SlideShare a Scribd company logo
ASAS SAINS DATA DALAM
PENGANGKUTAN
(LMCP1352)
PROJEK AKHIR
NAMA : AIDA ZAHIRAH BINTI SAMSUDIN
NO MATRIK : A164543
NAMA PENSYARAH : PROF DATO IR DR RIZA ATIQ ABDULLAH BIN 0.K.RAHMAT
SOALAN
Bandar Rumah Luas
Lantai
A 16,500 1,050,000
B 19,000 1,290,000
C 31,000 1,940,000
D 27,000 1,850,000
E 21,500 1,430,000
F 17,500 1,230,000
Bandar Pengeluaran Penarikan
A 36,300 34,650
B 41,800 42,570
C 68,200 64,020
D 59,400 61,050
E 47,300 47,190
F 38,500 40,590
• Kadar Penarikan: 2.2 Setiap Rumah
• Kadar Pengeluaran : 3.3 Setiap 100m Per Luas Lantai
1)
KIRAKAN PENGELUARAN DAN PENARIKAN BAGI SETIAP BANDAR.
BANDAR PENGELUARAN PENARIKAN
A 36,300 34,650
B 41,800 42,570
C 68,200 64,020
D 59,400 61,050
E 47,300 47,190
F 38,500 40,590
BANDAR PENGELUARAN PENARIKAN
A 12418 11854
B 14300 14563
C 23332 21902
D 20321 20886
E 16182 16144
F 13171 13886
Pengeluaran/ Penarikan x 65% ÷1.9
2)
JIKA 65% PERJALANAN MENGGUNAKAN KERETA PERSENDIRIAN DAN
PURATA ISIKERETA IALAH 1.9 ORANG/KERETA, KIRAKAN
PENGELUARAN DAN PENARIKAN PERJALANAN KERETA BAGI SETIAP
BANDAR.
BANDAR PENARIKAN PENGELUARAN
A 12388 11883
B 14265 14599
C 23274 21956
D 20271 20937
E 16142 16184
F 13139 13920
JUMLAH
99479 99479
3)
KIRAKAN SEMULA PENGELUARAN DAN PENARIKAN SUPAYA JUMLAH
PENGELUARAN DAN PENARIKAN MENJADI SAMA.
4)
KIRAKAN MATRIKS PERJALANAN ASALAN-TUJUAN
BANDAR A B C D E F PENGELUARAN
A 1,480 1,818 2,734 2,607 2,015 1,733 12,388
B 1,704 2,093 3,148 3,003 2,321 1,996 14,265
C 2,780 3,416 5,137 4,898 3,786 3,257 23,274
D 2,421 2,975 4,474 4,266 3,298 2,837 20,271
E 1,928 2,369 3,563 3,397 2,626 2,259 16,142
F 1,569 1,928 2,900 2,765 2,137 1,839 13,139
PENARIKAN 11,883 14,599 21,956 20,937 16,184 13,920 99,479
Purata: Pengeluaran + Penarikan
= 69,636
2
5)
JIKA 70% PERJALANAN ANTARA BANDAR MENGGUNAKAN LEBUH RAYA,
KIRAKAN SEMULA MATRIKS PERJALANAN ASAL- TUJUAN BAGI KERETA
YANG MELALUI LEBUH RAYA
BANDAR PENGELUARAN PENARIKAN
A 12,418 11,854
B 14,300 14,563
C 23,332 21,902
D 20,321 20,886
E 16,182 16,144
F 13,171 13,886
BANDAR RUMAH LUAS LANTAI
A 8,693 8,298
B 10,010 10,194
C 16,332 15,331
D 14,225 14,620
E 11,327 11,301
F 9,220 9,720
JUMLAH 69,807 69,464
PURATA PENGELUARAN DAN PENARIKAN = 69635
BANDAR PENGELUARAN PENARIKAN
A 8,672 8,318
B 9,985 10220
C 16,292 15,369
D 14,190 14,656
E 11,299 11,329
F 9,197 9,744
JUMLAH 69,635 69,635
Bandar A B C D E F Pengeluaran
A 1,036 1,273 1,914 1,825 1,411 1,213 8,671
B 1,193 1,465 2,204 2,102 1,624 1,397 9,985
C 1,946 2,391 3,596 3,429 2,651 2,280 16,292
D 1,695 2,082 3,132 2,987 2,308 1,986 14,190
E 1,350 1,658 2,494 2,378 1,838 1,581 11,300
