ACI 303.1-97 became effective September 1, 1997.
Copyright © 1998, American Concrete Institute.
All rights reserved including rights of reproduction and use in any form or by any
means, including the making of copies by any photo process, or by electronic or
mechanical device, printed, written, or oral, or recording for sound or visual reproduc-
tion or for use in any knowledge or retrieval system or device, unless permission in
writing is obtained from the copyright proprietors.
303.1-1
This Standard Specification states requirements for cast-in-place architec-
tural concrete. It includes requirements for the materials, forming, concrete
placement, curing, additional treatment, and inspection. The requirements
are for vertical (walls) and horizontal (flatwork) architectural concrete
separate from the requirements for structural concrete.
Keywords: abrasive blasting; architectural concrete; as-cast finish, bush-
hammering; cements; colored concrete; colors (materials); concrete con-
struction; concrete finishes; consolidation; curing; exposed aggregate; plac-
ing; repairs; rustications; sealants; sealers; specifications; surface retarders;
texture.
FOREWORD
F1. This foreword is included for explanatory purposes
only; it does not form a part of the Standard Specification
ACI 303.1.
F2. Standard Specification ACI 303.1 is a Reference Stan-
dard that the Architect/Engineer may cite in the Project
Specifications for project, together with supplementary re-
quirements for the specific project.
F3. Each technical section of Standard Specification
ACI 303.1 is written in the three-part Section Format of the
Construction Specifications Institute, as adapted by ACI,
modified to ACI requirements, and organized by types of ar-
chitectural concrete. The language is generally imperative
and terse.
F4. Checklists do not form a part of Standard Specification
ACI 303.1. Checklists are to assist the Architect/Engineer in
properly choosing and specifying Project Specifications.
PREFACE TO SPECIFICATION CHECKLIST
P1. Standard Specification ACI 303.1 is intended to be
used by reference or incorporation in its entirety in the
Project Specifications. Individual sections, articles, or para-
graphs shall not be copied into the Project Specifications,
since taking them out of context may change their meaning.
SI equivalents are provided for information only and are not
part of this specification.
P2. If sections or parts of Standard Specification
ACI 303.1 are edited into project specifications or any other
document, they shall not be referred to as ACI standards,
since the Standard Specification has been altered.
P3. Building codes set minimum requirements necessary
to protect the public. This Standard Specification may stipu-
late requirements more restrictive than the minimum. Ad-
justments to the needs of a particular project shall be made
by the Architect/Engineer by reviewing each of the items in
the Specification Checklist and then including the Architect/
Engineer’s decision on each item as a mandatory require-
ment in the Project Specifications.
P4. These mandatory requirements designate the specific
qualities, procedures, materials, and performance criteria for
which the alternates are permitted or for which provisions
Standard Specification for Cast-In-Place
Architectural Concrete (ACI 303.1-97)
ACI 303.1-97
Reported by ACI Committee 303
Robert Nussmeier, Chairman
Joseph A. Dobrowolski, Past Chairman Eugene H. Boeke, Jr., Vice Chairman Claude B. Trusty, Secretary
Michael Archambault Jerome H. Ford Russell B. Peck
George F. Baty Thomas J. Grisinger Alfred D. Perez Jr.
Muriel Burns Allan R. Kenney Richard T. Stack
Charles M. Dabney David O. Lower Louis Tallarico
Daniel P. Dorfmueller Thomas D. Verti
303.1-2 ACI STANDARD
were not made in the Standard Specification. Exceptions to
the Standard Specification shall be made in the Project Spec-
ification, if required.
P5. The following statement will serve to make Standard
Specification ACI 303.1 a part of Project Specifications:
Work on ______(Project Title )________ shall conform
to requirements of ACI Standard Specification for Cast-
In-Place Architectural Concrete, ACI 303.1, published
by the American Concrete Institute, Farmington Hills,
Michigan, except as modified by the requirements of
these Contract Documents.
P6. The Standard Specification Checklist identifies Archi-
tect/Engineer choices and alternatives. The checklist identifies
the sections, parts, and articles of the Standard Specification
and the action required by the Architect/Engineer.
