Why Asset Management for Airports?
Benefits
Purpose of an Asset Management Policy
Staff Competencies and Training
Asset Management Framework
Airport Information Systems for Asset Management
Why Asset Management for Airports?
• Make better investment decisions.
• Align managers, decision makers, and workers to a common purpose to
seek solutions and make decisions that result in the best economic, service
level, and risk exposure Outcomes.
• Improve flexibility to respond to changes in the regulatory and commercial
environment. The following significant benefits have been achieved:
- Pavement levels of service maintained with a 30 percent cut in budget (Falls
et al., 1994).
Benefits
PAS 55 identifies principal benefits of asset management as:
• Enhanced customer satisfaction from improved performance and control of product or service.
• Delivery to the required standards.
• Improved health, safety, and environmental performance.
Optimized return on investment and/or growth.
• Long-term planning, confidence, and performance sustainability.
• The ability to demonstrate best value for money within a constrained funding regime.
• Evidence, in the form of controlled and systematic processes, to demonstrate legal, regulatory,
and statutory compliance.
• Improved risk management and corporate governance and a clear audit trail for the appropriateness
of decisions taken and their associated risks.
• Improved corporate reputation, the benefits of which may include enhanced shareholder
value, improved marketability of product/service, greater staff satisfaction, and more efficient
and effective procurement from the supply chain.
• The ability to demonstrate that sustainable development is actively considered within the
management of the assets over their lifecycles.
• Asset management policy sets the framework for the management of
airport infrastructure and assets.
• The statements are intended to guide the airport organization by
specifying the minimum set of considerations and actions to be
undertaken by staff in the execution of asset management analysis and
decision making and the development of asset strategies
Purpose of an Asset Management Policy
Figurer 1. EPA’s 5 core questions in a 10-step approach to developing asset management plans
Staff Competencies and Training
Implementation of an asset management framework usually requires
increased scrutiny of investments to consider economic, social, and
environmental impacts, and risk reduction and levels of service assessment.
This indicates that additional skill sets may be required by airport
management, including:
 Engineering economics and investment modeling.
 Reliability analysis and risk assessment.
 Maintenance management.
Figure 2. Roles and competencies for an Asset Management Organization.
Asset Management Framework
The asset management policy sets the framework for the management of
airport infrastructure and assets. Each policy statement is endorsed and
upheld by all executive staff. The statements are intended to guide the airport
organization by specifying the minimum set of considerations and actions to
be undertaken by staff in the execution of asset management analysis and
decision making and the development of asset strategies.
Figure 3. Holistic integration of processes and systems for asset management.
Airport Information Systems for Asset Management
An effective asset management program typically requires a holistic approach
with integration or coordination between information systems to support
strategic requirements:
1. Financial system.
2. Customer complaint/inquiry system.
3. Complete asset registry and hierarchy.
4. Geographical information system.
5. CMMS or EAMS.
6. Electronic document management system for operations and maintenance
manuals and as-built drawings.
7. Data warehouse for data sharing between applications.
8. Facilities management system.
Figure 4. Schematic of asset management information systems for large airports.
Figure 4.
shows a schematic
example of an airport
asset management
information system
for large airports
References
• National Academies of Sciences, Engineering, and Medicine 2012. Asset and
Infrastructure Management for Airports Primer and Guidebook. Washington, DC: The
National Academies Press. https://doi.org/10.17226/22760.

More Related Content

What's hot

Unlocking Your Organization\'s Warranty Management Potential
Unlocking Your Organization\'s Warranty Management PotentialUnlocking Your Organization\'s Warranty Management Potential
Unlocking Your Organization\'s Warranty Management PotentialImranMasood
 
Intelligent transport system himanshi
Intelligent transport system   himanshiIntelligent transport system   himanshi
Intelligent transport system himanshi
Preeti Rashmi
 
WMS (Warehouse Management System)
WMS  (Warehouse Management System)WMS  (Warehouse Management System)
WMS (Warehouse Management System)
shamroz khan
 
Transportation strategy
Transportation strategyTransportation strategy
Transportation strategy
Timotius Febry
 
Group assignment revision uld
Group assignment revision uldGroup assignment revision uld
Group assignment revision uld
nisaqmathanafi
 
Intelligent Transportation Systems for Parking
Intelligent Transportation Systems for ParkingIntelligent Transportation Systems for Parking
Intelligent Transportation Systems for ParkingAndrew Vidor
 
Fleet management solution (with demo screenshots)
Fleet management solution  (with demo screenshots)Fleet management solution  (with demo screenshots)
Fleet management solution (with demo screenshots)
gredenzainternational
 
Warehouse Management System
Warehouse Management SystemWarehouse Management System
Warehouse Management System
Vishal Kaushik
 
