IS : 4101(Part II ) - 1967
Indian Standard
CODE OF PRACTICE FOR
EXTERNAL FACINGS AND VENEERS
PART II CEMENT CONCRETE FACING
( First Reprint AUGUST 1990 )
UDC 69.022.324:693.69:691.32
0 Copyrigh 1967
BUREAU OF INDIAN STANDARDS
MANAK BHAVAN, 9 BAHADUR SHAH ZAFAR MARC
NEW DELHI 110002
Cr5 October 1967
( Reaffirmed 1995 )
IS : 4101( Part II ) - 1967
Indian Standard
CODE OF PRACTICE FOR
EXTERNAL FACINGS AND VENEERS
PART II CEMENT CONCRETE FACING
Building Construction Practices Sectional Committee, BDC 13
Chairnmn
SHRI N. G. DEWAN
Members
Rcpresenfiag
Central Public Works Department
ADDITIONAL DIRECTOX STAND- Railway Board ( Ministry of Railways )
ARDB ( ARCHITECTURE ). RDSO
DEPUTY DIRECTOR STAXD-
ARDS ( ARCEITECTURE ),
RDSO ( Alternote )
SHRI B. V. APTE Builders’ Association of India, Bombay
SHRI IL 3. SAPRA ( Alternate )
SHFU J. P. J. BILIMORIA Indian Institute of Architects, Bombay
CHIEF ARCHITECT AND TOWN Central Public Works Dopnrtment
PLANNER
CHIEFSENGINEER National Buildings Construction Corporation Ltd,
CEIE~. ENQINEER I B & R 1
New Delhi -
Public Works ‘Department. Government of
Rajasthan - ’
EXECUTIVE ENGINEER
( DESIGN AND SPEOIYIO
DIVISION ) ( Alternate )
SHBI B. K. CHOK~I In personal capacity (M 60, Cusrow Bag,
SHRI V. S. DEVDHAR
Bombay I )
PROP DINESH MOHAN
Institute of Surveyors, New Delhi
Central Building Research Institute (CSIR ),
DIRECTOR
SHBI C. M. GOVEAS
Roorkee -
Engineering Research Department, Hydorabad
Atomic Energy Commission, Bombay; and Brick
and Tile. Floor and Roof Construction Sub-
committee, BDC 13 : 11, IS1
SERI HAEUSHCHANDRA Masonry Construction Subcommittee, BDC 13 : 7,
ISI
Saab S. B. JOSHI S. B. Joshi & Co Ltd, Bombay
Saar R. N. JOSHI ( AIIernale )
SERI V. S. KAMAT Hindustan Construction c/o Ltd, New Delhi
SERI KEWAL KRISIIAN Public Works Department, Government of
Punjab; and Soil Construction Subcommittee,
BDC 13 : 8, IS1
( Continued on page 2 )
BUREAU OF INDIAN STANDARDS
MANAK BHAVAN, 9BAHADUR SHAH ZAFAR MAR0
NEW DELHI llOOU2
IS : 4101 (Part II ) - 1967
( Continuedfrom page 1 )
Members Representing
SJIRI N. J. MASANK
SIIHI T. R. MEHANDRU
Sum K. K. NAMLKIAR
Forest Research Institute 6%Colleges, Debra Dun;
$Fin~Sy Engineering Subcommittee, BDC
Institriti& of Engineers ( India ), Calcutta
Concrete Association of India, Bombay; and
Concrete Construotion Subcommittee, BDC
13 : 9, IS1
SHRI B. T. UNWALLA Concrete Association of India, Bombay
( Alternate )
SHRI C. B. PATEL
SHRI
( ANertZte jD’
SHRI D. J. PATEL
SHRI M. L. RAI~IZJA
National Buildings Organisation ( Ministry of
Works & Housing ); and Expansion Joints
Subcommittee, BDC 13 : 14, IS1
AHUJA National Buildings Organisation ( Ministry of
Works 8; Housing )
Hindustan Housing Factory Ltd, New Delhi
Engineer-in-Chief’s Branoh, Army Headquarters
-SHRI H. V. MIRCHANDANI
( Alternate )
SHRI N. S. L. RAO Covering, Veneering and Glazing Suboommittee,
BDC 13 : 10, ISI
SIIRI J. D. SIIASTRI Directorate General of Health Services, New
Delhi
Sum T.N. SULWARAO Gammon India Ltd, Bombay
SHRI I’. M. APTE ( Alternate )
SUPERINTENDING EN~INIEER Public Works Department, Government of Madras
( PLANNING AND DESIQNS)
EXEOUTIVE ENCXNEER
( BUILDINO CENTRE DIVI-
610~ ) ( Alternate, )
SHRI R. NA~ARAJAN,
Director ( Civ Engg )
Director General, IS1 ( Ex-officio Member )
Secretary
SHRI s. P. RAMAN
Deputy Director ( Civ Engg), IS1
Covering, Veneering and Glazing Subcommittee, BDC 13 : 10
Convener
SHRI N. 5. L. RAO Central Public Works Department
Members
SERI K. C. BANEIZJEE
SHRI K. BARUA
Institution of Engineers ( India ), Calcutta
Publio Works Department, Qovernment of
Aeeam
DR BEAN BHUSRAN Central Glass & Ceramic Research Institute
( CSIR ), Calcutta
Sam M. BWATTAOHARYYA
SHRI J. DATT
EXEOUTIVE EXVGIINEER( DESI-
QNSDIV No. II )
Martin Burn Ltd, CalCUtt8
Concrete Aesociation of Indie, Bombay
Public Worke Depertment, Government of Went
Bengel
( Continued on page 17 )
L
IS : 4101( Part II ) - 1967
Indian Standard
CODE OF PRACTICE FOR
EXTERNAL FACINGS AND VENEERS
PART II CEMENT CONCRETE FACING
0. FOREWORD
0.1 This Indian Standard ( Part II ) was adopted by the Indian
Standards Institution on 30 March 1967, after the draft finalized by the
Building Construction Practices Sectional Committee had been approv-
ed by the Civil Engineering Division Council.
0.2 Concrete slabs with different colours, textures and finishes
provide possibilities for a wide range of architectural treatment
for external facing and are particularly suited for wide scale
adoption in multi-storey constructions. While finishes with natural
materials like stone slabs are restricted by the availability of suitable
stones and the dressing possible for facing, the concrete finishes can bc
made, in order to obtain a wide range of textures and colours. The
manufacture and marketing of white cement in this country IIOW
has considerably expanded the applicability of concrete to facing
work,
0.2.1 However, it may not be enough to make the concrete blocks
and slabs in the same manner as for interior work since when exposed
to action of weather, the dimensional changes are much more and
concrete has got to be carefully designed to accommodate this. Speci-
ally made facing blocks or slabs are necessary for this purpose. The
techniques of fixing concrete facing slabs also have made several
advancements with regard to fixing devices and their arrangements,
jointing mortar, etc, and their selection with regard to exposure condi-
tions and also with regard to types of units with which they are
used. Part II of this code is intended to provide guidance with regard
to selection of materials and fixing techniques for facing with.concrete
slabs; Part I covers stone facing and only such techniques which
are considered to be feasible for adoption in this country under the
present conditions have been included.
0.3 In the formulation of this standard due weightage has been given to
international co-ordination among the standards and practices prevail-
ing in different countries in addition to relating it to the practices
in the field in this country.
3
IS : 4101( Part II ) - 1967
0.4 For the purpose of deciding whether a particular requirement
of this standard is complied with, the final value, observed or calculat-
ed, expressing the result of a test or analysis, shall be rounded off in
accordance with IS : 2-1960*. The number of significant places
retained in the rounded off value should be the same as that of
the specified value in this standard.
1. SCOPE
1.1 This standard ( Part II ) covers fixing of cement concrete facing which
may be in the form of’precast concrete facing blocks or slab units.
1.2 This standard does not cover the fixing of prefabricated panels of
plaster rendering mosaic or terrazzo.
2. TERMINOLOGY
2.0 For the purpose of this standard, the following definitions shall apply.
2.1 Combing - The process of graining done with a flexible toothed
metal plate.
2.2 Facing - Where different parts of the, wall thickness are composed
of different materials or grades of materials, facing refers to the outer
part of the wall, composed of one material or grade of material
and held to the other part ( backing ) by bonding or mechanical anchors
or both.
2.3 Hardening Shrinkage -The shrinkage that occurs in a freshly made
precast concrete unit during the period of drying to maturity.
2.4 Joint Sealing Compound - A material used by itself or in conjunc-
tion with mortar or other material for making the joints watertight.
2.5 Mastic -A general term for any substance which remains
pliable, used for adhesive compounds and joint sealing compounds.
2.6 Starey Level Support - The support given to facings at storey levels,
SO that there is not a tendency to continuous load transfer from the top
facings of the building down to those at ground level.
3. NECESSARY INFORMATION
3.1 For the efficient planning, design and execution of external facing
or veneering work, detailed information with regard to the following
*Rules for rounding off numerical values ( revised).
4
IS : 4101( Part II) - 1967
shall b&‘furnished to those responsible for external facing and
veneering work:
a)
W
Cl
4
Dimensional details of the walls to be faced or veneered;
type and conditions of backing to which the facings are to
be attached;
The method of attachment, namely, whether the facing should
be independently supported or may be attached rigidly to the
backings;
Location and details of openings, chases, drainage pipes, service
lines, etc, to be embedded; and
Any special precaution with regard to design tihich are to be
taken into account depending upon the local climatic and other
conditions.
3.2 All information shall be made available to those who.are responsi-
ble for the facing work, necessary drawings and instructions for
planning work shall also be furnished.
3.3 Arrangements shall also be made for the proper exchange of infor-
mation between those engaged in facing work and all those whose work
will. effect or will be effected.
4. MATERIALS
4.1 Precast concrete facing concrete blocks shall conform generally
to the requirements of IS : 2185-1962* and in addition shall have special
treatment in regard to durability, colour and surface textures for the
