I would like to Elaborate about my experience on construction field as I worked as planning engineer at main
contractor for Turnkey Project “EPC” at power plant, I have strong motive for learning and working and I am
a hard worker and used to spend all my time until finishing the job I assigned, Seeking for challenging career
opportunity in reputable company.
Education
2014 – 2016 Diploma Project Management “PRMG”
American University in Cairo
2007–2012 Bachelor of Engineering,
Cairo University,
Electrical Power department.
2014 –2014 Preparation for LEED Certificate
American University in Cairo
Work History
Jan 2015 – Dec 2015 Planning and Cost Control Engineer (El-Sewedy PSP)
 Beni- Suief Power Generation Combined Cycle Plant 4800 MW.
 Consortium with Siemens.
 “8 Gas Turbine, 8 HRSG, 4 Steam Turbine”.
 Fast track Project “Three year”
 EPC Contract.
 Project Budget :2,736,000,000 LE
1. Preparing Baseline schedules.
2. Loading schedules with the budgeted cost, and resources.
3. Updating Program of works according to site data.
4. Preparing Daily, Weekly and Monthly progress Reports.
5. Following up engineering RFQ’s & Specs. Till issuing DWG to construction to Install.
6. Following Up Procurement all Material from purchase order to Delivery to Site.
Jan 2015 – Dec 2015 Planning and Cost Control Engineer (El-Sewedy PSP)
 Attaqa Power Generation Simple Cycle Plant 650 MW “Four Gas Turbines”.
 Fast track Project “One year”
 EPC Contract.
 Project Budget : 772,870,005 LE
1. Preparing Baseline schedules.
2. Loading schedules with the budgeted cost, and resources.
3. Updating Program of works according to site data.
4. Preparing Daily, Weekly and Monthly progress Reports.
5. Following up engineering RFQ’s & Specs. Till issuing DWG to construction to Install.
6. Following Up Procurement all Material from purchase order to Delivery to Site.
7. Following up project progress and highlighting delayed activities.
8. Attending progress meeting for monitoring project status.
9. Preparation of Prospective Time Impact Analysis and Time claims.
2
July 2013 – Jan2015 Construction Electrical Engineer (DETAC)
 Raya Plaza Mall – 6th October – Jizah
 Hanging gardens - Porto Ain ElSokhna
1. Generally responsible for implementations and monitoring of electrical related works at site.
2. Installation of all electrical systems as (Lighting- Power- MDP-RMU-Transformer-LV&MV cables
terminations) and light current systems as (Fire alarm-Data-Telephone-CCTV-Sound-BMS).
3. Plans the execution of all electrical related works and coordinates the works to mechanical group.
4. Supports the Asst. Project Manager in accomplishing all the goals for the electrical groups at site.
5. Prepare specifications for purchase of materials and equipment.
6. Collect data relating to commercial and residential development, population, and power system
interconnection to determine operating efficiency of electrical systems.
Jan 2013 –June 2013 Sales Electrical Engineer Sinalight Company
 Lighting Fixtures & Electrical Panels
Computer skills  AutoCAD
 Dialux
 MS-Office (Word, Excel, Power point…)
 Primavera P6
Language  Arabic: (Mother tongue).
 English: (Excellent).
 French: (Fair)
Personal Details
Name: Abdallah Ismail Abdelhalim Muhammad Soliman
Email: Abdallah.I.omara@gmail.com Mobile:+2010 046 466 82
Address: 6th October, Giza, Egypt. Date of birth: 30/03/1991
Marital Status : Single Military Status: Exempted
Bachelor: Faculty of Engineering, Cairo University B.Sc. Date: July 2012
Department: Electrical Power Engineering
Further Information or references Furnished upon Request.

