The Watergate Group of Hotels
• This Watergate Group of Hotels consists of three lands of which two are located
in Dubai Residential Community and one in Jumeirah Village Circle
• These lands will be constructed with three 3 star-hotels which would cater to
leading tourism and residents in the area
• The Watergate Hotel sets a new standard of complete accommodations and
services for the business traveller.
• The Watergate provides exceptional facilities and luxury business living.
Location Dubailand Residential Complex
Plot No. RC-A-076
Plot Area - m2 4381.61
Plot Area - sq,ft 47163.21
Floors/ Max. Height G+14
Construction built up area - sq.ft 226238.35
Allowed F.A.R - sq.ft 226238.35
Provided F.A.R - sq.ft 196729.43
Type No.of Apartments
Studios 49
1 Bedroom 131
2 Bedroom 98
3 Bedroom 20
Total Apartments 298
Car Parking (sq.ft) 173,000
Total Parkings Provided 432
Feasibility Study
Land Cost AED 19,219,200
Construction Cost AED 68,000,000
Avg. Monthly
Return
AED 505,690
IRR 19%
Total Keys 298 Rooms
Avg.Rev Per Room
(Yearly)
AED 81,016
Feasibility Study
Land Cost AED 18,439,200
Construction Cost AED 65,200,000
Avg. Monthly
Return
AED 466,500
IRR 18%
Total Keys 286 Rooms
Avg.Rev Per Room
(Yearly)
AED 80,888
Location Dubailand Residential Complex
Plot No. RC-A-077
Plot Area - m2 3710.79
Plot Area - sq,ft 39942.57
Floors/ Max. Height G+14
Construction built up area - sq.ft 217037.2
Allowed F.A.R - sq.ft 217037.2
Provided F.A.R - sq.ft 188728.84
Type No.of Apartments
Studios 48
1 Bedroom 125
2 Bedroom 94
3 Bedroom 19
Total Apartments 286
Car Parking (sq.ft) 166,000
Total Parkings Provided 432
Feasibility Study
Land Cost AED 15,518,751
Construction Cost AED 60,000,000
Avg. Monthly
Return
AED 3,402,575
IRR 30%
Total Keys 308 Rooms
Avg.Rev Per Room
(Yearly)
AED 162,938
Hotel Facts
Plot Number JVC10EMRM002
Plot Area 18292.00 Sq.ft
Built up Area (GFA) 196,334 Sq.ft
FAR 146,334 Sq.ft
Development complete 18 months
Estimated Retail/Restaurant Area - Sq.ft
Estimated Residential Area - Sq.ft
Total Key Units 308 keys
Area Required/ Car Parking 50,000 Sq.ft
No.of Car Parking 100 cars
*Average Yearly Income Profit 40.83
Overall Costs
Ownership Location JV Potential Investor Total
Stake 50% 50% 100%
Plot RC-A-076 (Land) Dubai Residential Community AED 9,609,600 AED 9,609,600 AED 19,219,200
Plot RC-A-076 (Construction Cost) Dubai Residential Community AED 34,000,000 AED 34,000,000 AED 68,000,000
Plot RC-A-077 (Land) Dubai Residential Community AED 9,219,600 AED 9,219,600 AED 18,439,200
Plot RC-A-077 (Construction Cost) Dubai Residential Community AED 32,600,000 AED 32,600,000 AED 65,200,000
JVC10EMRM002 (Land) Jumeirah Village Circle AED 7,836,201 AED 7,682,550 AED 15,518,751
JVC10EMRM002 (Construction Cost) Jumeirah Village Circle AED 30,000,000 AED 30,000,000 AED 60,000,000
Total Cost AED 123,265,401 AED 123,111,750 AED 246,377,151
NOTES
• A Down Payment of 20% on the land would be paid for Plot RC-A-076 and Plot RC-A-076 each.
• That sum would equal to AED 36,210,000 of which AED 18,105,000 would be paid by the JV and AED 18,105,000 by the Potential Investor
• The Land Cost of Al Dua Residences will be paid in full before commencing any construction
• The construction will initially begin with Al Dua Residences, followed by Plot RC-A-076 six months later and Plot RC-A-077 one year later
Funding
Funding
Required for the
first six months:
AED 54,050,431
Funding Required (AED)
2015 2016 2017
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
Al Dua Residences (JVC)
Land 15,518,751
Construction
Prepare site and pour foundation 6,000,000
Complete rough framing 20,000,000
Complete rough plumbing, electrical and HVAC 5,000,000
Install insulation 5,000,000
Complete drywall and interior textures; start exterior finishes 8,000,000
Finish interior trim; install exterior driveways and walkways 2,000,000
Install hard-surface flooring and countertops; complete exterior grading 2,000,000
Finish mechanical trims; install bathroom fixtures 3,000,000
Install mirrors, shower doors and finish flooring; finish exterior landscaping 3,000,000
Final Inspection and Fixtures 6,000,000
Plot RC-A-076 (Construction Cost)
Land 3,843,840 2,562,560 2,562,560 2,562,560 2,562,560 2,562,560 2,562,560
Construction
Prepare site and pour foundation 6,800,000
Complete rough framing 20,000,000
Complete rough plumbing, electrical and HVAC 5,000,000
Install insulation 5,000,000
Complete drywall and interior textures; start exterior finishes 8,000,000
Finish interior trim; install exterior driveways and walkways 5,000,000
Install hard-surface flooring and countertops; complete exterior grading 3,400,000
Finish mechanical trims; install bathroom fixtures 3,000,000
Install mirrors, shower doors and finish flooring; finish exterior landscaping 5,000,000
Final Inspection and Fixtures 6,800,000
Plot RC-A-077 (Construction Cost)
Land 3,687,840 2,458,560 2,458,560 2,458,560 2,458,560 2,458,560 2,458,560
Construction
Prepare site and pour foundation 6,520,000
Complete rough framing 18,000,000
Complete rough plumbing, electrical and HVAC 5,000,000
Install insulation 5,000,000
Complete drywall and interior textures; start exterior finishes 8,000,000
Finish interior trim; install exterior driveways and walkways 5,000,000
Install hard-surface flooring and countertops; complete exterior grading 3,160,000
Finish mechanical trims; install bathroom fixtures 3,000,000
Install mirrors, shower doors and finish flooring; finish exterior landscaping 5,000,000
Final Inspection and Fixtures 6,520,000
Total Cash Outflow 29,050,431 25,000,000 22,362,560 34,562,560 27,541,120 45,421,120 23,021,120 22,981,120 7,458,560 8,978,560
Cash Inflow JVC 6,517,039.00 6,517,039.00 6,517,039.00 6,517,039.00
Cash Inflow Plot RC-A-076 679,657.00 679,657.00
Total Cash Inflow 6,517,039.00 6,517,039.00 7,196,696.00 7,196,696.00
Total Cash Flow 29,050,431 25,000,000 22,362,560 34,562,560 27,541,120 45,421,120 16,504,081 16,464,081 261,864 1,781,864
JV (50%) 14,525,216 12,500,000 11,181,280 17,281,280 13,770,560 22,710,560 8,252,041 8,232,041 130,932 890,932
Potential Investor (50%) 14,525,216 12,500,000 11,181,280 17,281,280 13,770,560 22,710,560 8,252,041 8,232,041 130,932 890,932