Paul Cheng Resilience and Emergency Management (HKIA)
Paul Cheng Resilience and Emergency Management (HKIA)Paul Cheng Resilience and Emergency Management (HKIA)
Paul Cheng Resilience and Emergency Management (HKIA)
BCM Institute
 
Intelligent transportation system ITS
Intelligent transportation system ITSIntelligent transportation system ITS
Intelligent transportation system ITS
JYOTIRANJAN43
 
Intelligent transportation systems
Intelligent transportation systemsIntelligent transportation systems
Intelligent transportation systems
Gourab Debbarma
 
Bus Crash Analysis
Bus Crash AnalysisBus Crash Analysis
Bus Crash Analysis
tsmanjurao
 
Connected Car Security
Connected Car SecurityConnected Car Security
Connected Car Security
Suresh Mandava
 
Transportation Mgmt
Transportation MgmtTransportation Mgmt
Transportation Mgmt
Zubin Poonawalla
 
Warehouse Management System
Warehouse Management SystemWarehouse Management System
Warehouse Management SystemRRChandran
 
Fleet Management System from CodeLand
Fleet Management System from CodeLand Fleet Management System from CodeLand
Fleet Management System from CodeLand
Sachidanand Bhat
 
Inventory management system
Inventory management systemInventory management system
Inventory management system
MD.Samsul Hoque (salim)
 
ERTMS Presentation
ERTMS PresentationERTMS Presentation
ERTMS PresentationMartyn Tobin
 

What's hot (20)

Unlocking Your Organization\'s Warranty Management Potential
Unlocking Your Organization\'s Warranty Management PotentialUnlocking Your Organization\'s Warranty Management Potential
Unlocking Your Organization\'s Warranty Management Potential
 
Intelligent transport system himanshi
Intelligent transport system   himanshiIntelligent transport system   himanshi
Intelligent transport system himanshi
 
WMS (Warehouse Management System)
WMS  (Warehouse Management System)WMS  (Warehouse Management System)
WMS (Warehouse Management System)
 
Transportation strategy
Transportation strategyTransportation strategy
Transportation strategy
 
Group assignment revision uld
Group assignment revision uldGroup assignment revision uld
Group assignment revision uld
 
Intelligent Transportation Systems for Parking
Intelligent Transportation Systems for ParkingIntelligent Transportation Systems for Parking
Intelligent Transportation Systems for Parking
 
Fleet management solution (with demo screenshots)
Fleet management solution  (with demo screenshots)Fleet management solution  (with demo screenshots)
Fleet management solution (with demo screenshots)
 
Warehouse Management System
Warehouse Management SystemWarehouse Management System
Warehouse Management System
 
Paul Cheng Resilience and Emergency Management (HKIA)
Paul Cheng Resilience and Emergency Management (HKIA)Paul Cheng Resilience and Emergency Management (HKIA)
Paul Cheng Resilience and Emergency Management (HKIA)
 
Intelligent transportation system ITS
Intelligent transportation system ITSIntelligent transportation system ITS
Intelligent transportation system ITS
 
Intelligent transportation systems
Intelligent transportation systemsIntelligent transportation systems
Intelligent transportation systems
 
Bus Crash Analysis
Bus Crash AnalysisBus Crash Analysis
Bus Crash Analysis
 
Challenges airport planning
Challenges airport planningChallenges airport planning
Challenges airport planning
 
Connected Car Security
Connected Car SecurityConnected Car Security
Connected Car Security
 
Transportation Mgmt
Transportation MgmtTransportation Mgmt
Transportation Mgmt
 
Warehouse Management System
Warehouse Management SystemWarehouse Management System
Warehouse Management System
 
Crew scheduling
Crew schedulingCrew scheduling
Crew scheduling
 
Fleet Management System from CodeLand
Fleet Management System from CodeLand Fleet Management System from CodeLand
Fleet Management System from CodeLand
 
Inventory management system
Inventory management systemInventory management system
Inventory management system
 
ERTMS Presentation
ERTMS PresentationERTMS Presentation
ERTMS Presentation
 

Similar to Airport Asset management chapter 1

An IT Governance program
An IT Governance programAn IT Governance program
An IT Governance program
John Goodpasture
 
Measuring the performance of your fleet by clearly defining strategy and tactics
Measuring the performance of your fleet by clearly defining strategy and tacticsMeasuring the performance of your fleet by clearly defining strategy and tactics
Measuring the performance of your fleet by clearly defining strategy and tactics
Tristan Wiggill
 
Boeing Case Study | e-enabled Advantage
Boeing Case Study | e-enabled AdvantageBoeing Case Study | e-enabled Advantage
Boeing Case Study | e-enabled Advantage
Adheesha Dharmakeerthi
 