exposed facing.
NOTE - Where the blocks 8re manufactured in 8 horizontal core machine
8 Bpeciel face mix admired with 8 waterproofing compound shall be cast integrally
with the body of the block, both mixes hsving 8pproximately the same moisture
movement. Where the blocks are’ manufactured in 8 vertical core mschine,
combing marks 8re made on one face of the blocks after they are taken out of the
mould end Bubaequently this face is treated with 8 special face mix ‘admixed with
8 weterprooflng compound. If the COBt iB not prohibitive, 8 richer mix admixed
with 8 waterproofing compound mey be used throughout in the facing
blocks.
4.1.1 The size commonly adopted for concrete facing slabs will be
60 x 40 x 3 cm. The face finish of slabs shall also be adequately
waterproofed.
4.1.2 For obtaining various colours in the admixtures, reference may
be made to IS : 2114-1962t in which information regarding the pigments
to be used in concrete mixes are also covered, The textures and
*Specification for lood besring hollow concrete blocks.
tCode of practice for laying in situ cement concrete flooring.
5
IS : 4101( Part II) - 1967
patterns that are obtainable in precast concrete blocks are innumerable
and some of the popular patterns are the following:
a) Chequered rubber mat,
b) Corrugated surface,
c) Two-colour chequered patterns,
I’d) Multi-colour mosaic patterns, and
e) Canvas texture.
4.1.2.1 Some of the well-known textures are the following:
Smooth trowel finish,
Wood float finish,
Cork float finish,
Scraped surface finish,
Rubber sponge float finish,
Sand surface face down finish (see also IS : 2402-1963* ).
Pebble dash finish,
Rough cast finish, and
Cast-stone finish.
4.1.2.2 Further information about various finishes is given in
IS : 2402-1963*.
4.2 The material for cramps shall have high resistance to corrosion under
conditions of dampness and against the chemical action of mortar
or concrete in which cramps are usually embedded,
4.2.1 The cramps may be of copper, alloyed with zinc, tin, nickel and
aluminium or stainless steel.
4.2.2 Aluminium alloy H 9 in W condition ( see IS : 733-1956t ) may
also be used for cramps.
4.3 Metal Angle Supports -Metal steel angles used for metal angle
supports shall be clean of mill-scale and loose rust after fabrication and
shall be given a protective coat preferably in the form of galvanizing. or
with at least two coats of appropriate paint as specified in IS: 1477
( Part I )-1959$ and IS : 1477 ( Part II )-19635. Non-corrosive brass
angles will be preferable.
*Code of practice for external rendered Bnishes.
tSpecification for wrought aluminium 8nd aluminium elloys, bars, rods and
sections.
$Code of practice for finishing of ferrous metals in buildings: Painting and allied
5nishes: Part I Operations and workmanship.
(Code of practice for finishing of ferrous metals in buildings: Painting and allied
finishes: Part II Schedules and equipment.
6
--
IS - 4101 ( Part II ) : 1967
4.4 Mortar Materials
4.4.1 Cement -Cement used for making mortar for bedding joint
shall be of ordinary Portland cement conforming to IS : 269-1958* or
IS: 455-19627 or IS: 1489-19621.
4.4.2 Sand - shall conform to IS : 2116-1965s.
4.4.3 Lime - shall conform to IS : 712-196411.
4.4.4 SURKHI -shall conform to IS : 1344-19591.
4.4.5 The water shall be clean and free from injurious amounts
of deleterious materials.
5. DESIGN CONSIDERATIONS
5.1 Structural Design
5.1.1 The structural design of facings and their attachments must be
able to withstqnd, without damaging the pushing and pulling effect of
positive and negative air pressures got by winds. For design data with
regard to wind loads reference may be made to IS : 875-1964**.
5.1.2 In the case of cramp-supported facings, the stresses induced by
weight of the ficings shall also be codsidered in the design of the
cramps or other attachments.
5.2 Types of Facing and Methods of Attachment - Facings and veneer-
ings may be of two types:
4
b)
Methods of attachment of facings may be any one of the5.2.1
following:
a) Using cramps to hold the fa’cing units in position only, the
weight of the unit being transferred to the facing unit beneath;
or
Attached facings for use with backing only as a safe means of
attachment without essentially contributing to the stability or
load bearing properties of the wall, and
Integrally reacting facings which are bonded with the backing
and contribute to the structural stability and strength of
the wall.
*Specification for ordinary, repid-hardening nnd low heat Portland cement.
tspecificaticn for Portland blast furnace slag cement.
$SpeciAcation for Portland-pozzolana cement.
@peoificetion for sand for mesonry mortar.
#pecificetion for building limes ( revised).
nSpeci5cation for SURKHI for use in mortar and concrete.
**Code of preotice for structural safety of buildings: Loading standards (revised).
7
IS : 4101 (Part II) - 1967
b) Using cramps to hold the units in position and in, addition ’
to support the units thus transferring the weight of the unit to
the backing; or
c) The facing unit may contain projections which mechanically
bond into the backing and support the unit; or
d) By means of masonry bond or keying to the backing; or
e) By combinationspf the above methods.
5.2.2 Where cramps are used to hold the unit in position only, the
facings shall be provided with a continuous support on which they rest
at the ground level and other storey levels, the :support being in
the form of projection from or recess in the concrete floor slab, or
a beam between the columns or a metal angle attached to the floor slab
or beams. These supports shail preferably occur at vertical intervals
not more than 3.5 m apart and also over the heads of all open-
ings. Such supports shall also be provided where there is a transition
from thin facings below the thicker facings fixed above.
NOTE -Generally the week point about faoing of high walls with low
transmitting facing slabs will be the dependence of the whole upon the performance
of each unit. The failure to hold a slab properly in position by accidental
omission of a faulty cramp or a faihre in an imperfect facing, ebo, may result in
collapse of many facinga above and around the point of failure. To obviate this
risk intermediate supports for facings will be essential. However, the streeees set
up in the lower most facings as a result of accumulation of the load will normally
be of such an order that can be borne by the material.
5.2.3 Staggering - Staggering of vertical joints may also preferably
be adopted to reduce the danger of wholesale collapse.
5.3 Supporting by Projecting -Supporting by means of projections
which may mechanically bond into the facing is a common method of
attaching concrete facing units. Projecting portions must be reinforced
to prevent failures. In areas of severe exposure the reinforcement of the
concrete shaI1 have enough cover to minimize the risk of corrosion and
section spoiling.
5.4 Supporting by Cramps - Facing blocks or slab units shall be support-
ed by means of cramps for its stability. Cramps may be attached
to its sides (see A and B in Fig. 1 ) or at top and bottom (see C, D, E
and F in Fig. 1 ) or to its sides, top and bottom ( see G and H in Fig. 1)
or in its centre ( see J in Fig. 1 ).
5.4.1 The position and number of cramps shall be fixed with regard
to the facing type, size and weight of units and the condition
of workmanship obtainable in the particular situation. The minimum
number of cramps required for fixing facing unit to the wall are
illustrated in Fig. 1. These minimum requirements should be modified
in accordance with the situation.
8
A
Side attachment
C E
Top and bottom Top and bottom
attachment attachment
.
B
Side attachment
D
Top and bottom
attachment
F
Top and bottoti
attachment
H
Side, top and bottom
attachment
XOTE - Cramps shown in disgrsms ‘A-J'srerrrahged for facings with the longer sides vertical. For fading8
havipg the longer sides horizontal, crsmps would be positioned to suit the altered proportions of the facings.
FIG. 1 DIAGRAMMATIC ARRA,NCEMENTS OF CRAMPSFOR ATTACHING FACINGSTO BACKINGWALL
IS : 4101( Part II) - 1967
5.42 Side Attachment -For horizontal joints of double joggle or
grouted core type one cramp shall be attached to the both sides
of facing (see A in Fig. 1 ). Alternatively, two cramps shall be attached
to one side of facing and one cramp to the other side (see B in
Fig. 1).
5.4.3 Top and Bottom Attachment - Two cramps at top and one at
bottom of facing shall be attached in case the bottom cramps are
unsuitable for bearing load ( see C in Fig. 1); where bottom cramps are
in position to bear load, two cramps at bottom and one at top shall be
attached (see D in Fig. 1 ). For making arrangement, more simpler,
two double cramps shall be attached at bottom and top of the facing
block ( see E in Fig. 1). In case vertical joints are grouted and cramps
carry no weight, two double cramps shall be attached one at bottom
and the other at the top (see F in Fig. 1 ).
5.4.4 Side, Top and Bottom AttaChment - Three cramps shall be
attached to the facing block to have more security for holding; out
of three, two shall be double cramps and one single cramp. Single