Addendum
Cash Flow Projection (Plot RC-A-076)
Cash Flow Projection (1)
000,000 AED Year 0 Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10
Total Usable Area (F.A.R) 196729 196729 196729 196729 196729 196729 196729 196729 196729 196729
Occupancy % 60% 65% 70% 70% 70% 70% 70% 70% 70% 70%
Studio Apartments (49 Rooms) [@40k] 2 2 2 2 2 2 2 3 3 3
1 Bedroom Rent (131 Rooms) [@60k] 8 8 9 9 9 9 10 10 10 11
2 Bedroom Rent (98 Rooms) [@80k] 8 8 9 9 10 10 11 11 12 12
3 Bedroom Rent (20 Rooms) [@105k] 2 2 2 2 3 3 3 3 3 3
Rev per average room 66309 69624 73105 76034 79087 82271 85590 89052 92662 96428
Total Rooms 298 298 298 298 298 298 298 298 298 298
Total Revenues 0 11.86 13.49 15.25 15.86 16.50 17.16 17.85 18.58 19.33 20.11
Operating Cost (per sq.ft)
Maintainence 2.00 2.10 2.21 2.32 2.43 2.55 2.68 2.81 2.95 3.10
Staff Salaries 1.00 1.05 1.10 1.16 1.22 1.28 1.34 1.41 1.48 1.55
Others 0.87 0.91 0.96 1.01 1.06 1.11 1.17 1.22 1.29 1.35
Subtotal Operating Cost 3.87 4.06 4.27 4.48 4.70 4.94 5.19 5.45 5.72 6.00
Deductions
Admin & General (incl. base fee 1.5-2.5%) 0.67 0.70 0.74 0.78 0.81 0.86 0.90 0.94 0.99 1.04
Advertising & Sales (incl. Marketing Fee) 1.12 1.18 1.23 1.30 1.36 1.43 1.50 1.58 1.65 1.74
Total Deductions 0.00 1.79 1.88 1.97 2.07 2.18 2.28 2.40 2.52 2.64 2.78
Total Operating Cost 0.00 5.66 5.94 6.24 6.55 6.88 7.22 7.58 7.96 8.36 8.78
Financing Cost
Land 19.22
Soft Cost (5% of Land) 0.96
Financing Amount 68.0 64.8 61.7 58.8 56.0 53.3 50.8 48.4 46.1 43.9 41.8
Bank installments (4.75% reducing) 3.2 3.1 2.9 2.8 2.7 2.5 2.4 2.3 2.2 2.1 2.0
Total Financing Cost 23.4 3.1 2.9 2.8 2.7 2.5 2.4 2.3 2.2 2.1 2.0
Total Cost 23.41 8.74 8.87 9.03 9.21 9.41 9.64 9.88 10.15 10.45 10.77
Gross Operating Profit (GOP) -23.41 3.12 4.61 6.22 6.65 7.09 7.53 7.97 8.42 8.88 9.35
GOP Percentage 26.3% 34.2% 40.8% 41.9% 42.9% 43.9% 44.6% 45.3% 46.0% 46.5%
FF&E Reserve Fund 1-5% 0.12 0.18 0.24 0.29 0.34 0.34 0.34 0.34 0.34 0.34
Management Fee 9% 0.28 0.42 0.56 0.60 0.64 0.68 0.72 0.76 0.80 0.84
Adjusted GOP (AGOP) -23.41 2.72 4.02 5.42 5.76 6.11 6.51 6.91 7.33 7.74 8.17
Cash Flow Projection (Plot RC-A-077)
Cash Flow Projection (2)
000,000 AED Year 0 Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10
Total Usable Area (F.A.R) 188729 188729 188729 188729 188729 188729 188729 188729 188729 188729
Occupancy % 60% 65% 70% 70% 70% 70% 70% 70% 70% 70%
Studio Apartments (48 Rooms) [@40k] 2 2 2 2 2 2 2 2 3 3
1 Bedroom Rent (125 Rooms) [@60k] 8 8 8 9 9 9 9 10 10 10
2 Bedroom Rent (94 Rooms) [@80k] 8 8 8 9 9 10 10 11 11 12
3 Bedroom Rent (19 Rooms) [@105k] 2 2 2 2 2 3 3 3 3 3
Rev per average room 66206 69517 72992 75916 78964 82141 85455 88910 92514 96272
Total Rooms 286 286 286 286 286 286 286 286 286 286
Total Revenues 0 11.36 12.92 14.61 15.20 15.81 16.44 17.11 17.80 18.52 19.27
Operating Cost (per sq.ft)
Maintainence 1.89 1.98 2.08 2.19 2.30 2.41 2.53 2.66 2.79 2.93
Staff Salaries 0.89 0.93 0.98 1.03 1.08 1.14 1.19 1.25 1.31 1.38
Others 1.10 1.16 1.21 1.27 1.34 1.40 1.47 1.55 1.63 1.71
Subtotal Operating Cost 3.88 4.07 4.28 4.49 4.72 4.95 5.20 5.46 5.73 6.02
Deductions
Admin & General (incl. base fee 1.5-2.5%) 0.70 0.74 0.77 0.81 0.85 0.89 0.94 0.98 1.03 1.09
Advertising & Sales (incl. Marketing Fee) 1.02 1.07 1.12 1.18 1.24 1.30 1.37 1.44 1.51 1.58
Total Deductions 0.00 1.72 1.81 1.90 1.99 2.09 2.20 2.30 2.42 2.54 2.67
Total Operating Cost 0.00 5.60 5.88 6.17 6.48 6.81 7.15 7.50 7.88 8.27 8.69
Financing Cost
Land 18.43
Soft Cost (5% of Land) 0.92
Financing Amount 65.2 62.1 59.2 56.4 53.7 51.1 48.7 46.4 44.2 42.1 40.1
Bank installments (4.75% reducing) 3.1 3.0 2.8 2.7 2.6 2.4 2.3 2.2 2.1 2.0 1.9
Total Financing Cost 22.5 3.0 2.8 2.7 2.6 2.4 2.3 2.2 2.1 2.0 1.9
Total Cost 22.46 8.55 8.69 8.85 9.03 9.24 9.46 9.71 9.98 10.27 10.59
Gross Operating Profit (GOP) -22.46 2.81 4.23 5.76 6.16 6.57 6.98 7.40 7.82 8.25 8.68
GOP Percentage 24.7% 32.7% 39.4% 40.6% 41.6% 42.5% 43.2% 43.9% 44.5% 45.0%
FF&E Reserve Fund 1-5% 0.12 0.18 0.24 0.29 0.34 0.34 0.34 0.34 0.34 0.34
Management Fee 9% 0.25 0.38 0.52 0.55 0.59 0.63 0.67 0.70 0.74 0.78
Adjusted GOP (AGOP) -22.46 2.44 3.67 5.00 5.32 5.64 6.01 6.39 6.78 7.17 7.56
Cash Flow Projection (JVC10EMRM002)
Cash Flow Projection (Hotel)
000,000 AED Year 0 Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10
Number of Rooms 308 308 308 308 308 308 308 308 308 308
Occupancy % 60% 65% 70% 70% 70% 70% 70% 70% 70% 70%
Average Daily Rate 575.00 603.75 633.94 665.63 698.92 719.88 741.48 763.72 786.64 808.21
RevPAR 345.00 392.44 443.76 465.94 489.24 503.92 519.04 534.61 550.65 565.75
Revenues
Rooms 38.78 44.12 49.89 52.38 55.00 56.65 58.35 60.10 61.90 63.60
Food & Beverage 9.77 10.75 11.82 13.00 14.30 15.73 17.31 19.04 21.94 23.05
Other 1.63 1.79 1.97 2.17 2.39 2.63 2.89 3.18 3.49 3.18
Total Revenue 50.18 56.66 63.68 67.55 71.69 75.01 78.55 82.32 87.34 89.83
Operating Cost
Rooms (incl.Reservation Fee) 4.63 4.95 5.24 5.39 5.56 5.72 5.89 5.89 5.89 6.01
Food & Beverage 4.59 4.62 4.63 4.77 4.91 5.06 5.21 5.28 5.33 5.44
Other 0.33 0.34 0.36 0.37 0.38 0.39 0.40 0.42 0.43 0.46
Subtotal Operating Cost 9.55 9.91 10.23 10.53 10.85 11.17 11.50 11.59 11.65 11.91
Deductions
Land 15.67
Construction 60.00
Admin & General (incl. base fee 1.5-2.5%) 3.95 4.11 4.24 4.55 4.78 4.98 5.17 5.22 5.55 5.64
Advertising & Sales (incl. Marketing Fee) 3.47 3.65 3.82 3.94 4.06 4.18 4.30 4.35 4.42 4.50
Heat, Light & Power 2.17 2.41 2.68 2.76 2.84 2.93 3.01 3.01 3.01 3.18
Repairs & Maintenance 1.97 2.20 2.43 2.51 2.58 2.66 2.74 2.80 2.84 2.88
Total Deductions 75.67 11.56 12.37 13.17 13.76 14.26 14.75 15.22 15.38 15.82 16.20
Total Cost 75.67 21.11 22.28 23.40 24.29 25.11 25.92 26.72 26.97 27.47 28.11
Gross Operating Profit (GOP) -75.67 29.07 34.38 40.28 43.26 46.58 49.09 51.83 55.35 59.87 61.72
GOP Percentage 57.9% 60.7% 63.3% 64.0% 65.0% 65.4% 66.0% 67.2% 68.5% 68.7%
FF&E Reserve Fund 1-5% 0.39 0.44 0.97 1 1.55 2.13 2.74 3.74 4.74 2.99
Management Fee 9% 2.62 3.09 3.63 3.89 4.19 4.42 4.66 4.98 5.39 5.55
Adjusted GOP (AGOP) -75.67 26.07 30.84 35.69 38.37 40.84 42.54 44.42 46.62 49.74 53.17
G r o u p o f H o t e l s
Your Sanctum