F 1,099 1,350 2,030 1,936 1,496 1,287 9,197
Penarikan 8,318 10,219 15,369 14,656 11,329 9,744 69,636
MATRIKS-ASALAN DAN TUJUAN YANG BAHARU
TUJUAN
A
S
A
L
A
N
Bandar A B C D E F Umpukan
A 1,273 1,914 1,825 1,411 1,213 7,635
B 1,193 2,204 2,102 1,624 1,397 13,690
C 1,946 2,391 3,429 2,651 2,280 17,932
D 1,695 2,082 3,132 2,308 1,986 14,870
E 1,350 1,658 2,494 2,378 1,581 8,457
F 1,099 1,350 2,030 1,936 1,496
Umpukan 7,282 13,571 16,889 14,294 7,910
6)
UMPUKAN PERJALANAN LALU LINTAS DI ANTARA BANDAR-BANDAR
BAGI KEDUA-DUA ARAH
Kadar yang perlu dibayar mengikut bandar adalah : Jarak x RM0.20
Jumlah kutipan per bandar adalah:
(Jarak x RM0.20) x Jumlah perjalanan kereta
7)
JIKA KADAR TOL YANG DIKENAKAN SEBANYAK RM0.20 BAGI SETIAP
KM, KIRAKAN JUMLAH KUTIPAN TOL
JUMLAH KUTIPAN TOL JIKA BERMULA DARI BANDAR A DAN BERAKHIR
DI BANDAR F
Bandar A B C D E F
Jumlah kereta
yang memasuki
tol
7,635 6,362 4,449 2,624 1,213
7,327 5,123 3,021 1,397
8,359 4,930 2,280
4,294 1,986
1,581
Jarak (km)
*0.20 (RM)
0 RM3.80 RM4.20 RM3.00 RM3.40 RM3.60
(RM) 0 29,013 57,496 53,793 50,556 30,443
Jumlah RM 221,302
JUMLAH KUTIPAN TOL JIKA BERMULA DARI BANDAR F DAN
BERAKHIR DIBANDAR A
Bandar A B C D E F
Jumlah kereta yang
memasuki tol
1,098 2,448 4,478 6,414 7,910
1,350 3,008 5,502 7,880
1,695 3,777 6,909
1,946 4,337
1,193
Jarak (KM)
*0.20 (RM)
RM 3.80 RM 4.20 RM 3.00 RM 3.40 RM 3.60 0
(RM) 26,671 56,995 50,666 48,599 28,476 0
Jumlah RM 212,408
Jumlah Kesemua Kutipan Tol= Jumlah Kutipan Tol Jika Bermula Dari Bandar A Dan Berakhir Di
Bandar F + Jumlah Kutipan Tol Jika Bermula Dari Bandar F Dan Berakhir Di Bandar A
= RM 221,302 + RM 212,408
= RM 433,709
SOALAN 8
PENGALIRAN LALU LINTAS YANG ANDA KIRA ADALAH
JUMLAH : 1904 JUMLAH : 1824
PERJALANAN SEHARI JIKA 30% PENGALIRAN INI ADALAH DALAM MASA SATU JAM
PUNCAK, KIRAKAN PENGALIRAN MAKSIMUM / JAM
Pengiraan Maksimum/ Jam = [ ( 70 / 100) X Perjalanan Dari Suatu Bandar ÷ 23
A B C D E F
PENGALIRANMAKSIMUM/JAM
232 194 135 80 37
223 160 92 43
254 150 69
131 60
48
A B C D E F
PENGALIRANMAKSIMUM/JAM
33 75 136 195 241
41 92 167 240
52 115 210
59 132
36
A
B F
E
D
C
9)
LUKISKAN VISUAL UMPUKAN PERJALANAN ANTARA BANDAR
Bandar A Bandar F Bandar F Bandar A
10)
JIKA MUATAN JALAN RAYA ADALAH 1800 KERETA/JAM,
BERAPA LORONG LEBUH RAYA PATUT DIBINA?
JUMLAH
UMPUKAN
x 30%
JUMLAH
LORONG
YANG
DIPERLU
A → B 7635 2291 2
B → C 13690 4107 3
C → D 17932 5389 3
D → E 14780 4434 3
E → F 8457 2537 2
JUMLAH
UMPUKAN
x 30%
JUMLAH
LORONG
YANG
DIPERLU
F → E 7910
2373 2
E → D 14294
4288 3
D → C 16889
5067 3
C → B 13571
4071 3
B → A 7282
2185 2
A164543 projek akhir asas sains data dalam pengangkutan

