715 Main Street:
Preliminary Proposal for Preservation
Patrick Carroll – July 16, 2014
Preliminary Proposal – Preservation of 715 Main Street
History and current condition:
• 2 family house
• Original structure is a classic Greek Revival structure circa 1830’s
• Porch and rear addition constructed in 1940’s – 1950’s
• Interior renovated and most original interior details removed
• Vinyl siding added much later (late 20th century)
• Failed septic system (cess pool adjacent to wetlands) in 2005
• Vacated in 2010
2
Preliminary Proposal – Preservation of 715 Main Street
Proposal Summary:
• Demolish the existing porches on the west side
• Demolish the existing rear addition
• Renovate the interior to a 2-3 bedroom, 1-bath 1-family home
• Replace the electrical, plumbing and heating
• Insulate
• Replace, as required, windows, doors, flooring, trim, cabinets &
countertops
• Landscape & pave for access/parking
• Subdivide lot to leave ~ ¼ acre with the preserved house
• Permit and install a new septic system
3
Preliminary Proposal – Preservation of 715 Main Street
Current Footprint
Proposed Footprint
Current Town Common
lot lines
+
4
Preliminary Proposal – Preservation of 715 Main Street
Proposed Configuration:
5
Preliminary Proposal – Preservation of 715 Main Street
Preliminary Cost Estimate:
1 Septic system design & installation $50K - $70K
2 Well installation $7K
3 Demolition of porches and addition $6K
4 Disposal of demolition materials $6K
5 Electrical system renovation $14K
6 Plumbing system renovation $15K
7 Heating System renovation $7K
8 Plastering $12K
9 Insulation $10K
10 Paint $10K
11 Trim $7K
12 Windows & doors $15K
13 Cabinets & countertops $10K
14 Flooring $5K
15 Drawings $2K
16 Landscaping $6K
17 Paving $5K
TOTAL $187K - $207K
Not Currently Estimated
1 Asbestos removal
2 Siding
3 Permits
4 Fixtures
5 Appliances
6
Preliminary Proposal – Preservation of 715 Main Street
Critical Steps to Success:
• Subdivision of land (non-conforming lot - Zoning Board of Appeals)
• Sale of land (Bolton Conservation Trust)
• Access to parking area (driveway permit – Board of Selectmen)
• Design and construction of septic system (Board of Health and Conservation
Commission)
• Financing
7

More Related Content

What's hot

Benning Park Community Center - Community Meeting (September 2015)
Benning Park Community Center - Community Meeting (September 2015)Benning Park Community Center - Community Meeting (September 2015)
Benning Park Community Center - Community Meeting (September 2015)
DC Department of General Services
 
KAVYAKALA slide show (appd)
KAVYAKALA slide show (appd)KAVYAKALA slide show (appd)
KAVYAKALA slide show (appd)
RAVIKUMAR RT
 
Madison Homeless Shelter Community Meeting Presentation (November 21, 2013)
Madison Homeless Shelter Community Meeting Presentation (November 21, 2013)Madison Homeless Shelter Community Meeting Presentation (November 21, 2013)
Madison Homeless Shelter Community Meeting Presentation (November 21, 2013)
DC Department of General Services
 

What's hot (11)

Benning Park Community Center - Community Meeting (September 2015)
Benning Park Community Center - Community Meeting (September 2015)Benning Park Community Center - Community Meeting (September 2015)
Benning Park Community Center - Community Meeting (September 2015)
 
KAVYAKALA slide show (appd)
KAVYAKALA slide show (appd)KAVYAKALA slide show (appd)
KAVYAKALA slide show (appd)
 
Concrete Polishing Floor Concepts v1
Concrete Polishing Floor Concepts v1Concrete Polishing Floor Concepts v1
Concrete Polishing Floor Concepts v1
 
Ridgeway Supplemental Documentation
Ridgeway Supplemental DocumentationRidgeway Supplemental Documentation
Ridgeway Supplemental Documentation
 
Madison Homeless Shelter Community Meeting Presentation (November 21, 2013)
Madison Homeless Shelter Community Meeting Presentation (November 21, 2013)Madison Homeless Shelter Community Meeting Presentation (November 21, 2013)
Madison Homeless Shelter Community Meeting Presentation (November 21, 2013)
 
