Course Contents
i. Agile Revision
i. Mainfesto, values, Principals and methodologies
of Agile.
ii. Scrum
i. Tineline and Activities
ii. Product backlog & user stories.
iii.Measuring productivity, estimates and due dates
iii.Scrum vs other Agile methodologies.
● What could go wrong? And, How to fix?
Agile Revision
Mainfesto, values and roles
Waterfall Model
Waterfall
● Requirements are very
well documented, clear
and fixed
● Product definition is
stable
● Works well for smaller
projects where
requirements are very
well understood
● Process and results are
well documented
● No working software is
produced until late
● Cannot accommodate
changing requirements.
● Not a good model for
complex projects
Project Constrain and why it's
important
Waterfall problem in 1990s
● There were a frustration in the 1990s because The
enormous time lag between business requirements
(the applications and features customers were
requesting) and the delivery of technology that
answered those needs.
● Many projects were canceled
● Many projects were difficult to be altered.
Agile Manfesto Meeting
Agile Manfesto meeting
The Four Values of The Agile
Manifesto
● Individuals and interactions over processes and
tools.
● Working software over comprehensive
documentation.
● Customer collaboration over contract
negotiation.
● Responding to change over following a plan.
That is, while there is value in the items on
the right, we value the items on the left more.
The Twelve Agile Manifesto
Principles
● Customer satisfaction through early and continuous
software delivery
● Accommodate changing requirements throughout
the development process
● Frequent delivery of working software
● Enable face-to-face interactions – Communication is
more successful when development teams are co-
located.
The Twelve Agile Manifesto
Principles
● Support, trust, and motivate the people involved –
Motivated teams are more likely to deliver their
best work than unhappy teams.
● Self-organizing teams encourage great
architectures, requirements, and designs – Skilled
and motivated team members who have decision-
making power, take ownership, communicate
regularly with other team members, and share
ideas that deliver quality products.
The Twelve Agile Manifesto
Principles
● Working software is the primary measure of
progress.
● Agile processes to support a consistent development
pace – Teams establish a repeatable and
maintainable speed at which they can deliver
working software
The Twelve Agile Manifesto
Principles
● Collaboration between the business stakeholders and
developers throughout the project
● Attention to technical detail and design enhances
agility – The right skills and good design ensures the
team can maintain the pace, constantly improve the
product, and sustain change.
The Twelve Agile Manifesto
Principles
● Simplicity – Develop just enough to get the job
done for right now.
● Regular reflections on how to become more
effective – Self-improvement, process
improvement, advancing skills, and techniques
help team members work more efficiently.
Agile methodologies
The Agile methodologies outlined below share
much of the same overarching philosophy,
however, each has its own unique mix of practices,
terminology, and tactics.
● Scrum
● Kanban
● Extreme Programming (XP)
Agile methods differes on
● Roles
● Timeline, due dates
● Measurment of productivity
● Handling changes
● Type of projects fit for.
Agile Team Values
SCRUM Methodology
Principals
1. Empirical Process Control
2. Self-organization (Shared-Ownership)
3. Collaboration
4. Value-based Prioritization
5. Time-boxing
6. Iterative Development
Time Boxed Sprints
Scrum Aspects
Traditional software team vs
SCRUM team
● The traditional software team
is organized hierarchically,
with an assigned manager “on
top” and developers
“below.” .
● PM is responsible for
managing every thing!
● Self-Managed Agile teams,
on the other hand, are cross-
functional groups where
“individuals manage their
own workload, shift work
among themselves based on
need and best fit, and
participate in team decision
making.
● Team is fully responsible
with along with PO and
scrum master
Roles
PO Role
Scrum Master Role
3- The Scrum Team
● Cross-functionality
● Self-organization
● Collaboration
Cross-Functional
Self-organizing
Collabortaion
● Individuals working together need to be aware of
each other’s work.
● Collaborating individuals must partition work into
units, divide the units among team
● members, and then after the work is done,
reintegrate it.
● Identify risks
● Continous improvments
Tech vs Business
● Targets , sales, usability, Money
orianted
● Projects driven purely by
business people, impossible to
implement due to technology
problems.
● Code and quality orianted.
● Projects driven purely by
technical people don't make a
sustainable business.
Stop thinking about “us vs them”
and start building solutions together,
which fulfil the given requirements.
Confliect resolution
● Win Win
● Win Lose
● Lose Lose
●
Lose Win
● Listen, understand then
speak out
● Be imparcial
● Consider the other person's
constrain
●
Smooth and acomodate
● Explain in easy to
understand terms.
● Delay till you think
through.
● Get back to the team.
Scrum Meetings
All is time boxed
Sprints must have
● A specified goal.
● Set of Product backlog items selected from the product back log
each has acceptance criteria. And the priority of each item
should be known.
● Team with defined Capacity
● Time boxed length.
● Tool to help planing and monitor progress.
Sprint Activities
Sprint Zero Goals
● Create the project’s skeleton.
● Setting the project environment.
● Develop epics.
● A release plan assigning each epic/stories to a
release.
● Create user stories.
● Epic, feature, user story, task, sub task, technical
user story , bug, and spike.
Stability sprint / Bug sprints
● A Bug Sprint is a sprint specifically for fixing
bugs and increase stability.
● Needed when velocity in previous sprints are high
and testing is low.
● Bugs and code to be refactore are a technical dept.
Sprint planning meeting
● It is Timeboxed to eight hours for a one-month
Sprint
● This meeting have two parts:
● Objectives part 50% of time
– Sprint Goal
– User stories
● Capacity and estimate part 50% of time
– Team capacity.
– Tasks estimate.
– Assignment.
Team Capacity Calculation
The available hours of the Agile team for the upcoming Sprint.
Capacity TFS
Remember ..
● Put time for meetings.
