SlideShare a Scribd company logo
1 of 10
7
MOHAMMAD BALLAH MOHAMAD ALI
Contact Number # +966-505125841
Email : sudanaple@yahoo.com
Father Name : Ballah Mohammad Ali
Education : Civil Engineer
Religion : Islam
Address : Khartoum
Nationality : SUDAN
Status : Married
Date of Birth : 10 March 1973.
Respected Sir,
I am interested in the position of (Projects Manager).
I believe that my more than 20 years’ experience with 15 Years (Gulf)
experience as a Projects Manager with, SAUDI PAN KINGDOM – ( SAPAC )
Company (KSA) has given me a diverse background, which uniquely qualifies me for
this position with your company. I am well acquainted with the business of Projects
Manager.
I have enclosed my curriculum vitae, with references for your review. I would
welcome the opportunity to learn more about this exciting position. Please feel free to
contact me on my cell phone. Thank you for your time and consideration.
Sincerely,
Mohammad Ballah Mohammad Ali.
7
Experience:-
June 20 2012 to Till Date: - Saudi Pan Kingdom (SAPAC).
Riyadh Saudi Arabia
1. Work as a Project Manager.
• Project: - Construction of Main Channels and Networking for Storm
Water Lines At Al FALLAH, Al WADI and Al NADA Areas At
Northern Region of RIYADH City ( Al RIYADH ) .
 Excavation, Reinforcement Structure and Installing Manholes (Several
Drop) 32000 Meters Length Box Culverts Inner Size (1x1.4x1.4)
(1x2.0x1.5) (1x2.5x1.5) (1x3.0x1.5) (1x3.0x1.8) (1x3.0x2.0)
(2x3.0x1.5)m.
 Excavation, Installing Pipes and Manholes with Several Drop and
Backdrop 20000 Meters Length Concrete Pipe Inner Dia (300) (400) (500)
(600) (700) (800) (900) (1000) (1200) mm.
 Involved in all Projects Drawings and Redesigning the Several areas
Drawings, Profiles, Reinforcement Structural Detail as Clint Demands.
 Following the Work Permission Permit from Municipality of Riyadh at
Several Office’s like (National Water Company) (Saudi Electricity
Company) (Saudi Telecommunication Company) (Saudi Mobily
Company) (Traffic Department) (Office of Coordination and Follow-up),
etc.
 Make Good Atmosphere of Work and Relation with Staff and Engineer
According to the work Condition & Knowledge about how to use the staff
and Engineer Full Skills for the work Requirements.
7
 Excellent Control the Project According to Time Schedule and Hard work
for company benefit.
Project Total Cost 120 Million (Saudi Riyal’s)
March 20 2009 to June 20 2012: - Saudi Pan Kingdom (SAPAC).
Tabuk Saudi Arabia
• Work as a Project’s Manager For Tabuk Branch ( For The flowing
Projects ):-
• Project: - Construction of Stage-7 Major Sewer Line in Tabuk.
 Excavated, Install Pipes and Manholes with Several Drop and Backdrop
(500mm, 700mm, 1400mm Dia Pipes) 10000 Meters Length GRP Pipe
Inner Dia (1400) (1600) (1800) (2200) mm.
 Involved in all Projects Drawings and Redesigning the Several areas
Drawings, Profiles, Reinforcement Structural Detail as Clint Demands.
 Following the Work Permission Permit from Municipality of Tabuk at
Several Office’s like (National Water Company) (Saudi Electricity
Company) (Saudi Telecommunication Company) (Saudi Mobily
Company) (Traffic Department) (Office of Coordination and Follow-
up), etc.
 Make Good Atmosphere of Work and Relation with Staff and Engineer
According to the work Condition & Knowledge about how to use the
staff and Engineer Full Skills for the work Requirements.
 Excellent Control the Project According to Time Schedule and Hard
work for company benefit.
7
 Brilliant and Clever in Techniques for the Arrangement of work as
Required Condition at Sites.
Project Total Cost 27 Million (Saudi Riyal’s)
• Project: - Construction of Sewer Networks in Haql.
 Excavated, Install Pipe and Several type of Manhole with Different Size
of Drop, Backdrop 60000 Meters Length (GRP) and (Polyethylene) Pipe
Inner Dia (200) (250) (300) (350) (400) (450) (500) (600) (700) (800)
mm.
 Micro Tunnel 1000 Meters Length Concrete Pipe Inner Dia (800) mm.
 Control Excavated work, reinforcement structural work, Concreting
work, Mechanical work, Electrical work , Asphalt work And Pipe
Installing work Main Pumping station to the treatment plant and two
sub-lift.
 Excellent Control the Project According to Time Schedule and Hard
work for company benefit.
 Brilliant and Clever in Techniques for the Arrangement of work as
Required Condition at Sites.
 Following the Work Permission Permit from Municipality of Tabuk at
Several Offices like (National Water Company) (Saudi Electricity
Company) (Saudi Telecommunication Company) (Saudi Mobily
7
