K. Alan Williams
11/16/2016
10500 NW 36th ST, Coral Springs FL 33065
954-654-0581
k_alan.williams@hotmail.com
Objective
I am seeking a position as a Release/Project Manager within an IT department of a positive
office environment, which will allow me to grow and prosper within my career path while
navigating a world of constant change. I offer skills forged from a very rich and diverse
background across multiple disciplines of IT.
TECHNICAL SKILLS
Platforms: Windows Server 2000 – 2008 R2 AD/LDAP; XP – Windows 7. Mac OSX.
Software: Jira Engineer; Jenkins; TFS; Visual Studios; GitHub; Team City Microsoft: Active
Directory 2000, 2003, 2008 (R2). Exchange 2003 - 2010. SharePoint/ MS Search Server 2001 -
2010. SQL Server 2000 – SQL Server 2008 R2. MS Forefront. IIS. Office Suite; Visio and Project
VMWARE: VSphere 4, ESXi. EMC:Navisphere HP: NetApp Filers; Citrix XenApp; MS Hyper-V
(Server Core 2008 R2) with MS VMM.
Other:Backup Exec, Numara Track-IT, Symantec AV, TrendMicro OfficeScan, Ghost, VBScript,
PowerShell, HTML, CSS, Blackberry ES,Vipre AV, Vipre Enterprise, Replay 4 DR Solutions,
Networking & Protocols: DNS, TCP/IP, VPN, WAN, Cisco Routers and Switches. HP Switches.
PIX, CheckPoint, and Astaro firewalls. iSCSI, Fibre Channel, F5 Load balance appliances.
Hardware: HP Blade servers and enclosures (BL460 G1-G6), HP Proliant Servers. Dell
PowerEdge Servers. EMC CX4, NS20.
Certifications: Microsoft Certified Systems Engineer (2000), CompTIA A+ (2000), MCTS – Active
Directory (2008 R2).
K. Alan Williams
Page 2
SOFT SKILLS
Interpersonal: Strong customer service skills.
Communication: Strong written and verbal communication skills. I am able to articulate to both
technical and non-technical personal fluently. I can also communicate effectively with a wide
variety of IT personnel including DBA, TechOps, Executives, Product Owners, and development
teams. I can explain the specifics about the mechanics of good communication.
Professionalism: Ego must be set aside at all times while maintaining a professional posture.
Project Management: I take a systematic approach via project phases: Identifying the project;
Discovery and defining the requirements; Defining measures of success; Procurement;
Implementation/ Execution; Testing; After Action Review (Post-mortum/ lessons learned).
Typing: Can type up to 90 words per minute.
PROFESSIONAL EXPERIENCE
20 FEB 2012 – PRESENT: KAPLAN UNIVERSITY - FORT
LAUDERDALE, FL
Release/ConfigurationManagement Engineer II
 Concurrently managed multiple releases and infrastructure changes across 46
different platforms spanning 3 different business units in an enterprise agile
software development environment using both scrum and Kanban methodologies.
 Facilitated incident management throughout incident discovery, solution, and
execution to include organizing and conducting regular root cause analysis (RCA)
sessions and post-mortum action plans.
K. Alan Williams
Page 3
 Facilitated successful releases of code from development to production by
proactively & reactively working with Executives, Product Owners, Development,
QA and TechOps
 Negotiated Release issues and schedules with internal customers and reported
status to Executives
 Conducted Change Advisory Board (CAB) meetings to discuss and approve all
scheduled production changes for both infrastructure and code releases.
 Participated in daily operations calls to executive stake-holders updating the status
of every in-flight and scheduled release over the next plus or minus 24 hours.
 Scheduled and organized resources across several different departments and
disciplines for each scheduled production release across 46 different platforms.
 Lead cross-functional team to support each Release project plan and post
Release/Change review
 Provided Change and Configuration management for QA and other Pre-Production
Environments
 Provided Release services for agile scrum masters.