More Related Content

Viewers also liked

LODHA - SUPERNOVA
LODHA - SUPERNOVALODHA - SUPERNOVA
LODHA - SUPERNOVA
Wallsnroof1
 
GP_ACCT_sonyiagreer_2016 revs (1)
GP_ACCT_sonyiagreer_2016 revs (1)GP_ACCT_sonyiagreer_2016 revs (1)
GP_ACCT_sonyiagreer_2016 revs (1)SONYIA GREER
 
BRUIN SAM Q1 Market Commentary
BRUIN SAM Q1 Market CommentaryBRUIN SAM Q1 Market Commentary
BRUIN SAM Q1 Market CommentaryChristopher Rolfe
 
Fn methods em08
Fn methods em08Fn methods em08
Fn methods em08
Shu Wei Goh
 
Guida completa sugli outlet
Guida completa sugli outletGuida completa sugli outlet
Guida completa sugli outlet
Luigi Scarantino
 
VRnet.io Дні Науки
VRnet.io Дні НаукиVRnet.io Дні Науки
VRnet.io Дні Науки
Artem Batogovsky
 
TIBCO Spotfire в сфере ритейла и трейд маркетинга
TIBCO Spotfire в сфере ритейла и трейд маркетингаTIBCO Spotfire в сфере ритейла и трейд маркетинга
TIBCO Spotfire в сфере ритейла и трейд маркетинга
Компания Ксема
 
More efficient service deployment with Dell Active System Manager
More efficient service deployment with Dell Active System ManagerMore efficient service deployment with Dell Active System Manager
More efficient service deployment with Dell Active System Manager
Principled Technologies
 
Final_Parry_Frank_CMAP_Hourly_Crashes_ChicagoV2
Final_Parry_Frank_CMAP_Hourly_Crashes_ChicagoV2Final_Parry_Frank_CMAP_Hourly_Crashes_ChicagoV2
Final_Parry_Frank_CMAP_Hourly_Crashes_ChicagoV2Parry Frank
 
UNIQUE EMPORIA
UNIQUE EMPORIAUNIQUE EMPORIA
UNIQUE EMPORIA
Wallsnroof1
 

Viewers also liked (11)

LODHA - SUPERNOVA
LODHA - SUPERNOVALODHA - SUPERNOVA
LODHA - SUPERNOVA
 
GP_ACCT_sonyiagreer_2016 revs (1)
GP_ACCT_sonyiagreer_2016 revs (1)GP_ACCT_sonyiagreer_2016 revs (1)
GP_ACCT_sonyiagreer_2016 revs (1)
 
BICICLETA
BICICLETABICICLETA
BICICLETA
 
BRUIN SAM Q1 Market Commentary
BRUIN SAM Q1 Market CommentaryBRUIN SAM Q1 Market Commentary
BRUIN SAM Q1 Market Commentary
 
Fn methods em08
Fn methods em08Fn methods em08
Fn methods em08
 
Guida completa sugli outlet
Guida completa sugli outletGuida completa sugli outlet
Guida completa sugli outlet
 
VRnet.io Дні Науки
VRnet.io Дні НаукиVRnet.io Дні Науки
VRnet.io Дні Науки
 
TIBCO Spotfire в сфере ритейла и трейд маркетинга
TIBCO Spotfire в сфере ритейла и трейд маркетингаTIBCO Spotfire в сфере ритейла и трейд маркетинга
TIBCO Spotfire в сфере ритейла и трейд маркетинга
 
More efficient service deployment with Dell Active System Manager
More efficient service deployment with Dell Active System ManagerMore efficient service deployment with Dell Active System Manager
More efficient service deployment with Dell Active System Manager
 
Final_Parry_Frank_CMAP_Hourly_Crashes_ChicagoV2
Final_Parry_Frank_CMAP_Hourly_Crashes_ChicagoV2Final_Parry_Frank_CMAP_Hourly_Crashes_ChicagoV2
Final_Parry_Frank_CMAP_Hourly_Crashes_ChicagoV2
 
UNIQUE EMPORIA
UNIQUE EMPORIAUNIQUE EMPORIA
UNIQUE EMPORIA
 

Similar to The watergate confidential

Assignment - Financial Appraisal
Assignment - Financial AppraisalAssignment - Financial Appraisal
Assignment - Financial Appraisal
Kai Yun Pang
 
Real Estate Development - Financial Model
Real Estate Development - Financial ModelReal Estate Development - Financial Model
Real Estate Development - Financial Model
Imran Almaleh
 
