LRFs) are used to desulphurize steel, remove other impurities and hold the molten steel for casting operations. Without LRFs, higher tap temperatures are normally required from steel making furnaces due to heat losses during transfer and casting of liquid metal. LRF facilitates higher productive time to the melting furnace besides producing better quality of steel at lower cost.
  • 16. YASEEN RAZA NED University of Engineering And Technology | 16 When alloying is done in the LRF, the main melting furnace is freed from this activity providing more productive time to the melting equipment and this external treatment has a few distinct benefits like reduced alloy consumption, better lining life, excellent homogeneity of chemical composition & temperature and relatively lower energy cost. LADLE LINING The total height of ladle is 2900mm and top, bottom dia are 2400mm, 2090mm respectively. First lining of ladle is broken after 80 heats aprox. Bottom is prepared by Chrome Magnesite bricks [chromite (40–50 percent or higher)]. QC well block and porous plug well block are also placed and adjusted. Asbestos sheet (1000x1000x08mm) is placed. Safety lining of side walls is done by Chrome Magnesite bricks. There are for zones in ladle lining. Each zone consists of certain layers of refractory bricks lining. ZONE 1: Metal Zone 1-4th layer using High Alumina bricks(175x154/146x100) and (175x170/130x100) mm with Doloram as back filling mass ZONE 2: Metal Zone 5-13th layer using High Alumina bricks(150x154/146x100) and (150x165/135x100)mm with Doloram as back filling mass ZONE 3: Slag Zone 14-18th layer using Carbon Magnesite (150x154/146x100) and (150x154/146x100) mm with Doloram as back filling mass ZONE 4: Free Board 19-22nd layer using High Alumina bricks (250x150x100) mm Zone AH-90 paste (90% Al2O3, 4% CaO, SiO2+FeO) and SRA-95H (High % Al2O3) are used to fill gaps and inner side of well blocks.
  • 17. YASEEN RAZA NED University of Engineering And Technology | 17 CONTINUOUS CASTING Continuous casting is a process in which metal is cast in shape of billet, bloom or slab continuously. Metal ore or scrap is melted in a furnace and then transferred to ladle. Here refining, alloying additions if required are carried out. Ladle is then transferred to continuous casting plant. Tundish dummy bar, mold tube, entry and withdrawal rolls, straightener, crop and pinch, precutting roller table, discharge roller table, cooling belt, pusher, water spray nozzles,etc are some of the parts of continuous casting mill. Products obtained from continuous casting are mainly billet, bloom or slab. Heavy, four-piece plate molds with rigid backing plates are used to cast large, rectangularslabs, (50-250 mm thick and 0.5–2.2 m wide), which are rolled into plate or sheet. Similarmolds are used for casting relatively square blooms, which range up to 400 x 600 mm in crosssection. Single-piece tube molds are used to cast small, square billets, (100 - 200 mm thick)which are rolled into long products, such as bars, angles, rails, nails, and axles. Continuous casting
  • 18. YASEEN RAZA NED University of Engineering And Technology | 18 PROCESS Ladle after metal being taped in it and after refining is placed on a stand above tundish. Bottom of ladle consist of a slider gate assembly, which is operated hydraulically. The tundish allows a reservoir of metal to feed the casting machine while ladles are switched, thus acting as a buffer of hot metal, as well as smoothing out flow, regulating metal feed to the molds and cleaning the metal. Capacity of tundish is 4 tons. Before starting the casting process, dummy bar is prepared. A bolt is attached along with an asbestos sheet and metal sheet with the dummy bar. It is used to hold and drawn out cast product uniformly and accurately from mold. As the mold insert at the bottom, we add steel and iron chips and some asbestos power for ease of solidification. There is 4 mm gap between mold tube and jacket of mold for water circulation. The process is started by plugging the bottom of the mold with a dummy bar. After enough metal has solidified like a conventional casting onto its head, the dummy bar is then slowly withdrawn down through the continuous casting machine and steady state conditions evolve. The maximum casting speed of 1-5 m/min is governed by the allowable length. Once in the mold, the molten steel freezes against the water-cooled walls of a bottomless copper mold to form a solid shell. The mold is oscillated vertically in order to discourage sticking of the shell to the mold walls. Drive rolls lower in the machine continuously withdraw the shell fromthe mold at a rate or casting speed that matches the flow of incoming metal, so the process ideally runs in steady state. The liquid flow rate is controlled by restricting the opening in the nozzle according to the signal fed back from a level sensor in the mold. Mold Body:-  B ase