 Owned the release processes spanning 3 different business organizations.
 Migrated and simplified the SDLC from an archaic TFS implementation to a much
more streamlined Jira implementation. Consolidated 7 different tickets and flows
into 3 to cover all aspects from code review to the final production deployment.
 Spearheaded the design and implementation of an automated workflow using Jira,
TeamCity, and GitHub with gateways and checkpoints to mitigate high risk points of
the lifecycle.
 Designed a Jira solution to organize and consolidate environment refreshes (which
takes an average of 1-2 weeks to fully complete). Prior to the solution it was all
being done via emails and excel sheets.
 Worked with developers to utilize Jira’s rest API’s to create custom reporting
solutions for members of the executive team using 3rd party software.
 Customized Jira dashboards for VP’s and members of the executive team to give
them targeted visibility into their respective Jira projects (some involving more than
1 project).
 Implemented Jira to LDAP consumption to streamline user provisioning.
 Used a combination of Git triggers, post-functions, and validators/conditions from
within Jira to satisfy SOX/ PCI compliance requirements, business metrics, and
workflow automation.
 Worked closely with the compliance team and SOX/PCI auditors to get both
standardized reports and targeted ad hoc information quickly to reduce findings to
zero.
K. Alan Williams
Page 4
 Responsible for maintaining non-production configuration management and
troubleshooting in a Windows Server 2008 R2 and IIS environment.
1 OCT 11 – 20 FEB 2012: KAPLAN UNIVERSITY, FORT
LAUDERDALE, FL
Senior Systems Engineer
 Responsible for the non-production environment working in the Release
Management/ Configuration Management department in an enterprise
environment consisting of over 1100 servers in an MS Hyper -V setting.
 Created environments originating from requests from the development team,
stage teams, and DBA teams with specific OS configurations (server 2008 R2),
virtual hardware, and performance requirements.
 Tier 3 and 4 troubleshooting of issues with the virtual servers ranging from
connectivity issues to migrations and template creations.
 Created customized templates working from MS System Center VMM 2008 R2
for each development team and DBA team in order to stream line environment
requests.
 Migrated numerous VMs from an old VMware GSX server into Hyper-V (System
Center) by creating a “virtual host” using VMware workstation. Installed
ESX on the virtual host and once completed, I created a virtual server within
the virtual ESX host environment.
 Other VMware GSX VM’s were migrated using the physical to virtual
conversion (P2V) wizard within System Center for a clean migration.
 Managed IP’s across multiple VLANs within the environment using Solar
Winds.
 Appropriated the matching VLAN tag to new VM’s into the environment.
 Worked directly with network operations to get ports configured on physical
switches in the data center for VLANs.
 Recommended multiple GPO settings which were later submitted to the
security department for eventual approval in order to make active directory
administration a little easier.
 Managed all active directory objects for the non-production environment to
include moving server objects, forced replication, and OU structuring
anomalies.
K. Alan Williams
Page 5
 Participated in multiple projects working with 3rd
party software vendors
(Varalogix and soft tech amongst a few) with many moving parts from design to
implementation and testing.
 Assisted Release Management with troubleshooting some deployment scripting
errors in powershell (mostly syntax errors).
 Provided tier 3 and 4 break/fix support operations on an on-going basis for the
non-prod teams in Chicago and New York as well.
 Experience with F5 load balancer configurations for application level load
balancing including setting up app pools, and troubleshooting load balancing
issues.
 Performed customized SQL 2008 R2 installation on an as -needed basis from
the database administrator team.
 Adhered to industry standard practices and procedures for all requests.
1 JUN 10— 31 OCT 2011: COURTESY COMPUTERS, INC.,
DAVIE, FL
Senior Systems Engineer
 Worked as a Senior Engineer in an enterprise environment (Managed Service
Provider) with multiple locations and different environments, with direct client
interfacing.
 Maintained over 200 servers and 400-500 workstations as part of the
professional services team.