SPECIFICATION CHECKLISTS
Section/Part/Article Notes to the Architect/Engineer
M. MANDATORY REQUIREMENTS
Section 1—General Designate whether U.S. Customary or SI units in preface.
1.6—Quality assurance
1.6.1—Quality control plan Specify content and when to submit.
Section 2—Concrete for cast-in-place architectural concrete
2.2.1—Cementitious materials Specify type of cement required for the environment.
O. OPTIONAL REQUIREMENTS
Section 1—General
1.4—Reference standards Revise standards if project outside of U.S.
1.5—Submittals Specify size, quantity and scheduling of product submittals.
1.6—Quality assurance
1.6.2—Field mockup Specify details for field mockup. Allow structure wall
as option, if desired.
1.6.3—Qualifications and responsibility
1.6.3.1—Responsibility of contractor Modify responsibility requirements for contract.
1.6.3.2—QC inspector Specify extent of authority of inspector and experience.
1.6.5—Periodic acceptance Delete, if not required.
Section 2—Concrete for cast-in-place architectural concrete
2.1—General
2.1.2 —Tolerances Specify tolerances different from ACI 117.
2.2—Products Specify any additional requirements to ACI 301.
2.2.1—Cementitious materials Specify source of cement, if required for color.
2.2.4.6—Admixtures for flowing concrete Specify conditions for use.
2.2.4.7—Mineral admixtures Prohibit if necessary to ensure uniformity of color.
2.2.4.8—Coloring agents Designate coloring agent which matches
Design Reference Standard.
303.1-3CAST-IN-PLACE ARCHITECTURAL CONCRETE
2.2.5—Concrete Specify slump, strength and durability requirements
beyond ACI 301.
2.2.6—Concrete curing compounds Specify additional requirements beyond ASTM C 309.
2.3—Execution
2.3.4—Repairs Specify whether tie holes are to be filled flush, partially
filled or left as cast.
Section 3—Reinforcement, tie wire and bar supports
3.2—Products Specify choice of reinforcement, tie wire and class of bar
supports. Include pertinent portions from current
CRSI, MSP-1, Manual of Standard Practice.
Section 4 — Formwork for architectural concrete
4.2—Products
4.2.1—Formwork As there are many types of forms, designate type used on
Design Reference Standard and allow equivalent if
matching. Include applicable sections from APA Y510,
Plywood Design Specification.
4.2.3—Form ties Specify cone diameter or type of form tie material, if required.
4.2.4—Rustication form strips Specify type and size.
4.3.3—Form surface preparation Specify required tape for sealing form joints and around ties
using applicable portions of AAMA, 810.185 Specification.
4.3.4—Form stripping Modify minimum time, if required.
Section 5—Architectural treatments
5.2—Products
5.2.1—Aggregate Specify source of aggregate to be exposed, if required.
5.2.5—Acid Designate type of acid, if required.
5.3—Execution Specify method of aggregate exposure.
5.3.1—Aggregate exposed by abrasive blast Specify amount of reveal.
5.3.2—Aggregate exposed by removing retarded
paste on vertical surfaces
Specify amount of reveal.
5.3.3—Aggregate exposed by removing retarded
paste on horizontal surfaces
Specify amount of reveal.
5.3.6—Water blast Specify amount of reveal.
S. SUBMITTALS CHECKLIST
Section 1—General
1.5—Submittals Delete submittals which are not required. Specify schedule,
size and method of submitting samples.
1.6.5—Periodic review Specify different interval for periodic review of architectural
concrete, if desired.