De assignment
De assignmentDe assignment
De assignment
Lwj Welson
 
Daycare: Urban Land Development Project
Daycare: Urban Land Development ProjectDaycare: Urban Land Development Project
Daycare: Urban Land Development Project
Ashley Garvey
 
Final slideshow presentation (1)
Final slideshow presentation (1)Final slideshow presentation (1)
Final slideshow presentation (1)
Aura Investments
 
Midtown group the west end 10.27.08
Midtown group   the west end 10.27.08Midtown group   the west end 10.27.08
Midtown group the west end 10.27.08
Tyler Elick
 
Cr2 apresentacao - 3 q10-eng
Cr2   apresentacao - 3 q10-engCr2   apresentacao - 3 q10-eng
Cr2 apresentacao - 3 q10-engCR2
 
YorBox UK model
YorBox UK modelYorBox UK model
YorBox UK model
YorBox
 
2016 ULI Hines Student Competition Pro Forma_v11
2016 ULI Hines Student Competition  Pro Forma_v112016 ULI Hines Student Competition  Pro Forma_v11
2016 ULI Hines Student Competition Pro Forma_v11Miguel A. Garcia
 
Gopika viswanath
Gopika viswanathGopika viswanath
Gopika viswanath
gopika v
 
Final presentation with excel
Final presentation with excelFinal presentation with excel
Final presentation with excel
Aura Investments
 
B'dAfrique newco biocarbon 1
B'dAfrique  newco biocarbon 1B'dAfrique  newco biocarbon 1
B'dAfrique newco biocarbon 1
Ian Christopher Coates
 
GOM decom market reveiw and update mark kaiser, lsu
GOM decom market reveiw and update mark kaiser, lsuGOM decom market reveiw and update mark kaiser, lsu
GOM decom market reveiw and update mark kaiser, lsu
gomdecom
 
Final presentation with excel 2
Final presentation with excel 2Final presentation with excel 2
Final presentation with excel 2
Aura Investments
 
Colliers Gta office market statistics q1 2016
Colliers Gta office market statistics q1 2016Colliers Gta office market statistics q1 2016
Colliers Gta office market statistics q1 2016
Chris Fyvie
 
cost appraisal
cost appraisalcost appraisal
cost appraisal
ahmong4
 

Similar to The watergate confidential (20)

Assignment - Financial Appraisal
Assignment - Financial AppraisalAssignment - Financial Appraisal
Assignment - Financial Appraisal
 
Real Estate Development - Financial Model
Real Estate Development - Financial ModelReal Estate Development - Financial Model
Real Estate Development - Financial Model
 
De assignment
De assignmentDe assignment
De assignment
 
Daycare: Urban Land Development Project
Daycare: Urban Land Development ProjectDaycare: Urban Land Development Project
Daycare: Urban Land Development Project
 
Final slideshow presentation (1)
Final slideshow presentation (1)Final slideshow presentation (1)
Final slideshow presentation (1)
 
Midtown group the west end 10.27.08
Midtown group   the west end 10.27.08Midtown group   the west end 10.27.08
Midtown group the west end 10.27.08
 
Cr2 apresentacao - 3 q10-eng
Cr2   apresentacao - 3 q10-engCr2   apresentacao - 3 q10-eng
Cr2 apresentacao - 3 q10-eng
 
Airjet shiva
Airjet shivaAirjet shiva
Airjet shiva
 
2Q13
2Q132Q13
2Q13
 
YorBox UK model
YorBox UK modelYorBox UK model
YorBox UK model
 
2016 ULI Hines Student Competition Pro Forma_v11
2016 ULI Hines Student Competition  Pro Forma_v112016 ULI Hines Student Competition  Pro Forma_v11
2016 ULI Hines Student Competition Pro Forma_v11
 
Gopika viswanath
Gopika viswanathGopika viswanath
Gopika viswanath
 
Final presentation with excel
Final presentation with excelFinal presentation with excel
Final presentation with excel
 
B'dAfrique newco biocarbon 1
B'dAfrique  newco biocarbon 1B'dAfrique  newco biocarbon 1
B'dAfrique newco biocarbon 1
 
Sunshine garden 2 avp
Sunshine garden 2 avpSunshine garden 2 avp
Sunshine garden 2 avp
 
RE1-6
RE1-6RE1-6
RE1-6
 
GOM decom market reveiw and update mark kaiser, lsu
GOM decom market reveiw and update mark kaiser, lsuGOM decom market reveiw and update mark kaiser, lsu
GOM decom market reveiw and update mark kaiser, lsu
 
Final presentation with excel 2
Final presentation with excel 2Final presentation with excel 2
Final presentation with excel 2
 
Colliers Gta office market statistics q1 2016
Colliers Gta office market statistics q1 2016Colliers Gta office market statistics q1 2016
Colliers Gta office market statistics q1 2016
 
cost appraisal
cost appraisalcost appraisal
cost appraisal
 

More from Haris Memon

Vertex towers impz (confidential)
Vertex towers   impz (confidential)Vertex towers   impz (confidential)
Vertex towers impz (confidential)
Haris Memon
 
Canadian school
Canadian schoolCanadian school
Canadian school
Haris Memon
 
Usdjpy for the week may 20
Usdjpy for the week may 20Usdjpy for the week may 20
Usdjpy for the week may 20Haris Memon
 
Apple q1 earnings
Apple q1 earningsApple q1 earnings
Apple q1 earningsHaris Memon
 
Us 30 for the week feb 11
Us 30 for the week feb 11Us 30 for the week feb 11
Us 30 for the week feb 11Haris Memon
 
Silver for the week may 20
Silver for the week may 20Silver for the week may 20
Silver for the week may 20Haris Memon
 
Monthly portfolio (november)
Monthly portfolio (november)Monthly portfolio (november)
Monthly portfolio (november)Haris Memon
 
Financial trading strategy
Financial trading strategyFinancial trading strategy
Financial trading strategyHaris Memon
 
Gold performance and outlook
Gold performance and outlookGold performance and outlook
Gold performance and outlookHaris Memon
 
Aluminum hedging
Aluminum hedgingAluminum hedging
Aluminum hedgingHaris Memon
 

More from Haris Memon (13)

Vertex towers impz (confidential)
Vertex towers   impz (confidential)Vertex towers   impz (confidential)
Vertex towers impz (confidential)
 
Canadian school
Canadian schoolCanadian school
Canadian school
 
Usdjpy for the week may 20
Usdjpy for the week may 20Usdjpy for the week may 20
Usdjpy for the week may 20
 
Apple q1 earnings
Apple q1 earningsApple q1 earnings
Apple q1 earnings
 
Us 30 for the week feb 11
Us 30 for the week feb 11Us 30 for the week feb 11
Us 30 for the week feb 11
 
Silver for the week may 20
Silver for the week may 20Silver for the week may 20
Silver for the week may 20
 
Jc penney
Jc penneyJc penney
Jc penney
 
Monthly portfolio (november)
Monthly portfolio (november)Monthly portfolio (november)
Monthly portfolio (november)
 
Financial trading strategy
Financial trading strategyFinancial trading strategy
Financial trading strategy
 
Gold performance and outlook
Gold performance and outlookGold performance and outlook
Gold performance and outlook
 