OSWEGO TENNIS INDOOR CENTER
OSWEGO TENNIS INDOOR CENTEROSWEGO TENNIS INDOOR CENTER
OSWEGO TENNIS INDOOR CENTER
 
3 BHK flats near Siruseri | Apartment for sale in Chennai
3 BHK flats near Siruseri | Apartment for sale in Chennai3 BHK flats near Siruseri | Apartment for sale in Chennai
3 BHK flats near Siruseri | Apartment for sale in Chennai
 
3 BHK flats near Siruseri | Apartment for sale in Chennai
3 BHK flats near Siruseri | Apartment for sale in Chennai3 BHK flats near Siruseri | Apartment for sale in Chennai
3 BHK flats near Siruseri | Apartment for sale in Chennai
 
Provident Freedom
Provident FreedomProvident Freedom
Provident Freedom
 
Provident Freedom | Flats in Chennai | Ready to Move Flats in Chennai
Provident Freedom | Flats in Chennai | Ready to Move Flats in ChennaiProvident Freedom | Flats in Chennai | Ready to Move Flats in Chennai
Provident Freedom | Flats in Chennai | Ready to Move Flats in Chennai
 
Supertech golf village new launch 1/2 BHK Apartments Starts from 15.88 lacs o...
Supertech golf village new launch 1/2 BHK Apartments Starts from 15.88 lacs o...Supertech golf village new launch 1/2 BHK Apartments Starts from 15.88 lacs o...
Supertech golf village new launch 1/2 BHK Apartments Starts from 15.88 lacs o...
 

Viewers also liked

Preliminary Design Proposal/final design solutions kept for confidentiality.
Preliminary Design Proposal/final design solutions kept for confidentiality. Preliminary Design Proposal/final design solutions kept for confidentiality.
Preliminary Design Proposal/final design solutions kept for confidentiality.
Weiling Wang
 
Portfolio leen bels 2014
Portfolio leen bels 2014Portfolio leen bels 2014
Portfolio leen bels 2014
LeenBels
 
Foodservice systems2
Foodservice systems2Foodservice systems2
Foodservice systems2
Badrul Hisham
 

Viewers also liked (11)

Preliminary Design Proposal/final design solutions kept for confidentiality.
Preliminary Design Proposal/final design solutions kept for confidentiality. Preliminary Design Proposal/final design solutions kept for confidentiality.
Preliminary Design Proposal/final design solutions kept for confidentiality.
 
Interior Design Portfolio
Interior Design PortfolioInterior Design Portfolio
Interior Design Portfolio
 
Ankita Gupta,B.Sc- Interior Design (Commercial Design Portfolio)
Ankita Gupta,B.Sc- Interior Design (Commercial Design Portfolio)Ankita Gupta,B.Sc- Interior Design (Commercial Design Portfolio)
Ankita Gupta,B.Sc- Interior Design (Commercial Design Portfolio)
 
Portfolio leen bels 2014
Portfolio leen bels 2014Portfolio leen bels 2014
Portfolio leen bels 2014
 
Researching Old homesteads of Marlborough - History Camp 2015
Researching Old homesteads of Marlborough - History Camp 2015Researching Old homesteads of Marlborough - History Camp 2015
Researching Old homesteads of Marlborough - History Camp 2015
 
Lee Tait Interior Design Portfolio
Lee Tait Interior Design PortfolioLee Tait Interior Design Portfolio
Lee Tait Interior Design Portfolio
 
Starlit Suites Project, Bangalore
Starlit Suites Project, BangaloreStarlit Suites Project, Bangalore
Starlit Suites Project, Bangalore
 
MSc Dissertation: Restaurant e-menu software on iPad
MSc Dissertation: Restaurant e-menu software on iPadMSc Dissertation: Restaurant e-menu software on iPad
MSc Dissertation: Restaurant e-menu software on iPad
 
Foodservice systems2
Foodservice systems2Foodservice systems2
Foodservice systems2
 
Lintels and arches in construction
Lintels and arches in constructionLintels and arches in construction
Lintels and arches in construction
 
Types and categories of food service system..
Types and categories of food service system..Types and categories of food service system..
Types and categories of food service system..
 