cramp shall be attached at the top atid double cramps shall be
attached to both the sides (see G in Fig. 1 ). If single cramp is
attached to its side and double cramps are attached to the top and
bottom, the arrangement will be unsuitable for bearing load unless an
extra cramp is fixed at horizontal joint ( see H in Fig. 1 ).
5.4.5 Centre Attachment -One central holding cramp shall be
suitable for horizontal joints of double joggle or grouted core type
(see J in Fig. 1 ).
materials.
This arrangement is only specified for precast
5.5 Joints -The joints between facing units may be finished flush,
tuck, ruled, square, weathered-struck or rebated, as in Fig. 2. Where
expansion joints are formed in the general structure or backing walls,
these joints shall also be carried through the facing.
5.5.1 TO make the joints weather tight, normally composite mortar
cement lime sand 1 : 1 : 6 will be found satisfactory. .
NOTE -Special joint sealing compounda which have greater elasticity
than masonry mortar and better durability are used in other countries but these
compounds are not generatly available in this country.
5.5.2 For prevention of travel of moisture from the backing to the
facing where such trouble is envisaged, sometimes it may be useful
to attach the facing unit with only dabs of mortar instead with applica-
tion of mortar to the whole of the ,backing. However, this procedure
will have disadvantages compared to solid filling, such as less piotec-
tion against impact, tendency to warping and less security of cramp
fixing.
10
IS : 4101 (Part II ) - 1967
5.5.3 Use of string courses or other features for deflecting water from
the face of high buildings will considerably reduce the incidence of
moisture penetration both at the joints and at the facing unit. How-
ever, a vertical and horizontal joints around such features shall be
properly sealed with a waterproofing compound.
NOTE- Generally bitumens of Grade 260 to 500 will be suitable-for such seal.
ing ( see also IS : 1834-1961* ).
6. FIXING PRECAST CONCRETE SLAB FACINGS
6.1 The facings can be fixed with butt joints, single and double joggled
joints or grouted joints as illustrated in Fig. 2, 3 and 4.
6.2 When the backing wall is of in situ concrete it will be of advantage
to use dovetailed non-corrosive metal channels cast vertically in the
backing wall in which one end of the cramps fit, the other end being
cranked or drilled for dowells, the cramps being set into the channel as
the fixing proceeds.
6.3 Use of Butt Joints
6.3.1 Butt joint is the simplest form of joints and may be used when the
facing unit has a projection into a backing to provide mechanical
bond.
6.3.2 It may also be used when it has no such projection with
the following arrangements:
a) The weight of the facing unit is transmitted to the facing unit
under it and the facing unit is attached to the backing with
mortar only ( see Al in Fig. 4 ).
b) The weight of the facing units is transmitted to the filcing
unit below but the facing unit is attached to the backirlg
by means of flat cramps and by mortar. The split end 01
the cramp shall be fixed to the facing u&t by making a groove
in it ( see A2 in Fig. 4 ).
c) Part of the weight of the facing unit is transmitted directly to
the backing by means of a rag bolt ( see A3 in Fig. 4 ).
6.4 Single Joggled Joint - In the case of single joggled joints when
side cramps are used they need only be single cramp as, one side of the
cramp is already held in position. The. positionill g of single cramp .
will be easier than that of double cramps in practice (see 82 and B3
in Fig. 4). Where lec$ed type of facing is used in coljjunction with an
inverted single-joggle Joint, probably cramps may not be necessary and
the joint shall be as shown in Fig. 5.
-p--_
*Specification for hot applied ceiling compound for joints in concrete.
11
IS :4101 (Part II ) - 1967
3 DETAILSOF CRAMPFORPRECASTCONCRETEFACING:s - Contd
3 A TYPICAL FIXING DETAIL OF CRAMP
3 B ALTERNATIVE FIXING DETAIL OF CRAMP
IS : 4101(Part II) - 1967
3C TYPICAL FIXIN’G DETAIL OF CRAMP
3D TYPICAL FIXING DETAIL OF CRAMP
FIG. 3 DETAILSOF CRAMPFORPRECASTCONCRETEFACINGS
i4
BI
Cl
DI
A3
82 83
RAG aotT
D2 D3
FIG. 4 PRECAST CONCRETE FACING CRAMP AND JOINT DETAILS
..
P
5c
_
,
sJ
.
IS : 4101 ( Part II ) - 1967
LE
NOTE - The inverted joggle joint at the top nf tho ledge is suit8ble only wheq
the joining is applied to a cavity ~811.
FIG. 5 CONCRETE FACINGS SUPPORTED ON LEDGES
6.5 Double Joggled Joint - Double joggled joint ( see Cl in Fig. 4 )
will not be suitable for vertical joints as the sliding action necessary
to engage the unit vertically will interfere with the proper bedding of
the horizontal joint and the bond to the backing wall mortar.
This type of joint shall, however, be suitable for horizontal joints;
it locks the units to one another by positive action, but cramps may be
needed to hold the units to the wall as illustrated in C2 in Fig. 4.
Cramps when fitted to the wall with the help of rag bolt as shown in C3
in Fig. 4 shall be in position to support the weight of construction
at intermediate levels.
6.6 The grouted joint as shown in Dl in Fig. 4 shall stabilize the facing
system if applied to all horizontal and vertical joints. When this type of
joint is qe@ horizontally care shall be taken to ensure that as much as
possible the upper groove is filled with mortar. When using this type
of joint as a vertical joint it may be advantageous to plank off or caulk
the external portion of the joint up to the outer edge of the core
with rolled paper. The joint shall be filled with cement sand grout and
the rolled paper shall be extracted out when the grout has partially set
16
IS : 4101 (Part II) - 1967
and the joint shall be pointed immediately. Cramps may be used for
supporting the unit with the wall and aIso for bearing load partially as
in 02 and 03 in Fig. 4, respectively.
6.7 The thickness of joints may vary from 6 to 10 mm. Where necessary
from architectural considerations, thickness of weathered joints may be
more but shall never exceed 15 mm.
7. CONTROL OF ALIGNMENT
7.1 The appearance of the finished wall face exhibiting a plain surface
will be easily marked by inaccuracies of alignment. Accuracy of
alignment will depend upon the control of uniform size for the cover-
ings, freedom from warping as well as in the accuracy with which the
cramps are fixed. Where practicable the backing wall shall be built
simultaneously with the fixing of facings as this will assist in maintaining
the correct alignment of the facings. Inaccuracies in alignment of
slabs to some extent will be masked by the treatment of the joints, for
example, by the use of chamfered, slightly rounded or rebated edge in
place of simple squared edge. Such an edge will in addition be
free from chipping due to handling.
( Continued from page 2 )
Members
SHRI R. S. GODBOLE
SHRI R. K. G. NARAYAN
( Alternate )
SHRI P. GUI-IA
SHRI’N. J. MA~ANI
SHEI M. V. PEADEAN
SUEVEYOR OB WORKS (CAL-
CUTTA CENTRAL CIRCLE No.
II )
COL H. c. VWH
Representing
William Jacks & Co Ltd, Calcutta
Calcutta Municipal Corporation
Forest Research Institute &
Debra Dun
Colleges,
Bellardie, Thompson & Matthews, Calcutta.
Central Public Works Depertment
R8lmer Lswrie & Co Ltd, Calcutta
17 I
BUREAU OF INDtAN STANDARDS
.
Headquaners:
Manak Bhavan, 9 Bahadur Shah Zafar Marg, NEW DELHI 110002
Telephones: 331 01 31, 331 13 75 Telegrams: Manaksanstha
( ‘Common to all Offiies)
Regional Offices:
.“. .
Telephone
Central : Manak Bhavan, 9 Bahadur Shah Zafar Marg, 331 01 31
NEW DELHI 110002 331 1376
@Eastern : l/l 4 C. I. T. Scheme VII M, V. I. P. Road,
I
38 24 99
Maniktola. CALCUTTA 700064
Northern : SC0 445-448, Sector 36-C,
1
2 18 43’
CHANDIGARH 180038 3 1841
1
41 24 42
Southern : C. I. T. Campus, MADRAS 800113 41 26 19
41 2918
tWestern : Manakalaya, E9 MIDC, Marol, Andheri ( East ), 6 32 92 95
BOMBAY 400093
Branch Offices:
‘Pushpak’, Nurmohamed Shaikh Marg, Khanpur,
I
2 83 48
AHMADABAD 380001 2 83 49
SPeenya Industrial Area 1st Stage, Bangalore Tumkur Road 38 49 55
BANGALORE 560068
I
38 49 56
Gangotri Complex, 5th Floor, Bhadbhada Road, T. T. Nagar, 867 16
BHGPAL 482003
Plot No. 82/83. Lewis Road, BHUBANESHWAR 751002
631’6. Ward No. 29, R.G. Barua Road, 5th Byelane,
GUWAHATI 781003
5 36 27
3 31 77
6-8-56C L. N. Gupta Marg ( Nampally Station Road ),
HYDERABAD 500001
‘..+, 23 10 83
R14 Yudhister Marg. C Scheme, JAIPUR 302005
{
8 34 71
8 98 32
!17/418 B Sarvodaya Nagar, KANPUR 208006
Patliputra Industrial Estate. PATNA 800013
T.C. No. 14/l 421. Universitv P.O.. Palayam
TRIVANDRUM 895035
1fl tt ;2”
8 23 06
/8 21 04
18 21 17
fnspection Offices ( With Sale Point ):
Pushpanjali, First Floor, 205-A West High Court Road, 2 61 71
Shankar Nagar Square, NAGPUR 440010
Institution of Engineers ( India ) Building, 1332 Shivaji Nagar, 6 24 35
PUNE 411005
‘%ales Office in Calcutta ir at 6 Chowringhor Approach, P. 0. Princep 27 68 00
Street. Calcutta 700072
tSeler Office in Bombay is at Novelty Chambera, Grant Road, 89 65 28
Bombay 400007
$Sales Office in Bangalore is at Unity Building, Narasimharaja Square, 22 36 71
Bangalore 660002
Reprography Unit, BIS, New Delhi, India

