This document contains data on housing development and traffic flow for 6 different areas/bands labeled A through F. It includes tables showing housing units, floor area, output, withdrawal rates, and traffic in/out for each band. Calculations are shown to determine output/withdrawal rates, total output/withdrawal, distribution based on 65% and 70% rates, and potential toll collection amounts based on distance and traffic between each band. The summary concludes the total potential toll collection if travel begins at band A and ends at F, and vice versa, is RM433,709.