Riyaz Shaik is seeking a middle level position in instrumentation and control or project management, preferably in industrial automation. He has over 9 years of experience in industrial automation, instrumentation, project management, and resource planning. He has expertise in handling projects, installation and commissioning, and ensuring efficient and reliable operation of equipment.
1. RIYAZ SHAIK Phone: +971501023812 ~ E-Mail: riyaz.sk465@gmail.com
Objective:
Seeking middle level assignments in Instrumentation & Control and Project Management with an
organization of high repute, preferably in Industrial Automation Sector.
Professional Summary
• Automation and control systems development, System integration, Start-up support, Field installation,
Commissioning.
• Project Documentation - Function Design Specifications, Hardware Design, Software Design, Technical
Submittals, Test Procedures, O&M documentation.
• Project Engineering - PLC panel designs, PLC and SCADA Template designing, PLC Coding, SCADA and
HMI Application Development, System Configuration, VFD Commissioning, Inspection Test Plans, Loop
Testing and Process simulation for Interlock testing.
• Project Procurement - Material selection, Quotation follow-up, Project Material Requisition forms, Material
Procurement, Production Estimation.
• Project Coordination - End to End Project Coordination & Customer communication, Project review
meetings for resolving issues and queries and updates on project progress.
• Execution of FAT, SAT and Commissioning Activity.
• Onsite Support - Post execution on site customer support, after sales support.
Profile Summary:
• Over 9 years of experience in Industrial Automation, Instrumentation & Control, Project Management,
Documentation & Reporting and Resource Planning.
• Expertise in handling projects for improving efficiency by using available resources and installing suitable
instruments as per client’s requirements.
• Actively involved in handling:
o Instrumentation activities with respect to utilities, machines & manpower and monitoring overall project
operations for ensuring timely completion.
o Installation & commissioning and conducting tests to ensure operational effectiveness of utilities.
• Stellar role in leading & coordinating the activities as well as ensuring reliability of equipment and their
efficiency in the control.
• Adept in liaising with clients, driving quality enhancement, process improvement and cost savings initiatives
during the project span.
Automation & Control Engineering:
• HMI/SCADA Designing: Vijeo Designer, Vijeo Citect, Vijeo Look, AB - FactoryTalk View ME, Invensys -
Wonderware InTouch, Beckhoff - Built in Control Panel HMI.
• PLC: Schneider – Modicon Quantum, Modicon Premium, M340, M580, Advantys Distributed I/O’s, Twido,
ABB - AC 500, AB – Micro Logix, Control Logix, Compact Logix with Flex and Point I/O’s, Honeywell – ML
200R, Beckhoff - Built in Control Panel HMI with PLC.
• PLC Programming: Unity Pro, PL7 Pro, Twido Suite, Twido Soft, ABB - CodeSys, Honeywell - Soft Master,
AB - RS Logix 5, 500, 5000, Beckhoff – TwinCAT
• VFD: Siemens Micro Master 420, 430, 440. Fuji – Frenic, Schneider Altivar Series, AB-PowerFlex Series
and Danfoss.
• Industrial Networks and Communications: Modbus, Modbus Plus, JBUS, OPC, ControlNet, DeviceNet,
EtherCAT, Profibus.
Organizational Experience:
Since Nov 2013 : M/s SYSCOM, Dubai as a Senior Project Engineer
Aug’10 - Oct 2013 : M/s Base Control Tech FZC, Sharjah as a Senior Project Engineer
Nov’09 - Jul’10 : M/s GI Automation, Hyderabad as a Project Engineer
Aug’07 - Oct’09 : M/s Microsys Automation, Hyderabad as a Project Engineer
2. Industries Exposure:
• Oil & Gas : HVAC System for Gas Sweetening Facilities
• Water : Desalination Sewage Water Reverse Osmosis
Treated Sewage Effluent Treatment
Pumping Station (Sewage, Storm Water, Reservoir & Oil Water Separator)
Sewage Treatment Plant-MBR System
Irrigation Reservoir
MOV Irrigation System
• Metals : Sponge Iron Plants
Rolling Mills
Shot Blasting Machine
• Cements : Roller Press
• Tobacco : Automatic Press
• Power : 8x100.8 MW Power Plant
Power Monitoring & Control System
Synchronization & Totalizing System
Functional Areas:
• Understand System and Development Standards.