Company) (Traffic Department) (Office of Coordination and Follow-
up), etc.
Project Total Cost 34 Million (Saudi Riyal’s)
• Project: - Construction of Water Networks in Tabuk.
 Excavated and Install (Polyethylene) and (Ductile) Pipe 119000 Meters
Length.
 Excellent Control the Project According to Time Schedule and Hard
work for company benefit.
 Brilliant and Clever in Techniques for the Arrangement of work as
Required Condition at Sites.
Project Total Cost 29 Million (Saudi Riyal’s)
• Project: - Project Operation and Maintenance of Water at City of
Tabuk.
Project Total Cost 14 Million (Saudi Riyal’s)
• Project: - Project Operation and Maintenance of Drainage at City of
Tabuk.
7
Project Total Cost 21 Million (Saudi Riyal’s)
March 20 2006 to June 20 2009: - Saudi Pan Kingdom (SAPAC).
Yanbu Saudi Arabia
2. Work as a Project Manager.
• Project: - The establishment of sewage networks in Yanbu.
 Excavated, Install Pipe and Several type of Manhole with Different
Size of Drop, Backdrop. 175000 Meters Length Pipe Inner Dia (200)
(250) (300) (350) (400) (450) (500) (600) (700) (800) mm.
 Excellent Control the Project According to Time Schedule and Hard
work for company benefit.
 Brilliant and Clever in Techniques for the Arrangement of work as
Required Condition at Sites.
 Following the Work Permission Permit from Municipality of Yanbu
at Several Offices.
Project Total Cost 77 Million (Saudi Riyal’s)
December 25 2004 to August 20 2006: - Saudi Pan Kingdom (SAPAC).
Madina AL Munawra Saudi Arabia
3. Work as a Project Manager.
7
• Project: - Sanitation district, Prince Nayef Medina Al Munawra
project consists of a network.
 Excavated, Install Pipe and Several type of Manhole with Different Size
of Drop, Backdrop. 30000 Meters Length (Concrete) and (Clay) Pipe
Inner Dia (200) (250) (300) (350) (400) (450) (500) (600) (700) (800)
(1000) mm.
 Following the Work Permission Permit from Municipality of Madina Al
Munawra at Several Offices.
 Excellent Control the Project According to Time Schedule and Hard
work for company benefit.
 Brilliant and Clever in Techniques for the Arrangement of work as
Required Condition at Sites.
Project Total Cost 39 Million (Saudi Riyal’s)
August 01 2003 to December 25 2004: - Saudi Pan Kingdom (SAPAC).
Madina AL Munawra Saudi Arabia
4. Work as a Project Manager.
• Project: - Storm water drainage district Awali Medina AL Munawra
and includes Box Culvert channels.
 Excavation, Reinforcement Structure and Installing Manholes (Several
Drop) Box Culverts Inner Size (1x1.5x1.5) m.
7
 Excavated, Install Pipe and Several type of Manhole with Different Size of
Drop, Backdrop. (Concrete) and (GRP) Pipe Inner Dia (200) (250) (300)
(350) (400) (700) (800) mm.
 Involved in all Projects Drawings and Redesigning the Several areas
Drawings, Profiles, Reinforcement Structural Detail as Clint Demands.
 Brilliant and Clever in Techniques for the Arrangement of work as
Required Condition at Sites.
 Excellent Control the Project According to Time Schedule and Hard work
for company benefit.
Project Total Cost 6.7 Million (Saudi Riyal’s)
July 20 2002 to July 01 2003: - Foundation Marzouk Rashid Alrvieia Contracting.
Madina AL Munawra Saudi Arabia
5. Work as a Projects Manager.
• Project: - Foundation Marzouk Rashid Alrvieia Contracting.
 Project of establishing Palace Weddings Al Azizia district of Medina
Al Munawra.
 Project of establishment a multi-Villas and Mosques in Medina Al
Munawra.
 Project of establishing Red Crescent clinic Al Yatema Medina Al
Munawra.
Project Total Cost 6 Million (Saudi Riyal’s)
7
February 01 2001 to May 30 2002: - Dan Fodam Company of Commerce and Industry in Sudan.
Al Khartoum Sudan
6. Work as a Site Engineer.
• Project: - The implementation of building Central Bank of Sudan in
Khartoum.
Project Total Cost 56 Million (US Dollars)
September 13 1998 to January 10 2001: - Burooj Consultation and industrial Engineering Co.
Sudan
7. Work as a Site Engineer.
• Project: - The city of residential, Jiyad contains 1,000 housing units,
sewerage system, the water system, the electricity network, a hospital
and the 2 schools.
February 01 1996 to August 03 1998: - Company Huda for business and engineering trend.
Sudan
8. Work as a Site Engineer.
• Project: - Worked with site engineer supervising the implementation
the domestic market shops in Khartoum, Sudan.
Computer Software
MS Office and Auto CAD.
Education, Engineering.
Civil Engineer from Sudan University of Since and Technology.
Interests
Project’s Manager.
7
Languages
Arabic and English.