 Heavy experience with Windows Server 2008 R2 environment including GPO
design and management, Active Directory work, and Windows Server 2008
installations from scratch.
 Heavy experience with a virtualized server 2008 environment with MS Hyper-V
and server core 2008 R2.
 Moderate work with SQL 2005 and SQL 2008 R2 database platforms. Part of
a project team migrating databases from SQL 2005 to SQL 2008 R2.
 Heavy experience with IIS and “in-house” website and applications server
management with multiple websites and hosted applications.
 Worked alongside a contracted web development team to handle upgrade
projects and new features added to hosted application and website.
 Intermediate experience with Cisco routers to include adding NAT rules and
also static routes using ADSM management.
 Intermediate firewall appliance experience to include adding packet filter
rules, web security management, DNAT rules, and interface WAN/
LANconfigurations.
K. Alan Williams
Page 6
 Experience implementing advanced disaster recovery projects and continuity
plans with multiple different environments (including virtual environments),
using a combination of hosted online backups and a program called Replay 4.
 Also responsible for handling escalated level 1 and 2 helpdesk tickets.
 Heavy experience using thorough documentation and using a ticketing
system (Connectwise) to adhere to documentation policies.
 Performed Server 2008 R2 builds from scratch.
 Performed Exchange 2010 installations from scratch.
 Performed Exchange 2003 migrations to Exchange 2010.
 Maintained multiple Exchange 2010 environments including the use of
transport rules, exchange connectors, and mailbox migrations.
 Maintained MS Exchange 2010 databases to optimize performance.
 Limited experience with VMware and Vsphere 4 environments.
 Worked on large scale network merging projects as part of the project team
(4-5 engineers working different project parts) including mergers.
 Light experience with SAN storage arrays (EMC) including the creation of
aggregates, LUN’s, and CIF shares.
 Also performed help desk tasks as needed when other engineers are
unavailable.
 Light experience with XenApp (Citrix virtualization).
1 MAR 09— 1 MAY 2010 E-BUILDER, INC. PLANTATION, FL
Systems Engineer I
 Provide a broad range of IT services in a small internal office environmentof 40 usersand large
enterprise level production environment.
 Created custom built web application environments from scratch including Windows Server
2003 installs, active directory setup, custom domain creation, and setting up SQL 2005 clusters
with windows clustering services.
 Responsible for maintaining the enterprise production environmentto include replacing servers
and storage devices, decommissioning outdated servers,and coordinating with the hosted data
center personnel to accomplish tasks remotely.
K. Alan Williams
Page 7
 Re-designed the active directory OUstructurefor the internal officeenvironmentfor better
automation usinga series of customized GPO’s to manage the different departments
 Complete production rack projectre-design during a two hour maintenance window while
meeting SLAminimal production downtime.
 Implemented exchange activesync from scratch for the internal office to allow emails to go out
to windows mobile devices.
 Managed over 67 servers betweenthe internal office,production environment, and the backup
hot site environment.
 Managed and maintained a Windows Virtual server test environment for development testing.
 Aided and re-designedthe internal IT business process and workflow.
 Provided desktop support services for the internal office environment.
 Maintained production networking hardwaresuch as SAN’s (EMC), firewalls (checkpoint/
Nokia), VPN’s (checkpoint), and load balancers (F5’s).
1 NOV 07— 7 JAN 09: DUTY FREE AMERICAS, INC -
HOLLYWOOD, FL
Systems/Network Administrator
 Provided Systems and Network administration in an enterprise level Windows Server2003
Active Directory environment with a 3,000 user network.
 Responsible for the maintenance and administration of over 80 servers running Windows
Server 2000/ 2003 including 2 servers running Macintosh XServ 10.5.
 Extensive experience with MicrosoftActive Directory 2003 systems. Main responsibilities were
creating userprofiles, managing and creating user logon credentials,managing and maintaining
an effective OUstructure, and maintaining sites and services.