SPECIFICATION CHECKLISTS
Section/Part/Article Notes to the Architect/Engineer
303.1-4 ACI STANDARD
CONTENTS
Section 1—General, p. 4
1.1—Scope
1.2—Definitions
1.3—Reference organizations
1.4—Reference standards
1.5—Submittals
1.6—Quality assurance
1.7—Delivery, storage, and handling
1.8—Other general requirements
Section 2—Concrete for architectural cast-in-place
construction, p. 7
2.1—General
2.2—Products
2.3—Execution
Section 3—Reinforcement, tie wire and bar
supports, p. 8
3.1—General
3.2—Products
3.3—Execution
Section 4—Formwork for architectural concrete,
p. 8
4.1—General
4.2—Products
4.3—Execution
Section 5—Architectural treatments, p. 9
5.1—General
5.2—Products
5.3—Execution
Section 6—Miscellaneous, p. 10
6.1—General—Scope
6.2—Products
6.3—Execution
SECTION 1—GENERAL
1.1 —Scope
1.1.1—This Standard Specification covers requirements
for the materials and production of cast-in-place architectur-
al concrete having as cast or treated surfaces which are listed
in the specifications and located on the plans.
1.1.2 The provisions of this Standard Specification shall
govern unless otherwise specified in the Contract Docu-
ments.
1.2—Definitions
The following definitions have been used in writing the
provisions of this specification.
Accepted—Accepted by or acceptable to the Architect/En-
gineer.
Architect/Engineer—The architect, engineer, architectural
firm, engineering firm, or architectural and engineering
firm issuing Project Drawings and Specifications, or ad-
ministering the work under the Contract Documents.
As-cast architectural concrete—Architectural concrete
that requires no further surface treatment after stripping of
the forms, except for possible repairs.
Coloring admixture/agent—A blended mixture of color
oxides, water-reducing agent and a plasticizer.
Contractor—The person, firm, or corporation with whom
the Owner enters in an agreement for construction of the
Work.
Contract documents—Documents including Project Draw-
ings, Specifications, Addendums, Bulletins and Change
Orders covering the required Work.
Day—24 consecutive hours.
Design Reference Standard—Sample prepared under the
Architect/Engineer’s direction to be used by reference for
bidding purposes and construction of the Field Mockup;
having a minimum size of 18 × 18 in. (460 × 460 mm) by
2 in. (50 mm) thick, exhibiting the acceptable surfaces,
color and texture; and listing the sources and proportions
of materials used.
Excessive contrast—Degree of architectural concrete con-
struction blemish determined unacceptable by comparison
to the field mockup and remedial work or repair is re-
quired.
Field Mockup—A sample, which may be specified as to
size, constructed in the field by the Contractor incorporat-
ing the forming, materials, and procedures proposed for
the architectural concrete, which is to be used for compar-
ison during periodic and final acceptance. Upon approval
of the Architect/Engineer, this sample may be a portion of
a wall not scheduled for architectural treatment, such as a
basement wall, which can be preserved for viewing until
the final acceptance of the architectural concrete.
Kerf—A saw cut placed on the backside of a wood rustica-
tion strip to allow for expansion due to possible water ab-
sorption.
Layout drawings—Drawings showing forming details for
construction of formwork in the field.
Overlaid plywood—A plywood coated with a factory ap-
plied paper overlay that is impregnated with phenolic res-
ins. MDO is a Medium Density Overlay containing 35–45
percent phenolic resin by weight of the overlay. HDO is a
High Density Overlay containing 45–65 percent phenolic
resin by weight of the overlay. Finnish birch has an over-
lay which contains a minimum of 65 percent phenolic res-
in overlay by weight of the overlay.
Owner—The corporation, association, partnership, individ-
ual, or public body or authority with whom the Contractor
enters into an agreement and for whom the Work is pro-
vided.
Project drawings—The drawings that, along with the
Project Specifications, complete the descriptive informa-
tion for constructing the Work required or referred to in
the Contract Documents.
Project specifications—The written documents that specify
requirements for a project in accordance with the service
parameters and other specific criteria established by the
Owner.
Reference standards—Standards of a technical society, or-
ganization, or association, including the codes of local or
state authorities.
Required—Required by this Specification or the Contract
Documents.