More Related Content

What's hot

Cv For Sitemanager
Cv For SitemanagerCv For Sitemanager
Cv For Sitemanagermathavan2008
 
Amruta shinde resume
Amruta shinde resumeAmruta shinde resume
Amruta shinde resume
Amruta shinde
 
hikal CV June 2016
hikal CV June 2016hikal CV June 2016
hikal CV June 2016Ahmed Hikal
 
SambhuSureshPlanningEr
SambhuSureshPlanningErSambhuSureshPlanningEr
SambhuSureshPlanningErSambhu Suresh
 
CV_SR MEP MANAGER. NT.
CV_SR MEP MANAGER. NT.CV_SR MEP MANAGER. NT.
CV_SR MEP MANAGER. NT.Salem Hashish
 
SELVA RESUME
SELVA RESUMESELVA RESUME
SELVA RESUMEselva raj
 
Resume MRoyse 10_16
Resume MRoyse 10_16Resume MRoyse 10_16
Resume MRoyse 10_16Martin Royse
 
Abdullah Jaber Civil Eng CV EXP. 5 yrs
Abdullah Jaber Civil Eng CV EXP. 5 yrsAbdullah Jaber Civil Eng CV EXP. 5 yrs
Abdullah Jaber Civil Eng CV EXP. 5 yrsAbdullah Jaber
 
Application Engineer Melissa Watts Résumé
Application Engineer Melissa Watts Résumé Application Engineer Melissa Watts Résumé
Application Engineer Melissa Watts Résumé Melissa Urdaneta Watts
 

What's hot (20)

tufail CV dxb
tufail CV dxbtufail CV dxb
tufail CV dxb
 
Cv For Sitemanager
Cv For SitemanagerCv For Sitemanager
Cv For Sitemanager
 
CV_Ahmed Zaki
CV_Ahmed ZakiCV_Ahmed Zaki
CV_Ahmed Zaki
 
Amruta shinde resume
Amruta shinde resumeAmruta shinde resume
Amruta shinde resume
 
hikal CV June 2016
hikal CV June 2016hikal CV June 2016
hikal CV June 2016
 
Ahmed.Hassan_CV
Ahmed.Hassan_CVAhmed.Hassan_CV
Ahmed.Hassan_CV
 
Behnam Nikouei resume
Behnam Nikouei resumeBehnam Nikouei resume
Behnam Nikouei resume
 
SambhuSureshPlanningEr
SambhuSureshPlanningErSambhuSureshPlanningEr
SambhuSureshPlanningEr
 
CV_SR MEP MANAGER. NT.
CV_SR MEP MANAGER. NT.CV_SR MEP MANAGER. NT.
CV_SR MEP MANAGER. NT.
 
CV imran-Asghar
CV imran-AsgharCV imran-Asghar
CV imran-Asghar
 
SELVA RESUME
SELVA RESUMESELVA RESUME
SELVA RESUME
 
Ahmed Gameel_CV
Ahmed Gameel_CVAhmed Gameel_CV
Ahmed Gameel_CV
 
Resume MRoyse 10_16
Resume MRoyse 10_16Resume MRoyse 10_16
Resume MRoyse 10_16
 
MOHAN M&E SUPERVISOR CV
MOHAN M&E SUPERVISOR CVMOHAN M&E SUPERVISOR CV
MOHAN M&E SUPERVISOR CV
 
Abdallah Aboulatta
Abdallah AboulattaAbdallah Aboulatta
Abdallah Aboulatta
 
Mohamed_Quandeel_Quandeel
Mohamed_Quandeel_QuandeelMohamed_Quandeel_Quandeel
Mohamed_Quandeel_Quandeel
 
DCs CV
DCs CVDCs CV
DCs CV
 
Electrical Engineer Cv
Electrical Engineer CvElectrical Engineer Cv
Electrical Engineer Cv
 
Abdullah Jaber Civil Eng CV EXP. 5 yrs
Abdullah Jaber Civil Eng CV EXP. 5 yrsAbdullah Jaber Civil Eng CV EXP. 5 yrs
Abdullah Jaber Civil Eng CV EXP. 5 yrs
 