● Put time for week ends, national holidays
and individual vacations and ask team to
menaion any possible planned vacation
ahead.
● Keep focus factor for any thing that can not
be plan. That value can vary 75% to 95%
Team Velocity
By looking at the amount of work your team completed in previous
sprints, you should be able to estimate how much work they can do
in future sprints. In Agile development, this estimate is known as
sprint velocity.
- Sprint 1: 3 user stories x 8 story points = 24
- Sprint 2: 4 user stories x 8 story points = 32
- Sprint 3: 5 user stories x 8 story points = 40
- Total = 96
So, your average sprint velocity is 96 ÷ 3 = 32
Sprint planning
1- Objectives of the sprint
● Sprint Goal
● User stories
2- Estimating the capacity of the team.
The team is also responsible for estimating how much time
each member has for Sprint-related work. Most team
member’s days will not be dedicated entirely to Sprint work.
Team capacity = 300 Hours
Sprint Planning meeting
3- Identify and estimate tasks
the Product Owner and team to work together to break each
item down into individual tasks. Those tasks can then be
assigned an estimated time to complete.
- Tasks capacity can't exceed Team capacity, it's advisable
to leave 10% buffer for risks.
- The Product Owner will play a huge part in helping the
team fully understand each item so that they can break
things up to tasks.
Story takes about 2-3 calendar days (rule of thumb)
Sprint Planning
4- Task Assignment
Once your team has finalized member availability as well as
the time needed for each task, the team then begins
determining who will complete each item by volunteering.
The final workload of each individual must be reasonable
and fair.
TFS Sprint Planning
Sprint Planning Sheet
Put tasks in KanBan board
Stand Up meeting
● Select a casual location.
● Make time for appreciation
● Get update about progress
i. What have a recently accomplished?
ii.What are my in-progress tasks and/or plans?
iii.What obstacles are impeding my progress?
Standup meeting cont
● When there is reported problem:
● Help or communication from PO to explain
feature
● Needed data from the client
● Technical help needed
● Error or a bug without a suspect (Back end /
Mobile) => Separate meeting
Stand up meeting Cont
● Resource is later than estimate
– Re-assignment
– Negociate cutting stories from his scope
– Any resource idle
– Investigate Reason of the delay
● Some times it could be a good idea to invite
client or other stackholders to attend stand
up meeting, if they wont interrupt the
activities.
Review Meeting
● Attendees include the Scrum Team and key
stakeholders invited by the Product Owner at the
end of each sprint.
● Goals:
● PO explains what Product Backlog items have
been “Done” and what has not been “Done”.
● Team demonestrates the new features.
● Adapt the Product Backlog, and re-evaluate
priorities on what to do next.
● PO review the timeline and projects delivery
dates based on progress to date (if needed).
Retrosperct Meeting
● Within a week after a release. Could also held after
each sprint.
● Every retrospective should at a minimum result in a
list of “things that went well” and “things that could
use improvement.”
● Explore every aspect of the project, from locking
in the requirements to coding, Scheduling, resource
allocation, documentation, communication,
testing… they’re all viable topics for the discussion.
Backlog grooming sessions
● One of the Product Owner’s key responsibilities is
grooming the Prioritized Product Backlog.
● The Product Owner should invite stakeholders
whose feedback is required.
● Goals of Groming sessions:
● Refine requirments into suitable User Stories.
● Reperioritze user stories to match customer
change of prioritues.
● Estimate/re-setimate user stories
– Till sprint planning meeting any item in the
backlog is open for restimate.
Burn down chart
Agile Revision
Analysis
Epics, Features, User stories,
Technical user stories, spikes ,
Tasks and Sub tasks.
Software Requirments
Specifications
● Summery
● Product Description
● Functional
Requirments
● Non functional
requirments
● Large document
● Extreamed detailed
upfront
● Big upfront
commitment
Product Backlog
● Set of simple requirments (user stories)
● Periotitized
● Continous customer collaboration
Hirarchy of Backlog
Theme
A theme is a goal or an
abjective that is
correspond to a group
of business value that
customers can
understand.
Epic
● larger bodies of work (than tasks and stories),
which can be the building blocks of themes.
● is a collection of multiple tasks or user stories. It
is responsible for producing a major deliverable.
● A large user story that we need to break down
further.
A User Story is ...
● Valuable
Reprisents one new feature.
● Deployable / Shipable
● Testable
● Estimatable
● Small
For a 2 week sprint, it's better if every story can be completed in 1 to 3
days.
● CCC
Card, Conversation, Confirmation.
Writing a good user story
Acceptance criteria
Very simple User story
● As a User I want to see a newspage to read the latest
news.
● What could Go wrong :D
● Possible Design damage by missing images
● Possible security vulenrability by showing a maleware/malisious file
● Possible Null exception if no news yet
● Possible exception number of news less than number of items per
page.
● Possible Null exception if a news item is entered in approriatly (empty
title or empty summery)
● Possible random error that is totally not your fault yet annoy the user.
Acceptance criteria example
● A user should see:
● Latest 10 (or less) saved news items (Order DEC by date)
● Each news item has : - A thumnail
- Type JPG, Exact dimension (50 x 50)
- Size 100 KB or less.
- a summery (max 150 characters)
● Edge Cases:
● If a news item dosn't have an image, a default image should be loaded.
● If saved image with incorrect size, mime type or dimension, the default
image should be loaded
● if no news in DB, Error Message M20 should appear
● If saved news items are less than 10 show them.
● if Message is more than 150 charactersTruncate summery.
● If summery is Null/empty don't show this news item.
● If unknown error appear, show message to refresh page and try again.
● If a news item dosn't have an image, a default image should be loaded.