More Related Content

What's hot

MOHAMMAD SOLAIMAN 1.doc 15-05-2012
MOHAMMAD SOLAIMAN 1.doc 15-05-2012MOHAMMAD SOLAIMAN 1.doc 15-05-2012
MOHAMMAD SOLAIMAN 1.doc 15-05-2012Mohammad Solaiman
 
Amer Zubair - QS
Amer Zubair - QSAmer Zubair - QS
Amer Zubair - QSAmer Zubair
 
CV_M ASKAR 2017
CV_M ASKAR 2017CV_M ASKAR 2017
CV_M ASKAR 2017Moh Ask
 
AFTAB CURRICULAM VITAE
AFTAB CURRICULAM VITAEAFTAB CURRICULAM VITAE
AFTAB CURRICULAM VITAEaftab khan
 
Experince Certificate
Experince CertificateExperince Certificate
Experince CertificateZubair Noor
 
Cameron ian pistorius curriculum vitae
Cameron ian pistorius curriculum vitaeCameron ian pistorius curriculum vitae
Cameron ian pistorius curriculum vitaeCameron Pistorius
 
Ahmed as Road design eng
Ahmed as Road design engAhmed as Road design eng
Ahmed as Road design engahmed hasien
 
20161120 Binu CV - Sr. Civil Engineer
20161120 Binu CV - Sr. Civil Engineer20161120 Binu CV - Sr. Civil Engineer
20161120 Binu CV - Sr. Civil EngineerBinu Babu
 
Project Profile Metalbuilding
Project Profile MetalbuildingProject Profile Metalbuilding
Project Profile Metalbuildingmusahossein
 
Eng._Ramy_Hassan_Attia_C.V (11-3-2015)
Eng._Ramy_Hassan_Attia_C.V (11-3-2015)Eng._Ramy_Hassan_Attia_C.V (11-3-2015)
Eng._Ramy_Hassan_Attia_C.V (11-3-2015)Ramy Ahmed
 
Updated CV of Muhammad Ishfaq 17.5.15
Updated CV of Muhammad Ishfaq 17.5.15Updated CV of Muhammad Ishfaq 17.5.15
Updated CV of Muhammad Ishfaq 17.5.15muhammed ishfaq
 
BACHIR CHAKAR CV (7-4-2015)
BACHIR CHAKAR CV (7-4-2015)BACHIR CHAKAR CV (7-4-2015)
BACHIR CHAKAR CV (7-4-2015)Bashir Chakar
 

What's hot (20)

MOHAMMAD SOLAIMAN 1.doc 15-05-2012
MOHAMMAD SOLAIMAN 1.doc 15-05-2012MOHAMMAD SOLAIMAN 1.doc 15-05-2012
MOHAMMAD SOLAIMAN 1.doc 15-05-2012
 