Application Engineer Melissa Watts Résumé
Application Engineer Melissa Watts Résumé Application Engineer Melissa Watts Résumé
Application Engineer Melissa Watts Résumé
 

Viewers also liked

Guía destino Europa 2015 (Observatorio Vasco de la Juventud)
Guía destino Europa 2015 (Observatorio Vasco de la Juventud)Guía destino Europa 2015 (Observatorio Vasco de la Juventud)
Guía destino Europa 2015 (Observatorio Vasco de la Juventud)
Irekia - EJGV
 
Power Point de imagenes navideñas
Power Point de imagenes navideñas Power Point de imagenes navideñas
Power Point de imagenes navideñas
rosacnsg
 
95 propuestas para un chile mejor
95 propuestas para un chile mejor95 propuestas para un chile mejor
95 propuestas para un chile mejorMaria Peigneguy
 
Ict mentor el lesson prsntshn
Ict mentor el lesson prsntshnIct mentor el lesson prsntshn
Ict mentor el lesson prsntshnDezmond Zhong
 
Tu Me Enseñaste
Tu Me EnseñasteTu Me Enseñaste
Tu Me Enseñasteluna19
 
Resume 2015 Valier
Resume 2015 ValierResume 2015 Valier
Resume 2015 ValierHelen Valier
 
China Care Final Presentation
China Care Final PresentationChina Care Final Presentation
China Care Final Presentation
Erica Swallow
 
SACRIFICIO ANIMAL “LOS ANIMALES MERECEN RESPETO”
 SACRIFICIO ANIMAL “LOS ANIMALES MERECEN RESPETO” SACRIFICIO ANIMAL “LOS ANIMALES MERECEN RESPETO”
SACRIFICIO ANIMAL “LOS ANIMALES MERECEN RESPETO”
LULU977
 
Dossier Semana más Corta
Dossier Semana más CortaDossier Semana más Corta
Dossier Semana más Corta
Isaias Ortiz
 
tesis gestiom de riesgo de desastre
tesis gestiom de riesgo de desastre tesis gestiom de riesgo de desastre
tesis gestiom de riesgo de desastre
Brandon Chuchon Alarcon
 
Kermesse 2011
Kermesse 2011Kermesse 2011
Consideraciones técnicas para el establecimiento y manejo del cultivo del cau...
Consideraciones técnicas para el establecimiento y manejo del cultivo del cau...Consideraciones técnicas para el establecimiento y manejo del cultivo del cau...
Consideraciones técnicas para el establecimiento y manejo del cultivo del cau...
Cesar Lascarro
 
Fic real estate fund ltd v phoenix land ventures ltd 2015
Fic real estate fund ltd v phoenix land ventures ltd 2015Fic real estate fund ltd v phoenix land ventures ltd 2015
Fic real estate fund ltd v phoenix land ventures ltd 2015
johnhylandmohawk
 
Jorge Díaz Gutierrez
Jorge Díaz GutierrezJorge Díaz Gutierrez
Jorge Díaz Gutierrez
Olga Mendez
 
SPRINTERS COURIERS AND LOGISTICS - Profile
SPRINTERS COURIERS AND LOGISTICS - ProfileSPRINTERS COURIERS AND LOGISTICS - Profile
SPRINTERS COURIERS AND LOGISTICS - Profile
Salum Awadh
 
ARKOIL Technologies_oil tank cleaning_final
ARKOIL Technologies_oil tank cleaning_finalARKOIL Technologies_oil tank cleaning_final
ARKOIL Technologies_oil tank cleaning_finalAmir Dzugatti
 
Bosch catálogo diesel bombas ve 1999 2000
Bosch catálogo diesel bombas ve 1999 2000Bosch catálogo diesel bombas ve 1999 2000
Bosch catálogo diesel bombas ve 1999 2000
Adilson Amorim
 