More Related Content

What's hot

Projek Akhir Asas asas Sains Data Dalam Pengangkutan (A168202)
Projek Akhir Asas asas Sains Data Dalam Pengangkutan (A168202)Projek Akhir Asas asas Sains Data Dalam Pengangkutan (A168202)
Projek Akhir Asas asas Sains Data Dalam Pengangkutan (A168202)
SarasvathiSivaraman
 
Tugasan visual agihan perjalanan
Tugasan visual agihan perjalananTugasan visual agihan perjalanan
Tugasan visual agihan perjalanan
Universiti Kebangsaan Malaysia
 
Module 8 tugasan visual agihan perjalanan (a170308)
Module 8   tugasan visual agihan perjalanan (a170308)Module 8   tugasan visual agihan perjalanan (a170308)
Module 8 tugasan visual agihan perjalanan (a170308)
a170308
 
A160181 tugasan visual agihan perjalanan
A160181 tugasan visual agihan perjalananA160181 tugasan visual agihan perjalanan
A160181 tugasan visual agihan perjalanan
Chanyy96
 
A161446 Tugasan Pengagihan Perjalanan
A161446   Tugasan Pengagihan PerjalananA161446   Tugasan Pengagihan Perjalanan
A161446 Tugasan Pengagihan Perjalanan
Asyraaf Afandi
 
A160181 tugasan pisah ragaman
A160181 tugasan pisah ragamanA160181 tugasan pisah ragaman
A160181 tugasan pisah ragaman
Chanyy96
 
Tugasan Pisah Ragaman
Tugasan Pisah RagamanTugasan Pisah Ragaman
Tugasan Pisah Ragaman
LIMCHINLUN
 
Tugasan visual agihan perjalanan (a170432)
Tugasan visual agihan perjalanan (a170432)Tugasan visual agihan perjalanan (a170432)
Tugasan visual agihan perjalanan (a170432)
NurulNajwaNajihah
 
Tugasan visual penjanaan perjalanan
Tugasan visual penjanaan perjalananTugasan visual penjanaan perjalanan
Tugasan visual penjanaan perjalanan
LIMCHINLUN
 
Tugasan kluster (A170697)
Tugasan kluster (A170697)Tugasan kluster (A170697)
Tugasan kluster (A170697)
NURAZMINAMOHAMAD
 
Tugasan Visual Umpukan Perjalanan
Tugasan Visual Umpukan PerjalananTugasan Visual Umpukan Perjalanan
Tugasan Visual Umpukan Perjalanan
LIMCHINLUN
 
A161446 Tugasan Visualisasi Penjanaan Perjalanan
A161446   Tugasan Visualisasi Penjanaan PerjalananA161446   Tugasan Visualisasi Penjanaan Perjalanan
A161446 Tugasan Visualisasi Penjanaan Perjalanan
Asyraaf Afandi
 
Tugasan pisah ragaman
Tugasan pisah ragamanTugasan pisah ragaman
Tugasan pisah ragaman
AINAAMIRAHJAMRIY
 
TUGASAN VISUALISASI PENJANAAN PERJALANAN (modul 6)
TUGASAN VISUALISASI PENJANAAN PERJALANAN (modul 6) TUGASAN VISUALISASI PENJANAAN PERJALANAN (modul 6)
TUGASAN VISUALISASI PENJANAAN PERJALANAN (modul 6)
eikarshdn
 
Projek akhir lmcp1352 asas asas sains data dalam pengangkutan
Projek akhir lmcp1352 asas asas sains data dalam pengangkutanProjek akhir lmcp1352 asas asas sains data dalam pengangkutan
Projek akhir lmcp1352 asas asas sains data dalam pengangkutan
UNIVERSITI KEBANGSAAN MALAYSIA
 
Keberkesanan Dasar
Keberkesanan DasarKeberkesanan Dasar
Keberkesanan Dasar
Universiti Kebangsaan Malaysia
 
A157071 Modul 8 Tugasan Visual Agihan Perjalanan
A157071 Modul 8 Tugasan Visual Agihan PerjalananA157071 Modul 8 Tugasan Visual Agihan Perjalanan
A157071 Modul 8 Tugasan Visual Agihan Perjalanan
Loh Siew Ling
 
A169571 tugasan pengagihan perjalanan
A169571 tugasan pengagihan perjalananA169571 tugasan pengagihan perjalanan
A169571 tugasan pengagihan perjalanan
AZEEMSHAHAMIRUDDIN
 
Tugasan pisah ragaman
Tugasan pisah ragamanTugasan pisah ragaman
Tugasan pisah ragaman
RaVitalaRamaMoorthy
 
Pisah ragaman
Pisah ragamanPisah ragaman

What's hot (20)