Possible Design damage by missing images
● If saved image with incorrect size, mime type or dimension, the default
image should be loaded
Possible security vulenrability
● if no news in DB, Error Message M20 should appear
Possible Null exception
● If saved news items are less than 10 show them.
Possible exception
● If summery is Null/empty don't show this news item
Possible Null exception
● If unknown error appear, show message to refresh page and try again.
Possible random error that cause company to complain.
Splitting and Combining user stories.
Splitting user stories
● To deploy faster and be able to delay some of the
work for later.
● For better analysis, focus, negociation, testing and
estimate
● How?
● At mixed priorites acceptance criteria
● At Cross cutting concern
● Separating needed performance optimizations
as separate user stories
Are all acceptance criteria with
same priroity?
● If yes then all of them should be done
● If no, you have a mixed priorities in same user
story
● you can separate the lower priority
acceptance criteria to another user story in
a future release if you need time.
Mixed Priorities example
● To simplify, If there is a need to show along with
the news a pagger to pagginate to old news it
could be a part of the same user story or split it to
a new user story
● As a user I need to pagginate the news to check
old news.
Cross cutting concern separation
● An acceptance criteria that is needed in many user
stories. So it need to be separated as a user story
to decrease development time
● Examples :
● Rondom error handler
● Checking that a certain access being done by
authenticated access.
Splitting user stories for
Performance optimization
● Behind the scene stories that require more
optimization.
● As A user I want to see the news
● As A user I want to see the news in less than 30
seconds.
Spikes
● a spike is a story that cannot be estimated until a
development team runs a time-boxed
investigation. The output of a spike is an estimate
for the original story.
● Spikes represents risks, so it's good to do them
early on in the release and be resolved quickly.
Technical user stories what, when
and how?
● A Technical User Story is one focused on non-
functional support of a system.
● Dosn't add new behaviour
● Infrastructure stories
● For example, implementing back-end skilliton,
performance optimization or needed code refactor
for a module.
● No need a standerd formats, just write them in plain
english.
Technical user stories what, when
and how?
● Usually forgotten while planing or backlog
gromming sessions.
● Stack holders usually gravitate toward
functionality first
● No demo
Combining user stories
● Work needed in same itration
● User stories very related
● Each are very easy to be implemented by the team
● Forgot password and reset password
combining
● Login and Logout
Game with prizes
Guess The edge cases like a detective
Round No 1
As a Manger I want recieve a daily sales report
by email to monitor my sales progress.
Acceptance Criteria
● The report should be in PDF format
● The report should be sent to Manger's email
with subject M20 and Message M21
● The report should be sent from
● The report should include all sales done in
the sent date. Needed columns:
OrderId, Date, Package name, price,
Customer Country and Customer name
Guess Edge cases
Edge cases
● If no sales this day no email should be sent.
● If email server error, an SMS should be sent to
admin.
● All sent email should be logged in daily log file
with sent date.
● If customer name or any other report field
contains latin characters it should be correctly
encoded in the pdf report.
- Theme: Having HQ Movies Reviews
articles To increase user involvment
● Epic
As a Marketing Lead, I
want to have a content
management system so
that I can manage and
provide quality content
to users.
● As a content owner I
should see all my drafts to
edit or delete one of them
● As a Content Owner, I
want to be able to create
content to provide
information.
.
● As an Editor, I want to
review assigned content
before it is published so
that I can assure it is
optimized.
Round 2
As a Content Owner, I want to be able to create content
to provide information..
Acceptance Criteria
●Users should be logged in as Content owners
to post a new content
●User should be able to add title, summery and
body of the new content
●User should save draft for later.
●User should assign his content to an editor for
review.
●Each content should belong to one Content
owner and be assigned to a single one editor.
Edge cases
● Only admins and content owners can create
content. If anaymous user or a logged in user with
different role tries to post a content he should get
403 messge M20
● If content owner posts an article with empty title,
summery or body he should recieve message M21
● If no editors in system the Assign drop down
menu should be disabled.
● When clicking assign without selecting an Auther
M22 should be recieved.
Round 3
● As A user I want to reset my password to enter
my account if I forgot my password.
Acceptance criteria
● User should click on a 'Forgot Password' link in the login
page.
● In the forgot screen user should enter his saved email address
correctly first to recieve a Message M10 on screen and a reset
password email should be sent to this saved email address.
● The reset password email should has subject M15 , and body
M16 and sent from email address ---------
● The email should contain a reset link with a secure token that
is valid for 60 minutes.
● The reset link should redirect the user to reset page to enter a
new strong password twice (containig at least one uppercase,
one digit and length between 8 and 16 chars)
● After reset user should be recieve a confirmation M11.
Edge Cases
● If user enters wrong email address he should get
M12 message.
● If email server gets an error it should send SMS to
admin
● If token is expired or not correct user should get
error message M13.
● If new password is not strong user should get
M14
Q & A about Scrum
Agile is not a set of practices; this is a frame of
mind.
What could go wrong when applying scrum?
Top 12 Problems
What could go wrong with SCRUM
1- Too little flexibility
Agile projects often fall down because of rigid
procurement practices. A large organization will
appoint a supplier to deliver an agile project, but
with a contract that ties them to fixed
deliverables.
● You have to have contracts allowing Agile.
2- Lack of support from the top
“An urgent problem or request crops up and
everyone is forced to scatter like ants.”“Too often
management either doesn’t understand or doesn’t
care about the constraints required of agile.
● You have to make big efforts in conviencing Top
managment with Agile and get them included.
3- Incomplete User stories
Often when teams sit down to complete estimates
for the upcoming sprints, user stories are
incomplete. This results in the inability to
properly estimate, the likelihood of scope creep,
and an inability to deliver what was originally
planned.
● Good PO is a must & Get them certified if
possible
● Missing Acceptance criteria or Edge cases is a
future bug.