Viewers also liked (20)

Guía destino Europa 2015 (Observatorio Vasco de la Juventud)
Guía destino Europa 2015 (Observatorio Vasco de la Juventud)Guía destino Europa 2015 (Observatorio Vasco de la Juventud)
Guía destino Europa 2015 (Observatorio Vasco de la Juventud)
 
Power Point de imagenes navideñas
Power Point de imagenes navideñas Power Point de imagenes navideñas
Power Point de imagenes navideñas
 
95 propuestas para un chile mejor
95 propuestas para un chile mejor95 propuestas para un chile mejor
95 propuestas para un chile mejor
 
Ict mentor el lesson prsntshn
Ict mentor el lesson prsntshnIct mentor el lesson prsntshn
Ict mentor el lesson prsntshn
 
Tu Me Enseñaste
Tu Me EnseñasteTu Me Enseñaste
Tu Me Enseñaste
 
Resume 2015 Valier
Resume 2015 ValierResume 2015 Valier
Resume 2015 Valier
 
China Care Final Presentation
China Care Final PresentationChina Care Final Presentation
China Care Final Presentation
 
SACRIFICIO ANIMAL “LOS ANIMALES MERECEN RESPETO”
 SACRIFICIO ANIMAL “LOS ANIMALES MERECEN RESPETO” SACRIFICIO ANIMAL “LOS ANIMALES MERECEN RESPETO”
SACRIFICIO ANIMAL “LOS ANIMALES MERECEN RESPETO”
 
Dossier Semana más Corta
Dossier Semana más CortaDossier Semana más Corta
Dossier Semana más Corta
 
Que es merchandising
Que es merchandisingQue es merchandising
Que es merchandising
 
tesis gestiom de riesgo de desastre
tesis gestiom de riesgo de desastre tesis gestiom de riesgo de desastre
tesis gestiom de riesgo de desastre
 
Kermesse 2011
Kermesse 2011Kermesse 2011
Kermesse 2011
 
Antigua bendicion celta
Antigua bendicion celtaAntigua bendicion celta
Antigua bendicion celta
 
Consideraciones técnicas para el establecimiento y manejo del cultivo del cau...
Consideraciones técnicas para el establecimiento y manejo del cultivo del cau...Consideraciones técnicas para el establecimiento y manejo del cultivo del cau...
Consideraciones técnicas para el establecimiento y manejo del cultivo del cau...
 
Fic real estate fund ltd v phoenix land ventures ltd 2015
Fic real estate fund ltd v phoenix land ventures ltd 2015Fic real estate fund ltd v phoenix land ventures ltd 2015
Fic real estate fund ltd v phoenix land ventures ltd 2015
 
Jorge Díaz Gutierrez
Jorge Díaz GutierrezJorge Díaz Gutierrez
Jorge Díaz Gutierrez
 
SPRINTERS COURIERS AND LOGISTICS - Profile
SPRINTERS COURIERS AND LOGISTICS - ProfileSPRINTERS COURIERS AND LOGISTICS - Profile
SPRINTERS COURIERS AND LOGISTICS - Profile
 
ARKOIL Technologies_oil tank cleaning_final
ARKOIL Technologies_oil tank cleaning_finalARKOIL Technologies_oil tank cleaning_final
ARKOIL Technologies_oil tank cleaning_final
 
Bosch catálogo diesel bombas ve 1999 2000
Bosch catálogo diesel bombas ve 1999 2000Bosch catálogo diesel bombas ve 1999 2000
Bosch catálogo diesel bombas ve 1999 2000
 
Clavados
ClavadosClavados
Clavados
 

Similar to Abdallah Planning

ELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEsekar palani
 
Ahmed_Mohammed
Ahmed_MohammedAhmed_Mohammed
Ahmed_Mohammedahmed ali
 
Resume
ResumeResume
Resume of Islam M. Elshora MEP Technical Office & BIM Manager
Resume of Islam M. Elshora MEP Technical Office & BIM Manager Resume of Islam M. Elshora MEP Technical Office & BIM Manager
Resume of Islam M. Elshora MEP Technical Office & BIM Manager Islam Elshoura
 