• Understanding the P & ID’s and RFQ’s to take the inputs
• Interaction with client for Project Inputs.
• Documentation works like I/O list, Project Schedules, BOQ, Power Calculations, Method Statements,
Compliance, Catalogues, Datasheets and Submittals
• Experience in PLC Coding using Ladder, FBD and ST languages.
• PLC Modules and Remote I/O Configuration.
• PLC Hardware configuration and Testing.
• Experience in SCADA&HMI Application Static Graphics development and dynamic linking.
• Communication Driver Configuration, Tag Database Management and Reporting in SCADA.
• Third Party Communication like Modbus RS485/232/422/TCPIP, OPC, ModbusPlus and Jbus of field
devices with PLC and SCADA.
• Advantys I/O configuration with M340, Premium & Quantum PLC. PLC to PLC communication.
• Integration with BMS and ATS systems.
• Alarm viewer active and summary configuration in SCADA and HMI.
• Trend runtime and history configuration in SCADA and HMI.
• Test Procedures like Internal Test Reports, Inspection Test Plans, Test Sheets, Check lists, Commissioning
forms, FAT and SAT.
• Control Panel and I/O Loop Testing.
• Process Stimulation and testing of PLC, SCADA and HMI.
• MCC and Control Panel Engineering & Testing.
• Different make VFD’s commissioning based on the application.
• Field Instrument Installation, Calibration and commissioning.
• Execution of FAT and Commissioning and SAT.
• Basic operator training and Project Documentation.
Skill Set
• “Can-Do” Attitude.
• Right at First Time. NO Rework.
• Adaptive & Flexible.
• Multiple projects handling capability.
3. • Good Analysis, Designing and project development skills.
• Good Team Player and Ability to motivate the team to achieve project goal.
Educational Qualifications:
• B.Tech in Electronics and Instrumentation from Acharya Nagarjuna University, Bapatla Engg College in
Guntur with 64.5% aggregate in 2007
• Diploma in Electronics and Instrumentation from SBTET, GPM in Guntur with 50.7% aggregate in 2004
Personal Details
Father’s Name: Adam Shafi.
DOB: 10th
August 1984
Languages Known: English, Hindi, Urdu, Telugu and Tamil
Passport No.: H7937865
Permanent Address: D No. 1-448, Opp. Church, Siripuram (PO), Medikondur (MD), Guntur (DT),
Andhra Pradesh - 522401
Please refer to the annexure for project details
4. ANNEXURE
Projects Handled:
1. 2X50 TPD Sponge Iron Plant - Premratan Concast Pvt. Ltd., Wada, India.
• Project Scope - PLC and SCADA Application development for automation of Sponge Iron plant and
Commissioning.
• Process - Process involved raw materials such as Iron ore and coal coming from conveyor line is mixed
& heated in rotary Kiln for approximate 1000 degree Celsius. Then this mixture as sponge Iron is
passed into blast furnace for making pure steels.
• Automation - Automated using Modicon Premium PLC and Vijeo Look SCADA.
2. Roller Press Automation – Orient Cements, Devapur, India.
• Project Scope - PLC and SCADA application development for automation of Roller Press and
Commissioning.
• Process - Raw materials Lime Stone, Clinker, Gypsum, will be grinded in the roller press machine by
subjecting it to immense pressure, producing micro-cracks in the material as well as a substantial
amount of fine material. Fine dust will be separated by exhausters, which will be further being carried to
Silo’s through belt conveyors.