4- Agile ≠ Scrum
● Many people believe that Scrum equals Agile.
But Scrum is a framework for managing a project,
while Agile is a philosophy based on certain
principles. And Scrum is only one of many
methodologies built on agile principles.
5- Forgetting about modelling and design
● One of the Agile principle says “favouring
working software over documentation”, so it
might be tempting to skip all modelling and
design activities and only write code. But because
you’re doing agile, it doesn’t mean you “can’t”
model or design. Just the other way round – when
you’re trying to solve a really hard problem, all
means are important to figure out the right
solution.
6- No communication between technical and
business
The client needs to be able to communicate with
you and your teams on a constant basis.
● Agile depends on close, frequent interaction with
the customer.
7- No capacity / velocity planning.
Not measuring team velocity and estimating its
capacity may end up having burned or idle teams.
It's problematic in eaither ways.
8- No risk control
Risk Controls – If you don’t employ some risk
management techniques within your agile
development, you will have problems.
● You need to identify and mitigate risks a head
with each sprint / release planning.
● Have planned spikes , use pear programming at
difficult tasks, consult experts
What could goes wrong
9- No Product Roadmap
● RoadMap is a strategic tool which shows how the
product is expected to grow in phases (over time
and across a number of major releases).
● Scrum artifacts are Product backlog, sprint
backlog and Product Roadmap.
● Template for roadmap :
https://slideuplifts.medium.com/creative-ready-to-use-p
What could goes wrong
10- Poor product back log
● Backlog is not dynamic.
● Back log is not a living refrence.
● No product backlog grooming / refinemnt
sessions.
● Product backlog is not orderd correctly.
Holding backlog refinement / grooming meetings
ensures it happens regularly and it provides
another opportunity for the entire Scrum Team to
discuss the issues.
What could goes wrong
11- No retrospective meetings.
Feedback about the process remains hidden.
12- Micromanagment and lack of transperancy.
Self-Managed team that is shared responsability is
a core Agile proncipale. Doing Micromanagment
or not sharing necessary information about project
vison and growth plan with team prevents this
from happening.
Other Agile Methodologies
2- XP
XP
● XP is Scrum with technical practices. It’s
mindset/behavior and a more prescriptive
approach with a strong feedback loop.
● The iterations are 1-2 weeks or less.
● You can combine Scrum + XP
Any Scrum team can make its work more
effective by implementing some XP practices.
XP Engineering practices
● Code Refactoring
● Collective ownership of code
● TDD and automated testing
● Pair programming
● Small Releases with MVP first
● Simple design
● System Metaphor
Scrum Vs XP
● The iteration is between 2 to 4 weeks. The
iterations are 1-2 weeks or less. For very
aggressive teams, it can go up to a day.
● In scrumChanges in the sprint are not allowed.
whileXP Teams are much more amenable to
change within their iterations, but change can
only be made if the team hasn’t started working
on a feature and at the same time the change is of
the equivalent of the swapped item.
●
Scrum Vs XP
● In scrumThe testing of the software is completed
almost at the end of each sprint, (i.e. Sprint
Review) while in XP The software needs to be
validated at all times, to the extent that the tests
are written prior to the actual software. TDD
● Scrum doesn’t prescribe any engineering practices
while XP does.
● The Scrum Master is responsible for what is done
in the Sprint, including the code that is written A
developer can modify or refactor the parts of the
code as and when the need arises.
Roles in XP
● A typical XP team includes six roles.
● The customer is the person who is responsible for
writing user stories, setting priorities and
formulating the product backlog.
● The programmer is an ordinary developer, who
writes the code and performs the entire amount of
project tasks.
● The coach is the person who watches the team’s
work, controls it, and teaches its members to
implement the most effective practices.
●
Roles in XP
● The tracker is the person whose main task is to
monitor the progress of software development and
to detect all problems in it.
● The tester is the team member responsible for
product testing. The quality of the final product
strongly depends on his work.
● The doomsayer is the person who tracks the
project risks and warns the team about them.
Compirisons
Other Agile Methodologies
3- KanBan
KanBan Improve Flexibility
Kanban respects your organization's current state,
and it doesn’t require revolutionary changes. On the
contrary, it suggests that you should pursue
incremental, evolutionary change and continuously
improve.
Comprison
KanBan Practices
1-Visualize work flow
Visualize work flow
● Kanban reveals bottlenecks in your workflow
● Once you build a Kanban board and you fill it
with cards, you will see that some columns will
get overcrowded with tasks. This will help you
spotlight bottlenecks in your workflow and tackle
them properly.
2- WIP Limit
- WIP is the number of task items that a team is
currently working on.
-Limiting WIP means implementing a pull
system on parts or the complete workflow.
Setting maximum items per stage ensures that
a card is only “pulled” into the next step when
there is available capacity.
2- WIP
● WIP limits allows you to complete single work
items faster by helping your team focus only on
current tasks.
● In a team of two, installing a limit on work in
progress of one task per person would prevent
context-switching and immediately reveal the
difference in throughput rates
2-WIP
● WIP limits should not be exceeded at any cost
unless there is an urgent task that needs to be
considered the highest priority.
Measuring cycle time
3- Managing Flow
● One of the main goals when implementing a
Kanban system is to create a smooth, healthy
flow. Instead of micro-managing people and
trying to keep them busy all the time
4. Feedback Loops
● An example of a feedback loop is the daily stand
up meeting for team synchronization. It takes
place in front of the Kanban board, and every
member tells the others what they did the
previous day and what they will be doing today.

Agile Course

  • 1.
    Course Contents i. AgileRevision i. Mainfesto, values, Principals and methodologies of Agile. ii. Scrum i. Tineline and Activities ii. Product backlog & user stories. iii.Measuring productivity, estimates and due dates iii.Scrum vs other Agile methodologies. ● What could go wrong? And, How to fix?