More Related Content

What's hot (20)

2770 1
2770 12770 1
2770 1
 
Is 1343 2012
Is 1343 2012Is 1343 2012
Is 1343 2012
 
2722
27222722
2722
 
6512
65126512
6512
 
10334
1033410334
10334
 
Is code 456 2000
Is code 456 2000Is code 456 2000
Is code 456 2000
 
383
383383
383
 
Is 456 2000
Is 456 2000Is 456 2000
Is 456 2000
 
6041
60416041
6041
 
6441 6
6441 66441 6
6441 6
 
457
457457
457
 
10297
1029710297
10297
 
is 456 amendment 4
is 456 amendment 4is 456 amendment 4
is 456 amendment 4
 
1200 12
1200 121200 12
1200 12
 
875 1
875 1875 1
875 1
 
Plain and-reinforced-concrete(IS 456 2000)
Plain and-reinforced-concrete(IS 456 2000)Plain and-reinforced-concrete(IS 456 2000)
Plain and-reinforced-concrete(IS 456 2000)
 
Is 456.2000 plain and reinforced concrete
Is 456.2000 plain and reinforced concreteIs 456.2000 plain and reinforced concrete
Is 456.2000 plain and reinforced concrete
 
456
456456
456
 
1199
11991199
1199
 
1343
13431343
1343
 

Similar to 4101 2 (20)