Similar to Restoring 715 Main St in Bolton - a preliminary proposal by Pat Carroll

Project List
Project ListProject List
Project List
Jim Ryan
 
River Forest ppoint for Lenders
River Forest ppoint for LendersRiver Forest ppoint for Lenders
River Forest ppoint for Lenders
John Michael Croft
 
Chaplin & Avenue Construction Liaison Committee Meeting - July 2017
Chaplin & Avenue Construction Liaison Committee Meeting - July 2017Chaplin & Avenue Construction Liaison Committee Meeting - July 2017
Chaplin & Avenue Construction Liaison Committee Meeting - July 2017
Crosstown TO
 
District 5 Infrastructure Issues by Neighborhood - Terrilyn Tarlton - Updated...
District 5 Infrastructure Issues by Neighborhood - Terrilyn Tarlton - Updated...District 5 Infrastructure Issues by Neighborhood - Terrilyn Tarlton - Updated...
District 5 Infrastructure Issues by Neighborhood - Terrilyn Tarlton - Updated...
terrilyntarlton
 

Similar to Restoring 715 Main St in Bolton - a preliminary proposal by Pat Carroll (19)

H-Town Day: Minnette Boesel
H-Town Day:  Minnette BoeselH-Town Day:  Minnette Boesel
H-Town Day: Minnette Boesel
 
Glenbrook Road Sanitary Sewer Extension and Improvement Project
Glenbrook Road Sanitary Sewer Extension and Improvement ProjectGlenbrook Road Sanitary Sewer Extension and Improvement Project
Glenbrook Road Sanitary Sewer Extension and Improvement Project
 
Alamo Heights CCM Item #4 ppt 225 e. oakview
Alamo Heights CCM Item #4   ppt 225 e. oakviewAlamo Heights CCM Item #4   ppt 225 e. oakview
Alamo Heights CCM Item #4 ppt 225 e. oakview
 
Acm project presentation
Acm  project presentationAcm  project presentation
Acm project presentation
 
LAKE OSWEGO TENNIS INDOOR CENTER
LAKE OSWEGO TENNIS INDOOR CENTERLAKE OSWEGO TENNIS INDOOR CENTER
LAKE OSWEGO TENNIS INDOOR CENTER
 
Alamo Heights CCM Item #5 ppt 248 w castano
Alamo Heights CCM Item #5   ppt 248 w castanoAlamo Heights CCM Item #5   ppt 248 w castano
Alamo Heights CCM Item #5 ppt 248 w castano
 
Project List
Project ListProject List
Project List
 
River Forest ppoint for Lenders
River Forest ppoint for LendersRiver Forest ppoint for Lenders
River Forest ppoint for Lenders
 
Item # 7 PPT 224 W. Elmview
Item # 7 PPT 224 W. ElmviewItem # 7 PPT 224 W. Elmview
Item # 7 PPT 224 W. Elmview
 
Presentation 2016
Presentation 2016Presentation 2016
Presentation 2016
 
Display boards
Display boardsDisplay boards
Display boards
 
Item #4 ppt 517 alta
Item #4   ppt 517 altaItem #4   ppt 517 alta
Item #4 ppt 517 alta
 
St james parochial house athboy project pp for sharing
St james parochial house athboy project pp for sharingSt james parochial house athboy project pp for sharing
St james parochial house athboy project pp for sharing
 
Case study of ralph rapson greenbelt house final
Case study of ralph rapson greenbelt house finalCase study of ralph rapson greenbelt house final
Case study of ralph rapson greenbelt house final
 
B5 A Miraculous Transformation
B5 A Miraculous TransformationB5 A Miraculous Transformation
B5 A Miraculous Transformation
 
Langley School Pump Station Community Meeting October 22, 2020
Langley School Pump Station Community Meeting October 22, 2020Langley School Pump Station Community Meeting October 22, 2020
Langley School Pump Station Community Meeting October 22, 2020
 
Chaplin & Avenue Construction Liaison Committee Meeting - July 2017
Chaplin & Avenue Construction Liaison Committee Meeting - July 2017Chaplin & Avenue Construction Liaison Committee Meeting - July 2017
Chaplin & Avenue Construction Liaison Committee Meeting - July 2017
 
District 5 Infrastructure Issues by Neighborhood - Terrilyn Tarlton - Updated...
District 5 Infrastructure Issues by Neighborhood - Terrilyn Tarlton - Updated...District 5 Infrastructure Issues by Neighborhood - Terrilyn Tarlton - Updated...
District 5 Infrastructure Issues by Neighborhood - Terrilyn Tarlton - Updated...
 
