1. 7
MOHAMMAD BALLAH MOHAMAD ALI
Contact Number # +966-505125841
Email : sudanaple@yahoo.com
Father Name : Ballah Mohammad Ali
Education : Civil Engineer
Religion : Islam
Address : Khartoum
Nationality : SUDAN
Status : Married
Date of Birth : 10 March 1973.
Respected Sir,
I am interested in the position of (Projects Manager).
I believe that my more than 20 years’ experience with 15 Years (Gulf)
experience as a Projects Manager with, SAUDI PAN KINGDOM – ( SAPAC )
Company (KSA) has given me a diverse background, which uniquely qualifies me for
this position with your company. I am well acquainted with the business of Projects
Manager.
I have enclosed my curriculum vitae, with references for your review. I would
welcome the opportunity to learn more about this exciting position. Please feel free to
contact me on my cell phone. Thank you for your time and consideration.
Sincerely,
Mohammad Ballah Mohammad Ali.
2. 7
Experience:-
June 20 2012 to Till Date: - Saudi Pan Kingdom (SAPAC).
Riyadh Saudi Arabia
1. Work as a Project Manager.
• Project: - Construction of Main Channels and Networking for Storm
Water Lines At Al FALLAH, Al WADI and Al NADA Areas At
Northern Region of RIYADH City ( Al RIYADH ) .
Excavation, Reinforcement Structure and Installing Manholes (Several
Drop) 32000 Meters Length Box Culverts Inner Size (1x1.4x1.4)
(1x2.0x1.5) (1x2.5x1.5) (1x3.0x1.5) (1x3.0x1.8) (1x3.0x2.0)
(2x3.0x1.5)m.
Excavation, Installing Pipes and Manholes with Several Drop and
Backdrop 20000 Meters Length Concrete Pipe Inner Dia (300) (400) (500)
(600) (700) (800) (900) (1000) (1200) mm.
Involved in all Projects Drawings and Redesigning the Several areas
Drawings, Profiles, Reinforcement Structural Detail as Clint Demands.
Following the Work Permission Permit from Municipality of Riyadh at
Several Office’s like (National Water Company) (Saudi Electricity
Company) (Saudi Telecommunication Company) (Saudi Mobily
Company) (Traffic Department) (Office of Coordination and Follow-up),
etc.
Make Good Atmosphere of Work and Relation with Staff and Engineer
According to the work Condition & Knowledge about how to use the staff
and Engineer Full Skills for the work Requirements.
3. 7
Excellent Control the Project According to Time Schedule and Hard work
for company benefit.
Project Total Cost 120 Million (Saudi Riyal’s)
March 20 2009 to June 20 2012: - Saudi Pan Kingdom (SAPAC).
Tabuk Saudi Arabia
• Work as a Project’s Manager For Tabuk Branch ( For The flowing
Projects ):-
• Project: - Construction of Stage-7 Major Sewer Line in Tabuk.
Excavated, Install Pipes and Manholes with Several Drop and Backdrop
(500mm, 700mm, 1400mm Dia Pipes) 10000 Meters Length GRP Pipe
Inner Dia (1400) (1600) (1800) (2200) mm.
Involved in all Projects Drawings and Redesigning the Several areas
Drawings, Profiles, Reinforcement Structural Detail as Clint Demands.
Following the Work Permission Permit from Municipality of Tabuk at
Several Office’s like (National Water Company) (Saudi Electricity
Company) (Saudi Telecommunication Company) (Saudi Mobily
Company) (Traffic Department) (Office of Coordination and Follow-
up), etc.
Make Good Atmosphere of Work and Relation with Staff and Engineer
According to the work Condition & Knowledge about how to use the
staff and Engineer Full Skills for the work Requirements.
Excellent Control the Project According to Time Schedule and Hard
work for company benefit.
4. 7
Brilliant and Clever in Techniques for the Arrangement of work as
Required Condition at Sites.
Project Total Cost 27 Million (Saudi Riyal’s)
• Project: - Construction of Sewer Networks in Haql.
Excavated, Install Pipe and Several type of Manhole with Different Size
of Drop, Backdrop 60000 Meters Length (GRP) and (Polyethylene) Pipe
Inner Dia (200) (250) (300) (350) (400) (450) (500) (600) (700) (800)
mm.
Micro Tunnel 1000 Meters Length Concrete Pipe Inner Dia (800) mm.
Control Excavated work, reinforcement structural work, Concreting
work, Mechanical work, Electrical work , Asphalt work And Pipe
Installing work Main Pumping station to the treatment plant and two
sub-lift.
Excellent Control the Project According to Time Schedule and Hard
work for company benefit.
Brilliant and Clever in Techniques for the Arrangement of work as
Required Condition at Sites.
Following the Work Permission Permit from Municipality of Tabuk at
Several Offices like (National Water Company) (Saudi Electricity
Company) (Saudi Telecommunication Company) (Saudi Mobily
5. 7
Company) (Traffic Department) (Office of Coordination and Follow-
up), etc.