Projek Akhir Asas asas Sains Data Dalam Pengangkutan (A168202)
Projek Akhir Asas asas Sains Data Dalam Pengangkutan (A168202)Projek Akhir Asas asas Sains Data Dalam Pengangkutan (A168202)
Projek Akhir Asas asas Sains Data Dalam Pengangkutan (A168202)
 
Tugasan visual agihan perjalanan
Tugasan visual agihan perjalananTugasan visual agihan perjalanan
Tugasan visual agihan perjalanan
 
Module 8 tugasan visual agihan perjalanan (a170308)
Module 8   tugasan visual agihan perjalanan (a170308)Module 8   tugasan visual agihan perjalanan (a170308)
Module 8 tugasan visual agihan perjalanan (a170308)
 
A160181 tugasan visual agihan perjalanan
A160181 tugasan visual agihan perjalananA160181 tugasan visual agihan perjalanan
A160181 tugasan visual agihan perjalanan
 
A161446 Tugasan Pengagihan Perjalanan
A161446   Tugasan Pengagihan PerjalananA161446   Tugasan Pengagihan Perjalanan
A161446 Tugasan Pengagihan Perjalanan
 
A160181 tugasan pisah ragaman
A160181 tugasan pisah ragamanA160181 tugasan pisah ragaman
A160181 tugasan pisah ragaman
 
Tugasan Pisah Ragaman
Tugasan Pisah RagamanTugasan Pisah Ragaman
Tugasan Pisah Ragaman
 
Tugasan visual agihan perjalanan (a170432)
Tugasan visual agihan perjalanan (a170432)Tugasan visual agihan perjalanan (a170432)
Tugasan visual agihan perjalanan (a170432)
 
Tugasan visual penjanaan perjalanan
Tugasan visual penjanaan perjalananTugasan visual penjanaan perjalanan
Tugasan visual penjanaan perjalanan
 
Tugasan kluster (A170697)
Tugasan kluster (A170697)Tugasan kluster (A170697)
Tugasan kluster (A170697)
 
Tugasan Visual Umpukan Perjalanan
Tugasan Visual Umpukan PerjalananTugasan Visual Umpukan Perjalanan
Tugasan Visual Umpukan Perjalanan
 
A161446 Tugasan Visualisasi Penjanaan Perjalanan
A161446   Tugasan Visualisasi Penjanaan PerjalananA161446   Tugasan Visualisasi Penjanaan Perjalanan
A161446 Tugasan Visualisasi Penjanaan Perjalanan
 
Tugasan pisah ragaman
Tugasan pisah ragamanTugasan pisah ragaman
Tugasan pisah ragaman
 
TUGASAN VISUALISASI PENJANAAN PERJALANAN (modul 6)
TUGASAN VISUALISASI PENJANAAN PERJALANAN (modul 6) TUGASAN VISUALISASI PENJANAAN PERJALANAN (modul 6)
TUGASAN VISUALISASI PENJANAAN PERJALANAN (modul 6)
 
Projek akhir lmcp1352 asas asas sains data dalam pengangkutan
Projek akhir lmcp1352 asas asas sains data dalam pengangkutanProjek akhir lmcp1352 asas asas sains data dalam pengangkutan
Projek akhir lmcp1352 asas asas sains data dalam pengangkutan
 
Keberkesanan Dasar
Keberkesanan DasarKeberkesanan Dasar
Keberkesanan Dasar
 
A157071 Modul 8 Tugasan Visual Agihan Perjalanan
A157071 Modul 8 Tugasan Visual Agihan PerjalananA157071 Modul 8 Tugasan Visual Agihan Perjalanan
A157071 Modul 8 Tugasan Visual Agihan Perjalanan
 
A169571 tugasan pengagihan perjalanan
A169571 tugasan pengagihan perjalananA169571 tugasan pengagihan perjalanan
A169571 tugasan pengagihan perjalanan
 
Tugasan pisah ragaman
Tugasan pisah ragamanTugasan pisah ragaman
Tugasan pisah ragaman
 
Pisah ragaman
Pisah ragamanPisah ragaman
Pisah ragaman
 

Similar to A164543 projek akhir asas sains data dalam pengangkutan

Projek akhir a163333
Projek akhir a163333Projek akhir a163333
Projek akhir a163333
Imman Nerrysya
 
A157705 projek akhir
A157705 projek akhirA157705 projek akhir
A157705 projek akhir
Chiew Pei Lian
 
Yee Xin Ni a161031 project akhir
Yee Xin Ni a161031 project akhirYee Xin Ni a161031 project akhir
Yee Xin Ni a161031 project akhir
Yeexinni
 