 Extensive experience with DNS. Main responsibilities werecreating Arecords and SRV
records forvarious systems including MS Office Communicator.
 Also created exchange MXrecords for new exchange serverbuilds. Experiencedwith forward
lookup zones, and creating aliases for easy access to new systems and servers.
 Provided Exchange2003 administration includingmailbox management,mailbox storage
management, creatingscheduling and resource solutions using exchange/ outlook, and daily
maintenanceof mailboxes and size/ storage limitations.
K. Alan Williams
Page 8
 Extensive experience with a Macintosh Xserv environment.Iwas the projecttechnical lead for
a completerevamp of the marketing Macintoshsolution including installation,configuration, and
maintenanceof a VTRAK disk array with Fiberchannel, a new Macintosh Xserv, and a
Quantum tape loader fora customized backup solution for the Macintosh network. Also the “
go to” guy for client side Macintosh related issues.
 Played a main role in the disasterrecovery planning and implementation process. This
included a VMware solution using Site Recovery Manager and the VMotion application to create
a virtualized and dynamic data center ready to migrate to the “hot site.”
 Experienced with the Storage Area Network (SAN) applianceNetApp. Skills includecreating
LUNs, Aggrogates, and Volumes to accommodate various databases includingexchange, citrix,
and sequel as well as other thirdparty database applications.
 Played a main role in 3 major projects;DisasterRecovery, Re-engineeringan MS Office
Communicatorinfrastructure, and Installing, configuring, and maintaining a new Macintosh file
server, network storage,and custom backup solution.
 Posses limited experiencewith Checkpoint firewalls and cisco routers and switches. Skills
include experiencewith VLANs and configuring ports on routers and switches.
11 NOV 06— 15 NOV 07: ALERT GLOBAL MEDIA, INC. -
MIAMI, FL
Systems/Network Administrator
 Provided network administrator services for a Microsoft Server 2003 Active Directory
environment.
 Administered Exchange Server 2003 withoutlook.
 Administered the ACTdatabase and played a key role in migrating ACTto SalesForce.
 Experience setting up and administering Terminal Servers for remote access to the
network.
 Also provided help desk level support for the company. Covered a wide variety of IT
issues from troubleshooting hardware and software to networking printers, as well as
assistance witha disaster recoveryplan.
K. Alan Williams
Page 9
1 JUN 02— 21 JUL 06: UNITED STATES ARMY - FORT
BENNING, GA
Information Assurance Security Officer(IASO) - Systems/Network
Administrator
 Network administrator/ InformationAssurance SecurityOfficer (IASO).
 Responsible for administrating Microsoft Active Directoryand NT systems. Analyze
and provide network migrationfor the battalionfrom NT to Microsoft Active Directory.
 Provided technical support for a variety of computer problems from basic internet
connectivity to MS EXCHANGE issues.
 Construct, running, and cutting CAT5 cable to add new computers to the
network. Perform technical support duties in the operationof the 1/11th Regiment
computer systems/services including the Local Area Network (LAN) and Benning
Intranet.
 Troubleshoot and diagnose system failures to isolate the source of the problem
betweenequipment, system software and applications.
 Install and test equipment and their associated peripheral devices.
 Perform installationdiagnostics, provide technical advice, and provide support for
standard software programs.
 Determine placement of, configure network cabling, troubleshoot and maintainservers,
hubs, routers (Cisco) and switches (Cisco).
 Also responsible for the supervision, management, and selectionof companylevel
Information Assurance SecurityOfficers (IASO, 4 personnel).
EDUCATION
K. Alan Williams
Page 10
1 SEP 09— 31 JUL 2011 Broward College - Fort Lauderdale, FL
Business Administration
1 OCT 01— 15 DEC 01 Troy State University - Columbus, GA
Microsoft Certified Systems Engineer – (Windows Server 2003)
Comptia A+
AWARDS
Army Achievement Medal, 1 JUN 04
Army Commendation Medal, 1 MAY 06
National Defense Medal, 1 JAN 03
Global War on Terrorism Medal, 1 JAN 03
COMMENTS
 My rich and diverse background has significantly developed my problem solving
and analytical skills to the top 10% of my peers.