Project Total Cost 34 Million (Saudi Riyal’s)
• Project: - Construction of Water Networks in Tabuk.
Excavated and Install (Polyethylene) and (Ductile) Pipe 119000 Meters
Length.
Excellent Control the Project According to Time Schedule and Hard
work for company benefit.
Brilliant and Clever in Techniques for the Arrangement of work as
Required Condition at Sites.
Project Total Cost 29 Million (Saudi Riyal’s)
• Project: - Project Operation and Maintenance of Water at City of
Tabuk.
Project Total Cost 14 Million (Saudi Riyal’s)
• Project: - Project Operation and Maintenance of Drainage at City of
Tabuk.
6. 7
Project Total Cost 21 Million (Saudi Riyal’s)
March 20 2006 to June 20 2009: - Saudi Pan Kingdom (SAPAC).
Yanbu Saudi Arabia
2. Work as a Project Manager.
• Project: - The establishment of sewage networks in Yanbu.
Excavated, Install Pipe and Several type of Manhole with Different
Size of Drop, Backdrop. 175000 Meters Length Pipe Inner Dia (200)
(250) (300) (350) (400) (450) (500) (600) (700) (800) mm.
Excellent Control the Project According to Time Schedule and Hard
work for company benefit.
Brilliant and Clever in Techniques for the Arrangement of work as
Required Condition at Sites.
Following the Work Permission Permit from Municipality of Yanbu
at Several Offices.
Project Total Cost 77 Million (Saudi Riyal’s)
December 25 2004 to August 20 2006: - Saudi Pan Kingdom (SAPAC).
Madina AL Munawra Saudi Arabia
3. Work as a Project Manager.
7. 7
• Project: - Sanitation district, Prince Nayef Medina Al Munawra
project consists of a network.
Excavated, Install Pipe and Several type of Manhole with Different Size
of Drop, Backdrop. 30000 Meters Length (Concrete) and (Clay) Pipe
Inner Dia (200) (250) (300) (350) (400) (450) (500) (600) (700) (800)
(1000) mm.
Following the Work Permission Permit from Municipality of Madina Al
Munawra at Several Offices.
Excellent Control the Project According to Time Schedule and Hard
work for company benefit.
Brilliant and Clever in Techniques for the Arrangement of work as
Required Condition at Sites.
Project Total Cost 39 Million (Saudi Riyal’s)
August 01 2003 to December 25 2004: - Saudi Pan Kingdom (SAPAC).
Madina AL Munawra Saudi Arabia
4. Work as a Project Manager.
• Project: - Storm water drainage district Awali Medina AL Munawra
and includes Box Culvert channels.
Excavation, Reinforcement Structure and Installing Manholes (Several
Drop) Box Culverts Inner Size (1x1.5x1.5) m.
8. 7
Excavated, Install Pipe and Several type of Manhole with Different Size of
Drop, Backdrop. (Concrete) and (GRP) Pipe Inner Dia (200) (250) (300)
(350) (400) (700) (800) mm.
Involved in all Projects Drawings and Redesigning the Several areas
Drawings, Profiles, Reinforcement Structural Detail as Clint Demands.
Brilliant and Clever in Techniques for the Arrangement of work as
Required Condition at Sites.
Excellent Control the Project According to Time Schedule and Hard work
for company benefit.
Project Total Cost 6.7 Million (Saudi Riyal’s)
July 20 2002 to July 01 2003: - Foundation Marzouk Rashid Alrvieia Contracting.
Madina AL Munawra Saudi Arabia
5. Work as a Projects Manager.
• Project: - Foundation Marzouk Rashid Alrvieia Contracting.
Project of establishing Palace Weddings Al Azizia district of Medina
Al Munawra.
Project of establishment a multi-Villas and Mosques in Medina Al
Munawra.
Project of establishing Red Crescent clinic Al Yatema Medina Al
Munawra.
Project Total Cost 6 Million (Saudi Riyal’s)
9. 7
February 01 2001 to May 30 2002: - Dan Fodam Company of Commerce and Industry in Sudan.
Al Khartoum Sudan
6. Work as a Site Engineer.
• Project: - The implementation of building Central Bank of Sudan in
Khartoum.
Project Total Cost 56 Million (US Dollars)
September 13 1998 to January 10 2001: - Burooj Consultation and industrial Engineering Co.
Sudan
7. Work as a Site Engineer.
• Project: - The city of residential, Jiyad contains 1,000 housing units,
sewerage system, the water system, the electricity network, a hospital
and the 2 schools.
February 01 1996 to August 03 1998: - Company Huda for business and engineering trend.
Sudan
8. Work as a Site Engineer.
• Project: - Worked with site engineer supervising the implementation
the domestic market shops in Khartoum, Sudan.
Computer Software
MS Office and Auto CAD.
Education, Engineering.
Civil Engineer from Sudan University of Since and Technology.
Interests
Project’s Manager.