Resume Vijai Nair
Resume Vijai NairResume Vijai Nair
Resume Vijai NairVijai Nair
 
Lecture-3-Introduction to Maintenance Management.ppt
Lecture-3-Introduction to Maintenance Management.pptLecture-3-Introduction to Maintenance Management.ppt
Lecture-3-Introduction to Maintenance Management.ppt
Thushan9
 
How I Improved My Airport Service In One Day.pdf
How I Improved My Airport Service In One Day.pdfHow I Improved My Airport Service In One Day.pdf
How I Improved My Airport Service In One Day.pdf
skr travel & insurance deals
 
Administrative support system
Administrative support systemAdministrative support system
Administrative support system
JoyAnn7
 
Page 1 of 82 1.M.1 PMM System - EMRC
 Page 1 of 82 1.M.1 PMM System - EMRC  Page 1 of 82 1.M.1 PMM System - EMRC
Page 1 of 82 1.M.1 PMM System - EMRC
MoseStaton39
 
Process of Operation management
Process of Operation management Process of Operation management
Process of Operation management
Nevedida
 
2018-GoMaximo-Asset-Management-Fundamentals.pptx
2018-GoMaximo-Asset-Management-Fundamentals.pptx2018-GoMaximo-Asset-Management-Fundamentals.pptx
2018-GoMaximo-Asset-Management-Fundamentals.pptx
Saravana Kumar
 
Stream C_Ross Agnew Ursula Bryan
Stream C_Ross Agnew Ursula BryanStream C_Ross Agnew Ursula Bryan
Stream C_Ross Agnew Ursula Bryan
BecarAsset
 
Measuring and Improving MP1.ppt
Measuring and Improving MP1.pptMeasuring and Improving MP1.ppt
Measuring and Improving MP1.ppt
ssuserf2880f
 
Energy Consulting SDVOSB Organizational Assessment
Energy Consulting SDVOSB Organizational AssessmentEnergy Consulting SDVOSB Organizational Assessment
Energy Consulting SDVOSB Organizational Assessment
gasanden
 
Energy Consulting SDVOSB Organizational Assessment
Energy Consulting SDVOSB Organizational AssessmentEnergy Consulting SDVOSB Organizational Assessment
Energy Consulting SDVOSB Organizational Assessment
Link Resources
 

Similar to Airport Asset management chapter 1 (20)

cm-05x01.pdf
cm-05x01.pdfcm-05x01.pdf
cm-05x01.pdf
 
cm-02x01.pdf
cm-02x01.pdfcm-02x01.pdf
cm-02x01.pdf
 
An IT Governance program
An IT Governance programAn IT Governance program
An IT Governance program
 
Maintenance management
Maintenance managementMaintenance management
Maintenance management
 
Measuring the performance of your fleet by clearly defining strategy and tactics
Measuring the performance of your fleet by clearly defining strategy and tacticsMeasuring the performance of your fleet by clearly defining strategy and tactics
Measuring the performance of your fleet by clearly defining strategy and tactics
 
Boeing Case Study | e-enabled Advantage
Boeing Case Study | e-enabled AdvantageBoeing Case Study | e-enabled Advantage
Boeing Case Study | e-enabled Advantage
 
Resume Vijai Nair
Resume Vijai NairResume Vijai Nair
Resume Vijai Nair
 
Lecture-3-Introduction to Maintenance Management.ppt
Lecture-3-Introduction to Maintenance Management.pptLecture-3-Introduction to Maintenance Management.ppt
Lecture-3-Introduction to Maintenance Management.ppt
 
How I Improved My Airport Service In One Day.pdf
How I Improved My Airport Service In One Day.pdfHow I Improved My Airport Service In One Day.pdf
How I Improved My Airport Service In One Day.pdf
 
cm-06x01.pdf
cm-06x01.pdfcm-06x01.pdf
cm-06x01.pdf
 
Administrative support system
Administrative support systemAdministrative support system
Administrative support system
 
Page 1 of 82 1.M.1 PMM System - EMRC
 Page 1 of 82 1.M.1 PMM System - EMRC  Page 1 of 82 1.M.1 PMM System - EMRC
Page 1 of 82 1.M.1 PMM System - EMRC
 
CMMS
CMMSCMMS
CMMS
 
Process of Operation management
Process of Operation management Process of Operation management
Process of Operation management
 
2018-GoMaximo-Asset-Management-Fundamentals.pptx
2018-GoMaximo-Asset-Management-Fundamentals.pptx2018-GoMaximo-Asset-Management-Fundamentals.pptx
2018-GoMaximo-Asset-Management-Fundamentals.pptx
 