Alan Resume Release Management 16NOV2016

  • 1.
    K. Alan Williams 11/16/2016 10500NW 36th ST, Coral Springs FL 33065 954-654-0581 k_alan.williams@hotmail.com Objective I am seeking a position as a Release/Project Manager within an IT department of a positive office environment, which will allow me to grow and prosper within my career path while navigating a world of constant change. I offer skills forged from a very rich and diverse background across multiple disciplines of IT. TECHNICAL SKILLS Platforms: Windows Server 2000 – 2008 R2 AD/LDAP; XP – Windows 7. Mac OSX. Software: Jira Engineer; Jenkins; TFS; Visual Studios; GitHub; Team City Microsoft: Active Directory 2000, 2003, 2008 (R2). Exchange 2003 - 2010. SharePoint/ MS Search Server 2001 - 2010. SQL Server 2000 – SQL Server 2008 R2. MS Forefront. IIS. Office Suite; Visio and Project VMWARE: VSphere 4, ESXi. EMC:Navisphere HP: NetApp Filers; Citrix XenApp; MS Hyper-V (Server Core 2008 R2) with MS VMM. Other:Backup Exec, Numara Track-IT, Symantec AV, TrendMicro OfficeScan, Ghost, VBScript, PowerShell, HTML, CSS, Blackberry ES,Vipre AV, Vipre Enterprise, Replay 4 DR Solutions, Networking & Protocols: DNS, TCP/IP, VPN, WAN, Cisco Routers and Switches. HP Switches. PIX, CheckPoint, and Astaro firewalls. iSCSI, Fibre Channel, F5 Load balance appliances. Hardware: HP Blade servers and enclosures (BL460 G1-G6), HP Proliant Servers. Dell PowerEdge Servers. EMC CX4, NS20. Certifications: Microsoft Certified Systems Engineer (2000), CompTIA A+ (2000), MCTS – Active Directory (2008 R2).
  • 2.
    K. Alan Williams Page2 SOFT SKILLS Interpersonal: Strong customer service skills. Communication: Strong written and verbal communication skills. I am able to articulate to both technical and non-technical personal fluently. I can also communicate effectively with a wide variety of IT personnel including DBA, TechOps, Executives, Product Owners, and development teams. I can explain the specifics about the mechanics of good communication. Professionalism: Ego must be set aside at all times while maintaining a professional posture. Project Management: I take a systematic approach via project phases: Identifying the project; Discovery and defining the requirements; Defining measures of success; Procurement; Implementation/ Execution; Testing; After Action Review (Post-mortum/ lessons learned). Typing: Can type up to 90 words per minute. PROFESSIONAL EXPERIENCE 20 FEB 2012 – PRESENT: KAPLAN UNIVERSITY - FORT LAUDERDALE, FL Release/ConfigurationManagement Engineer II  Concurrently managed multiple releases and infrastructure changes across 46 different platforms spanning 3 different business units in an enterprise agile software development environment using both scrum and Kanban methodologies.  Facilitated incident management throughout incident discovery, solution, and execution to include organizing and conducting regular root cause analysis (RCA) sessions and post-mortum action plans.
  • 3.