  • 2.
  • 3.
  • 4.
    Waterfall ● Requirements arevery well documented, clear and fixed ● Product definition is stable ● Works well for smaller projects where requirements are very well understood ● Process and results are well documented ● No working software is produced until late ● Cannot accommodate changing requirements. ● Not a good model for complex projects
  • 5.
    Project Constrain andwhy it's important
  • 6.
    Waterfall problem in1990s ● There were a frustration in the 1990s because The enormous time lag between business requirements (the applications and features customers were requesting) and the delivery of technology that answered those needs. ● Many projects were canceled ● Many projects were difficult to be altered.
  • 7.
  • 8.
  • 9.
    The Four Valuesof The Agile Manifesto ● Individuals and interactions over processes and tools. ● Working software over comprehensive documentation. ● Customer collaboration over contract negotiation. ● Responding to change over following a plan. That is, while there is value in the items on the right, we value the items on the left more.
  • 10.
    The Twelve AgileManifesto Principles ● Customer satisfaction through early and continuous software delivery ● Accommodate changing requirements throughout the development process ● Frequent delivery of working software ● Enable face-to-face interactions – Communication is more successful when development teams are co- located.
  • 11.
    The Twelve AgileManifesto Principles ● Support, trust, and motivate the people involved – Motivated teams are more likely to deliver their best work than unhappy teams. ● Self-organizing teams encourage great architectures, requirements, and designs – Skilled and motivated team members who have decision- making power, take ownership, communicate regularly with other team members, and share ideas that deliver quality products.
  • 12.
    The Twelve AgileManifesto Principles ● Working software is the primary measure of progress. ● Agile processes to support a consistent development pace – Teams establish a repeatable and maintainable speed at which they can deliver working software
  • 13.
    The Twelve AgileManifesto Principles ● Collaboration between the business stakeholders and developers throughout the project ● Attention to technical detail and design enhances agility – The right skills and good design ensures the team can maintain the pace, constantly improve the product, and sustain change.
  • 14.
    The Twelve AgileManifesto Principles ● Simplicity – Develop just enough to get the job done for right now. ● Regular reflections on how to become more effective – Self-improvement, process improvement, advancing skills, and techniques help team members work more efficiently.
  • 15.
    Agile methodologies The Agilemethodologies outlined below share much of the same overarching philosophy, however, each has its own unique mix of practices, terminology, and tactics. ● Scrum ● Kanban ● Extreme Programming (XP)
  • 16.
    Agile methods differeson ● Roles ● Timeline, due dates ● Measurment of productivity ● Handling changes ● Type of projects fit for.
  • 17.
  • 18.
  • 19.
    Principals 1. Empirical ProcessControl 2. Self-organization (Shared-Ownership) 3. Collaboration 4. Value-based Prioritization 5. Time-boxing 6. Iterative Development
  • 23.
  • 24.
  • 25.
    Traditional software teamvs SCRUM team ● The traditional software team is organized hierarchically, with an assigned manager “on top” and developers “below.” . ● PM is responsible for managing every thing! ● Self-Managed Agile teams, on the other hand, are cross- functional groups where “individuals manage their own workload, shift work among themselves based on need and best fit, and participate in team decision making. ● Team is fully responsible with along with PO and scrum master
  • 26.
  • 27.
  • 28.
  • 29.
    3- The ScrumTeam ● Cross-functionality ● Self-organization ● Collaboration
  • 30.
  • 31.
  • 32.
    Collabortaion ● Individuals workingtogether need to be aware of each other’s work. ● Collaborating individuals must partition work into units, divide the units among team ● members, and then after the work is done, reintegrate it. ● Identify risks ● Continous improvments
  • 34.
    Tech vs Business ●Targets , sales, usability, Money orianted ● Projects driven purely by business people, impossible to implement due to technology problems. ● Code and quality orianted. ● Projects driven purely by technical people don't make a sustainable business. Stop thinking about “us vs them” and start building solutions together, which fulfil the given requirements.
  • 35.
    Confliect resolution ● WinWin ● Win Lose ● Lose Lose ● Lose Win ● Listen, understand then speak out ● Be imparcial ● Consider the other person's constrain ● Smooth and acomodate ● Explain in easy to understand terms. ● Delay till you think through. ● Get back to the team.
  • 36.
  • 37.
  • 38.
    Sprints must have ●A specified goal. ● Set of Product backlog items selected from the product back log each has acceptance criteria. And the priority of each item should be known. ● Team with defined Capacity ● Time boxed length. ● Tool to help planing and monitor progress.
  • 39.
  • 40.
    Sprint Zero Goals ●Create the project’s skeleton. ● Setting the project environment. ● Develop epics. ● A release plan assigning each epic/stories to a release. ● Create user stories. ● Epic, feature, user story, task, sub task, technical user story , bug, and spike.
  • 41.
    Stability sprint /Bug sprints ● A Bug Sprint is a sprint specifically for fixing bugs and increase stability. ● Needed when velocity in previous sprints are high and testing is low. ● Bugs and code to be refactore are a technical dept.
  • 42.
    Sprint planning meeting ●It is Timeboxed to eight hours for a one-month Sprint ● This meeting have two parts: ● Objectives part 50% of time – Sprint Goal – User stories ● Capacity and estimate part 50% of time – Team capacity. – Tasks estimate. – Assignment.
  • 43.
    Team Capacity Calculation Theavailable hours of the Agile team for the upcoming Sprint.
  • 44.
  • 45.
    Remember .. ● Puttime for meetings. ● Put time for week ends, national holidays and individual vacations and ask team to menaion any possible planned vacation ahead. ● Keep focus factor for any thing that can not be plan. That value can vary 75% to 95%
  • 46.