RESUME VICTOR
RESUME VICTORRESUME VICTOR
RESUME VICTOR
 
Crispan Falcao-2017
Crispan Falcao-2017Crispan Falcao-2017
Crispan Falcao-2017
 
Amer Zubair - QS
Amer Zubair - QSAmer Zubair - QS
Amer Zubair - QS
 
CV_M ASKAR 2017
CV_M ASKAR 2017CV_M ASKAR 2017
CV_M ASKAR 2017
 
AFTAB CURRICULAM VITAE
AFTAB CURRICULAM VITAEAFTAB CURRICULAM VITAE
AFTAB CURRICULAM VITAE
 
Experince Certificate
Experince CertificateExperince Certificate
Experince Certificate
 
Cameron ian pistorius curriculum vitae
Cameron ian pistorius curriculum vitaeCameron ian pistorius curriculum vitae
Cameron ian pistorius curriculum vitae
 
Ahmed as Road design eng
Ahmed as Road design engAhmed as Road design eng
Ahmed as Road design eng
 
A. Nasir CV(1)
A. Nasir CV(1)A. Nasir CV(1)
A. Nasir CV(1)
 
cv
cvcv
cv
 
20161120 Binu CV - Sr. Civil Engineer
20161120 Binu CV - Sr. Civil Engineer20161120 Binu CV - Sr. Civil Engineer
20161120 Binu CV - Sr. Civil Engineer
 
Project Profile Metalbuilding
Project Profile MetalbuildingProject Profile Metalbuilding
Project Profile Metalbuilding
 
Eng._Ramy_Hassan_Attia_C.V (11-3-2015)
Eng._Ramy_Hassan_Attia_C.V (11-3-2015)Eng._Ramy_Hassan_Attia_C.V (11-3-2015)
Eng._Ramy_Hassan_Attia_C.V (11-3-2015)
 
Nick Kennedy cv
Nick Kennedy cvNick Kennedy cv
Nick Kennedy cv
 
Updated CV of Muhammad Ishfaq 17.5.15
Updated CV of Muhammad Ishfaq 17.5.15Updated CV of Muhammad Ishfaq 17.5.15
Updated CV of Muhammad Ishfaq 17.5.15
 
Patricia Khouzam CV
Patricia Khouzam CVPatricia Khouzam CV
Patricia Khouzam CV
 
CV-SITE SUPERVISOR
CV-SITE SUPERVISORCV-SITE SUPERVISOR
CV-SITE SUPERVISOR
 
modified cv khaled
modified  cv khaledmodified  cv khaled
modified cv khaled
 
BACHIR CHAKAR CV (7-4-2015)
BACHIR CHAKAR CV (7-4-2015)BACHIR CHAKAR CV (7-4-2015)
BACHIR CHAKAR CV (7-4-2015)
 

Viewers also liked

Time and space complexity
Time and space complexityTime and space complexity
Time and space complexityAnkit Katiyar
 
Resume Template for Undergraduate Students
Resume Template for Undergraduate StudentsResume Template for Undergraduate Students
Resume Template for Undergraduate StudentsCSPD_at_UTSA
 
20. Object-Oriented Programming Fundamental Principles
20. Object-Oriented Programming Fundamental Principles20. Object-Oriented Programming Fundamental Principles
20. Object-Oriented Programming Fundamental PrinciplesIntro C# Book
 
Civil engineer resume samples india
Civil engineer resume samples  indiaCivil engineer resume samples  india
Civil engineer resume samples indiasanthose menon
 
Sample Curriculum Vitae
Sample Curriculum VitaeSample Curriculum Vitae
Sample Curriculum VitaeNoeleen
 
Resume writing for students and freshers
Resume writing for students and freshersResume writing for students and freshers
Resume writing for students and freshersPaku Sastry
 

Viewers also liked (10)

farooq cv
farooq cvfarooq cv
farooq cv
 
My CV APRIL2016
My CV APRIL2016My CV APRIL2016
My CV APRIL2016
 
Computational Complexity
Computational ComplexityComputational Complexity
Computational Complexity
 
Complexity of Algorithm
Complexity of AlgorithmComplexity of Algorithm
Complexity of Algorithm
 
Time and space complexity
Time and space complexityTime and space complexity
Time and space complexity
 
Resume Template for Undergraduate Students
Resume Template for Undergraduate StudentsResume Template for Undergraduate Students
Resume Template for Undergraduate Students
 