Sugar
SugarSugar
Sugar
 
Fed ex
Fed exFed ex
Fed ex
 
Aluminum hedging
Aluminum hedgingAluminum hedging
Aluminum hedging
 

Recently uploaded

Urbanrise Paradise on Earth - Unveiling Unprecedented Luxury in Exquisite Vil...
Urbanrise Paradise on Earth - Unveiling Unprecedented Luxury in Exquisite Vil...Urbanrise Paradise on Earth - Unveiling Unprecedented Luxury in Exquisite Vil...
Urbanrise Paradise on Earth - Unveiling Unprecedented Luxury in Exquisite Vil...
JagadishKR1
 
Biography and career about Lixin Azarmehr
Biography and career about Lixin AzarmehrBiography and career about Lixin Azarmehr
Biography and career about Lixin Azarmehr
Lixin Azarmehr
 
Presentation to Windust Meadows HOA Board of Directors June 4, 2024: Focus o...
Presentation to Windust Meadows HOA Board of Directors June 4, 2024:  Focus o...Presentation to Windust Meadows HOA Board of Directors June 4, 2024:  Focus o...
Presentation to Windust Meadows HOA Board of Directors June 4, 2024: Focus o...
Joseph Lewis Aguirre
 
Architectural & Interior design portfolio.pdf
Architectural & Interior design portfolio.pdfArchitectural & Interior design portfolio.pdf
Architectural & Interior design portfolio.pdf
susantebinum
 
Elegant Evergreen Homes - Luxury Apartments Redefining Comfort in Yelahanka, ...
Elegant Evergreen Homes - Luxury Apartments Redefining Comfort in Yelahanka, ...Elegant Evergreen Homes - Luxury Apartments Redefining Comfort in Yelahanka, ...
Elegant Evergreen Homes - Luxury Apartments Redefining Comfort in Yelahanka, ...
JagadishKR1
 
Brigade Insignia at Yelahanka Brochure.pdf
Brigade Insignia at Yelahanka Brochure.pdfBrigade Insignia at Yelahanka Brochure.pdf
Brigade Insignia at Yelahanka Brochure.pdf
SachinChauhan191
 
2BHK-3BHK NEW FLAT FOR SALE IN TUPUDANA,RANCHI.
2BHK-3BHK NEW FLAT FOR SALE IN TUPUDANA,RANCHI.2BHK-3BHK NEW FLAT FOR SALE IN TUPUDANA,RANCHI.
2BHK-3BHK NEW FLAT FOR SALE IN TUPUDANA,RANCHI.
aashiyanastardevelop
 
Oeiras Tech City, Developed by RE Capital and REIG, Will Become Lisbon's Futu...
Oeiras Tech City, Developed by RE Capital and REIG, Will Become Lisbon's Futu...Oeiras Tech City, Developed by RE Capital and REIG, Will Become Lisbon's Futu...
Oeiras Tech City, Developed by RE Capital and REIG, Will Become Lisbon's Futu...
Newman George Leech
 
BricknBolt Understanding Load-Bearing Walls and Their Structural Support in H...
BricknBolt Understanding Load-Bearing Walls and Their Structural Support in H...BricknBolt Understanding Load-Bearing Walls and Their Structural Support in H...
BricknBolt Understanding Load-Bearing Walls and Their Structural Support in H...
BrickAndBolt
 
Green Homes, Islamabad Presentation .pdf
Green Homes, Islamabad Presentation .pdfGreen Homes, Islamabad Presentation .pdf
Green Homes, Islamabad Presentation .pdf
ticktoktips
 
Omaxe Sports City Dwarka A Comprehensive Guide
Omaxe Sports City Dwarka A Comprehensive GuideOmaxe Sports City Dwarka A Comprehensive Guide
Omaxe Sports City Dwarka A Comprehensive Guide
omaxesportscitydwark
 
Investing In The US As A Canadian… And How To Do It RIGHT!! (feat. Erwin Szet...
Investing In The US As A Canadian… And How To Do It RIGHT!! (feat. Erwin Szet...Investing In The US As A Canadian… And How To Do It RIGHT!! (feat. Erwin Szet...
Investing In The US As A Canadian… And How To Do It RIGHT!! (feat. Erwin Szet...
Volition Properties
 
Killer Referans Bahcesehir Catalog Listing Turkey
Killer Referans Bahcesehir Catalog Listing TurkeyKiller Referans Bahcesehir Catalog Listing Turkey
Killer Referans Bahcesehir Catalog Listing Turkey
Listing Turkey
 
Avrupa Konutlari Yenimahalle - Listing Turkey
Avrupa Konutlari Yenimahalle - Listing TurkeyAvrupa Konutlari Yenimahalle - Listing Turkey
Avrupa Konutlari Yenimahalle - Listing Turkey
Listing Turkey
 
How to keep your Home naturally Cool and Warm
How to keep your Home naturally Cool and WarmHow to keep your Home naturally Cool and Warm
How to keep your Home naturally Cool and Warm
Vinra Construction
 
Riverview City Loni Kalbhor Pune Brochure
Riverview City Loni Kalbhor Pune BrochureRiverview City Loni Kalbhor Pune Brochure
Riverview City Loni Kalbhor Pune Brochure
kishor21012022
 
Optimizing Your MCA Lead Capture Process for Better Results
Optimizing Your MCA Lead Capture Process for Better ResultsOptimizing Your MCA Lead Capture Process for Better Results
Optimizing Your MCA Lead Capture Process for Better Results
Lead Generation Media
 
How to Scan Tenants in NYC - You Should Know!
How to Scan Tenants in NYC - You Should Know!How to Scan Tenants in NYC - You Should Know!
How to Scan Tenants in NYC - You Should Know!
BelgiumManagement
 
Simpolo Company Profile & Corporate Logo
Simpolo Company Profile & Corporate LogoSimpolo Company Profile & Corporate Logo
Simpolo Company Profile & Corporate Logo
simpolosparkteam
 
Torun Center Residences Istanbul - Listing Turkey
Torun Center Residences Istanbul - Listing TurkeyTorun Center Residences Istanbul - Listing Turkey
Torun Center Residences Istanbul - Listing Turkey
Listing Turkey
 

Recently uploaded (20)

Urbanrise Paradise on Earth - Unveiling Unprecedented Luxury in Exquisite Vil...
Urbanrise Paradise on Earth - Unveiling Unprecedented Luxury in Exquisite Vil...Urbanrise Paradise on Earth - Unveiling Unprecedented Luxury in Exquisite Vil...
Urbanrise Paradise on Earth - Unveiling Unprecedented Luxury in Exquisite Vil...
 
Biography and career about Lixin Azarmehr
Biography and career about Lixin AzarmehrBiography and career about Lixin Azarmehr
Biography and career about Lixin Azarmehr
 
Presentation to Windust Meadows HOA Board of Directors June 4, 2024: Focus o...
Presentation to Windust Meadows HOA Board of Directors June 4, 2024:  Focus o...Presentation to Windust Meadows HOA Board of Directors June 4, 2024:  Focus o...
Presentation to Windust Meadows HOA Board of Directors June 4, 2024: Focus o...
 