• Automation - Automated using Modicon Quantum PLC and Vijeo Citect SCADA.
3. 3X100 TPD Sponge Iron Plant – Gupta Metallics & Power Ltd., Ballarshah, India.
• Project Scope - PLC and SCADA Application development for automation of Sponge Iron plant and
Commissioning.
• Process - Process involved raw materials such as Iron ore and coal coming from conveyor line is mixed
& heated in rotary Kiln for approximate 1000 degree Celsius. Then this mixture as sponge Iron is passed
into blast furnace for making pure steels.
• Automation - Automated using Modicon Premium PLC and Vijeo Look & Citect SCADA.
4. Medium Merchant Structural Mill (Steel Rolling Unit) - Visakhapatnam Steel Plant, Visakhapatnam,
India
• Project Scope - Up gradation of MMSM with Schneider Quantum PLC.
• Process - Project was related to up gradation of old Siemens plc to Schneider Quantum PLC. Metals
blooms will be rolled in the rolling mills which will produce medium range beams.
• Automation - Automated Medium Merchant Structural Mill using Schneider Quantum PLC.
5. 3X100 TPD Sponge Iron Plant – Hothur Steels, Bellary, India.
• Project Scope - PLC and SCADA Application development for automation of Sponge Iron plant and
Commissioning.
• Process - Process involved raw materials such as Iron ore and coal coming from conveyor line is mixed
& heated in rotary Kiln for approximate 1000 degree Celsius. Then this mixture as sponge Iron is passed
into blast furnace for making pure steels.
• Automation - Automated using Modicon Premium PLC and Vijeo Look & Vijeo Citect SCADA.
6. Automatic Press for Tobacco System – Polisetty Soma Sundaram, Chilakaluripeta, India.
• Project Scope - PLC Application development for automation of Automatic Press for Tobacco system
and Commissioning.
• Process - The Project was the Automatic Press of tobacco leafs in to the boxes with the help of
Hydraulic Piston and Chargers based on the weight requirement. After that packing of boxes and
exports to other plants. It’s totally a control desk operation through the control panel.
• Automation - Automated using Modicon Premium PLC.
7. 1X75 TPD Sponge Iron Plant – Sri Subramanya Sponge Iron Pvt. Ltd., Bellary, India.
• Project Scope - PLC and SCADA Application development for automation of Sponge Iron plant and
Commissioning.
• Process - Process involved raw materials such as Iron ore and coal coming from conveyor line is mixed
5. & heated in rotary Kiln for approximate 1000 degree Celsius. Then this mixture as sponge Iron is passed
into blast furnace for making pure steels.
• Automation - Automated using Honeywell ML200R PLC and Vijeo Citect SCADA.
8. 8X100.8 MW Power Generation Plant – AP GENCO Ltd., Nagarjunasagar, India.
• Project Scope - PLC and SCADA Application development for automation of Power Generation Plant
and Commissioning.
• Process - Project was Reversible Units is that they can be operated in either Conventional Generator
mode or Reversible Pump Turbine mode. They can also be operated in Synchronous Condenser mode
to improve the Grid System voltage.
• Automation - Automated using Modicon Quantum Hot Standby PLC and Vijeo Citect SCADA.
9. Automation of Water Treatment Plant – Ship Building Centre, Visakhapatnam, India.
• Project Scope - PLC and SCADA Application development for automation of Water Treatment Plant
and Commissioning.
• Process - Process involved water treatment of novel project with pressure and flow maintaining and
monitoring.
• Automation - Automated using ABB AC500 PLC and Vijeo Citect SCADA.
10. 2X100 TPD Sponge Iron Plant – Poineer Torsteel Mills (P) Ltd., Chegunta, India.
• Project Scope - PLC and SCADA Application development for automation of Sponge Iron plant and
Commissioning.
