1. CURRICULAM VITAE
Name : Aftab Khan
Profession : Civil Engineer
Position : ARE roads.
Languages : English, Arabic, Urdu, Pashto, Farsi, Russian.
Date of Birth : 1967
Visa Validity : 16 July. 2015.
Passport No : GH 4119562 (Validity till 23 Dec 2018.)
Nationality : Pakistani
Marital Status : Married
Driving License : U.A.E (Valid) and Qatar Doha
E-mail address : aftab644@yahoo.com contact No- 00974-33173982
00923369526713.
QUALIFICATION:
1) B.S Civil Engineer : USSR : Moscow
2) PMP
3) Computer Applications : Dubai : U.A.E
4) AutoCAD : Dubai : U.A.E
5) Fist Aid Certificate : Dubai : U.A.E
Career Highlights:
Total experience 23 years out of 16 years in UAE (Dubai, Abu Dhabi) and 3.5 years
in Doha Qatar; Pakistan and Afghanistan (UNO). which 5.8 years as a ARE roads
high level experience in major infrastructure projects, Works like general over site of
inspectors, surveyors daily activities including works assignments, performance of
the supervision on the contractors operations on the projects etc.
Following are the projects in UAE details;
APPROVAL CERTIFICATE OF U.A.E:
2. 1 LIST OF RECENT PROJECTS (Approved By Al Ain Municipality)
1. Upgrading of Northern Ring road of Al ain city...
2. Upgrading the Traffic Movement & Intersections in Central Area of Al Ain
3. Development of Road from Intercontinental R/A to Khatm Shakla R/A.
4. Development of Nadood Jeham area with the border road and masoudi road in Al Ain.
5 Drainage & Sewer Line and Internal Roads (276) Plots in Umm Ghafa (Phase III).
2 LIST OF RECENT PROJECTS (Approved By DUBAI RTA).
1. R924 / 4 – Beautification of Jumeira Road – Al Mina areas.
2. R924 / 1 – Beautification of Jumeira Road.
3. R587 – Nad Al Hammar to Rashidiya Road.
4. R654 – Footpaths in Mamzer area.
5. R630 – Road and Levelling in Al Qusais North.
6. DUBAI PROPERTIES PROJECT. Infrastructure Phase 1 at Al Jadaf Cultural Village.
2014 till now ITALCONSULT QATAR.
Improvement of Ring road junction and roundabout.
Position .Senior road engineer. Ashghal project.
Preparing daily, weekly and monthly reports for the projects, to check
method statements, and check the shop drawings. To solve the site problems
with contractor and guide contractor. To monitor inspectors, surveyor’s daily
activity and performance on project etc. . . .
July 2011 to 2014. AECOM QATAR DOHA
(With Ashghal three projects) No.1. Peripheral roads to Barwa city. No. 2 Doha
express way P-7 successfully completed two projects as Position site engineer
and No.3 lusail stock pile project ARE Position.
To supervise Construction of all roads works, Asphalt works,4 no’s under
passes 7 km high way, FR roads, parking’s, links roads with foot paths tiles,
TSE network,300,600,1800mm dia Pipes, GRP, VC,DI,HDPE, uPVC and PVC
Pipes Works, water line & other services ,Inspection of road works,25 Km roads
works, 8 no’s signalize junction and 6 no’s roundabout and utility ducts, sub
base & road base and asphalt, Preparing daily , weekly and monthly reports for
the projects, to check method statements, and check the shop drawings. To
solve the site problems with contractor and guide contractor. Etc. . . .
3. March 2010 to July 2011 ENGINEERING ASSOCIATES.9/29/201
Upgrading and Intersection Improvement of Northern Ring Road in Al Ain
(Project completed in time successfully) Position ARE.
Construction of roads, storm water network, water line & other services
Inspection of road works, utility ducts, sub base & road base and asphalt
Preparing daily & weekly reports for the work
March 2009 to March 2010 WILBURSMITH ASSOCIATES AL AIN.
Upgrading the Traffic Movement and Intersection in Central Area of Al Ain.
(Project completed successfully) Position ARE
Project consist of sewerage & storm water network, water line & other
services
Construction of roads and parking at different location in Al Ain
Inspection of road works, utility ducts, sub base & road base and asphalt
Preparing daily & weekly reports for the work
2006 to March 2009 HALCROW INTERNATIONAL PARTNERSHIP, DUBAI.
Dubai, UAE: Infrastructure Phase 1 at Al Jadaf Culture Village – (Roads and
infrastructures) (Project completed successfully) POSITION ARE
Duties involved the supervision of all civil works creek Q wall blocks
concrete and filling of the roads embankment
Layers, irrigation line, sewer line, storm water line GRP lining, deflection,
air test Micro tunneling under GARHUD BRIDGE DUBAI CREEK and all
roads crossing ducts. Preparation of the weekly and monthly reports and
submitted to the client.
2001 to 2006 MAUNSELL CONSULTANCY SERVICES LTD. DUBAI.
DUBAI MUNICIPALITY PROJECTS, RTA & Al AIN MUNCIPALITY ROAD
PROJECTS. (Project completed successfully) position site engineer
Development of Nadood Jeham area with the border road and masoudi road in
Al Ain, Contract value Dhs.55milln.
Duties involved the supervision of all civil works, cutting, filling formation layer,
sub grade layer, sub base layer, Road base layer, asphalt base course and
wearing course. All kerbstone works with footpath tiles. Two Nos. of box culvert
three cells and six cells. Preparing monthly progress reports. Drainage and
sewer line and Internal Roads (276) Plots in Umm Ghafa (Phase III). Contract
value Dhs.32 million.AE
4. 1998 to 2001 MAUNSELL CONSULTANCY SERVICES LTD. DUBAI.
DUBAI RTA Road Projects. (Projects completed successfully) Position site
engineer
a. R630 – Road and leveling in Al Quais North, Contract Value Dhs.15
million AED
b. R654 – Footpaths in Al Mamzer area, Contract value 13.5 million AED.
c. R587 –Nad Al Hammar to Rashidiyah Road.
Duties involved the supervision of all civil works including laying SWD Drainage
lines, Backfilling, Trenches, Construction of manholes and chamber for various
services, Construction of parking, footpath, and service works. Checking the
survey works, witness density tests carried out at site and others. Construction of
all storm water drainage manholes and chambers, Construction of Etisalat
manholes, chambers and future ducts and all future road crossing ducts.
Preparing monthly progress reports.
1997 to 1998 ITAL CONSULT. DUBAI.
Dubai Municipality Road Project. (Project completed successfully) site Eng.
R664 – Improvement of Al Dhiyafah Road, Contract ValueDhs.12 million AED.
The Project comprised improvement of the road, parking, footpath beautification
plantation civil works utilities diversions etc.
1995 to 1997 CONCORD GEN. CONTRACTOR CO. DUBAI.
Construction of Building Project (projects engineer.)
Construction of building including foundations RCC columns, Reinforcement
slab, waterproofing and finishes.
Duties involved also checking of reinforcement, quality control, curing of
concrete, quantity calculations
1991 to 1995 BAK CONSULTANTS ENGINEERING, PAKISTAN.
Irrigation and Road Project (site engineer)
Supervision of Pehur high level irrigation project.
Duties involved survey and investigation to irrigation scheme.
Survey and investigation of power scheme for auxiliary tunnel.
Survey of Road in Afghanistan, Supervision of Hydro project water supply Canal
Bridge tells box culverts and concrete canal.