    K. Alan Williams Page3  Facilitated successful releases of code from development to production by proactively & reactively working with Executives, Product Owners, Development, QA and TechOps  Negotiated Release issues and schedules with internal customers and reported status to Executives  Conducted Change Advisory Board (CAB) meetings to discuss and approve all scheduled production changes for both infrastructure and code releases.  Participated in daily operations calls to executive stake-holders updating the status of every in-flight and scheduled release over the next plus or minus 24 hours.  Scheduled and organized resources across several different departments and disciplines for each scheduled production release across 46 different platforms.  Lead cross-functional team to support each Release project plan and post Release/Change review  Provided Change and Configuration management for QA and other Pre-Production Environments  Provided Release services for agile scrum masters.  Owned the release processes spanning 3 different business organizations.  Migrated and simplified the SDLC from an archaic TFS implementation to a much more streamlined Jira implementation. Consolidated 7 different tickets and flows into 3 to cover all aspects from code review to the final production deployment.  Spearheaded the design and implementation of an automated workflow using Jira, TeamCity, and GitHub with gateways and checkpoints to mitigate high risk points of the lifecycle.  Designed a Jira solution to organize and consolidate environment refreshes (which takes an average of 1-2 weeks to fully complete). Prior to the solution it was all being done via emails and excel sheets.  Worked with developers to utilize Jira’s rest API’s to create custom reporting solutions for members of the executive team using 3rd party software.  Customized Jira dashboards for VP’s and members of the executive team to give them targeted visibility into their respective Jira projects (some involving more than 1 project).  Implemented Jira to LDAP consumption to streamline user provisioning.  Used a combination of Git triggers, post-functions, and validators/conditions from within Jira to satisfy SOX/ PCI compliance requirements, business metrics, and workflow automation.  Worked closely with the compliance team and SOX/PCI auditors to get both standardized reports and targeted ad hoc information quickly to reduce findings to zero.
  • 4.
    K. Alan Williams Page4  Responsible for maintaining non-production configuration management and troubleshooting in a Windows Server 2008 R2 and IIS environment. 1 OCT 11 – 20 FEB 2012: KAPLAN UNIVERSITY, FORT LAUDERDALE, FL Senior Systems Engineer  Responsible for the non-production environment working in the Release Management/ Configuration Management department in an enterprise environment consisting of over 1100 servers in an MS Hyper -V setting.  Created environments originating from requests from the development team, stage teams, and DBA teams with specific OS configurations (server 2008 R2), virtual hardware, and performance requirements.  Tier 3 and 4 troubleshooting of issues with the virtual servers ranging from connectivity issues to migrations and template creations.  Created customized templates working from MS System Center VMM 2008 R2 for each development team and DBA team in order to stream line environment requests.  Migrated numerous VMs from an old VMware GSX server into Hyper-V (System Center) by creating a “virtual host” using VMware workstation. Installed ESX on the virtual host and once completed, I created a virtual server within the virtual ESX host environment.  Other VMware GSX VM’s were migrated using the physical to virtual conversion (P2V) wizard within System Center for a clean migration.  Managed IP’s across multiple VLANs within the environment using Solar Winds.  Appropriated the matching VLAN tag to new VM’s into the environment.  Worked directly with network operations to get ports configured on physical switches in the data center for VLANs.  Recommended multiple GPO settings which were later submitted to the security department for eventual approval in order to make active directory administration a little easier.  Managed all active directory objects for the non-production environment to include moving server objects, forced replication, and OU structuring anomalies.
  • 5.
    K. Alan Williams Page5  Participated in multiple projects working with 3rd party software vendors (Varalogix and soft tech amongst a few) with many moving parts from design to implementation and testing.  Assisted Release Management with troubleshooting some deployment scripting errors in powershell (mostly syntax errors).  Provided tier 3 and 4 break/fix support operations on an on-going basis for the non-prod teams in Chicago and New York as well.  Experience with F5 load balancer configurations for application level load balancing including setting up app pools, and troubleshooting load balancing issues.  Performed customized SQL 2008 R2 installation on an as -needed basis from the database administrator team.  Adhered to industry standard practices and procedures for all requests. 1 JUN 10— 31 OCT 2011: COURTESY COMPUTERS, INC., DAVIE, FL Senior Systems Engineer  Worked as a Senior Engineer in an enterprise environment (Managed Service Provider) with multiple locations and different environments, with direct client interfacing.  Maintained over 200 servers and 400-500 workstations as part of the professional services team.  Heavy experience with Windows Server 2008 R2 environment including GPO design and management, Active Directory work, and Windows Server 2008 installations from scratch.  Heavy experience with a virtualized server 2008 environment with MS Hyper-V and server core 2008 R2.  Moderate work with SQL 2005 and SQL 2008 R2 database platforms. Part of a project team migrating databases from SQL 2005 to SQL 2008 R2.  Heavy experience with IIS and “in-house” website and applications server management with multiple websites and hosted applications.  Worked alongside a contracted web development team to handle upgrade projects and new features added to hosted application and website.  Intermediate experience with Cisco routers to include adding NAT rules and also static routes using ADSM management.  Intermediate firewall appliance experience to include adding packet filter rules, web security management, DNAT rules, and interface WAN/ LANconfigurations.