    Team Velocity By lookingat the amount of work your team completed in previous sprints, you should be able to estimate how much work they can do in future sprints. In Agile development, this estimate is known as sprint velocity. - Sprint 1: 3 user stories x 8 story points = 24 - Sprint 2: 4 user stories x 8 story points = 32 - Sprint 3: 5 user stories x 8 story points = 40 - Total = 96 So, your average sprint velocity is 96 ÷ 3 = 32
  • 47.
    Sprint planning 1- Objectivesof the sprint ● Sprint Goal ● User stories 2- Estimating the capacity of the team. The team is also responsible for estimating how much time each member has for Sprint-related work. Most team member’s days will not be dedicated entirely to Sprint work. Team capacity = 300 Hours
  • 48.
    Sprint Planning meeting 3-Identify and estimate tasks the Product Owner and team to work together to break each item down into individual tasks. Those tasks can then be assigned an estimated time to complete. - Tasks capacity can't exceed Team capacity, it's advisable to leave 10% buffer for risks. - The Product Owner will play a huge part in helping the team fully understand each item so that they can break things up to tasks. Story takes about 2-3 calendar days (rule of thumb)
  • 49.
    Sprint Planning 4- TaskAssignment Once your team has finalized member availability as well as the time needed for each task, the team then begins determining who will complete each item by volunteering. The final workload of each individual must be reasonable and fair.
  • 50.
  • 51.
  • 52.
    Put tasks inKanBan board
  • 53.
    Stand Up meeting ●Select a casual location. ● Make time for appreciation ● Get update about progress i. What have a recently accomplished? ii.What are my in-progress tasks and/or plans? iii.What obstacles are impeding my progress?
  • 54.
    Standup meeting cont ●When there is reported problem: ● Help or communication from PO to explain feature ● Needed data from the client ● Technical help needed ● Error or a bug without a suspect (Back end / Mobile) => Separate meeting
  • 55.
    Stand up meetingCont ● Resource is later than estimate – Re-assignment – Negociate cutting stories from his scope – Any resource idle – Investigate Reason of the delay ● Some times it could be a good idea to invite client or other stackholders to attend stand up meeting, if they wont interrupt the activities.
  • 56.
    Review Meeting ● Attendeesinclude the Scrum Team and key stakeholders invited by the Product Owner at the end of each sprint. ● Goals: ● PO explains what Product Backlog items have been “Done” and what has not been “Done”. ● Team demonestrates the new features. ● Adapt the Product Backlog, and re-evaluate priorities on what to do next. ● PO review the timeline and projects delivery dates based on progress to date (if needed).
  • 57.
    Retrosperct Meeting ● Withina week after a release. Could also held after each sprint. ● Every retrospective should at a minimum result in a list of “things that went well” and “things that could use improvement.” ● Explore every aspect of the project, from locking in the requirements to coding, Scheduling, resource allocation, documentation, communication, testing… they’re all viable topics for the discussion.
  • 58.
    Backlog grooming sessions ●One of the Product Owner’s key responsibilities is grooming the Prioritized Product Backlog. ● The Product Owner should invite stakeholders whose feedback is required. ● Goals of Groming sessions: ● Refine requirments into suitable User Stories. ● Reperioritze user stories to match customer change of prioritues. ● Estimate/re-setimate user stories – Till sprint planning meeting any item in the backlog is open for restimate.
  • 59.
  • 60.
    Agile Revision Analysis Epics, Features,User stories, Technical user stories, spikes , Tasks and Sub tasks.
  • 61.
    Software Requirments Specifications ● Summery ●Product Description ● Functional Requirments ● Non functional requirments ● Large document ● Extreamed detailed upfront ● Big upfront commitment
  • 62.
    Product Backlog ● Setof simple requirments (user stories) ● Periotitized ● Continous customer collaboration
  • 63.
  • 64.
    Theme A theme isa goal or an abjective that is correspond to a group of business value that customers can understand.
  • 65.
    Epic ● larger bodiesof work (than tasks and stories), which can be the building blocks of themes. ● is a collection of multiple tasks or user stories. It is responsible for producing a major deliverable. ● A large user story that we need to break down further.
  • 66.
    A User Storyis ... ● Valuable Reprisents one new feature. ● Deployable / Shipable ● Testable ● Estimatable ● Small For a 2 week sprint, it's better if every story can be completed in 1 to 3 days. ● CCC Card, Conversation, Confirmation.
  • 67.
    Writing a gooduser story
  • 68.
  • 69.
    Very simple Userstory ● As a User I want to see a newspage to read the latest news. ● What could Go wrong :D ● Possible Design damage by missing images ● Possible security vulenrability by showing a maleware/malisious file ● Possible Null exception if no news yet ● Possible exception number of news less than number of items per page. ● Possible Null exception if a news item is entered in approriatly (empty title or empty summery) ● Possible random error that is totally not your fault yet annoy the user.
  • 70.
    Acceptance criteria example ●A user should see: ● Latest 10 (or less) saved news items (Order DEC by date) ● Each news item has : - A thumnail - Type JPG, Exact dimension (50 x 50) - Size 100 KB or less. - a summery (max 150 characters) ● Edge Cases: ● If a news item dosn't have an image, a default image should be loaded. ● If saved image with incorrect size, mime type or dimension, the default image should be loaded ● if no news in DB, Error Message M20 should appear ● If saved news items are less than 10 show them. ● if Message is more than 150 charactersTruncate summery. ● If summery is Null/empty don't show this news item. ● If unknown error appear, show message to refresh page and try again.
  • 71.