CV - Tarun (Electrical Engineer)
CV - Tarun (Electrical Engineer) CV - Tarun (Electrical Engineer)
CV - Tarun (Electrical Engineer) Tarun Kumar
 
CV Electrical Engineer - Emad Ahmed Mohamed Sabek
CV Electrical Engineer - Emad  Ahmed Mohamed SabekCV Electrical Engineer - Emad  Ahmed Mohamed Sabek
CV Electrical Engineer - Emad Ahmed Mohamed SabekEmad Ahmed Mohamed Sabek
 
Saibal Datta_CV15122015
Saibal Datta_CV15122015Saibal Datta_CV15122015
Saibal Datta_CV15122015Saibal Datta
 
YOGESH ELECTRICAL ENGG
YOGESH ELECTRICAL ENGG YOGESH ELECTRICAL ENGG
YOGESH ELECTRICAL ENGG yogesh kumar
 

Similar to Abdallah Planning (20)

Syed C.V
Syed C.VSyed C.V
Syed C.V
 
Yahya Khan CV(1)
Yahya Khan CV(1)Yahya Khan CV(1)
Yahya Khan CV(1)
 
ELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAE
 
Resume_sdy-4-1
Resume_sdy-4-1Resume_sdy-4-1
Resume_sdy-4-1
 
V.GUHAN-CV 01 link
V.GUHAN-CV 01 linkV.GUHAN-CV 01 link
V.GUHAN-CV 01 link
 
Project Engineer1
Project Engineer1Project Engineer1
Project Engineer1
 
Ahmed_Mohammed
Ahmed_MohammedAhmed_Mohammed
Ahmed_Mohammed
 
Resume
ResumeResume
Resume
 
Resume
Resume Resume
Resume
 
CV_WALEED
CV_WALEEDCV_WALEED
CV_WALEED
 
Resume of Islam M. Elshora MEP Technical Office & BIM Manager
Resume of Islam M. Elshora MEP Technical Office & BIM Manager Resume of Islam M. Elshora MEP Technical Office & BIM Manager
Resume of Islam M. Elshora MEP Technical Office & BIM Manager
 
CV - Tarun (Electrical Engineer)
CV - Tarun (Electrical Engineer) CV - Tarun (Electrical Engineer)
CV - Tarun (Electrical Engineer)
 
CV Electrical Engineer - Emad Ahmed Mohamed Sabek
CV Electrical Engineer - Emad  Ahmed Mohamed SabekCV Electrical Engineer - Emad  Ahmed Mohamed Sabek
CV Electrical Engineer - Emad Ahmed Mohamed Sabek
 
Anshul_Resume
Anshul_Resume Anshul_Resume
Anshul_Resume
 
Saibal Datta_CV15122015
Saibal Datta_CV15122015Saibal Datta_CV15122015
Saibal Datta_CV15122015
 
Abdelmouizz Mahfouz
Abdelmouizz MahfouzAbdelmouizz Mahfouz
Abdelmouizz Mahfouz
 
YOGESH ELECTRICAL ENGG
YOGESH ELECTRICAL ENGG YOGESH ELECTRICAL ENGG
YOGESH ELECTRICAL ENGG
 
Mohammed Islam's Resume-05-20-15
Mohammed Islam's Resume-05-20-15Mohammed Islam's Resume-05-20-15
Mohammed Islam's Resume-05-20-15
 
ALAA ABBAS
ALAA ABBASALAA ABBAS
ALAA ABBAS
 
Electrical_Engineer_CV
Electrical_Engineer_CVElectrical_Engineer_CV
Electrical_Engineer_CV
 