303.1-5CAST-IN-PLACE ARCHITECTURAL CONCRETE
Reveal—Projection of the aggregate from the mortar after
completion of exposure operations. Amount of reveal is
specified as brush—sufficient to dull surface sheen but not
have any reveal, light—a maximum 1/16 in. (2 mm) reveal,
medium—a maximum reveal of 1
/4 in. (6 mm) or heavy—
a maximum reveal of 1/3 of the large aggregate diameter.
Submitted—Submitted to the Architect/Engineer for review.
Zones of influence—Surface area of concrete visibly affect-
ed by internal vibration. Size of area will vary with the size
and type of internal vibrator used and concrete mixture
characteristics and proportions.
Work—The entire construction required or separately iden-
tifiable parts thereof that are required to be furnished un-
der the Contract Documents. Work is the result of
performing services, furnishing labor, and furnishing and
incorporating materials and equipment into the construc-
tion, as required by the Contract Documents.
1.3— Reference organizations
American Concrete Institute (ACI)
P.O. Box 9094
Farmington Hills, MI 48333
American Architectural Manufacturer’s Association
(AAMA)
2700 River Road, Suite 118
Des Plaines, IL 60018
American Plywood Association (APA)
P.O. Box 11700
Tacoma, WA 98411
American Society for Testing and Materials (ASTM)
100 Barr Harbor Drive
West Conshohocken, PA 19428
U.S. Department of Commerce
publications available from:
U.S. Government Printing Office
Washington DC 20402
1.4—Reference standards
1.4.1 General—Standards of the organizations referred to
in this specification are listed below with their serial desig-
nations including year of adoption or revision, and are de-
clared to be a part of this specification as if fully set forth
herein.
1.4.2 American Concrete Institute (ACI)
117-90 Specifications for Tolerances for Concrete
Construction and Materials
301-96 Specifications for Structural Concrete
for Buildings
315-80 (Revised 1986; Reapproved 1991)
Details and Detailing of Concrete Reinforcement
306.1-90 Specification for Cold Weather Concreting
318-95 Building Code Requirements for Reinforced
Concrete
1.4.3 American Society for Testing and Materials (ASTM)
A185-94a Specification for Steel Welded Wire Fabric,
Plain, for Concrete Reinforcement
A493-92 Specification for Stainless and Heat Resisting
Steel for Cold Heading and Cold Forging Bar
and Wire
A497-94a Specification for Steel Welded Wire Fabric,
Deformed, for Concrete Reinforcement.
A615-94 Specification for Deformed and Plain Billet
Steel Bars for Concrete Reinforcement
A706-93 Specification for Low-Alloy Steel Deformed
Bars for Concrete Reinforcement
A767-90 Specification for Zinc-Coated (Galvanized)
Bars for Concrete Reinforcement
A775-95 Specification for Epoxy-Coated
Reinforcement Steel Bars
A884-94a Specification for Epoxy-Coated Steel
Wire and Welded Wire Fabric for Concrete
Reinforcement
C33-93 Specification for Concrete Aggregates
C94-95 Specification for Ready-Mixed Concrete
C144-93 Specification for Aggregate for Masonry Mortar
C150-94 Specification for Portland Cement
C156-93 Specification for Water Retention by Concrete
Curing Materials
C171-95 Specification for Sheet Materials for Curing
Concrete
C260-95 Specification for Air-Entraining Admixtures
for Concrete
C309-95 Specification for Liquid Membrane Forming
Compounds for Curing Concrete
C330-89 Specification for Lightweight Aggregates
for Structural Concrete
C494-92 Specification for Chemical Admixtures
C595-94a Specification for Blended Hydraulic Cements
C618-95 Specification for Fly Ash and Raw or Calcined
Natural Pozzolan for Use as a Mineral
Admixture in Portland Cement Concrete
C834-91 Specification for Latex Sealants
C845-90 Specification for Expansive Hydraulic Cement
C920-87 Specification for Elastomeric Joint Sealants
C957-87 Specification for High Solids Content Cold
Liquid-Applied Elastomeric Waterproofing
Membrane with Integral Wearing Surface
C979-82(93) Specification for Pigments for Integrally
Colored Concrete
C989-93 Specification for Ground Granulated Blast-
Furnace Slag for Use in Concrete and Mortar
C1017-92 Specification for Chemical Admixtures
for Use in Producing Flowing Admixtures
303.1-6 ACI STANDARD
C1077-95b Practice for Laboratories Testing Concrete and
Concrete Aggregates for use in Construction
and Criteria for Laboratory Evaluation
C1157-94a Performance Specification for Blended
Hydraulic Cements
C1193-91 Guide for use of Elastomeric Joint Sealants
C1240-93 Specification for Silica Fume for Use In
Hydraulic-Cement Concrete and Mortar
1.4.4 U.S. Department of Commerce
Federal Specification PS1-83: Construction and
Industrial Plywood
1.5—Submittals
1.6.1 Quality control plan—To be submitted by Contrac-
tor prior to commencing construction of architectural con-
crete.
