1) The document describes a split metal sleeve for protecting drill pipes during oil drilling.
2) The sleeve consists of two resilient metal segments that interlock at side edges to form a continuous circumference when installed on the drill pipe.
3) The segments are curved more than 180 degrees so they must be sprung over the pipe diameter, and their interlocking edges ensure a tight, secure fit that can withstand stresses during drilling.