20. Object-Oriented Programming Fundamental Principles
20. Object-Oriented Programming Fundamental Principles20. Object-Oriented Programming Fundamental Principles
20. Object-Oriented Programming Fundamental Principles
 
Civil engineer resume samples india
Civil engineer resume samples  indiaCivil engineer resume samples  india
Civil engineer resume samples india
 
Sample Curriculum Vitae
Sample Curriculum VitaeSample Curriculum Vitae
Sample Curriculum Vitae
 
Resume writing for students and freshers
Resume writing for students and freshersResume writing for students and freshers
Resume writing for students and freshers
 

Similar to Projects Manager CV

Similar to Projects Manager CV (20)

أغسطس 2015AHMED SANOSY C.V NEW
أغسطس 2015AHMED SANOSY C.V NEWأغسطس 2015AHMED SANOSY C.V NEW
أغسطس 2015AHMED SANOSY C.V NEW
 
Amjad survey inspector
Amjad survey inspectorAmjad survey inspector
Amjad survey inspector
 
CV., Till now
CV., Till nowCV., Till now
CV., Till now
 
ALI FAKHIR IBRAHEEM - C.V
ALI FAKHIR IBRAHEEM -  C.VALI FAKHIR IBRAHEEM -  C.V
ALI FAKHIR IBRAHEEM - C.V
 
ENGLISH
ENGLISH ENGLISH
ENGLISH
 
CV1
CV1CV1
CV1
 
Ramy-Galal-Abbas-Omar-Abbas-c.v (2)
Ramy-Galal-Abbas-Omar-Abbas-c.v (2)Ramy-Galal-Abbas-Omar-Abbas-c.v (2)
Ramy-Galal-Abbas-Omar-Abbas-c.v (2)
 
mathy 2015
mathy 2015mathy 2015
mathy 2015
 
CV
CVCV
CV
 
Eng.Youssef ELTehawy 2016
Eng.Youssef ELTehawy 2016Eng.Youssef ELTehawy 2016
Eng.Youssef ELTehawy 2016
 
Marwans CV. updated
Marwans CV. updatedMarwans CV. updated
Marwans CV. updated
 
AutoCad Designer (1)
AutoCad Designer (1)AutoCad Designer (1)
AutoCad Designer (1)
 
CV QS AKHTAR RASUL
CV QS AKHTAR RASULCV QS AKHTAR RASUL
CV QS AKHTAR RASUL
 
En c.v
En c.v En c.v
En c.v
 
C V Eng.Youssef ELTehawy 2016 - Full Profile
C V   Eng.Youssef ELTehawy 2016 - Full ProfileC V   Eng.Youssef ELTehawy 2016 - Full Profile
C V Eng.Youssef ELTehawy 2016 - Full Profile
 
Wissam chehab's CV
Wissam chehab's CVWissam chehab's CV
Wissam chehab's CV
 
Hesham ELdieushy 2016
Hesham ELdieushy 2016Hesham ELdieushy 2016
Hesham ELdieushy 2016
 
curriculum vitae
curriculum vitaecurriculum vitae
curriculum vitae
 
Cv pdf
Cv pdfCv pdf
Cv pdf
 
Hesham Magdy curriculum vitae
Hesham Magdy curriculum vitaeHesham Magdy curriculum vitae
Hesham Magdy curriculum vitae
 