    ● If anews item dosn't have an image, a default image should be loaded. Possible Design damage by missing images ● If saved image with incorrect size, mime type or dimension, the default image should be loaded Possible security vulenrability ● if no news in DB, Error Message M20 should appear Possible Null exception ● If saved news items are less than 10 show them. Possible exception ● If summery is Null/empty don't show this news item Possible Null exception ● If unknown error appear, show message to refresh page and try again. Possible random error that cause company to complain.
  • 72.
  • 73.
    Splitting user stories ●To deploy faster and be able to delay some of the work for later. ● For better analysis, focus, negociation, testing and estimate ● How? ● At mixed priorites acceptance criteria ● At Cross cutting concern ● Separating needed performance optimizations as separate user stories
  • 74.
    Are all acceptancecriteria with same priroity? ● If yes then all of them should be done ● If no, you have a mixed priorities in same user story ● you can separate the lower priority acceptance criteria to another user story in a future release if you need time.
  • 75.
    Mixed Priorities example ●To simplify, If there is a need to show along with the news a pagger to pagginate to old news it could be a part of the same user story or split it to a new user story ● As a user I need to pagginate the news to check old news.
  • 76.
    Cross cutting concernseparation ● An acceptance criteria that is needed in many user stories. So it need to be separated as a user story to decrease development time ● Examples : ● Rondom error handler ● Checking that a certain access being done by authenticated access.
  • 77.
    Splitting user storiesfor Performance optimization ● Behind the scene stories that require more optimization. ● As A user I want to see the news ● As A user I want to see the news in less than 30 seconds.
  • 78.
    Spikes ● a spikeis a story that cannot be estimated until a development team runs a time-boxed investigation. The output of a spike is an estimate for the original story. ● Spikes represents risks, so it's good to do them early on in the release and be resolved quickly.
  • 79.
    Technical user storieswhat, when and how? ● A Technical User Story is one focused on non- functional support of a system. ● Dosn't add new behaviour ● Infrastructure stories ● For example, implementing back-end skilliton, performance optimization or needed code refactor for a module. ● No need a standerd formats, just write them in plain english.
  • 80.
    Technical user storieswhat, when and how? ● Usually forgotten while planing or backlog gromming sessions. ● Stack holders usually gravitate toward functionality first ● No demo
  • 81.
    Combining user stories ●Work needed in same itration ● User stories very related ● Each are very easy to be implemented by the team ● Forgot password and reset password combining ● Login and Logout
  • 82.
    Game with prizes GuessThe edge cases like a detective
  • 83.
    Round No 1 Asa Manger I want recieve a daily sales report by email to monitor my sales progress.
  • 84.
    Acceptance Criteria ● Thereport should be in PDF format ● The report should be sent to Manger's email with subject M20 and Message M21 ● The report should be sent from ● The report should include all sales done in the sent date. Needed columns: OrderId, Date, Package name, price, Customer Country and Customer name Guess Edge cases
  • 85.
    Edge cases ● Ifno sales this day no email should be sent. ● If email server error, an SMS should be sent to admin. ● All sent email should be logged in daily log file with sent date. ● If customer name or any other report field contains latin characters it should be correctly encoded in the pdf report.
  • 86.
    - Theme: HavingHQ Movies Reviews articles To increase user involvment ● Epic As a Marketing Lead, I want to have a content management system so that I can manage and provide quality content to users. ● As a content owner I should see all my drafts to edit or delete one of them ● As a Content Owner, I want to be able to create content to provide information. . ● As an Editor, I want to review assigned content before it is published so that I can assure it is optimized.
  • 87.
    Round 2 As aContent Owner, I want to be able to create content to provide information..
  • 88.
    Acceptance Criteria ●Users shouldbe logged in as Content owners to post a new content ●User should be able to add title, summery and body of the new content ●User should save draft for later. ●User should assign his content to an editor for review. ●Each content should belong to one Content owner and be assigned to a single one editor.
  • 89.
    Edge cases ● Onlyadmins and content owners can create content. If anaymous user or a logged in user with different role tries to post a content he should get 403 messge M20 ● If content owner posts an article with empty title, summery or body he should recieve message M21 ● If no editors in system the Assign drop down menu should be disabled. ● When clicking assign without selecting an Auther M22 should be recieved.
  • 90.
    Round 3 ● AsA user I want to reset my password to enter my account if I forgot my password.
  • 91.
    Acceptance criteria ● Usershould click on a 'Forgot Password' link in the login page. ● In the forgot screen user should enter his saved email address correctly first to recieve a Message M10 on screen and a reset password email should be sent to this saved email address. ● The reset password email should has subject M15 , and body M16 and sent from email address --------- ● The email should contain a reset link with a secure token that is valid for 60 minutes. ● The reset link should redirect the user to reset page to enter a new strong password twice (containig at least one uppercase, one digit and length between 8 and 16 chars) ● After reset user should be recieve a confirmation M11.
  • 92.
    Edge Cases ● Ifuser enters wrong email address he should get M12 message. ● If email server gets an error it should send SMS to admin ● If token is expired or not correct user should get error message M13. ● If new password is not strong user should get M14
  • 93.
    Q & Aabout Scrum Agile is not a set of practices; this is a frame of mind.
  • 94.
    What could gowrong when applying scrum? Top 12 Problems
  • 95.
    What could gowrong with SCRUM 1- Too little flexibility Agile projects often fall down because of rigid procurement practices. A large organization will appoint a supplier to deliver an agile project, but with a contract that ties them to fixed deliverables. ● You have to have contracts allowing Agile.
  • 96.
    2- Lack ofsupport from the top “An urgent problem or request crops up and everyone is forced to scatter like ants.”“Too often management either doesn’t understand or doesn’t care about the constraints required of agile. ● You have to make big efforts in conviencing Top managment with Agile and get them included.
  • 97.