  • 19. YASEEN RAZA NED University of Engineering And Technology | 19 plate  Sincere or detector  Mold jacket  Mold tube  Flanges  Flange  Cobalt-60  Water Outlet  Oil plate  Water inlet  Bottom plate OPERATION MODES There are four operation modes  Test mode: in which equipment`s working like oscillation etc is checked out  Casting mode: oscillation and withdrawal  DBI: Dummy Bar Insertion  Run out The most critical part of the process is the initial solidification at the meniscus, found at thejunction where the top of the shell meets the mold, and the liquid surface. This is where the surface of the final product is created, and defects such as surface cracks can form, level fluctuations can occur. To avoid this, oil or mold powderis added to the steel meniscus, which flows into the gap between the mold and shell. In addition to lubricating the contact, a mold slag layer protects the steel from air, provides thermal insulation, and absorbs inclusions. Water or air mist sprays cool thesurface of the strand between the support rolls. The withdrawal speed, mold level and water cooling are synchronized. The spray flow rates are adjusted to control the strand surface temperature with minimal reheating until the molten core is solid. After the center is completely solid (at the “metallurgical length” of the caster) the strand is cut with gas torches billets of any desired length. Gas torches move along the billet and cut at desire length. Fuel gas is LPG along with oxygen at pressure of 2 bars. Launder pipe is used to open the nozzle, and then tundish is filled metal to desire level. Tundish has two nozzles for two strands. Dia of nozzle pouring hole is 14mm. it is made of 95% zirconium to avoid erosion
  • 20. YASEEN RAZA NED University of Engineering And Technology | 20 Metallurgical length The length at which core of billet solidifies is called metallurgical length. Metallurgical length depends upon the rate of cooling and speed of withdrawal or casting speed, temperature and dimensions of billet. Temperature required for CC is 1510-1550o c mold level is controlled by Auto Mold Level Control (AMLC). 6/11 radius ratio is used for this continuous casting. 6 is bending radius and 11 is unbending radius. Calculation Metallurgical length can be calculated by L= (A2 /4k2 ) x V L = Metallurgical length A = Crossectional Area K = Constant V = Casting Speed Also it can be calculated by S = K√ (L/Vc) For 150 x 150 billet and speed of 1.2 m/min when constant = 30 Metallurgical length = [(150x150)2 / 4 x (30)2 ] x 1.2 Metallurgical length = 8.1 meters Cooling zones There are three cooling zones  Spray ring  Zone 1: consist of 32 nozzles  Zone 2 Volume flow rate are different for different nozzles. Nozzle angle is same i.e. 65o 57-65 50-65 35-65 25-65
  • 21. YASEEN RAZA NED University of Engineering And Technology | 21 Liquidus temperature Temperature at which steel starts to solidify is called Liquidus temperature. Liquidus temperature is about 1512o c. For carbon content (For %C < 0.5) it can be calculated by Tliq (°C) = 1537 - 73.1%C - 4%Mn - 14%Si - 45%S - 30%P - 1.5%Cr - 2.5%Al - 3.5%Ni - 4%V - 5%Mo Carbon Equivalent Carbon equivalent is a value used to predict the process of treatment to be performed on the specimen, to predict the weldability etc. Effect on weldability: Upto 0.35 excellent 0.35-0.40 Very Good 0.40-0.45 Good 0.45-0.50 Fair Above 0.50 Poor Carbon equivalent can be calculated by CE = %C + (Mn + Si)/6 +(Cr + Mo + V)/5 + (Cu + Ni)/15
  • 22. YASEEN RAZA NED University of Engineering And Technology | 22 ASL Grades & Composition ASL Grade Billet Chemistry(%) CE Colour Coding Bar size to be Rolled Mold Lubrication BS 4449-3 C 0.20-0.24 Mn 0.55-0.65 Si 0.15-0.30 S <0.05 P <0.05 Max 0.35 For 3/8 Rolling Yellow Cut in 6m 905mm Oil/powder BS 4449-1 C 0.18-0.26 Mn 0.60-0.80 Si 0.15-0.30 S <0.05 P <0.05 0.36-0.380 For Xtreme Bars upto 25mm Green Cut in 6m 12mm, 16mm Mold powder BS 4449-2 C 0.26-0.30 Mn0.60-0.80 Si 0.15-0.30 S <0.05 P <0.05 0.39-0.44 G-60 Bars upto 25mm Blue Cut in 3m 19/22/25/28/32mm Mold powder Special Grade C 0.22-0.25 Mn1.05-1.15 Si 0.15-0.30 S <0.05 no tolerance P <0.05 0.41-0.51 To be confined 40mm Mold powder Special Grade with High Carbon C 0.30-0.34 Mn 0.60-0.80 Si 0.15-0.30 S <0.05 P <0.05 0.48-0.51 To be confined 40mm Mold powder
  • 23. YASEEN RAZA NED University of Engineering And Technology | 23 Slag Processing Area The molten oxide by-product obtained during smelting and refining is called slag. Oxides like SiO2, Al2O3, P2O5 and B2O3 are acidic oxides. They form acidic slag. Oxides like MgO, FeO, and MnO are basic oxides. They form basic slag The slag, poured in slag pot is transferred to slag processing area. Here the slag is crushed first into small size by labours. Then it is transferred to slag crushing area. It is transferred to hopper then to conveyer belt. It goes to Jaw crusher, from where it goes to 2nd conveyer belt. A magnetic screen separates ferrous particles from them. Again it is passed to a roller crusher and crushed parts are moved on 3rd conveyer belt. Another magnetic drum separates iron contents and it fell down. Slag particles transferred to 4th conveyer belt and at last fell to stock area. Quality Control At ASL there are two laboratories for checking the composition of metal and billet, and also the quality of water, silica sanded. Distilled water also produces here.  Spectrolab  Wet lab Spectroscopy Lab Spectroscopy is a terms used to refer to the measurement of radiation intensity as a function of wavelength. Device used to measure the intensity of the radiation emitted is called spectrometer. The energy of a photon is related to its frequency by Where is Planck's constant. Spectroscopy is a method to find out the composition of specimen by generating a spark on the surface of sample. This spark makes the electrons move in an exited stage as a result they change their energy. As they move to high energy state they absorb energy and when they come back to ground state they emit energy in the form of radiations. This principle is used in spectroscopy. Each element in a sample has its own radiation emission. A magnifying glass is attached which magnifies these radiations and guide to their respective silts. In this way elements are detected. Before starting this process, samples grind and polished, Grit size 36 and 60 paper is used. Sample must be homogenized i.e. no trapped inclusions or slag, and it must be iron base for proper conductivity.