  • 6.
    K. Alan Williams Page6  Experience implementing advanced disaster recovery projects and continuity plans with multiple different environments (including virtual environments), using a combination of hosted online backups and a program called Replay 4.  Also responsible for handling escalated level 1 and 2 helpdesk tickets.  Heavy experience using thorough documentation and using a ticketing system (Connectwise) to adhere to documentation policies.  Performed Server 2008 R2 builds from scratch.  Performed Exchange 2010 installations from scratch.  Performed Exchange 2003 migrations to Exchange 2010.  Maintained multiple Exchange 2010 environments including the use of transport rules, exchange connectors, and mailbox migrations.  Maintained MS Exchange 2010 databases to optimize performance.  Limited experience with VMware and Vsphere 4 environments.  Worked on large scale network merging projects as part of the project team (4-5 engineers working different project parts) including mergers.  Light experience with SAN storage arrays (EMC) including the creation of aggregates, LUN’s, and CIF shares.  Also performed help desk tasks as needed when other engineers are unavailable.  Light experience with XenApp (Citrix virtualization). 1 MAR 09— 1 MAY 2010 E-BUILDER, INC. PLANTATION, FL Systems Engineer I  Provide a broad range of IT services in a small internal office environmentof 40 usersand large enterprise level production environment.  Created custom built web application environments from scratch including Windows Server 2003 installs, active directory setup, custom domain creation, and setting up SQL 2005 clusters with windows clustering services.  Responsible for maintaining the enterprise production environmentto include replacing servers and storage devices, decommissioning outdated servers,and coordinating with the hosted data center personnel to accomplish tasks remotely.
  • 7.
    K. Alan Williams Page7  Re-designed the active directory OUstructurefor the internal officeenvironmentfor better automation usinga series of customized GPO’s to manage the different departments  Complete production rack projectre-design during a two hour maintenance window while meeting SLAminimal production downtime.  Implemented exchange activesync from scratch for the internal office to allow emails to go out to windows mobile devices.  Managed over 67 servers betweenthe internal office,production environment, and the backup hot site environment.  Managed and maintained a Windows Virtual server test environment for development testing.  Aided and re-designedthe internal IT business process and workflow.  Provided desktop support services for the internal office environment.  Maintained production networking hardwaresuch as SAN’s (EMC), firewalls (checkpoint/ Nokia), VPN’s (checkpoint), and load balancers (F5’s). 1 NOV 07— 7 JAN 09: DUTY FREE AMERICAS, INC - HOLLYWOOD, FL Systems/Network Administrator  Provided Systems and Network administration in an enterprise level Windows Server2003 Active Directory environment with a 3,000 user network.  Responsible for the maintenance and administration of over 80 servers running Windows Server 2000/ 2003 including 2 servers running Macintosh XServ 10.5.  Extensive experience with MicrosoftActive Directory 2003 systems. Main responsibilities were creating userprofiles, managing and creating user logon credentials,managing and maintaining an effective OUstructure, and maintaining sites and services.  Extensive experience with DNS. Main responsibilities werecreating Arecords and SRV records forvarious systems including MS Office Communicator.  Also created exchange MXrecords for new exchange serverbuilds. Experiencedwith forward lookup zones, and creating aliases for easy access to new systems and servers.  Provided Exchange2003 administration includingmailbox management,mailbox storage management, creatingscheduling and resource solutions using exchange/ outlook, and daily maintenanceof mailboxes and size/ storage limitations.