• Process - Process involved raw materials such as Iron ore and coal coming from conveyor line is mixed
& heated in rotary Kiln for approximate 1000 degree Celsius. Then this mixture as sponge Iron is passed
into blast furnace for making pure steels.
• Automation - Automated using Modicon Premium PLC and Vijeo Citect SCADA.
11. Weather Monitoring and Control System – Abu Dhabi Future Energy Company, Masdar City, UAE.
• Project Scope - PLC and HMI Application development for automation of Weather Monitoring and
Control System and Commissioning.
• Process – Project is related to monitoring and controlling the automatic operation of water misting and
wind tower louvers based on the environment condition of sandy or windy. Then the wind air is supplied
to the building through the louvers.
• Automation - Automated using Modicon M340 PLC and Magelis HMI.
12. SWRO Desalination Plant – Public Authority of Electricity and Water, Wilayat Dibba Musandam
Governorate, Dibba, Oman.
• Project Scope - PLC and SCADA Application development for automation of SWRO Desalination plant
control system and Commissioning.
• Process - Project is related to Reverse Osmosis which is known as drinking water purification from
seawater, removing the salt and other effluent materials from the water molecules using the membranes.
The sea water passes to the Multi Media filters first then it will pass to the membranes for the purification
and then the product water will be used for the drinking.
• Automation - Automated using Schneider Quantum PLC and Vijeo Citect SCADA.
13. Abu Dhabi Detainees Building – Abu Dhabi Judiciary Department, Abu Dhabi, UAE.
• Project Scope - PLC and SCADA Application development for automation of Detainees Building control
system and Commissioning.
• Process - Project is related to Detainees cell controls and monitoring from the control room. Detainees
cell operation from the control desk which is located in the control room. 10 No’s of RTU panels are
located in the 5 floors which is communicating to M340 PLC of control desk to monitor and control.
• Automation - Automated using Schneider Quantum and M340 PLC and Vijeo Citect SCADA.
14. Power Monitoring and Control System of Substation – Landmark Tower, Abu Dhabi, UAE.
• Project Scope - PLC and SCADA Application development for automation of Substation Control System
and Commissioning.
• Process – Project is related to Power monitoring and control of MV/LV substation system. MV/LV
6. Incomers/Breakers/Isolators are controlling from the SCADA system. 10 No’s of RTU panels are located
in the 10 floors of the tower which is communicating to Quantum PLC of located in basement to monitor
and control.
• Automation - Automated using Schneider Quantum PLC and Vijeo Citect SCADA.
15. TSE Treatment Plant – Dubai International Financial Centre, Dubai, UAE.
• Project Scope - PLC and SCADA Application development for automation of Treated Sewage Effluent
Treatment plant and Commissioning.
• Process – Project is related to Reverse Osmosis which is known as drinking water purification from
sewage water, removing the salt and other effluent materials from the water molecules using the
membranes. The sewage water passes to the Multi Media filters first then it will pass to the UF system
for ultra filtration and then to membranes for the purification and then the product water will be used for
the drinking.
• Automation - Automated using Schneider M340 PLC and Wonderware SCADA & Magelis HMI.
16. Desalination SWRO Upgradation Plant – Rural Areas Electricity Company, Kumzar, Oman.
• Project Scope - PLC and SCADA Application development for automation of SWRO Desalination
upgradation plant control system and Commissioning.
• Process – Project is related to Reverse Osmosis which is known as drinking water purification from
seawater, removing the salt and other effluent materials from the water molecules using the membranes.
The sea water passes to the Multi Media filters first then it will pass to the membranes for the purification
and then the product water will be used for the drinking.
• Automation - Automated using Schneider M340 PLC and Vijeo Citect SCADA.
17. Storm Water-4 Pumping Station – Lusail Development – Doha, Qatar
• Project Scope - Project Engineering, FAT execution, Commissioning and SAT execution.