Stream C_Ross Agnew Ursula Bryan
Stream C_Ross Agnew Ursula BryanStream C_Ross Agnew Ursula Bryan
Stream C_Ross Agnew Ursula Bryan
 
Measuring and Improving MP1.ppt
Measuring and Improving MP1.pptMeasuring and Improving MP1.ppt
Measuring and Improving MP1.ppt
 
cm-04x01.pdf
cm-04x01.pdfcm-04x01.pdf
cm-04x01.pdf
 
Energy Consulting SDVOSB Organizational Assessment
Energy Consulting SDVOSB Organizational AssessmentEnergy Consulting SDVOSB Organizational Assessment
Energy Consulting SDVOSB Organizational Assessment
 
Energy Consulting SDVOSB Organizational Assessment
Energy Consulting SDVOSB Organizational AssessmentEnergy Consulting SDVOSB Organizational Assessment
Energy Consulting SDVOSB Organizational Assessment
 

Recently uploaded

Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
NidhalKahouli2
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Christina Lin
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
ClaraZara1
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
drwaing
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
gestioneergodomus
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
Dr Ramhari Poudyal
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
ssuser7dcef0
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
dxobcob
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
symbo111
 

Recently uploaded (20)

Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
 

Airport Asset management chapter 1

  • 1. AIRPORT ASSET MANAGEMENT Information System Engineer : Safiya Al Mahrouqi Chapter 1
  • 2. AIRPORT ASSET MANAGEMENT Why Asset Management for Airports? Benefits Purpose of an Asset Management Policy Staff Competencies and Training Asset Management Framework Airport Information Systems for Asset Management
  • 3. Why Asset Management for Airports? • Make better investment decisions. • Align managers, decision makers, and workers to a common purpose to seek solutions and make decisions that result in the best economic, service level, and risk exposure Outcomes. • Improve flexibility to respond to changes in the regulatory and commercial environment. The following significant benefits have been achieved: - Pavement levels of service maintained with a 30 percent cut in budget (Falls et al., 1994).
  • 4. Benefits PAS 55 identifies principal benefits of asset management as: • Enhanced customer satisfaction from improved performance and control of product or service. • Delivery to the required standards. • Improved health, safety, and environmental performance. Optimized return on investment and/or growth. • Long-term planning, confidence, and performance sustainability. • The ability to demonstrate best value for money within a constrained funding regime. • Evidence, in the form of controlled and systematic processes, to demonstrate legal, regulatory, and statutory compliance. • Improved risk management and corporate governance and a clear audit trail for the appropriateness of decisions taken and their associated risks. • Improved corporate reputation, the benefits of which may include enhanced shareholder value, improved marketability of product/service, greater staff satisfaction, and more efficient and effective procurement from the supply chain. • The ability to demonstrate that sustainable development is actively considered within the management of the assets over their lifecycles.
  • 5. • Asset management policy sets the framework for the management of airport infrastructure and assets. • The statements are intended to guide the airport organization by specifying the minimum set of considerations and actions to be undertaken by staff in the execution of asset management analysis and decision making and the development of asset strategies Purpose of an Asset Management Policy Figurer 1. EPA’s 5 core questions in a 10-step approach to developing asset management plans
  • 6. Staff Competencies and Training Implementation of an asset management framework usually requires increased scrutiny of investments to consider economic, social, and environmental impacts, and risk reduction and levels of service assessment. This indicates that additional skill sets may be required by airport management, including:  Engineering economics and investment modeling.  Reliability analysis and risk assessment.  Maintenance management.
  • 7. Figure 2. Roles and competencies for an Asset Management Organization.
  • 8. Asset Management Framework The asset management policy sets the framework for the management of airport infrastructure and assets. Each policy statement is endorsed and upheld by all executive staff. The statements are intended to guide the airport organization by specifying the minimum set of considerations and actions to be undertaken by staff in the execution of asset management analysis and decision making and the development of asset strategies. Figure 3. Holistic integration of processes and systems for asset management.
  • 9. Airport Information Systems for Asset Management An effective asset management program typically requires a holistic approach with integration or coordination between information systems to support strategic requirements: 1. Financial system. 2. Customer complaint/inquiry system. 3. Complete asset registry and hierarchy. 4. Geographical information system. 5. CMMS or EAMS. 6. Electronic document management system for operations and maintenance manuals and as-built drawings. 7. Data warehouse for data sharing between applications. 8. Facilities management system.
  • 10. Figure 4. Schematic of asset management information systems for large airports. Figure 4. shows a schematic example of an airport asset management information system for large airports
  • 11. References • National Academies of Sciences, Engineering, and Medicine 2012. Asset and Infrastructure Management for Airports Primer and Guidebook. Washington, DC: The National Academies Press. https://doi.org/10.17226/22760.