Architectural & Interior design portfolio.pdf
Architectural & Interior design portfolio.pdfArchitectural & Interior design portfolio.pdf
Architectural & Interior design portfolio.pdf
 
Elegant Evergreen Homes - Luxury Apartments Redefining Comfort in Yelahanka, ...
Elegant Evergreen Homes - Luxury Apartments Redefining Comfort in Yelahanka, ...Elegant Evergreen Homes - Luxury Apartments Redefining Comfort in Yelahanka, ...
Elegant Evergreen Homes - Luxury Apartments Redefining Comfort in Yelahanka, ...
 
Brigade Insignia at Yelahanka Brochure.pdf
Brigade Insignia at Yelahanka Brochure.pdfBrigade Insignia at Yelahanka Brochure.pdf
Brigade Insignia at Yelahanka Brochure.pdf
 
2BHK-3BHK NEW FLAT FOR SALE IN TUPUDANA,RANCHI.
2BHK-3BHK NEW FLAT FOR SALE IN TUPUDANA,RANCHI.2BHK-3BHK NEW FLAT FOR SALE IN TUPUDANA,RANCHI.
2BHK-3BHK NEW FLAT FOR SALE IN TUPUDANA,RANCHI.
 
Oeiras Tech City, Developed by RE Capital and REIG, Will Become Lisbon's Futu...
Oeiras Tech City, Developed by RE Capital and REIG, Will Become Lisbon's Futu...Oeiras Tech City, Developed by RE Capital and REIG, Will Become Lisbon's Futu...
Oeiras Tech City, Developed by RE Capital and REIG, Will Become Lisbon's Futu...
 
BricknBolt Understanding Load-Bearing Walls and Their Structural Support in H...
BricknBolt Understanding Load-Bearing Walls and Their Structural Support in H...BricknBolt Understanding Load-Bearing Walls and Their Structural Support in H...
BricknBolt Understanding Load-Bearing Walls and Their Structural Support in H...
 
Green Homes, Islamabad Presentation .pdf
Green Homes, Islamabad Presentation .pdfGreen Homes, Islamabad Presentation .pdf
Green Homes, Islamabad Presentation .pdf
 
Omaxe Sports City Dwarka A Comprehensive Guide
Omaxe Sports City Dwarka A Comprehensive GuideOmaxe Sports City Dwarka A Comprehensive Guide
Omaxe Sports City Dwarka A Comprehensive Guide
 
Investing In The US As A Canadian… And How To Do It RIGHT!! (feat. Erwin Szet...
Investing In The US As A Canadian… And How To Do It RIGHT!! (feat. Erwin Szet...Investing In The US As A Canadian… And How To Do It RIGHT!! (feat. Erwin Szet...
Investing In The US As A Canadian… And How To Do It RIGHT!! (feat. Erwin Szet...
 
Killer Referans Bahcesehir Catalog Listing Turkey
Killer Referans Bahcesehir Catalog Listing TurkeyKiller Referans Bahcesehir Catalog Listing Turkey
Killer Referans Bahcesehir Catalog Listing Turkey
 
Avrupa Konutlari Yenimahalle - Listing Turkey
Avrupa Konutlari Yenimahalle - Listing TurkeyAvrupa Konutlari Yenimahalle - Listing Turkey
Avrupa Konutlari Yenimahalle - Listing Turkey
 
How to keep your Home naturally Cool and Warm
How to keep your Home naturally Cool and WarmHow to keep your Home naturally Cool and Warm
How to keep your Home naturally Cool and Warm
 
Riverview City Loni Kalbhor Pune Brochure
Riverview City Loni Kalbhor Pune BrochureRiverview City Loni Kalbhor Pune Brochure
Riverview City Loni Kalbhor Pune Brochure
 
Optimizing Your MCA Lead Capture Process for Better Results
Optimizing Your MCA Lead Capture Process for Better ResultsOptimizing Your MCA Lead Capture Process for Better Results
Optimizing Your MCA Lead Capture Process for Better Results
 
How to Scan Tenants in NYC - You Should Know!
How to Scan Tenants in NYC - You Should Know!How to Scan Tenants in NYC - You Should Know!
How to Scan Tenants in NYC - You Should Know!
 
Simpolo Company Profile & Corporate Logo
Simpolo Company Profile & Corporate LogoSimpolo Company Profile & Corporate Logo
Simpolo Company Profile & Corporate Logo
 
Torun Center Residences Istanbul - Listing Turkey
Torun Center Residences Istanbul - Listing TurkeyTorun Center Residences Istanbul - Listing Turkey
Torun Center Residences Istanbul - Listing Turkey
 