LPC-App
LPC-AppLPC-App
LPC-App
 

Recently uploaded

一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
ehbuaw
 
一比一原版(GU毕业证)格里菲斯大学毕业证成绩单
一比一原版(GU毕业证)格里菲斯大学毕业证成绩单一比一原版(GU毕业证)格里菲斯大学毕业证成绩单
一比一原版(GU毕业证)格里菲斯大学毕业证成绩单
enbam
 
一比一原版(SUT毕业证)斯威本科技大学毕业证成绩单
一比一原版(SUT毕业证)斯威本科技大学毕业证成绩单一比一原版(SUT毕业证)斯威本科技大学毕业证成绩单
一比一原版(SUT毕业证)斯威本科技大学毕业证成绩单
aveka1
 
一比一原版(UWA毕业证)西澳大学毕业证成绩单
一比一原版(UWA毕业证)西澳大学毕业证成绩单一比一原版(UWA毕业证)西澳大学毕业证成绩单
一比一原版(UWA毕业证)西澳大学毕业证成绩单
enbam
 
Up the Ratios Bylaws - a Comprehensive Process of Our Organization
Up the Ratios Bylaws - a Comprehensive Process of Our OrganizationUp the Ratios Bylaws - a Comprehensive Process of Our Organization
Up the Ratios Bylaws - a Comprehensive Process of Our Organization
uptheratios
 
一比一原版(MQU毕业证)麦考瑞大学毕业证成绩单
一比一原版(MQU毕业证)麦考瑞大学毕业证成绩单一比一原版(MQU毕业证)麦考瑞大学毕业证成绩单
一比一原版(MQU毕业证)麦考瑞大学毕业证成绩单
enbam
 

Recently uploaded (20)

PPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way StopPPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way Stop
 
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
 
一比一原版(GU毕业证)格里菲斯大学毕业证成绩单
一比一原版(GU毕业证)格里菲斯大学毕业证成绩单一比一原版(GU毕业证)格里菲斯大学毕业证成绩单
一比一原版(GU毕业证)格里菲斯大学毕业证成绩单
 
Item # 8 -- Tuxedo Columbine 3--way Stop
Item # 8 -- Tuxedo Columbine 3--way StopItem # 8 -- Tuxedo Columbine 3--way Stop
Item # 8 -- Tuxedo Columbine 3--way Stop
 
Writing Sample-Title: Pioneering Urban Transformation: The Collective Power o...
Writing Sample-Title: Pioneering Urban Transformation: The Collective Power o...Writing Sample-Title: Pioneering Urban Transformation: The Collective Power o...
Writing Sample-Title: Pioneering Urban Transformation: The Collective Power o...
 
What is the point of small housing associations.pptx
What is the point of small housing associations.pptxWhat is the point of small housing associations.pptx
What is the point of small housing associations.pptx
 
一比一原版(SUT毕业证)斯威本科技大学毕业证成绩单
一比一原版(SUT毕业证)斯威本科技大学毕业证成绩单一比一原版(SUT毕业证)斯威本科技大学毕业证成绩单
一比一原版(SUT毕业证)斯威本科技大学毕业证成绩单
 
一比一原版(UWA毕业证)西澳大学毕业证成绩单
一比一原版(UWA毕业证)西澳大学毕业证成绩单一比一原版(UWA毕业证)西澳大学毕业证成绩单
一比一原版(UWA毕业证)西澳大学毕业证成绩单
 
Elderly Persons Midday Meal Program kurnool
Elderly Persons Midday Meal Program kurnoolElderly Persons Midday Meal Program kurnool
Elderly Persons Midday Meal Program kurnool
 
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
 
Up the Ratios Bylaws - a Comprehensive Process of Our Organization
Up the Ratios Bylaws - a Comprehensive Process of Our OrganizationUp the Ratios Bylaws - a Comprehensive Process of Our Organization
Up the Ratios Bylaws - a Comprehensive Process of Our Organization
 