[A167649] Projek Akhir Asas-Asas Sains Data dalam Pengangkutan
[A167649] Projek Akhir Asas-Asas Sains Data dalam Pengangkutan[A167649] Projek Akhir Asas-Asas Sains Data dalam Pengangkutan
[A167649] Projek Akhir Asas-Asas Sains Data dalam Pengangkutan
IzzatHaridan
 
Projek Akhir LMCP 1352 (A168200).pptx
Projek Akhir LMCP 1352 (A168200).pptxProjek Akhir LMCP 1352 (A168200).pptx
Projek Akhir LMCP 1352 (A168200).pptx
AhmadZulirfan
 
Projek akhir a165585_zuriani
Projek akhir a165585_zurianiProjek akhir a165585_zuriani
Projek akhir a165585_zuriani
Zuriani Burhanuddin
 
PLF-1408-AT-SD-CO-011 - REV 00
PLF-1408-AT-SD-CO-011 - REV 00PLF-1408-AT-SD-CO-011 - REV 00
PLF-1408-AT-SD-CO-011 - REV 00Mansoor Sakharkar
 
Design of an industrial park
Design of an industrial parkDesign of an industrial park
Design of an industrial park
Mohammad Alimuzzaman Bappy
 
Ciclovia: Goiânia - Trindade
Ciclovia: Goiânia - TrindadeCiclovia: Goiânia - Trindade
Ciclovia: Goiânia - Trindade
Prefeito Municipal de Trindade Jânio Darrot
 
The watergate confidential
The watergate confidentialThe watergate confidential
The watergate confidential
Haris Memon
 
Modul 6 visual penjanaan perjalanan
Modul 6  visual penjanaan perjalananModul 6  visual penjanaan perjalanan
Modul 6 visual penjanaan perjalanan
shaayesha9
 
ID workshop 2009 presentation
ID workshop 2009 presentationID workshop 2009 presentation
ID workshop 2009 presentation
guest825788f
 
New microsoft office word document
New microsoft office word documentNew microsoft office word document
New microsoft office word documentCanh Nguyen Van
 
Presentasi evaluasi 2014 bid retribusi
Presentasi evaluasi 2014 bid retribusiPresentasi evaluasi 2014 bid retribusi
Presentasi evaluasi 2014 bid retribusi
Yessi Nunuhitu
 
Final presentation with excel 2
Final presentation with excel 2Final presentation with excel 2
Final presentation with excel 2
Aura Investments
 
Project Performance Report August 2018.pptx
Project Performance Report August 2018.pptxProject Performance Report August 2018.pptx
Project Performance Report August 2018.pptx
Chinelo Ezenwa
 
Residence addition _ Structural plans and details
Residence addition _ Structural plans and detailsResidence addition _ Structural plans and details
Residence addition _ Structural plans and detailsTeresa Seasons
 
Assignment - Financial Appraisal
Assignment - Financial AppraisalAssignment - Financial Appraisal
Assignment - Financial Appraisal
Kai Yun Pang
 
Contables
ContablesContables
Contablesnene fi
 

Similar to A164543 projek akhir asas sains data dalam pengangkutan (20)

Projek akhir a163333
Projek akhir a163333Projek akhir a163333
Projek akhir a163333
 
A157705 projek akhir
A157705 projek akhirA157705 projek akhir
A157705 projek akhir
 
Yee Xin Ni a161031 project akhir
Yee Xin Ni a161031 project akhirYee Xin Ni a161031 project akhir
Yee Xin Ni a161031 project akhir
 
[A167649] Projek Akhir Asas-Asas Sains Data dalam Pengangkutan
[A167649] Projek Akhir Asas-Asas Sains Data dalam Pengangkutan[A167649] Projek Akhir Asas-Asas Sains Data dalam Pengangkutan
[A167649] Projek Akhir Asas-Asas Sains Data dalam Pengangkutan
 
Projek Akhir LMCP 1352 (A168200).pptx
Projek Akhir LMCP 1352 (A168200).pptxProjek Akhir LMCP 1352 (A168200).pptx
Projek Akhir LMCP 1352 (A168200).pptx
 
Projek akhir a165585_zuriani
Projek akhir a165585_zurianiProjek akhir a165585_zuriani
Projek akhir a165585_zuriani
 
PLF-1408-AT-SD-CO-011 - REV 00
PLF-1408-AT-SD-CO-011 - REV 00PLF-1408-AT-SD-CO-011 - REV 00
PLF-1408-AT-SD-CO-011 - REV 00
 