Projects Manager CV

  • 1. 7 MOHAMMAD BALLAH MOHAMAD ALI Contact Number # +966-505125841 Email : sudanaple@yahoo.com Father Name : Ballah Mohammad Ali Education : Civil Engineer Religion : Islam Address : Khartoum Nationality : SUDAN Status : Married Date of Birth : 10 March 1973. Respected Sir, I am interested in the position of (Projects Manager). I believe that my more than 20 years’ experience with 15 Years (Gulf) experience as a Projects Manager with, SAUDI PAN KINGDOM – ( SAPAC ) Company (KSA) has given me a diverse background, which uniquely qualifies me for this position with your company. I am well acquainted with the business of Projects Manager. I have enclosed my curriculum vitae, with references for your review. I would welcome the opportunity to learn more about this exciting position. Please feel free to contact me on my cell phone. Thank you for your time and consideration. Sincerely, Mohammad Ballah Mohammad Ali.
  • 2. 7 Experience:- June 20 2012 to Till Date: - Saudi Pan Kingdom (SAPAC). Riyadh Saudi Arabia 1. Work as a Project Manager. • Project: - Construction of Main Channels and Networking for Storm Water Lines At Al FALLAH, Al WADI and Al NADA Areas At Northern Region of RIYADH City ( Al RIYADH ) .  Excavation, Reinforcement Structure and Installing Manholes (Several Drop) 32000 Meters Length Box Culverts Inner Size (1x1.4x1.4) (1x2.0x1.5) (1x2.5x1.5) (1x3.0x1.5) (1x3.0x1.8) (1x3.0x2.0) (2x3.0x1.5)m.  Excavation, Installing Pipes and Manholes with Several Drop and Backdrop 20000 Meters Length Concrete Pipe Inner Dia (300) (400) (500) (600) (700) (800) (900) (1000) (1200) mm.  Involved in all Projects Drawings and Redesigning the Several areas Drawings, Profiles, Reinforcement Structural Detail as Clint Demands.  Following the Work Permission Permit from Municipality of Riyadh at Several Office’s like (National Water Company) (Saudi Electricity Company) (Saudi Telecommunication Company) (Saudi Mobily Company) (Traffic Department) (Office of Coordination and Follow-up), etc.  Make Good Atmosphere of Work and Relation with Staff and Engineer According to the work Condition & Knowledge about how to use the staff and Engineer Full Skills for the work Requirements.
  • 3. 7  Excellent Control the Project According to Time Schedule and Hard work for company benefit. Project Total Cost 120 Million (Saudi Riyal’s) March 20 2009 to June 20 2012: - Saudi Pan Kingdom (SAPAC). Tabuk Saudi Arabia • Work as a Project’s Manager For Tabuk Branch ( For The flowing Projects ):- • Project: - Construction of Stage-7 Major Sewer Line in Tabuk.  Excavated, Install Pipes and Manholes with Several Drop and Backdrop (500mm, 700mm, 1400mm Dia Pipes) 10000 Meters Length GRP Pipe Inner Dia (1400) (1600) (1800) (2200) mm.  Involved in all Projects Drawings and Redesigning the Several areas Drawings, Profiles, Reinforcement Structural Detail as Clint Demands.  Following the Work Permission Permit from Municipality of Tabuk at Several Office’s like (National Water Company) (Saudi Electricity Company) (Saudi Telecommunication Company) (Saudi Mobily Company) (Traffic Department) (Office of Coordination and Follow- up), etc.  Make Good Atmosphere of Work and Relation with Staff and Engineer According to the work Condition & Knowledge about how to use the staff and Engineer Full Skills for the work Requirements.  Excellent Control the Project According to Time Schedule and Hard work for company benefit.
  • 4. 7  Brilliant and Clever in Techniques for the Arrangement of work as Required Condition at Sites. Project Total Cost 27 Million (Saudi Riyal’s) • Project: - Construction of Sewer Networks in Haql.  Excavated, Install Pipe and Several type of Manhole with Different Size of Drop, Backdrop 60000 Meters Length (GRP) and (Polyethylene) Pipe Inner Dia (200) (250) (300) (350) (400) (450) (500) (600) (700) (800) mm.  Micro Tunnel 1000 Meters Length Concrete Pipe Inner Dia (800) mm.  Control Excavated work, reinforcement structural work, Concreting work, Mechanical work, Electrical work , Asphalt work And Pipe Installing work Main Pumping station to the treatment plant and two sub-lift.  Excellent Control the Project According to Time Schedule and Hard work for company benefit.  Brilliant and Clever in Techniques for the Arrangement of work as Required Condition at Sites.  Following the Work Permission Permit from Municipality of Tabuk at Several Offices like (National Water Company) (Saudi Electricity Company) (Saudi Telecommunication Company) (Saudi Mobily