The watergate confidential

  • 1. G r o u p o f H o t e l s
  • 2. The Watergate Group of Hotels • This Watergate Group of Hotels consists of three lands of which two are located in Dubai Residential Community and one in Jumeirah Village Circle • These lands will be constructed with three 3 star-hotels which would cater to leading tourism and residents in the area • The Watergate Hotel sets a new standard of complete accommodations and services for the business traveller. • The Watergate provides exceptional facilities and luxury business living.
  • 3. Location Dubailand Residential Complex Plot No. RC-A-076 Plot Area - m2 4381.61 Plot Area - sq,ft 47163.21 Floors/ Max. Height G+14 Construction built up area - sq.ft 226238.35 Allowed F.A.R - sq.ft 226238.35 Provided F.A.R - sq.ft 196729.43 Type No.of Apartments Studios 49 1 Bedroom 131 2 Bedroom 98 3 Bedroom 20 Total Apartments 298 Car Parking (sq.ft) 173,000 Total Parkings Provided 432 Feasibility Study Land Cost AED 19,219,200 Construction Cost AED 68,000,000 Avg. Monthly Return AED 505,690 IRR 19% Total Keys 298 Rooms Avg.Rev Per Room (Yearly) AED 81,016
  • 4. Feasibility Study Land Cost AED 18,439,200 Construction Cost AED 65,200,000 Avg. Monthly Return AED 466,500 IRR 18% Total Keys 286 Rooms Avg.Rev Per Room (Yearly) AED 80,888 Location Dubailand Residential Complex Plot No. RC-A-077 Plot Area - m2 3710.79 Plot Area - sq,ft 39942.57 Floors/ Max. Height G+14 Construction built up area - sq.ft 217037.2 Allowed F.A.R - sq.ft 217037.2 Provided F.A.R - sq.ft 188728.84 Type No.of Apartments Studios 48 1 Bedroom 125 2 Bedroom 94 3 Bedroom 19 Total Apartments 286 Car Parking (sq.ft) 166,000 Total Parkings Provided 432
  • 5. Feasibility Study Land Cost AED 15,518,751 Construction Cost AED 60,000,000 Avg. Monthly Return AED 3,402,575 IRR 30% Total Keys 308 Rooms Avg.Rev Per Room (Yearly) AED 162,938 Hotel Facts Plot Number JVC10EMRM002 Plot Area 18292.00 Sq.ft Built up Area (GFA) 196,334 Sq.ft FAR 146,334 Sq.ft Development complete 18 months Estimated Retail/Restaurant Area - Sq.ft Estimated Residential Area - Sq.ft Total Key Units 308 keys Area Required/ Car Parking 50,000 Sq.ft No.of Car Parking 100 cars *Average Yearly Income Profit 40.83
  • 6. Overall Costs Ownership Location JV Potential Investor Total Stake 50% 50% 100% Plot RC-A-076 (Land) Dubai Residential Community AED 9,609,600 AED 9,609,600 AED 19,219,200 Plot RC-A-076 (Construction Cost) Dubai Residential Community AED 34,000,000 AED 34,000,000 AED 68,000,000 Plot RC-A-077 (Land) Dubai Residential Community AED 9,219,600 AED 9,219,600 AED 18,439,200 Plot RC-A-077 (Construction Cost) Dubai Residential Community AED 32,600,000 AED 32,600,000 AED 65,200,000 JVC10EMRM002 (Land) Jumeirah Village Circle AED 7,836,201 AED 7,682,550 AED 15,518,751 JVC10EMRM002 (Construction Cost) Jumeirah Village Circle AED 30,000,000 AED 30,000,000 AED 60,000,000 Total Cost AED 123,265,401 AED 123,111,750 AED 246,377,151 NOTES • A Down Payment of 20% on the land would be paid for Plot RC-A-076 and Plot RC-A-076 each. • That sum would equal to AED 36,210,000 of which AED 18,105,000 would be paid by the JV and AED 18,105,000 by the Potential Investor • The Land Cost of Al Dua Residences will be paid in full before commencing any construction • The construction will initially begin with Al Dua Residences, followed by Plot RC-A-076 six months later and Plot RC-A-077 one year later
  • 7. Funding Funding Required for the first six months: AED 54,050,431 Funding Required (AED) 2015 2016 2017 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Al Dua Residences (JVC) Land 15,518,751 Construction Prepare site and pour foundation 6,000,000 Complete rough framing 20,000,000 Complete rough plumbing, electrical and HVAC 5,000,000 Install insulation 5,000,000 Complete drywall and interior textures; start exterior finishes 8,000,000 Finish interior trim; install exterior driveways and walkways 2,000,000 Install hard-surface flooring and countertops; complete exterior grading 2,000,000 Finish mechanical trims; install bathroom fixtures 3,000,000 Install mirrors, shower doors and finish flooring; finish exterior landscaping 3,000,000 Final Inspection and Fixtures 6,000,000 Plot RC-A-076 (Construction Cost) Land 3,843,840 2,562,560 2,562,560 2,562,560 2,562,560 2,562,560 2,562,560 Construction Prepare site and pour foundation 6,800,000 Complete rough framing 20,000,000 Complete rough plumbing, electrical and HVAC 5,000,000 Install insulation 5,000,000 Complete drywall and interior textures; start exterior finishes 8,000,000 Finish interior trim; install exterior driveways and walkways 5,000,000 Install hard-surface flooring and countertops; complete exterior grading 3,400,000 Finish mechanical trims; install bathroom fixtures 3,000,000 Install mirrors, shower doors and finish flooring; finish exterior landscaping 5,000,000 Final Inspection and Fixtures 6,800,000 Plot RC-A-077 (Construction Cost) Land 3,687,840 2,458,560 2,458,560 2,458,560 2,458,560 2,458,560 2,458,560 Construction Prepare site and pour foundation 6,520,000 Complete rough framing 18,000,000 Complete rough plumbing, electrical and HVAC 5,000,000 Install insulation 5,000,000 Complete drywall and interior textures; start exterior finishes 8,000,000 Finish interior trim; install exterior driveways and walkways 5,000,000 Install hard-surface flooring and countertops; complete exterior grading 3,160,000 Finish mechanical trims; install bathroom fixtures 3,000,000 Install mirrors, shower doors and finish flooring; finish exterior landscaping 5,000,000 Final Inspection and Fixtures 6,520,000 Total Cash Outflow 29,050,431 25,000,000 22,362,560 34,562,560 27,541,120 45,421,120 23,021,120 22,981,120 7,458,560 8,978,560 Cash Inflow JVC 6,517,039.00 6,517,039.00 6,517,039.00 6,517,039.00 Cash Inflow Plot RC-A-076 679,657.00 679,657.00 Total Cash Inflow 6,517,039.00 6,517,039.00 7,196,696.00 7,196,696.00 Total Cash Flow 29,050,431 25,000,000 22,362,560 34,562,560 27,541,120 45,421,120 16,504,081 16,464,081 261,864 1,781,864 JV (50%) 14,525,216 12,500,000 11,181,280 17,281,280 13,770,560 22,710,560 8,252,041 8,232,041 130,932 890,932 Potential Investor (50%) 14,525,216 12,500,000 11,181,280 17,281,280 13,770,560 22,710,560 8,252,041 8,232,041 130,932 890,932