    3- Incomplete Userstories Often when teams sit down to complete estimates for the upcoming sprints, user stories are incomplete. This results in the inability to properly estimate, the likelihood of scope creep, and an inability to deliver what was originally planned. ● Good PO is a must & Get them certified if possible ● Missing Acceptance criteria or Edge cases is a future bug.
  • 98.
    4- Agile ≠Scrum ● Many people believe that Scrum equals Agile. But Scrum is a framework for managing a project, while Agile is a philosophy based on certain principles. And Scrum is only one of many methodologies built on agile principles.
  • 99.
    5- Forgetting aboutmodelling and design ● One of the Agile principle says “favouring working software over documentation”, so it might be tempting to skip all modelling and design activities and only write code. But because you’re doing agile, it doesn’t mean you “can’t” model or design. Just the other way round – when you’re trying to solve a really hard problem, all means are important to figure out the right solution.
  • 100.
    6- No communicationbetween technical and business The client needs to be able to communicate with you and your teams on a constant basis. ● Agile depends on close, frequent interaction with the customer.
  • 101.
    7- No capacity/ velocity planning. Not measuring team velocity and estimating its capacity may end up having burned or idle teams. It's problematic in eaither ways.
  • 102.
    8- No riskcontrol Risk Controls – If you don’t employ some risk management techniques within your agile development, you will have problems. ● You need to identify and mitigate risks a head with each sprint / release planning. ● Have planned spikes , use pear programming at difficult tasks, consult experts
  • 103.
    What could goeswrong 9- No Product Roadmap ● RoadMap is a strategic tool which shows how the product is expected to grow in phases (over time and across a number of major releases). ● Scrum artifacts are Product backlog, sprint backlog and Product Roadmap. ● Template for roadmap : https://slideuplifts.medium.com/creative-ready-to-use-p
  • 104.
    What could goeswrong 10- Poor product back log ● Backlog is not dynamic. ● Back log is not a living refrence. ● No product backlog grooming / refinemnt sessions. ● Product backlog is not orderd correctly. Holding backlog refinement / grooming meetings ensures it happens regularly and it provides another opportunity for the entire Scrum Team to discuss the issues.
  • 105.
    What could goeswrong 11- No retrospective meetings. Feedback about the process remains hidden. 12- Micromanagment and lack of transperancy. Self-Managed team that is shared responsability is a core Agile proncipale. Doing Micromanagment or not sharing necessary information about project vison and growth plan with team prevents this from happening.
  • 106.
  • 107.
    XP ● XP isScrum with technical practices. It’s mindset/behavior and a more prescriptive approach with a strong feedback loop. ● The iterations are 1-2 weeks or less. ● You can combine Scrum + XP Any Scrum team can make its work more effective by implementing some XP practices.
  • 108.
    XP Engineering practices ●Code Refactoring ● Collective ownership of code ● TDD and automated testing ● Pair programming ● Small Releases with MVP first ● Simple design ● System Metaphor
  • 109.
    Scrum Vs XP ●The iteration is between 2 to 4 weeks. The iterations are 1-2 weeks or less. For very aggressive teams, it can go up to a day. ● In scrumChanges in the sprint are not allowed. whileXP Teams are much more amenable to change within their iterations, but change can only be made if the team hasn’t started working on a feature and at the same time the change is of the equivalent of the swapped item. ●
  • 110.
    Scrum Vs XP ●In scrumThe testing of the software is completed almost at the end of each sprint, (i.e. Sprint Review) while in XP The software needs to be validated at all times, to the extent that the tests are written prior to the actual software. TDD ● Scrum doesn’t prescribe any engineering practices while XP does. ● The Scrum Master is responsible for what is done in the Sprint, including the code that is written A developer can modify or refactor the parts of the code as and when the need arises.
  • 111.
    Roles in XP ●A typical XP team includes six roles. ● The customer is the person who is responsible for writing user stories, setting priorities and formulating the product backlog. ● The programmer is an ordinary developer, who writes the code and performs the entire amount of project tasks. ● The coach is the person who watches the team’s work, controls it, and teaches its members to implement the most effective practices. ●
  • 112.
    Roles in XP ●The tracker is the person whose main task is to monitor the progress of software development and to detect all problems in it. ● The tester is the team member responsible for product testing. The quality of the final product strongly depends on his work. ● The doomsayer is the person who tracks the project risks and warns the team about them.
  • 113.
  • 114.
  • 115.
    KanBan Improve Flexibility Kanbanrespects your organization's current state, and it doesn’t require revolutionary changes. On the contrary, it suggests that you should pursue incremental, evolutionary change and continuously improve.
  • 116.
  • 117.
  • 118.
  • 119.
    Visualize work flow ●Kanban reveals bottlenecks in your workflow ● Once you build a Kanban board and you fill it with cards, you will see that some columns will get overcrowded with tasks. This will help you spotlight bottlenecks in your workflow and tackle them properly.
  • 120.
    2- WIP Limit -WIP is the number of task items that a team is currently working on. -Limiting WIP means implementing a pull system on parts or the complete workflow. Setting maximum items per stage ensures that a card is only “pulled” into the next step when there is available capacity.
  • 121.
    2- WIP ● WIPlimits allows you to complete single work items faster by helping your team focus only on current tasks. ● In a team of two, installing a limit on work in progress of one task per person would prevent context-switching and immediately reveal the difference in throughput rates
  • 122.
    2-WIP ● WIP limitsshould not be exceeded at any cost unless there is an urgent task that needs to be considered the highest priority.
  • 124.
  • 125.
    3- Managing Flow ●One of the main goals when implementing a Kanban system is to create a smooth, healthy flow. Instead of micro-managing people and trying to keep them busy all the time
  • 126.
    4. Feedback Loops ●An example of a feedback loop is the daily stand up meeting for team synchronization. It takes place in front of the Kanban board, and every member tells the others what they did the previous day and what they will be doing today.