• Process - The process of the Storm Water pumping station is to pump the water which is stored in the
storm water tank. The process will be maintained by the PID control to maintain the pressure at the
manifold header.
• Automation - Commissioned using Schneider Quantum PLC, Vijeo Citect SCADA and Vijeo
Designer HMI.
18. Irrigation Reservoir 3 – Lusail Development – Doha, Qatar
• Project Scope - Project Engineering, FAT execution, Commissioning and SAT execution.
• Process - The process of the Irrigation reservoir pumping station is to pump the water which is stored in
the reservoirs. The process will be maintained by the PID control to maintain the pressure at the
manifold header.
• Automation - Commissioned using Schneider Quantum PLC, Vijeo Citect SCADA and Vijeo
Designer HMI.
19. Irrigation Reservoir 4 – Lusail Development – Doha, Qatar
• Project Scope - Project Engineering, FAT execution, Commissioning and SAT execution.
• Process - The process of the Irrigation reservoir pumping station is to pump the water which is stored in
the reservoirs. The process will be maintained by the PID control to maintain the pressure at the
manifold header.
• Automation - Commissioned using Schneider Quantum PLC, Vijeo Citect SCADA and Vijeo
Designer HMI.
20. Extension system for Packing Machine – Mars GCC – Dubai, UAE.
• Project Scope - PLC application development for the Extension conveyor system for the Packing
Machine.
• Process - The process of the system is to collect the chocolate from the existing conveyor and passed
to the wrapping machine to wrapping up the chocolate.
• Automation - Commissioned using Allen Bradley Micrologix 1400 PLC.
21. DS130 Pumping Station-H – Dubai Municipality, Dubai, UAE.
• Project Scope - Project SCADA application development and commissioning.
7. • Process - The process of the DS130 sewage water pumping station is to pump the water which is
stored in the wet well water tanks.
• Automation - Commissioned using Allen Bradley PLC and Vijeo Citect SCADA.
22. Sewage Treatment Plant & Pumping Station – Khalifa Port, Abu Dhabi, UAE
• Project Scope - Project SCADA application development and commissioning.
• Process - The process of the sewage treatment plant and water pumping station is to pump the water
which is stored in the Lifting Tanks and passed to MBR system.
• Automation - Commissioned using Allen Bradley PLC and Vijeo Citect SCADA.
23. HVAC Control System of Gas Sweetening Facilities at SRU – Qatar Petroleum, Mesaieed, Qatar.
• Project Scope - PLC and HMI Application development for automation of HVAC Control System and
Commissioning.
• Process - Project is related to HVAC systems use ventilation air ducts installed throughout a building to
supply conditioned air to a room through outlet vents and ducts to remove air through return-air grilles.
Where safe and healthy building conditions are regulated with respect to temperature and humidity,
using fresh air from outdoors.
• Automation - Automated using Schneider Quantum PLC and Vijeo Designer HMI.
24. HVAC Control System of Gas Sweetening Facilities at AGRP – Qatar Petroleum, Dukhan, Qatar.
• Project Scope - PLC and HMI Application development for automation of HVAC Control System and
Commissioning.
• Process - Project is related to HVAC systems use ventilation air ducts installed throughout a building to
supply conditioned air to a room through outlet vents and ducts to remove air through return-air grilles.
Where safe and healthy building conditions are regulated with respect to temperature and humidity,
using fresh air from outdoors.
• Automation - Automated using Schneider Quantum PLC and Vijeo Designer HMI.
25. R777/4A Dubai Creek 7th Crossing Tunnel System – Road Transport Authority, Dubai, UAE.
• Project Scope - PLC and HMI Application development for automation of Tunnel Control System and
Commissioning.
• Process - Project is related to Power monitoring and control of several MDB & MCC panels through the
HMI and SCADA also monitoring the tunnel status through the Modbus TCP/IP. The PLC will collect the
data from the MDB & MCC panels through the Modbus Serial RS-485 and send it to SCADA system for
the controlling and monitoring.