HH2 Duong Noi Xuan Mai
HH2 Duong Noi Xuan Mai HH2 Duong Noi Xuan Mai
HH2 Duong Noi Xuan Mai
 
Design of an industrial park
Design of an industrial parkDesign of an industrial park
Design of an industrial park
 
Ciclovia: Goiânia - Trindade
Ciclovia: Goiânia - TrindadeCiclovia: Goiânia - Trindade
Ciclovia: Goiânia - Trindade
 
The watergate confidential
The watergate confidentialThe watergate confidential
The watergate confidential
 
Modul 6 visual penjanaan perjalanan
Modul 6  visual penjanaan perjalananModul 6  visual penjanaan perjalanan
Modul 6 visual penjanaan perjalanan
 
ID workshop 2009 presentation
ID workshop 2009 presentationID workshop 2009 presentation
ID workshop 2009 presentation
 
New microsoft office word document
New microsoft office word documentNew microsoft office word document
New microsoft office word document
 
Presentasi evaluasi 2014 bid retribusi
Presentasi evaluasi 2014 bid retribusiPresentasi evaluasi 2014 bid retribusi
Presentasi evaluasi 2014 bid retribusi
 
Final presentation with excel 2
Final presentation with excel 2Final presentation with excel 2
Final presentation with excel 2
 
Project Performance Report August 2018.pptx
Project Performance Report August 2018.pptxProject Performance Report August 2018.pptx
Project Performance Report August 2018.pptx
 
Residence addition _ Structural plans and details
Residence addition _ Structural plans and detailsResidence addition _ Structural plans and details
Residence addition _ Structural plans and details
 
Assignment - Financial Appraisal
Assignment - Financial AppraisalAssignment - Financial Appraisal
Assignment - Financial Appraisal
 
Contables
ContablesContables
Contables
 

Recently uploaded

June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
Levi Shapiro
 
Operation Blue Star - Saka Neela Tara
Operation Blue Star   -  Saka Neela TaraOperation Blue Star   -  Saka Neela Tara
Operation Blue Star - Saka Neela Tara
Balvir Singh
 
Acetabularia Information For Class 9 .docx
Acetabularia Information For Class 9  .docxAcetabularia Information For Class 9  .docx
Acetabularia Information For Class 9 .docx
vaibhavrinwa19
 
How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17
Celine George
 
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
EugeneSaldivar
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
siemaillard
 
"Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe..."Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe...
SACHIN R KONDAGURI
 
Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345
beazzy04
 
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
MysoreMuleSoftMeetup
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
Jheel Barad
 
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXPhrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
MIRIAMSALINAS13
 
Introduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp NetworkIntroduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp Network
TechSoup
 
Lapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdfLapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdf
Jean Carlos Nunes Paixão
 
1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx
JosvitaDsouza2
 
The approach at University of Liverpool.pptx
The approach at University of Liverpool.pptxThe approach at University of Liverpool.pptx
The approach at University of Liverpool.pptx
Jisc
 
Polish students' mobility in the Czech Republic
Polish students' mobility in the Czech RepublicPolish students' mobility in the Czech Republic
Polish students' mobility in the Czech Republic
Anna Sz.
 
The French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free downloadThe French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free download
Vivekanand Anglo Vedic Academy
 
Model Attribute Check Company Auto Property
Model Attribute  Check Company Auto PropertyModel Attribute  Check Company Auto Property
Model Attribute Check Company Auto Property
Celine George
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
Thiyagu K
 
Palestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxPalestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptx
RaedMohamed3
 

Recently uploaded (20)

June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
 
Operation Blue Star - Saka Neela Tara
Operation Blue Star   -  Saka Neela TaraOperation Blue Star   -  Saka Neela Tara
Operation Blue Star - Saka Neela Tara
 
Acetabularia Information For Class 9 .docx
Acetabularia Information For Class 9  .docxAcetabularia Information For Class 9  .docx
Acetabularia Information For Class 9 .docx
 
How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17
 
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
 
"Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe..."Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe...
 
Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345
 
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
 
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXPhrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
 
Introduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp NetworkIntroduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp Network
 
Lapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdfLapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdf
 
1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx
 
The approach at University of Liverpool.pptx
The approach at University of Liverpool.pptxThe approach at University of Liverpool.pptx
The approach at University of Liverpool.pptx
 
Polish students' mobility in the Czech Republic
Polish students' mobility in the Czech RepublicPolish students' mobility in the Czech Republic
Polish students' mobility in the Czech Republic
 
The French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free downloadThe French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free download
 
Model Attribute Check Company Auto Property
Model Attribute  Check Company Auto PropertyModel Attribute  Check Company Auto Property
Model Attribute Check Company Auto Property
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
 
Palestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxPalestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptx
 

A164543 projek akhir asas sains data dalam pengangkutan

  • 1. ASAS SAINS DATA DALAM PENGANGKUTAN (LMCP1352) PROJEK AKHIR NAMA : AIDA ZAHIRAH BINTI SAMSUDIN NO MATRIK : A164543 NAMA PENSYARAH : PROF DATO IR DR RIZA ATIQ ABDULLAH BIN 0.K.RAHMAT
  • 3. Bandar Rumah Luas Lantai A 16,500 1,050,000 B 19,000 1,290,000 C 31,000 1,940,000 D 27,000 1,850,000 E 21,500 1,430,000 F 17,500 1,230,000 Bandar Pengeluaran Penarikan A 36,300 34,650 B 41,800 42,570 C 68,200 64,020 D 59,400 61,050 E 47,300 47,190 F 38,500 40,590 • Kadar Penarikan: 2.2 Setiap Rumah • Kadar Pengeluaran : 3.3 Setiap 100m Per Luas Lantai 1) KIRAKAN PENGELUARAN DAN PENARIKAN BAGI SETIAP BANDAR.
  • 4. BANDAR PENGELUARAN PENARIKAN A 36,300 34,650 B 41,800 42,570 C 68,200 64,020 D 59,400 61,050 E 47,300 47,190 F 38,500 40,590 BANDAR PENGELUARAN PENARIKAN A 12418 11854 B 14300 14563 C 23332 21902 D 20321 20886 E 16182 16144 F 13171 13886 Pengeluaran/ Penarikan x 65% ÷1.9 2) JIKA 65% PERJALANAN MENGGUNAKAN KERETA PERSENDIRIAN DAN PURATA ISIKERETA IALAH 1.9 ORANG/KERETA, KIRAKAN PENGELUARAN DAN PENARIKAN PERJALANAN KERETA BAGI SETIAP BANDAR.
  • 5. BANDAR PENARIKAN PENGELUARAN A 12388 11883 B 14265 14599 C 23274 21956 D 20271 20937 E 16142 16184 F 13139 13920 JUMLAH 99479 99479 3) KIRAKAN SEMULA PENGELUARAN DAN PENARIKAN SUPAYA JUMLAH PENGELUARAN DAN PENARIKAN MENJADI SAMA.
  • 6. 4) KIRAKAN MATRIKS PERJALANAN ASALAN-TUJUAN BANDAR A B C D E F PENGELUARAN A 1,480 1,818 2,734 2,607 2,015 1,733 12,388 B 1,704 2,093 3,148 3,003 2,321 1,996 14,265 C 2,780 3,416 5,137 4,898 3,786 3,257 23,274 D 2,421 2,975 4,474 4,266 3,298 2,837 20,271 E 1,928 2,369 3,563 3,397 2,626 2,259 16,142 F 1,569 1,928 2,900 2,765 2,137 1,839 13,139 PENARIKAN 11,883 14,599 21,956 20,937 16,184 13,920 99,479