1.6.2 Field Mockup—Upon completion, to be reviewed
for acceptance by Architect/Engineer by comparison to De-
sign Reference Standard and prior to ordering forming.
1.6.2.1 Layout drawings for Field Mockup—For review
prior to constructing architectural concrete formwork.
1.6.5 Periodic review—For review of architectural con-
crete completed to date to determine uniformity.
2.2.1 Cement—Sample for information and review of Cer-
tificates of Compliance.
2.2.3 Aggregates—Samples for information and review.
2.2.4 Admixtures—Samples for information and review.
2.2.4.8 Coloring admixture—Samples for information
and review.
2.2.5 Concrete mix design—For review.
2.2.6 Concrete curing compound—For review.
2.2.7 Sheet materials for concrete curing—For review.
3.2 Reinforcement, tie wire and bar supports—Certificates
of compliance.
4.2.1 Formwork—For information.
4.2.2 Form face, form liner and molds—For information.
4.2.3 Form ties—For information.
4.2.5 Form release agents—For information.
4.2.6 Miscellaneous
4.2.6.1 Compressible tape—For information.
4.2.6.2 Form joint caulking—For information.
5.1.4 Safety plan—For record.
5.2.5 Sealers or coatings—Certificates of Compliance.
5.3.6.3 Acid wash and water-blasting waste water dis-
posal plan—For record.
6.2.1 Joint sealants—For review.
1.6—Quality assurance
1.6.1 Quality control plan—Submit quality control plan as
outlined in Section 1.5 for acceptance prior to commencing
any construction of architectural concrete.
1.6.2 Field Mockup
1.6.2.1 Construct Field Mockups using procedures,
equipment, materials, simulated repairs and quality control
plan submitted for production of cast-in-place architectural
concrete. Begin fabrication of architectural forms for
construction of Field Mockup upon acceptance of layout
drawings. Upon acceptance of the completed Field Mock-
up, begin fabrication of the architectural concrete forms.
Maintain and protect Field Mockups on the jobsite until fi-
nal acceptance of architectural concrete. Construct field
mockup sample to match accepted Design Reference Stan-
dard in color and texture.
1.6.2.2 For walls, include vertical, horizontal and rusti-
cation joints, demonstrate methods of repair, curing, aggre-
gate exposure, sealers and coating. Construct mockup to
include a minimum of two lifts having heights planned for
placement of the architectural concrete.
1.6.2.3 For flatwork, construct a 10 × 10 ft (3 m × 3 m)
sample for acceptance with the same materials and methods
as planned for the production concrete.
1.6.3 Qualifications and responsibilities
1.6.3.1 Responsibility of the Contractor—Contractor
shall obtain a project superintendent and forming and con-
crete subcontractors who are experienced in the construction
of architectural concrete.
1.6.3.2 Qualification of QC inspector—The QC inspec-
tor shall be trained for inspection of cast-in-place architec-
tural concrete and have a minimum ACI Certification as a
Level II Concrete Construction Inspector or equivalent.
Equivalent certification programs shall include the policies
and procedures conforming to ACI Publication CP-20.