5491
54915491
5491
 
2571
25712571
2571
 
3370 2
3370 23370 2
3370 2
 
2572
25722572
2572
 
2911 1 1
2911 1 12911 1 1
2911 1 1
 
2911 1 3
2911 1 32911 1 3
2911 1 3
 
2950 1
2950 12950 1
2950 1
 
2185 1
2185 12185 1
2185 1
 
2911 1 2
2911 1 22911 1 2
2911 1 2
 
3370 3
3370 33370 3
3370 3
 
2911 1 4
2911 1 42911 1 4
2911 1 4
 
6461 9
6461 96461 9
6461 9
 
4880 5
4880 54880 5
4880 5
 
383.pdf
383.pdf383.pdf
383.pdf
 
6523
65236523
6523
 
3370 4
3370 43370 4
3370 4
 
1237
12371237
1237
 
6509
65096509
6509
 
Is code 3370
Is code 3370Is code 3370
Is code 3370
 
Is 2185 1 1979(2003)
Is 2185 1  1979(2003)Is 2185 1  1979(2003)
Is 2185 1 1979(2003)
 

More from Boopathi Yoganathan (20)

28-5.21 Company Profile of Pyrmaid structural consultant.pptx
28-5.21 Company Profile of Pyrmaid structural consultant.pptx28-5.21 Company Profile of Pyrmaid structural consultant.pptx
28-5.21 Company Profile of Pyrmaid structural consultant.pptx
 
Front page upto content new
Front page upto content newFront page upto content new
Front page upto content new
 
Book report new
Book report newBook report new
Book report new
 
Fem
FemFem
Fem
 
Exopy injection
Exopy injectionExopy injection
Exopy injection
 
Embedded
EmbeddedEmbedded
Embedded
 
Earthquakes seminar
Earthquakes seminarEarthquakes seminar
Earthquakes seminar
 
10302
1030210302
10302
 
9527 1
9527 19527 1
9527 1
 
9459
94599459
9459
 
9456
94569456
9456
 
9429
94299429
9429
 
9417
94179417
9417
 
7873
78737873
7873
 
7563
75637563
7563
 
7500
75007500
7500
 
7436 1
7436 17436 1
7436 1
 
7246
72467246
7246
 
7245
72457245
7245
 
7242
72427242
7242
 

Recently uploaded

Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 
Types of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxTypes of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxEyham Joco
 
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxHistory Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxsocialsciencegdgrohi
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Celine George
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxiammrhaywood
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfMahmoud M. Sallam
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersSabitha Banu
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaVirag Sontakke
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfFraming an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfUjwalaBharambe
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 
Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...jaredbarbolino94
 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementmkooblal
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceSamikshaHamane
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxRaymartEstabillo3
 
Biting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfBiting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfadityarao40181
 

Recently uploaded (20)

Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 
Types of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxTypes of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptx
 
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxHistory Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
 
OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdf
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginners
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of India
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfFraming an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 
Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...
 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of management
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in Pharmacovigilance
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
 
Biting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfBiting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdf
 