• Automation - Automated using Schneider Quantum PLC, SCADAPack RTU and Vijeo Designer
HMI.
26. Shot Blast Control System - Inco Steels, Sohar, Oman.
Al Ajab, Dammam, Saudi Arabia.
Hiddadah, Jeddah, Saudi Arabia.
Thyssen Group, Abu Dhabi, UAE.
• Project Scope - PLC and HMI Application development for automation of Shot Blasting System and
Commissioning.
• Process - Project is related to Blasting system is a method that prepares a surface by removing all kinds
of coatings and pollutants such as old paint layers, foils, casting filings, etc. At the same time pollutant
removal produces rugosity over the treated surface, not only improving its visual aspect but also giving
depth so that any kind of coating or paint can be applied. As a result rugosities ranging from 5 microns
up to more than 150/200 microns can be obtained.
• Automation - Automated using Beckhoff PLC and HMI.
27. Fresh and Potable Water Maker System – Advanced Watertek, Dubai, UAE.
• Project Scope - PLC and HMI Application development for automation of Fresh and Potable Water
Maker System and Commissioning.
• Process - Project is related to Reverse Osmosis which is known as drinking water purification from
seawater, removing the salt and other effluent materials from the water molecules using the membranes.
8. The sea water passes to the Multi Media filters first then it will pass to the membranes for the purification
and then passed from the UF system for further filtration. After the ultra-filtration water will be used for
the drinking.
• Automation - Automated using Rockwell Control Logix PLC and Panel View Plus HMI
28. Storm Water Drainage and Sewerage System Phase-1 – JXB/103B - DWC Airport, Dubai, UAE.
• Project Scope - Engineering, Application development, testing and commissioning of Storm Water
Drainage and Sewerage System Pumping Station and Commissioning.
• Process – The process of the Storm Water Pumping Stations is to pump the water which is stored in the
storm water tank. The process will be controlled through the Float switches drain the wet well tank where
the water comes from many areas in the landside of the airport.
• Automation - Automated using Rockwell Control Logix PLC
29. Storm Water Drainage and Sewerage System Phase-1 for Oil Water Separators – JXB/103B - DWC
Airport, Dubai, UAE.
• Project Scope - Engineering, Application development, testing and commissioning of Storm Water and
Sewerage System of Oil Water Separator Systems and Commissioning.
• Process – The process of the Oil water separators is to separate the oil mixed in the water which is
coming from the Airport. Oil will be separated from the water through the trays arranged in the chambers
and will be stored in the storm water tank. The process will be controlled through the Float switches to
drain the tank and oil will be pumped to the oil tankers. Gas detectors and Water quality sensors are
used to monitor the oil and water quality.
• Automation - Automated using Rockwell Control Logix PLC
30. TSE Network for Irrigation System – Lusail CP5B – Lusail City, Qatar
• Project Scope – Design, Engineering, Application development and Testing for RTU based TSE
Network of MOV Irrigation system.
• Process – The process of the irrigation network is supplying the Treated Sewage water to different
areas of the Lusail city. Motorized valve will be useful to circulate the treated water to gardens, villas and
parks available in the city. These MOV‘s are controlled through the float switches, where flow and
pressure will monitored in the SCADA.
• Automation - Automated using Schneider SCADAPack RTU
31. New Doha Port Project Sewage Treatment Plant 1 & 2 – NPP/0026 – Doha, Qatar
• Project Scope - Design, Engineering, Application development and Testing of Sewage Treatment
Plants 1 & 2.
• Process – The process of the sewage treatment plant and water pumping station is to pump the water
which is stored in the Lifting Station Tanks and passed to MBR system. The process also involves pre-
treatment, aeration, secondary clarifier, UF and Cleaning.
• Automation - Automated using Schneider Quantum PLC with M340 IO’s over Ethernet, Vijeo Citect
SCADA and Vijeo Designer HMI.