  • 8.
    K. Alan Williams Page8  Extensive experience with a Macintosh Xserv environment.Iwas the projecttechnical lead for a completerevamp of the marketing Macintoshsolution including installation,configuration, and maintenanceof a VTRAK disk array with Fiberchannel, a new Macintosh Xserv, and a Quantum tape loader fora customized backup solution for the Macintosh network. Also the “ go to” guy for client side Macintosh related issues.  Played a main role in the disasterrecovery planning and implementation process. This included a VMware solution using Site Recovery Manager and the VMotion application to create a virtualized and dynamic data center ready to migrate to the “hot site.”  Experienced with the Storage Area Network (SAN) applianceNetApp. Skills includecreating LUNs, Aggrogates, and Volumes to accommodate various databases includingexchange, citrix, and sequel as well as other thirdparty database applications.  Played a main role in 3 major projects;DisasterRecovery, Re-engineeringan MS Office Communicatorinfrastructure, and Installing, configuring, and maintaining a new Macintosh file server, network storage,and custom backup solution.  Posses limited experiencewith Checkpoint firewalls and cisco routers and switches. Skills include experiencewith VLANs and configuring ports on routers and switches. 11 NOV 06— 15 NOV 07: ALERT GLOBAL MEDIA, INC. - MIAMI, FL Systems/Network Administrator  Provided network administrator services for a Microsoft Server 2003 Active Directory environment.  Administered Exchange Server 2003 withoutlook.  Administered the ACTdatabase and played a key role in migrating ACTto SalesForce.  Experience setting up and administering Terminal Servers for remote access to the network.  Also provided help desk level support for the company. Covered a wide variety of IT issues from troubleshooting hardware and software to networking printers, as well as assistance witha disaster recoveryplan.
  • 9.
    K. Alan Williams Page9 1 JUN 02— 21 JUL 06: UNITED STATES ARMY - FORT BENNING, GA Information Assurance Security Officer(IASO) - Systems/Network Administrator  Network administrator/ InformationAssurance SecurityOfficer (IASO).  Responsible for administrating Microsoft Active Directoryand NT systems. Analyze and provide network migrationfor the battalionfrom NT to Microsoft Active Directory.  Provided technical support for a variety of computer problems from basic internet connectivity to MS EXCHANGE issues.  Construct, running, and cutting CAT5 cable to add new computers to the network. Perform technical support duties in the operationof the 1/11th Regiment computer systems/services including the Local Area Network (LAN) and Benning Intranet.  Troubleshoot and diagnose system failures to isolate the source of the problem betweenequipment, system software and applications.  Install and test equipment and their associated peripheral devices.  Perform installationdiagnostics, provide technical advice, and provide support for standard software programs.  Determine placement of, configure network cabling, troubleshoot and maintainservers, hubs, routers (Cisco) and switches (Cisco).  Also responsible for the supervision, management, and selectionof companylevel Information Assurance SecurityOfficers (IASO, 4 personnel). EDUCATION
  • 10.
    K. Alan Williams Page10 1 SEP 09— 31 JUL 2011 Broward College - Fort Lauderdale, FL Business Administration 1 OCT 01— 15 DEC 01 Troy State University - Columbus, GA Microsoft Certified Systems Engineer – (Windows Server 2003) Comptia A+ AWARDS Army Achievement Medal, 1 JUN 04 Army Commendation Medal, 1 MAY 06 National Defense Medal, 1 JAN 03 Global War on Terrorism Medal, 1 JAN 03 COMMENTS  My rich and diverse background has significantly developed my problem solving and analytical skills to the top 10% of my peers.