4101 2

  • 1. IS : 4101(Part II ) - 1967 Indian Standard CODE OF PRACTICE FOR EXTERNAL FACINGS AND VENEERS PART II CEMENT CONCRETE FACING ( First Reprint AUGUST 1990 ) UDC 69.022.324:693.69:691.32 0 Copyrigh 1967 BUREAU OF INDIAN STANDARDS MANAK BHAVAN, 9 BAHADUR SHAH ZAFAR MARC NEW DELHI 110002 Cr5 October 1967 ( Reaffirmed 1995 )
  • 2. IS : 4101( Part II ) - 1967 Indian Standard CODE OF PRACTICE FOR EXTERNAL FACINGS AND VENEERS PART II CEMENT CONCRETE FACING Building Construction Practices Sectional Committee, BDC 13 Chairnmn SHRI N. G. DEWAN Members Rcpresenfiag Central Public Works Department ADDITIONAL DIRECTOX STAND- Railway Board ( Ministry of Railways ) ARDB ( ARCHITECTURE ). RDSO DEPUTY DIRECTOR STAXD- ARDS ( ARCEITECTURE ), RDSO ( Alternote ) SHRI B. V. APTE Builders’ Association of India, Bombay SHRI IL 3. SAPRA ( Alternate ) SHFU J. P. J. BILIMORIA Indian Institute of Architects, Bombay CHIEF ARCHITECT AND TOWN Central Public Works Dopnrtment PLANNER CHIEFSENGINEER National Buildings Construction Corporation Ltd, CEIE~. ENQINEER I B & R 1 New Delhi - Public Works ‘Department. Government of Rajasthan - ’ EXECUTIVE ENGINEER ( DESIGN AND SPEOIYIO DIVISION ) ( Alternate ) SHBI B. K. CHOK~I In personal capacity (M 60, Cusrow Bag, SHRI V. S. DEVDHAR Bombay I ) PROP DINESH MOHAN Institute of Surveyors, New Delhi Central Building Research Institute (CSIR ), DIRECTOR SHBI C. M. GOVEAS Roorkee - Engineering Research Department, Hydorabad Atomic Energy Commission, Bombay; and Brick and Tile. Floor and Roof Construction Sub- committee, BDC 13 : 11, IS1 SERI HAEUSHCHANDRA Masonry Construction Subcommittee, BDC 13 : 7, ISI Saab S. B. JOSHI S. B. Joshi & Co Ltd, Bombay Saar R. N. JOSHI ( AIIernale ) SERI V. S. KAMAT Hindustan Construction c/o Ltd, New Delhi SERI KEWAL KRISIIAN Public Works Department, Government of Punjab; and Soil Construction Subcommittee, BDC 13 : 8, IS1 ( Continued on page 2 ) BUREAU OF INDIAN STANDARDS MANAK BHAVAN, 9BAHADUR SHAH ZAFAR MAR0 NEW DELHI llOOU2
  • 3. IS : 4101 (Part II ) - 1967 ( Continuedfrom page 1 ) Members Representing SJIRI N. J. MASANK SIIHI T. R. MEHANDRU Sum K. K. NAMLKIAR Forest Research Institute 6%Colleges, Debra Dun; $Fin~Sy Engineering Subcommittee, BDC Institriti& of Engineers ( India ), Calcutta Concrete Association of India, Bombay; and Concrete Construotion Subcommittee, BDC 13 : 9, IS1 SHRI B. T. UNWALLA Concrete Association of India, Bombay ( Alternate ) SHRI C. B. PATEL SHRI ( ANertZte jD’ SHRI D. J. PATEL SHRI M. L. RAI~IZJA National Buildings Organisation ( Ministry of Works & Housing ); and Expansion Joints Subcommittee, BDC 13 : 14, IS1 AHUJA National Buildings Organisation ( Ministry of Works 8; Housing ) Hindustan Housing Factory Ltd, New Delhi Engineer-in-Chief’s Branoh, Army Headquarters -SHRI H. V. MIRCHANDANI ( Alternate ) SHRI N. S. L. RAO Covering, Veneering and Glazing Suboommittee, BDC 13 : 10, ISI SIIRI J. D. SIIASTRI Directorate General of Health Services, New Delhi Sum T.N. SULWARAO Gammon India Ltd, Bombay SHRI I’. M. APTE ( Alternate ) SUPERINTENDING EN~INIEER Public Works Department, Government of Madras ( PLANNING AND DESIQNS) EXEOUTIVE ENCXNEER ( BUILDINO CENTRE DIVI- 610~ ) ( Alternate, ) SHRI R. NA~ARAJAN, Director ( Civ Engg ) Director General, IS1 ( Ex-officio Member ) Secretary SHRI s. P. RAMAN Deputy Director ( Civ Engg), IS1 Covering, Veneering and Glazing Subcommittee, BDC 13 : 10 Convener SHRI N. 5. L. RAO Central Public Works Department Members SERI K. C. BANEIZJEE SHRI K. BARUA Institution of Engineers ( India ), Calcutta Publio Works Department, Qovernment of Aeeam DR BEAN BHUSRAN Central Glass & Ceramic Research Institute ( CSIR ), Calcutta Sam M. BWATTAOHARYYA SHRI J. DATT EXEOUTIVE EXVGIINEER( DESI- QNSDIV No. II ) Martin Burn Ltd, CalCUtt8 Concrete Aesociation of Indie, Bombay Public Worke Depertment, Government of Went Bengel ( Continued on page 17 ) L
  • 4. IS : 4101( Part II ) - 1967 Indian Standard CODE OF PRACTICE FOR EXTERNAL FACINGS AND VENEERS PART II CEMENT CONCRETE FACING 0. FOREWORD 0.1 This Indian Standard ( Part II ) was adopted by the Indian Standards Institution on 30 March 1967, after the draft finalized by the Building Construction Practices Sectional Committee had been approv- ed by the Civil Engineering Division Council. 0.2 Concrete slabs with different colours, textures and finishes provide possibilities for a wide range of architectural treatment for external facing and are particularly suited for wide scale adoption in multi-storey constructions. While finishes with natural materials like stone slabs are restricted by the availability of suitable stones and the dressing possible for facing, the concrete finishes can bc made, in order to obtain a wide range of textures and colours. The manufacture and marketing of white cement in this country IIOW has considerably expanded the applicability of concrete to facing work, 0.2.1 However, it may not be enough to make the concrete blocks and slabs in the same manner as for interior work since when exposed to action of weather, the dimensional changes are much more and concrete has got to be carefully designed to accommodate this. Speci- ally made facing blocks or slabs are necessary for this purpose. The techniques of fixing concrete facing slabs also have made several advancements with regard to fixing devices and their arrangements, jointing mortar, etc, and their selection with regard to exposure condi- tions and also with regard to types of units with which they are used. Part II of this code is intended to provide guidance with regard to selection of materials and fixing techniques for facing with.concrete slabs; Part I covers stone facing and only such techniques which are considered to be feasible for adoption in this country under the present conditions have been included. 0.3 In the formulation of this standard due weightage has been given to international co-ordination among the standards and practices prevail- ing in different countries in addition to relating it to the practices in the field in this country. 3
  • 5. IS : 4101( Part II ) - 1967 0.4 For the purpose of deciding whether a particular requirement of this standard is complied with, the final value, observed or calculat- ed, expressing the result of a test or analysis, shall be rounded off in accordance with IS : 2-1960*. The number of significant places retained in the rounded off value should be the same as that of the specified value in this standard. 1. SCOPE 1.1 This standard ( Part II ) covers fixing of cement concrete facing which may be in the form of’precast concrete facing blocks or slab units. 1.2 This standard does not cover the fixing of prefabricated panels of plaster rendering mosaic or terrazzo. 2. TERMINOLOGY 2.0 For the purpose of this standard, the following definitions shall apply. 2.1 Combing - The process of graining done with a flexible toothed metal plate. 2.2 Facing - Where different parts of the, wall thickness are composed of different materials or grades of materials, facing refers to the outer part of the wall, composed of one material or grade of material and held to the other part ( backing ) by bonding or mechanical anchors or both. 2.3 Hardening Shrinkage -The shrinkage that occurs in a freshly made precast concrete unit during the period of drying to maturity. 2.4 Joint Sealing Compound - A material used by itself or in conjunc- tion with mortar or other material for making the joints watertight. 2.5 Mastic -A general term for any substance which remains pliable, used for adhesive compounds and joint sealing compounds. 2.6 Starey Level Support - The support given to facings at storey levels, SO that there is not a tendency to continuous load transfer from the top facings of the building down to those at ground level. 3. NECESSARY INFORMATION 3.1 For the efficient planning, design and execution of external facing or veneering work, detailed information with regard to the following *Rules for rounding off numerical values ( revised). 4
  • 6. IS : 4101( Part II) - 1967 shall b&‘furnished to those responsible for external facing and veneering work: a) W Cl 4 Dimensional details of the walls to be faced or veneered; type and conditions of backing to which the facings are to be attached; The method of attachment, namely, whether the facing should be independently supported or may be attached rigidly to the backings; Location and details of openings, chases, drainage pipes, service lines, etc, to be embedded; and Any special precaution with regard to design tihich are to be taken into account depending upon the local climatic and other conditions. 3.2 All information shall be made available to those who.are responsi- ble for the facing work, necessary drawings and instructions for planning work shall also be furnished. 3.3 Arrangements shall also be made for the proper exchange of infor- mation between those engaged in facing work and all those whose work will. effect or will be effected. 4. MATERIALS 4.1 Precast concrete facing concrete blocks shall conform generally to the requirements of IS : 2185-1962* and in addition shall have special treatment in regard to durability, colour and surface textures for the exposed facing. NOTE - Where the blocks 8re manufactured in 8 horizontal core machine 8 Bpeciel face mix admired with 8 waterproofing compound shall be cast integrally with the body of the block, both mixes hsving 8pproximately the same moisture movement. Where the blocks are’ manufactured in 8 vertical core mschine, combing marks 8re made on one face of the blocks after they are taken out of the mould end Bubaequently this face is treated with 8 special face mix ‘admixed with 8 weterprooflng compound. If the COBt iB not prohibitive, 8 richer mix admixed with 8 waterproofing compound mey be used throughout in the facing blocks. 4.1.1 The size commonly adopted for concrete facing slabs will be 60 x 40 x 3 cm. The face finish of slabs shall also be adequately waterproofed. 4.1.2 For obtaining various colours in the admixtures, reference may be made to IS : 2114-1962t in which information regarding the pigments to be used in concrete mixes are also covered, The textures and *Specification for lood besring hollow concrete blocks. tCode of practice for laying in situ cement concrete flooring. 5