  • 24. YASEEN RAZA NED University of Engineering And Technology | 24 Wet lab Wet lab uses classical method of Volumetric, gravimetric, and instrumental analysis for analyzing the metal samples, silica samples and water samples. It also produces Demineralize water by electrical distiller at a rate of 5lit/hr. Etching is done about 1/2hr for finding defects in billets like pin holes, pipes etc. Moisture Content is find out by using electrical ovens i.e. %loss in weight after drying. Loss of ignition (volatile matter, gases) of silica is finding out by using Box furnace. First silica is heated to about 1000o c, then cooled about 2-3 min in air then cooled in desigator. Logistics and stores At ASL, all the spare parts, extra equipment’s etc. is placed in store. In case of any emergency, they may be utilized. Different sections are made for each plant. There are Refractory storage, LRF, IF, FES, CCM etc. sections with their respective spare parts, nuts, bolts, pipes etc. Whatever the parts are required are first undersigned on a paper by incharge and then give to store incharge, he then handover the desire part to the worker. All details of store, i.e. item entered in the inventory, items given, remaining stock, all are managed through ERP- Enterprise Resource Planning. Fume Exhaust System (FES) Fume exhaust system is to exhaust the gases, dust evolving from induction furnaces.Scrubbing the exhaust air prevents the release of aggressive and harmful vapors into the environmentan impeller creates suction and transferred to air bags. These bags allow them to pass through but dust, in which main content is zinc, does not pass through it, it is then transferred to hopper, from where it is collected in bags.
  • 25. YASEEN RAZA NED University of Engineering And Technology | 25 Reverse Osmosis Plant (RO) Reverse osmosis (RO) is a filtration method that removes many types of large molecules and ions from solutions by applying pressure to the solution when it is on one side of a membrane. The result is that the solute is retained on the pressurized side of the membrane and the pure solvent is allowed to pass to the other side Osmosis is a natural process. When two liquids of different concentration are separated by a semipermeable membrane, the fluid has a tendency to move from low to high solute concentrations for chemical potential equilibrium.Formally, reverse osmosis is the process of forcing a solvent from a region of high solute concentration through a semipermeable membrane to a region of low solute concentration by applying a pressure.  There are 5 underground bores, among which 3 are in operation.  Water is extract from here and transferred to pressurized vessel, which holds it. Some suspended particles settle down and separated. There are 4 pressurized vessels  Then it is transferred to multimedia filter tank.  It filters water, suspended particles.  Filter size is 30 microns.  VFD – Variable Frequency Distribution: Controls, change frequency.  This water is then transferred to Cartage filter in which it separates 5 microns particles.  Then membrane is used for final filtration of about0.03 microns. It consists of biosites, anti scalant which kill bacterial effects. Electromagnetic Dosing pump is attached along with this. Suggestions  Safety precautions are not followed. Therefore many accidents have been occurred. Safety inspector must be appointed in order to check these precautions by workers, engineers etc  There are many health hazards because of evolution of gases, dust. Feeding of charge can be done through vibratory feeder completely, because open feeding through cranes causes problems like splashes dust evolution etc  Training period for trainee engineers can be reduced to 4 months instead of 6 months, along with their initial salary, which is somehow low.  Scrap feeding can be done fron scrap yard to transfer trolley directly. It saves time, because first it is transferred to scrap bay, then by EOT cranes to transfer Trolley.
  • 26. YASEEN RAZA NED University of Engineering And Technology | 26