Recently uploaded

HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
abh.arya
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
Kamal Acharya
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
MuhammadTufail242431
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
Kamal Acharya
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
Kamal Acharya
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 

Recently uploaded (20)

HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 

Abdallah Planning

  • 1. 1 CurriculumVitae AbdallahSoliman–PlanningEngineer Character and Objectives I would like to Elaborate about my experience on construction field as I worked as planning engineer at main contractor for Turnkey Project “EPC” at power plant, I have strong motive for learning and working and I am a hard worker and used to spend all my time until finishing the job I assigned, Seeking for challenging career opportunity in reputable company. Education 2014 – 2016 Diploma Project Management “PRMG” American University in Cairo 2007–2012 Bachelor of Engineering, Cairo University, Electrical Power department. 2014 –2014 Preparation for LEED Certificate American University in Cairo Work History Jan 2015 – Dec 2015 Planning and Cost Control Engineer (El-Sewedy PSP)  Beni- Suief Power Generation Combined Cycle Plant 4800 MW.  Consortium with Siemens.  “8 Gas Turbine, 8 HRSG, 4 Steam Turbine”.  Fast track Project “Three year”  EPC Contract.  Project Budget :2,736,000,000 LE 1. Preparing Baseline schedules. 2. Loading schedules with the budgeted cost, and resources. 3. Updating Program of works according to site data. 4. Preparing Daily, Weekly and Monthly progress Reports. 5. Following up engineering RFQ’s & Specs. Till issuing DWG to construction to Install. 6. Following Up Procurement all Material from purchase order to Delivery to Site. Jan 2015 – Dec 2015 Planning and Cost Control Engineer (El-Sewedy PSP)  Attaqa Power Generation Simple Cycle Plant 650 MW “Four Gas Turbines”.  Fast track Project “One year”  EPC Contract.  Project Budget : 772,870,005 LE 1. Preparing Baseline schedules. 2. Loading schedules with the budgeted cost, and resources. 3. Updating Program of works according to site data. 4. Preparing Daily, Weekly and Monthly progress Reports. 5. Following up engineering RFQ’s & Specs. Till issuing DWG to construction to Install. 6. Following Up Procurement all Material from purchase order to Delivery to Site. 7. Following up project progress and highlighting delayed activities. 8. Attending progress meeting for monitoring project status. 9. Preparation of Prospective Time Impact Analysis and Time claims.
  • 2. 2 July 2013 – Jan2015 Construction Electrical Engineer (DETAC)  Raya Plaza Mall – 6th October – Jizah  Hanging gardens - Porto Ain ElSokhna 1. Generally responsible for implementations and monitoring of electrical related works at site. 2. Installation of all electrical systems as (Lighting- Power- MDP-RMU-Transformer-LV&MV cables terminations) and light current systems as (Fire alarm-Data-Telephone-CCTV-Sound-BMS). 3. Plans the execution of all electrical related works and coordinates the works to mechanical group. 4. Supports the Asst. Project Manager in accomplishing all the goals for the electrical groups at site. 5. Prepare specifications for purchase of materials and equipment. 6. Collect data relating to commercial and residential development, population, and power system interconnection to determine operating efficiency of electrical systems. Jan 2013 –June 2013 Sales Electrical Engineer Sinalight Company  Lighting Fixtures & Electrical Panels Computer skills  AutoCAD  Dialux  MS-Office (Word, Excel, Power point…)  Primavera P6 Language  Arabic: (Mother tongue).  English: (Excellent).  French: (Fair) Personal Details Name: Abdallah Ismail Abdelhalim Muhammad Soliman Email: Abdallah.I.omara@gmail.com Mobile:+2010 046 466 82 Address: 6th October, Giza, Egypt. Date of birth: 30/03/1991 Marital Status : Single Military Status: Exempted Bachelor: Faculty of Engineering, Cairo University B.Sc. Date: July 2012 Department: Electrical Power Engineering Further Information or references Furnished upon Request.