  • 9. Cash Flow Projection (Plot RC-A-076) Cash Flow Projection (1) 000,000 AED Year 0 Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 Total Usable Area (F.A.R) 196729 196729 196729 196729 196729 196729 196729 196729 196729 196729 Occupancy % 60% 65% 70% 70% 70% 70% 70% 70% 70% 70% Studio Apartments (49 Rooms) [@40k] 2 2 2 2 2 2 2 3 3 3 1 Bedroom Rent (131 Rooms) [@60k] 8 8 9 9 9 9 10 10 10 11 2 Bedroom Rent (98 Rooms) [@80k] 8 8 9 9 10 10 11 11 12 12 3 Bedroom Rent (20 Rooms) [@105k] 2 2 2 2 3 3 3 3 3 3 Rev per average room 66309 69624 73105 76034 79087 82271 85590 89052 92662 96428 Total Rooms 298 298 298 298 298 298 298 298 298 298 Total Revenues 0 11.86 13.49 15.25 15.86 16.50 17.16 17.85 18.58 19.33 20.11 Operating Cost (per sq.ft) Maintainence 2.00 2.10 2.21 2.32 2.43 2.55 2.68 2.81 2.95 3.10 Staff Salaries 1.00 1.05 1.10 1.16 1.22 1.28 1.34 1.41 1.48 1.55 Others 0.87 0.91 0.96 1.01 1.06 1.11 1.17 1.22 1.29 1.35 Subtotal Operating Cost 3.87 4.06 4.27 4.48 4.70 4.94 5.19 5.45 5.72 6.00 Deductions Admin & General (incl. base fee 1.5-2.5%) 0.67 0.70 0.74 0.78 0.81 0.86 0.90 0.94 0.99 1.04 Advertising & Sales (incl. Marketing Fee) 1.12 1.18 1.23 1.30 1.36 1.43 1.50 1.58 1.65 1.74 Total Deductions 0.00 1.79 1.88 1.97 2.07 2.18 2.28 2.40 2.52 2.64 2.78 Total Operating Cost 0.00 5.66 5.94 6.24 6.55 6.88 7.22 7.58 7.96 8.36 8.78 Financing Cost Land 19.22 Soft Cost (5% of Land) 0.96 Financing Amount 68.0 64.8 61.7 58.8 56.0 53.3 50.8 48.4 46.1 43.9 41.8 Bank installments (4.75% reducing) 3.2 3.1 2.9 2.8 2.7 2.5 2.4 2.3 2.2 2.1 2.0 Total Financing Cost 23.4 3.1 2.9 2.8 2.7 2.5 2.4 2.3 2.2 2.1 2.0 Total Cost 23.41 8.74 8.87 9.03 9.21 9.41 9.64 9.88 10.15 10.45 10.77 Gross Operating Profit (GOP) -23.41 3.12 4.61 6.22 6.65 7.09 7.53 7.97 8.42 8.88 9.35 GOP Percentage 26.3% 34.2% 40.8% 41.9% 42.9% 43.9% 44.6% 45.3% 46.0% 46.5% FF&E Reserve Fund 1-5% 0.12 0.18 0.24 0.29 0.34 0.34 0.34 0.34 0.34 0.34 Management Fee 9% 0.28 0.42 0.56 0.60 0.64 0.68 0.72 0.76 0.80 0.84 Adjusted GOP (AGOP) -23.41 2.72 4.02 5.42 5.76 6.11 6.51 6.91 7.33 7.74 8.17
  • 10. Cash Flow Projection (Plot RC-A-077) Cash Flow Projection (2) 000,000 AED Year 0 Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 Total Usable Area (F.A.R) 188729 188729 188729 188729 188729 188729 188729 188729 188729 188729 Occupancy % 60% 65% 70% 70% 70% 70% 70% 70% 70% 70% Studio Apartments (48 Rooms) [@40k] 2 2 2 2 2 2 2 2 3 3 1 Bedroom Rent (125 Rooms) [@60k] 8 8 8 9 9 9 9 10 10 10 2 Bedroom Rent (94 Rooms) [@80k] 8 8 8 9 9 10 10 11 11 12 3 Bedroom Rent (19 Rooms) [@105k] 2 2 2 2 2 3 3 3 3 3 Rev per average room 66206 69517 72992 75916 78964 82141 85455 88910 92514 96272 Total Rooms 286 286 286 286 286 286 286 286 286 286 Total Revenues 0 11.36 12.92 14.61 15.20 15.81 16.44 17.11 17.80 18.52 19.27 Operating Cost (per sq.ft) Maintainence 1.89 1.98 2.08 2.19 2.30 2.41 2.53 2.66 2.79 2.93 Staff Salaries 0.89 0.93 0.98 1.03 1.08 1.14 1.19 1.25 1.31 1.38 Others 1.10 1.16 1.21 1.27 1.34 1.40 1.47 1.55 1.63 1.71 Subtotal Operating Cost 3.88 4.07 4.28 4.49 4.72 4.95 5.20 5.46 5.73 6.02 Deductions Admin & General (incl. base fee 1.5-2.5%) 0.70 0.74 0.77 0.81 0.85 0.89 0.94 0.98 1.03 1.09 Advertising & Sales (incl. Marketing Fee) 1.02 1.07 1.12 1.18 1.24 1.30 1.37 1.44 1.51 1.58 Total Deductions 0.00 1.72 1.81 1.90 1.99 2.09 2.20 2.30 2.42 2.54 2.67 Total Operating Cost 0.00 5.60 5.88 6.17 6.48 6.81 7.15 7.50 7.88 8.27 8.69 Financing Cost Land 18.43 Soft Cost (5% of Land) 0.92 Financing Amount 65.2 62.1 59.2 56.4 53.7 51.1 48.7 46.4 44.2 42.1 40.1 Bank installments (4.75% reducing) 3.1 3.0 2.8 2.7 2.6 2.4 2.3 2.2 2.1 2.0 1.9 Total Financing Cost 22.5 3.0 2.8 2.7 2.6 2.4 2.3 2.2 2.1 2.0 1.9 Total Cost 22.46 8.55 8.69 8.85 9.03 9.24 9.46 9.71 9.98 10.27 10.59 Gross Operating Profit (GOP) -22.46 2.81 4.23 5.76 6.16 6.57 6.98 7.40 7.82 8.25 8.68 GOP Percentage 24.7% 32.7% 39.4% 40.6% 41.6% 42.5% 43.2% 43.9% 44.5% 45.0% FF&E Reserve Fund 1-5% 0.12 0.18 0.24 0.29 0.34 0.34 0.34 0.34 0.34 0.34 Management Fee 9% 0.25 0.38 0.52 0.55 0.59 0.63 0.67 0.70 0.74 0.78 Adjusted GOP (AGOP) -22.46 2.44 3.67 5.00 5.32 5.64 6.01 6.39 6.78 7.17 7.56
  • 11. Cash Flow Projection (JVC10EMRM002) Cash Flow Projection (Hotel) 000,000 AED Year 0 Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 Number of Rooms 308 308 308 308 308 308 308 308 308 308 Occupancy % 60% 65% 70% 70% 70% 70% 70% 70% 70% 70% Average Daily Rate 575.00 603.75 633.94 665.63 698.92 719.88 741.48 763.72 786.64 808.21 RevPAR 345.00 392.44 443.76 465.94 489.24 503.92 519.04 534.61 550.65 565.75 Revenues Rooms 38.78 44.12 49.89 52.38 55.00 56.65 58.35 60.10 61.90 63.60 Food & Beverage 9.77 10.75 11.82 13.00 14.30 15.73 17.31 19.04 21.94 23.05 Other 1.63 1.79 1.97 2.17 2.39 2.63 2.89 3.18 3.49 3.18 Total Revenue 50.18 56.66 63.68 67.55 71.69 75.01 78.55 82.32 87.34 89.83 Operating Cost Rooms (incl.Reservation Fee) 4.63 4.95 5.24 5.39 5.56 5.72 5.89 5.89 5.89 6.01 Food & Beverage 4.59 4.62 4.63 4.77 4.91 5.06 5.21 5.28 5.33 5.44 Other 0.33 0.34 0.36 0.37 0.38 0.39 0.40 0.42 0.43 0.46 Subtotal Operating Cost 9.55 9.91 10.23 10.53 10.85 11.17 11.50 11.59 11.65 11.91 Deductions Land 15.67 Construction 60.00 Admin & General (incl. base fee 1.5-2.5%) 3.95 4.11 4.24 4.55 4.78 4.98 5.17 5.22 5.55 5.64 Advertising & Sales (incl. Marketing Fee) 3.47 3.65 3.82 3.94 4.06 4.18 4.30 4.35 4.42 4.50 Heat, Light & Power 2.17 2.41 2.68 2.76 2.84 2.93 3.01 3.01 3.01 3.18 Repairs & Maintenance 1.97 2.20 2.43 2.51 2.58 2.66 2.74 2.80 2.84 2.88 Total Deductions 75.67 11.56 12.37 13.17 13.76 14.26 14.75 15.22 15.38 15.82 16.20 Total Cost 75.67 21.11 22.28 23.40 24.29 25.11 25.92 26.72 26.97 27.47 28.11 Gross Operating Profit (GOP) -75.67 29.07 34.38 40.28 43.26 46.58 49.09 51.83 55.35 59.87 61.72 GOP Percentage 57.9% 60.7% 63.3% 64.0% 65.0% 65.4% 66.0% 67.2% 68.5% 68.7% FF&E Reserve Fund 1-5% 0.39 0.44 0.97 1 1.55 2.13 2.74 3.74 4.74 2.99 Management Fee 9% 2.62 3.09 3.63 3.89 4.19 4.42 4.66 4.98 5.39 5.55 Adjusted GOP (AGOP) -75.67 26.07 30.84 35.69 38.37 40.84 42.54 44.42 46.62 49.74 53.17
  • 12. G r o u p o f H o t e l s Your Sanctum