32. Storm Water Pumping Stations J5 & J6 – Lusail CP5B – Lusail City, Qatar
• Project Scope - Design, Engineering, Application development and Testing for automation of Storm
Water Pumping Stations J5 & J6.
• Process – The process of the Storm Water Pumping Stations is to pump the water which is stored in the
storm water tank. The process will be controlled through the Level Transmitter and Float switches drain
the wet well tank.
• Automation - Automated using Schneider Premium PLC with M340 IO’s over Ethernet and Vijeo
Designer HMI.
33. Barwa Pumping Stations R1 & R2 – Barwa City, Qatar
• Project Scope - Engineering, Application development, testing and commissioning of Barwa Pumping
Stations R1 & R2.
• Process – The process of the Storm Water Pumping Stations is to pump the water which is stored in the
storm water tank. The process will be controlled through the Float switches drain the wet well tank.
• Automation - Automated using Rockwell Compact Logix PLC with Point IO’s on DeviceNet and
9. Panel View Plus Compact HMI
34. Totalizing & Synchronization System at High Service Block HMC – Doha, Qatar
• Project Scope - Engineering, Application development, testing and Commissioning of Application
development for automation of Totalizing & Synchronization system.
• Process – When any of the Kahramaa transformer supply fails PLC gives command to generators to
start. This also includes the control and monitor of the Generator incoming and outgoing breakers of
Totalizing panel to feed generator power LV panels.
• Automation - Automated using Schneider Premium PLC with M340 IO’s and Vijeo Designer HMI.
35. Valve Automatic Changeover System at Sidra Hospital – Doha, Qatar
• Project Scope – Design, Engineering, Application development, and testing of Valve Automatic
Changeover system.
• Process – The process of the Valve changeover system is to supply the chilled water to be distributed to
the air handling units to cool the air through the supply line. The water is recirculated again to chiller
through the return line to be cooled again. This automatic changeover system is controlled through
temperature transmitter and pressure transmitters.
• Automation - Automated using Schneider Twido PLC.
36. Sump Pump CP KSB – Lusail CP5B – Lusail City, Qatar
• Project Scope - Design, Engineering, Application development, and testing of Sump Pump Control
Panel of LV building.
• Process – The process of the Sump pump control panel is to pump the water which is stored in the
sump. The process will be controlled through the Float switches to drain the sump.
• Automation - Automated using Rockwell Micro850 PLC
10. Panel View Plus Compact HMI
34. Totalizing & Synchronization System at High Service Block HMC – Doha, Qatar
• Project Scope - Engineering, Application development, testing and Commissioning of Application
development for automation of Totalizing & Synchronization system.
• Process – When any of the Kahramaa transformer supply fails PLC gives command to generators to
start. This also includes the control and monitor of the Generator incoming and outgoing breakers of
Totalizing panel to feed generator power LV panels.
• Automation - Automated using Schneider Premium PLC with M340 IO’s and Vijeo Designer HMI.
35. Valve Automatic Changeover System at Sidra Hospital – Doha, Qatar
• Project Scope – Design, Engineering, Application development, and testing of Valve Automatic
Changeover system.
• Process – The process of the Valve changeover system is to supply the chilled water to be distributed to
the air handling units to cool the air through the supply line. The water is recirculated again to chiller
through the return line to be cooled again. This automatic changeover system is controlled through
temperature transmitter and pressure transmitters.
• Automation - Automated using Schneider Twido PLC.
36. Sump Pump CP KSB – Lusail CP5B – Lusail City, Qatar
• Project Scope - Design, Engineering, Application development, and testing of Sump Pump Control
Panel of LV building.
• Process – The process of the Sump pump control panel is to pump the water which is stored in the
sump. The process will be controlled through the Float switches to drain the sump.
• Automation - Automated using Rockwell Micro850 PLC