  • 7. IS : 4101( Part II) - 1967 patterns that are obtainable in precast concrete blocks are innumerable and some of the popular patterns are the following: a) Chequered rubber mat, b) Corrugated surface, c) Two-colour chequered patterns, I’d) Multi-colour mosaic patterns, and e) Canvas texture. 4.1.2.1 Some of the well-known textures are the following: Smooth trowel finish, Wood float finish, Cork float finish, Scraped surface finish, Rubber sponge float finish, Sand surface face down finish (see also IS : 2402-1963* ). Pebble dash finish, Rough cast finish, and Cast-stone finish. 4.1.2.2 Further information about various finishes is given in IS : 2402-1963*. 4.2 The material for cramps shall have high resistance to corrosion under conditions of dampness and against the chemical action of mortar or concrete in which cramps are usually embedded, 4.2.1 The cramps may be of copper, alloyed with zinc, tin, nickel and aluminium or stainless steel. 4.2.2 Aluminium alloy H 9 in W condition ( see IS : 733-1956t ) may also be used for cramps. 4.3 Metal Angle Supports -Metal steel angles used for metal angle supports shall be clean of mill-scale and loose rust after fabrication and shall be given a protective coat preferably in the form of galvanizing. or with at least two coats of appropriate paint as specified in IS: 1477 ( Part I )-1959$ and IS : 1477 ( Part II )-19635. Non-corrosive brass angles will be preferable. *Code of practice for external rendered Bnishes. tSpecification for wrought aluminium 8nd aluminium elloys, bars, rods and sections. $Code of practice for finishing of ferrous metals in buildings: Painting and allied 5nishes: Part I Operations and workmanship. (Code of practice for finishing of ferrous metals in buildings: Painting and allied finishes: Part II Schedules and equipment. 6
  • 8. -- IS - 4101 ( Part II ) : 1967 4.4 Mortar Materials 4.4.1 Cement -Cement used for making mortar for bedding joint shall be of ordinary Portland cement conforming to IS : 269-1958* or IS: 455-19627 or IS: 1489-19621. 4.4.2 Sand - shall conform to IS : 2116-1965s. 4.4.3 Lime - shall conform to IS : 712-196411. 4.4.4 SURKHI -shall conform to IS : 1344-19591. 4.4.5 The water shall be clean and free from injurious amounts of deleterious materials. 5. DESIGN CONSIDERATIONS 5.1 Structural Design 5.1.1 The structural design of facings and their attachments must be able to withstqnd, without damaging the pushing and pulling effect of positive and negative air pressures got by winds. For design data with regard to wind loads reference may be made to IS : 875-1964**. 5.1.2 In the case of cramp-supported facings, the stresses induced by weight of the ficings shall also be codsidered in the design of the cramps or other attachments. 5.2 Types of Facing and Methods of Attachment - Facings and veneer- ings may be of two types: 4 b) Methods of attachment of facings may be any one of the5.2.1 following: a) Using cramps to hold the fa’cing units in position only, the weight of the unit being transferred to the facing unit beneath; or Attached facings for use with backing only as a safe means of attachment without essentially contributing to the stability or load bearing properties of the wall, and Integrally reacting facings which are bonded with the backing and contribute to the structural stability and strength of the wall. *Specification for ordinary, repid-hardening nnd low heat Portland cement. tspecificaticn for Portland blast furnace slag cement. $SpeciAcation for Portland-pozzolana cement. @peoificetion for sand for mesonry mortar. #pecificetion for building limes ( revised). nSpeci5cation for SURKHI for use in mortar and concrete. **Code of preotice for structural safety of buildings: Loading standards (revised). 7
  • 9. IS : 4101 (Part II) - 1967 b) Using cramps to hold the units in position and in, addition ’ to support the units thus transferring the weight of the unit to the backing; or c) The facing unit may contain projections which mechanically bond into the backing and support the unit; or d) By means of masonry bond or keying to the backing; or e) By combinationspf the above methods. 5.2.2 Where cramps are used to hold the unit in position only, the facings shall be provided with a continuous support on which they rest at the ground level and other storey levels, the :support being in the form of projection from or recess in the concrete floor slab, or a beam between the columns or a metal angle attached to the floor slab or beams. These supports shail preferably occur at vertical intervals not more than 3.5 m apart and also over the heads of all open- ings. Such supports shall also be provided where there is a transition from thin facings below the thicker facings fixed above. NOTE -Generally the week point about faoing of high walls with low transmitting facing slabs will be the dependence of the whole upon the performance of each unit. The failure to hold a slab properly in position by accidental omission of a faulty cramp or a faihre in an imperfect facing, ebo, may result in collapse of many facinga above and around the point of failure. To obviate this risk intermediate supports for facings will be essential. However, the streeees set up in the lower most facings as a result of accumulation of the load will normally be of such an order that can be borne by the material. 5.2.3 Staggering - Staggering of vertical joints may also preferably be adopted to reduce the danger of wholesale collapse. 5.3 Supporting by Projecting -Supporting by means of projections which may mechanically bond into the facing is a common method of attaching concrete facing units. Projecting portions must be reinforced to prevent failures. In areas of severe exposure the reinforcement of the concrete shaI1 have enough cover to minimize the risk of corrosion and section spoiling. 5.4 Supporting by Cramps - Facing blocks or slab units shall be support- ed by means of cramps for its stability. Cramps may be attached to its sides (see A and B in Fig. 1 ) or at top and bottom (see C, D, E and F in Fig. 1 ) or to its sides, top and bottom ( see G and H in Fig. 1) or in its centre ( see J in Fig. 1 ). 5.4.1 The position and number of cramps shall be fixed with regard to the facing type, size and weight of units and the condition of workmanship obtainable in the particular situation. The minimum number of cramps required for fixing facing unit to the wall are illustrated in Fig. 1. These minimum requirements should be modified in accordance with the situation. 8
  • 10. A Side attachment C E Top and bottom Top and bottom attachment attachment . B Side attachment D Top and bottom attachment F Top and bottoti attachment H Side, top and bottom attachment XOTE - Cramps shown in disgrsms ‘A-J'srerrrahged for facings with the longer sides vertical. For fading8 havipg the longer sides horizontal, crsmps would be positioned to suit the altered proportions of the facings. FIG. 1 DIAGRAMMATIC ARRA,NCEMENTS OF CRAMPSFOR ATTACHING FACINGSTO BACKINGWALL