  • 5. 7 Company) (Traffic Department) (Office of Coordination and Follow- up), etc. Project Total Cost 34 Million (Saudi Riyal’s) • Project: - Construction of Water Networks in Tabuk.  Excavated and Install (Polyethylene) and (Ductile) Pipe 119000 Meters Length.  Excellent Control the Project According to Time Schedule and Hard work for company benefit.  Brilliant and Clever in Techniques for the Arrangement of work as Required Condition at Sites. Project Total Cost 29 Million (Saudi Riyal’s) • Project: - Project Operation and Maintenance of Water at City of Tabuk. Project Total Cost 14 Million (Saudi Riyal’s) • Project: - Project Operation and Maintenance of Drainage at City of Tabuk.
  • 6. 7 Project Total Cost 21 Million (Saudi Riyal’s) March 20 2006 to June 20 2009: - Saudi Pan Kingdom (SAPAC). Yanbu Saudi Arabia 2. Work as a Project Manager. • Project: - The establishment of sewage networks in Yanbu.  Excavated, Install Pipe and Several type of Manhole with Different Size of Drop, Backdrop. 175000 Meters Length Pipe Inner Dia (200) (250) (300) (350) (400) (450) (500) (600) (700) (800) mm.  Excellent Control the Project According to Time Schedule and Hard work for company benefit.  Brilliant and Clever in Techniques for the Arrangement of work as Required Condition at Sites.  Following the Work Permission Permit from Municipality of Yanbu at Several Offices. Project Total Cost 77 Million (Saudi Riyal’s) December 25 2004 to August 20 2006: - Saudi Pan Kingdom (SAPAC). Madina AL Munawra Saudi Arabia 3. Work as a Project Manager.
  • 7. 7 • Project: - Sanitation district, Prince Nayef Medina Al Munawra project consists of a network.  Excavated, Install Pipe and Several type of Manhole with Different Size of Drop, Backdrop. 30000 Meters Length (Concrete) and (Clay) Pipe Inner Dia (200) (250) (300) (350) (400) (450) (500) (600) (700) (800) (1000) mm.  Following the Work Permission Permit from Municipality of Madina Al Munawra at Several Offices.  Excellent Control the Project According to Time Schedule and Hard work for company benefit.  Brilliant and Clever in Techniques for the Arrangement of work as Required Condition at Sites. Project Total Cost 39 Million (Saudi Riyal’s) August 01 2003 to December 25 2004: - Saudi Pan Kingdom (SAPAC). Madina AL Munawra Saudi Arabia 4. Work as a Project Manager. • Project: - Storm water drainage district Awali Medina AL Munawra and includes Box Culvert channels.  Excavation, Reinforcement Structure and Installing Manholes (Several Drop) Box Culverts Inner Size (1x1.5x1.5) m.
  • 8. 7  Excavated, Install Pipe and Several type of Manhole with Different Size of Drop, Backdrop. (Concrete) and (GRP) Pipe Inner Dia (200) (250) (300) (350) (400) (700) (800) mm.  Involved in all Projects Drawings and Redesigning the Several areas Drawings, Profiles, Reinforcement Structural Detail as Clint Demands.  Brilliant and Clever in Techniques for the Arrangement of work as Required Condition at Sites.  Excellent Control the Project According to Time Schedule and Hard work for company benefit. Project Total Cost 6.7 Million (Saudi Riyal’s) July 20 2002 to July 01 2003: - Foundation Marzouk Rashid Alrvieia Contracting. Madina AL Munawra Saudi Arabia 5. Work as a Projects Manager. • Project: - Foundation Marzouk Rashid Alrvieia Contracting.  Project of establishing Palace Weddings Al Azizia district of Medina Al Munawra.  Project of establishment a multi-Villas and Mosques in Medina Al Munawra.  Project of establishing Red Crescent clinic Al Yatema Medina Al Munawra. Project Total Cost 6 Million (Saudi Riyal’s)
  • 9. 7 February 01 2001 to May 30 2002: - Dan Fodam Company of Commerce and Industry in Sudan. Al Khartoum Sudan 6. Work as a Site Engineer. • Project: - The implementation of building Central Bank of Sudan in Khartoum. Project Total Cost 56 Million (US Dollars) September 13 1998 to January 10 2001: - Burooj Consultation and industrial Engineering Co. Sudan 7. Work as a Site Engineer. • Project: - The city of residential, Jiyad contains 1,000 housing units, sewerage system, the water system, the electricity network, a hospital and the 2 schools. February 01 1996 to August 03 1998: - Company Huda for business and engineering trend. Sudan 8. Work as a Site Engineer. • Project: - Worked with site engineer supervising the implementation the domestic market shops in Khartoum, Sudan. Computer Software MS Office and Auto CAD. Education, Engineering. Civil Engineer from Sudan University of Since and Technology. Interests Project’s Manager.