1. -Wiring and instruments installation
- loop check and function test
- Workstation Hw and S/w Installation,
Rockwell programs Activation tools
-PLC5/60 programming with rslogix5
- SCADA system and HMI configuration
with RSview32.
-Scada Application Development; with
Graphic, Data Log, Alarms, Trends..etc.
- AB Panel view Configuration with
Panelbuilder32.
-Network Setup ,DH+ and OPC Servers
automation L1and L2
- Production report generation over Ethernet
networks using vb6 and Microsoft networks
services Dcom and DDE.
- Commissioning and start up
Anode Paste Plant
(6/2000 – 6/2001)
2. Anode Handling
(1/2001 – 1/2001)
-PLC5/60 programming with
rslogix5
- SCADA system and HMI -
configuration withRSview32
-AB Panel view Configuration with
Panelbuilder32
4. Wiring and instruments installation
- loop check and function test
- Workstation Hw and S/w Installation,
Rockwell programs Activation tools
-PLC5/60 programming with rslogix5
- SCADA system and HMI configuration
with RSview32.
-Scada Application Development; with
Graphic, Data Log, Alarms, Trends..etc.
-AB Panel view Configuration with
Panelbuilder32
-Network Setup DH+ .automation L1and L2
- Commissioning and start up
Anode Paste Plant
Second production line
(6/2002– 6/2003)
5. Coke Calciner Unit
(9/2003 – 3/2004)
- Remote I/O extension unit
- loop check and function test
Workstation Hw and S/w Installation,
Rockwell programs Activation tools
-PLC programming with new Rslogix5 rather
than old DOS 6200
- new SCADA system and HMI configuration
with rsview32 programs rather than old DOS
op teos
- Rslinx,RIO and DH+ networks
- Commissioning and start up
6. Panel view Updating
(1/2006 – 1/2006)
-RIO to DH+ Network
- Panel view 900,1000
-AB Panel view Configuration with
Panelbuilder32
Casting and Rolling Mill
Magelis XBTG Telemecanique operator
terminals updating using Vijeo design software
(1/2015 – 1/2015)
(7/2016 – 8/2016)
RIO PanelView to PanelView Plus Comms
Migration using FactoryTalk® View
Machine Edition
Furnace Crane control
Anode paste plant
7. Pitch Melting Unit
(9/2009 – 6/2010)
-- Wiring and Instruments Installation
Workstation Hw and S/w Installation,
Rockwell programs Activation tools
-- PLC programming with Rslogix500
- SCADA system and HMI configuration
with rsview32 programs
- loop check and function test
- commissioning and start up
-Allen Bradley SLC500 Configuration
with Rslogix500
-Ethernet(fiber,RJ45) networks
8. Pitch fume treatment unit
(regeneration temperature oxidizer)
- Loop check and function test
- Commissioning and start up
-Thermocouples
- Process Controller
- Siemens Logo
- Micro master speed variator
(1/2011 – 4/2011)
9. Coke Calciner Unit
(9/2011 – 3/2012)
- Updating A.B PLC5/15 to controllogix5000
- Slc500 , controllogix5000 DH+ connection
- Remote I/O to control net extension unit
- loop check and function test
Workstation Hw and S/w Installation,
Rockwell programs Activation tools
- PLC programming with Rslogix5000
- SCADA system and HMI configuration with
rsview32 programs
- Allen Bradley PLC controllogix5000
Configuration with Rslogix5000
- commissioning and start up
- Ethernet ,control net ,RIO and DH+ networks
10. New Scraps handling chain
(3/2012 – 5/2012)
-PLC5/60 programming with
rslogix5
- SCADA system and HMI -
configuration withRSview32
11. Oil Heating Unit
(5/2011 – 8/2012)
- Wiring and Instruments installation
- Workstation Hw and S/w Installation,
SIMATIC Automation License
Manager tool.
- Updating plc from old S5 to S7
-Siemens S7 300 programming with
Step7 manager
- SCADA system and HMI
configuration with SIMATIC WinCC
flexible rather than old OS2 O.S.
Scada Application Development;
with Graphics, Data Log, Alarms,
Trends..etc.
-Network Setup MPI
- loop check and function test
- Commissioning and start up
12. Paste mixer
new mixer installation ERICH company
(1/2013– 7/2013)
- Wiring and Instruments installation
- Loop check and function test
- Greasing timing sequence
- PLC5/60 programming with rslogix5
- SCADA system and HMI
- Configuration withRSVIEW32
commissioning and start up
PID Regulation to Hydraulic cylinder
Gate
13. Filter Gate Damper
(8/2013 – 8/2013)
-Wiring-motorized cylinder installation
-Virtual Position feedback process
-Plc5/60 PID regulation
-SCADA Modification RSview32
14. Coke Silos
(9/2013 – 10/2013)
-Updating scada programs from old
data32 to RSview32
WINTNT to XP O.S
-New SCADA project with Rockwell
- Workstation Hw and S/w
Installation,
Rockwell programs Activation tools.
- SCADA system and HMI
configuration with rsview32 Graphix,
DataLog, Alarms, Trends..etc
-Serial DH485 ,Ethernet and DH+
networks
15. Mixer DC motor Updating
(2/2014 – 3/2014)
-PLC5/60 programming with
rslogix5
-PID power Regulation
for ac seed variator
- PID regulation for hydraulic
cylinder gate controller
16. General Dedusting project
(dust collection and recycling system)
(9/2015 – 10/2016)
- Wiring and Instruments installation.
- Workstation Hw and S/w Installation,
Rockwell programs Activation tools.
- PLC programming with Rslogix500
- SCADA system and HMI configuration
with rsview32 programs
- loop check and function test
- Commissioning and start up
A.B SLC500 Configuration
with Rslogix500
- Ethernet(fiber,RJ45) networks