  • 11. IS : 4101( Part II) - 1967 5.42 Side Attachment -For horizontal joints of double joggle or grouted core type one cramp shall be attached to the both sides of facing (see A in Fig. 1 ). Alternatively, two cramps shall be attached to one side of facing and one cramp to the other side (see B in Fig. 1). 5.4.3 Top and Bottom Attachment - Two cramps at top and one at bottom of facing shall be attached in case the bottom cramps are unsuitable for bearing load ( see C in Fig. 1); where bottom cramps are in position to bear load, two cramps at bottom and one at top shall be attached (see D in Fig. 1 ). For making arrangement, more simpler, two double cramps shall be attached at bottom and top of the facing block ( see E in Fig. 1). In case vertical joints are grouted and cramps carry no weight, two double cramps shall be attached one at bottom and the other at the top (see F in Fig. 1 ). 5.4.4 Side, Top and Bottom AttaChment - Three cramps shall be attached to the facing block to have more security for holding; out of three, two shall be double cramps and one single cramp. Single cramp shall be attached at the top atid double cramps shall be attached to both the sides (see G in Fig. 1 ). If single cramp is attached to its side and double cramps are attached to the top and bottom, the arrangement will be unsuitable for bearing load unless an extra cramp is fixed at horizontal joint ( see H in Fig. 1 ). 5.4.5 Centre Attachment -One central holding cramp shall be suitable for horizontal joints of double joggle or grouted core type (see J in Fig. 1 ). materials. This arrangement is only specified for precast 5.5 Joints -The joints between facing units may be finished flush, tuck, ruled, square, weathered-struck or rebated, as in Fig. 2. Where expansion joints are formed in the general structure or backing walls, these joints shall also be carried through the facing. 5.5.1 TO make the joints weather tight, normally composite mortar cement lime sand 1 : 1 : 6 will be found satisfactory. . NOTE -Special joint sealing compounda which have greater elasticity than masonry mortar and better durability are used in other countries but these compounds are not generatly available in this country. 5.5.2 For prevention of travel of moisture from the backing to the facing where such trouble is envisaged, sometimes it may be useful to attach the facing unit with only dabs of mortar instead with applica- tion of mortar to the whole of the ,backing. However, this procedure will have disadvantages compared to solid filling, such as less piotec- tion against impact, tendency to warping and less security of cramp fixing. 10
  • 12. IS : 4101 (Part II ) - 1967 5.5.3 Use of string courses or other features for deflecting water from the face of high buildings will considerably reduce the incidence of moisture penetration both at the joints and at the facing unit. How- ever, a vertical and horizontal joints around such features shall be properly sealed with a waterproofing compound. NOTE- Generally bitumens of Grade 260 to 500 will be suitable-for such seal. ing ( see also IS : 1834-1961* ). 6. FIXING PRECAST CONCRETE SLAB FACINGS 6.1 The facings can be fixed with butt joints, single and double joggled joints or grouted joints as illustrated in Fig. 2, 3 and 4. 6.2 When the backing wall is of in situ concrete it will be of advantage to use dovetailed non-corrosive metal channels cast vertically in the backing wall in which one end of the cramps fit, the other end being cranked or drilled for dowells, the cramps being set into the channel as the fixing proceeds. 6.3 Use of Butt Joints 6.3.1 Butt joint is the simplest form of joints and may be used when the facing unit has a projection into a backing to provide mechanical bond. 6.3.2 It may also be used when it has no such projection with the following arrangements: a) The weight of the facing unit is transmitted to the facing unit under it and the facing unit is attached to the backing with mortar only ( see Al in Fig. 4 ). b) The weight of the facing units is transmitted to the filcing unit below but the facing unit is attached to the backirlg by means of flat cramps and by mortar. The split end 01 the cramp shall be fixed to the facing u&t by making a groove in it ( see A2 in Fig. 4 ). c) Part of the weight of the facing unit is transmitted directly to the backing by means of a rag bolt ( see A3 in Fig. 4 ). 6.4 Single Joggled Joint - In the case of single joggled joints when side cramps are used they need only be single cramp as, one side of the cramp is already held in position. The. positionill g of single cramp . will be easier than that of double cramps in practice (see 82 and B3 in Fig. 4). Where lec$ed type of facing is used in coljjunction with an inverted single-joggle Joint, probably cramps may not be necessary and the joint shall be as shown in Fig. 5. -p--_ *Specification for hot applied ceiling compound for joints in concrete. 11
  • 13.
  • 14. IS :4101 (Part II ) - 1967 3 DETAILSOF CRAMPFORPRECASTCONCRETEFACING:s - Contd 3 A TYPICAL FIXING DETAIL OF CRAMP 3 B ALTERNATIVE FIXING DETAIL OF CRAMP
  • 15. IS : 4101(Part II) - 1967 3C TYPICAL FIXIN’G DETAIL OF CRAMP 3D TYPICAL FIXING DETAIL OF CRAMP FIG. 3 DETAILSOF CRAMPFORPRECASTCONCRETEFACINGS i4
  • 16. BI Cl DI A3 82 83 RAG aotT D2 D3 FIG. 4 PRECAST CONCRETE FACING CRAMP AND JOINT DETAILS .. P 5c _ , sJ .
  • 17. IS : 4101 ( Part II ) - 1967 LE NOTE - The inverted joggle joint at the top nf tho ledge is suit8ble only wheq the joining is applied to a cavity ~811. FIG. 5 CONCRETE FACINGS SUPPORTED ON LEDGES 6.5 Double Joggled Joint - Double joggled joint ( see Cl in Fig. 4 ) will not be suitable for vertical joints as the sliding action necessary to engage the unit vertically will interfere with the proper bedding of the horizontal joint and the bond to the backing wall mortar. This type of joint shall, however, be suitable for horizontal joints; it locks the units to one another by positive action, but cramps may be needed to hold the units to the wall as illustrated in C2 in Fig. 4. Cramps when fitted to the wall with the help of rag bolt as shown in C3 in Fig. 4 shall be in position to support the weight of construction at intermediate levels. 6.6 The grouted joint as shown in Dl in Fig. 4 shall stabilize the facing system if applied to all horizontal and vertical joints. When this type of joint is qe@ horizontally care shall be taken to ensure that as much as possible the upper groove is filled with mortar. When using this type of joint as a vertical joint it may be advantageous to plank off or caulk the external portion of the joint up to the outer edge of the core with rolled paper. The joint shall be filled with cement sand grout and the rolled paper shall be extracted out when the grout has partially set 16
  • 18. IS : 4101 (Part II) - 1967 and the joint shall be pointed immediately. Cramps may be used for supporting the unit with the wall and aIso for bearing load partially as in 02 and 03 in Fig. 4, respectively. 6.7 The thickness of joints may vary from 6 to 10 mm. Where necessary from architectural considerations, thickness of weathered joints may be more but shall never exceed 15 mm. 7. CONTROL OF ALIGNMENT 7.1 The appearance of the finished wall face exhibiting a plain surface will be easily marked by inaccuracies of alignment. Accuracy of alignment will depend upon the control of uniform size for the cover- ings, freedom from warping as well as in the accuracy with which the cramps are fixed. Where practicable the backing wall shall be built simultaneously with the fixing of facings as this will assist in maintaining the correct alignment of the facings. Inaccuracies in alignment of slabs to some extent will be masked by the treatment of the joints, for example, by the use of chamfered, slightly rounded or rebated edge in place of simple squared edge. Such an edge will in addition be free from chipping due to handling. ( Continued from page 2 ) Members SHRI R. S. GODBOLE SHRI R. K. G. NARAYAN ( Alternate ) SHRI P. GUI-IA SHRI’N. J. MA~ANI SHEI M. V. PEADEAN SUEVEYOR OB WORKS (CAL- CUTTA CENTRAL CIRCLE No. II ) COL H. c. VWH Representing William Jacks & Co Ltd, Calcutta Calcutta Municipal Corporation Forest Research Institute & Debra Dun Colleges, Bellardie, Thompson & Matthews, Calcutta. Central Public Works Depertment R8lmer Lswrie & Co Ltd, Calcutta 17 I
  • 19. BUREAU OF INDtAN STANDARDS . Headquaners: Manak Bhavan, 9 Bahadur Shah Zafar Marg, NEW DELHI 110002 Telephones: 331 01 31, 331 13 75 Telegrams: Manaksanstha ( ‘Common to all Offiies) Regional Offices: .“. . Telephone Central : Manak Bhavan, 9 Bahadur Shah Zafar Marg, 331 01 31 NEW DELHI 110002 331 1376 @Eastern : l/l 4 C. I. T. Scheme VII M, V. I. P. Road, I 38 24 99 Maniktola. CALCUTTA 700064 Northern : SC0 445-448, Sector 36-C, 1 2 18 43’ CHANDIGARH 180038 3 1841 1 41 24 42 Southern : C. I. T. Campus, MADRAS 800113 41 26 19 41 2918 tWestern : Manakalaya, E9 MIDC, Marol, Andheri ( East ), 6 32 92 95 BOMBAY 400093 Branch Offices: ‘Pushpak’, Nurmohamed Shaikh Marg, Khanpur, I 2 83 48 AHMADABAD 380001 2 83 49 SPeenya Industrial Area 1st Stage, Bangalore Tumkur Road 38 49 55 BANGALORE 560068 I 38 49 56 Gangotri Complex, 5th Floor, Bhadbhada Road, T. T. Nagar, 867 16 BHGPAL 482003 Plot No. 82/83. Lewis Road, BHUBANESHWAR 751002 631’6. Ward No. 29, R.G. Barua Road, 5th Byelane, GUWAHATI 781003 5 36 27 3 31 77 6-8-56C L. N. Gupta Marg ( Nampally Station Road ), HYDERABAD 500001 ‘..+, 23 10 83 R14 Yudhister Marg. C Scheme, JAIPUR 302005 { 8 34 71 8 98 32 !17/418 B Sarvodaya Nagar, KANPUR 208006 Patliputra Industrial Estate. PATNA 800013 T.C. No. 14/l 421. Universitv P.O.. Palayam TRIVANDRUM 895035 1fl tt ;2” 8 23 06 /8 21 04 18 21 17 fnspection Offices ( With Sale Point ): Pushpanjali, First Floor, 205-A West High Court Road, 2 61 71 Shankar Nagar Square, NAGPUR 440010 Institution of Engineers ( India ) Building, 1332 Shivaji Nagar, 6 24 35 PUNE 411005 ‘%ales Office in Calcutta ir at 6 Chowringhor Approach, P. 0. Princep 27 68 00 Street. Calcutta 700072 tSeler Office in Bombay is at Novelty Chambera, Grant Road, 89 65 28 Bombay 400007 $Sales Office in Bangalore is at Unity Building, Narasimharaja Square, 22 36 71 Bangalore 660002 Reprography Unit, BIS, New Delhi, India