Creating an Effective Veteran Policy in Ukraine
Creating an Effective Veteran Policy in UkraineCreating an Effective Veteran Policy in Ukraine
Creating an Effective Veteran Policy in Ukraine
 
PPT Item # 2 -- Announcements Powerpoint
PPT Item # 2 -- Announcements PowerpointPPT Item # 2 -- Announcements Powerpoint
PPT Item # 2 -- Announcements Powerpoint
 
Setting a new path to greater, shared prosperity
Setting a new path to greater, shared prosperitySetting a new path to greater, shared prosperity
Setting a new path to greater, shared prosperity
 
一比一原版(MQU毕业证)麦考瑞大学毕业证成绩单
一比一原版(MQU毕业证)麦考瑞大学毕业证成绩单一比一原版(MQU毕业证)麦考瑞大学毕业证成绩单
一比一原版(MQU毕业证)麦考瑞大学毕业证成绩单
 
Item # 7 - BB Inspection Services Agreement
Item # 7 - BB Inspection Services AgreementItem # 7 - BB Inspection Services Agreement
Item # 7 - BB Inspection Services Agreement
 
2024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 372024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 37
 
“Educate an African fit for the 21st Century: Building resilient education sy...
“Educate an African fit for the 21st Century: Building resilient education sy...“Educate an African fit for the 21st Century: Building resilient education sy...
“Educate an African fit for the 21st Century: Building resilient education sy...
 
Russian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale warRussian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale war
 
Counting Class for Micro Observers 2024.pptx
Counting Class for Micro Observers 2024.pptxCounting Class for Micro Observers 2024.pptx
Counting Class for Micro Observers 2024.pptx
 

Restoring 715 Main St in Bolton - a preliminary proposal by Pat Carroll

  • 1. 715 Main Street: Preliminary Proposal for Preservation Patrick Carroll – July 16, 2014
  • 2. Preliminary Proposal – Preservation of 715 Main Street History and current condition: • 2 family house • Original structure is a classic Greek Revival structure circa 1830’s • Porch and rear addition constructed in 1940’s – 1950’s • Interior renovated and most original interior details removed • Vinyl siding added much later (late 20th century) • Failed septic system (cess pool adjacent to wetlands) in 2005 • Vacated in 2010 2
  • 3. Preliminary Proposal – Preservation of 715 Main Street Proposal Summary: • Demolish the existing porches on the west side • Demolish the existing rear addition • Renovate the interior to a 2-3 bedroom, 1-bath 1-family home • Replace the electrical, plumbing and heating • Insulate • Replace, as required, windows, doors, flooring, trim, cabinets & countertops • Landscape & pave for access/parking • Subdivide lot to leave ~ ¼ acre with the preserved house • Permit and install a new septic system 3
  • 4. Preliminary Proposal – Preservation of 715 Main Street Current Footprint Proposed Footprint Current Town Common lot lines + 4
  • 5. Preliminary Proposal – Preservation of 715 Main Street Proposed Configuration: 5
  • 6. Preliminary Proposal – Preservation of 715 Main Street Preliminary Cost Estimate: 1 Septic system design & installation $50K - $70K 2 Well installation $7K 3 Demolition of porches and addition $6K 4 Disposal of demolition materials $6K 5 Electrical system renovation $14K 6 Plumbing system renovation $15K 7 Heating System renovation $7K 8 Plastering $12K 9 Insulation $10K 10 Paint $10K 11 Trim $7K 12 Windows & doors $15K 13 Cabinets & countertops $10K 14 Flooring $5K 15 Drawings $2K 16 Landscaping $6K 17 Paving $5K TOTAL $187K - $207K Not Currently Estimated 1 Asbestos removal 2 Siding 3 Permits 4 Fixtures 5 Appliances 6
  • 7. Preliminary Proposal – Preservation of 715 Main Street Critical Steps to Success: • Subdivision of land (non-conforming lot - Zoning Board of Appeals) • Sale of land (Bolton Conservation Trust) • Access to parking area (driveway permit – Board of Selectmen) • Design and construction of septic system (Board of Health and Conservation Commission) • Financing 7