  • 7. Purata: Pengeluaran + Penarikan = 69,636 2 5) JIKA 70% PERJALANAN ANTARA BANDAR MENGGUNAKAN LEBUH RAYA, KIRAKAN SEMULA MATRIKS PERJALANAN ASAL- TUJUAN BAGI KERETA YANG MELALUI LEBUH RAYA BANDAR PENGELUARAN PENARIKAN A 12,418 11,854 B 14,300 14,563 C 23,332 21,902 D 20,321 20,886 E 16,182 16,144 F 13,171 13,886 BANDAR RUMAH LUAS LANTAI A 8,693 8,298 B 10,010 10,194 C 16,332 15,331 D 14,225 14,620 E 11,327 11,301 F 9,220 9,720 JUMLAH 69,807 69,464
  • 8. PURATA PENGELUARAN DAN PENARIKAN = 69635 BANDAR PENGELUARAN PENARIKAN A 8,672 8,318 B 9,985 10220 C 16,292 15,369 D 14,190 14,656 E 11,299 11,329 F 9,197 9,744 JUMLAH 69,635 69,635
  • 9. Bandar A B C D E F Pengeluaran A 1,036 1,273 1,914 1,825 1,411 1,213 8,671 B 1,193 1,465 2,204 2,102 1,624 1,397 9,985 C 1,946 2,391 3,596 3,429 2,651 2,280 16,292 D 1,695 2,082 3,132 2,987 2,308 1,986 14,190 E 1,350 1,658 2,494 2,378 1,838 1,581 11,300 F 1,099 1,350 2,030 1,936 1,496 1,287 9,197 Penarikan 8,318 10,219 15,369 14,656 11,329 9,744 69,636 MATRIKS-ASALAN DAN TUJUAN YANG BAHARU TUJUAN A S A L A N
  • 10. Bandar A B C D E F Umpukan A 1,273 1,914 1,825 1,411 1,213 7,635 B 1,193 2,204 2,102 1,624 1,397 13,690 C 1,946 2,391 3,429 2,651 2,280 17,932 D 1,695 2,082 3,132 2,308 1,986 14,870 E 1,350 1,658 2,494 2,378 1,581 8,457 F 1,099 1,350 2,030 1,936 1,496 Umpukan 7,282 13,571 16,889 14,294 7,910 6) UMPUKAN PERJALANAN LALU LINTAS DI ANTARA BANDAR-BANDAR BAGI KEDUA-DUA ARAH
  • 11.
  • 12. Kadar yang perlu dibayar mengikut bandar adalah : Jarak x RM0.20 Jumlah kutipan per bandar adalah: (Jarak x RM0.20) x Jumlah perjalanan kereta 7) JIKA KADAR TOL YANG DIKENAKAN SEBANYAK RM0.20 BAGI SETIAP KM, KIRAKAN JUMLAH KUTIPAN TOL
  • 13. JUMLAH KUTIPAN TOL JIKA BERMULA DARI BANDAR A DAN BERAKHIR DI BANDAR F Bandar A B C D E F Jumlah kereta yang memasuki tol 7,635 6,362 4,449 2,624 1,213 7,327 5,123 3,021 1,397 8,359 4,930 2,280 4,294 1,986 1,581 Jarak (km) *0.20 (RM) 0 RM3.80 RM4.20 RM3.00 RM3.40 RM3.60 (RM) 0 29,013 57,496 53,793 50,556 30,443 Jumlah RM 221,302
  • 14. JUMLAH KUTIPAN TOL JIKA BERMULA DARI BANDAR F DAN BERAKHIR DIBANDAR A Bandar A B C D E F Jumlah kereta yang memasuki tol 1,098 2,448 4,478 6,414 7,910 1,350 3,008 5,502 7,880 1,695 3,777 6,909 1,946 4,337 1,193 Jarak (KM) *0.20 (RM) RM 3.80 RM 4.20 RM 3.00 RM 3.40 RM 3.60 0 (RM) 26,671 56,995 50,666 48,599 28,476 0 Jumlah RM 212,408 Jumlah Kesemua Kutipan Tol= Jumlah Kutipan Tol Jika Bermula Dari Bandar A Dan Berakhir Di Bandar F + Jumlah Kutipan Tol Jika Bermula Dari Bandar F Dan Berakhir Di Bandar A = RM 221,302 + RM 212,408 = RM 433,709
  • 15. SOALAN 8 PENGALIRAN LALU LINTAS YANG ANDA KIRA ADALAH JUMLAH : 1904 JUMLAH : 1824 PERJALANAN SEHARI JIKA 30% PENGALIRAN INI ADALAH DALAM MASA SATU JAM PUNCAK, KIRAKAN PENGALIRAN MAKSIMUM / JAM Pengiraan Maksimum/ Jam = [ ( 70 / 100) X Perjalanan Dari Suatu Bandar ÷ 23 A B C D E F PENGALIRANMAKSIMUM/JAM 232 194 135 80 37 223 160 92 43 254 150 69 131 60 48 A B C D E F PENGALIRANMAKSIMUM/JAM 33 75 136 195 241 41 92 167 240 52 115 210 59 132 36
  • 16. A B F E D C 9) LUKISKAN VISUAL UMPUKAN PERJALANAN ANTARA BANDAR
  • 17. Bandar A Bandar F Bandar F Bandar A 10) JIKA MUATAN JALAN RAYA ADALAH 1800 KERETA/JAM, BERAPA LORONG LEBUH RAYA PATUT DIBINA? JUMLAH UMPUKAN x 30% JUMLAH LORONG YANG DIPERLU A → B 7635 2291 2 B → C 13690 4107 3 C → D 17932 5389 3 D → E 14780 4434 3 E → F 8457 2537 2 JUMLAH UMPUKAN x 30% JUMLAH LORONG YANG DIPERLU F → E 7910 2373 2 E → D 14294 4288 3 D → C 16889 5067 3 C → B 13571 4071 3 B → A 7282 2185 2