1.6.4 Reports
1.6.4.1 Maintain logs of concrete placements. Record
date, location and quantities of concrete placement, air tem-
perature, and location and identification of material and ar-
chitectural concrete sampling. Maintain file of architectural
concrete delivery tickets.
1.6.4.2 Report any proposed changes from procedures
and materials used in the original Field Mockup. Submit new
sample having the same dimensions and texture as the origi-
nal Design Reference Sample for review. Upon acceptance
construct another Field Mockup with the new materials and
procedures for acceptance prior to proceeding further with
construction of the architectural concrete. Further construc-
tion with the new materials shall be planned so as to mini-
mize contrast with previously placed architectural concrete.
1.6.5 Periodic acceptance—Failure of the completed ar-
chitectural concrete to receive acceptance during a semi-
monthly periodic review requires the submittal of a plan of
remedial repair and proposed revisions to methods of con-
struction for acceptance before proceeding with additional
architectural concrete construction.
1.6.6 Final acceptance—Protect accepted architectural
concrete from damage after completion of the architectural
concrete construction until completion of project.
1.7—Delivery, storage, and handling
1.7.1 Deliver materials to jobsite in manufacturer’s origi-
nal containers.
1.7.2 Store materials in a clean dry location. Maintain
method of storage and temperature of materials as required
by manufacturer.
303.1-7CAST-IN-PLACE ARCHITECTURAL CONCRETE
1.8—Other general requirements
1.8.1 Adhere to local ordinances requiring restrictions on
sound, dust and work hours during construction of architec-
tural concrete.
SECTION 2—CONCRETE FOR ARCHITECTURAL
CAST-IN-PLACE CONSTRUCTION
2.1—General
2.1.1 Scope—This section specifies requirements for cast-
in-place architectural concrete having as-cast surfaces or
treated surfaces which are listed in the specifications.
2.1.2 Tolerances—Tolerances shall conform to ACI-117.
2.2—Products
2.2.1 Cement shall conform to ASTM C 150, C 595,
C 845, or C 1157.
2.2.1.1 Use only one source, type and brand for the
project architectural concrete.
2.2.1.2 Ensure adequate supply of specified special ce-
ments for construction of architectural concrete.
2.2.2 Water
2.2.2.1 Concrete mix water shall conform to ASTM C 94.
2.2.2.2 Temperature of water for curing shall be not
more than 20 F (10 C) lower than the concrete surface tem-
perature.
2.2.3 Aggregates shall have a satisfactory service record
nonstaining and not being disruptively reactive with cement
alkalis
2.2.3.1 Coarse aggregate shall meet the requirements of
ASTM C 33 or C 330
2.2.3.2 Fine aggregate shall meet the requirements of
ASTM C 33, C 330 or C 144.
2.2.4 Admixtures—Calcium chloride, or any admixture
containing calcium chloride, shall not be used.
2.2.4.1 Air-entraining agents shall meet ASTM C 260.
2.2.4.2 Water-reducing admixtures shall meet ASTM
C494, Type A
2.2.4.3 Water-reducing and retarding admixtures shall
meet ASTM C 494, Type D.
2.2.4.4 High-range water reducers (superplasticizers)
shall meet ASTM C 494, Types F or G
2.2.4.5 Accelerating admixtures shall meet ASTM
C 494, Types C and E
2.2.4.6 Admixtures for flowing concrete shall meet
ASTM C 1017, Type I or II
2.2.4.7 Mineral admixtures fly ash shall meet ASTM
C618, ground granulated blast-furnace slag shall meet
ASTM C989, and silica fume shall meet ASTM C1240.
Mineral admixtures shall be compatible with other admix-
tures.
2.2.4.8 Coloring admixture/agents shall meet ASTM
C979 and ASTM C494.
2.2.5 Concrete
2.2.5.1 Slump, strength and durability requirements
shall be as shown in the Contract Documents.
2.2.5.2 Concrete shall match color and surface of the
Design Reference Standard and the accepted Field Mockup.
2.2.5.3 Concrete shall comply with Section 6 of
ACI 301.
2.2.5.4 For colored concrete, prepare trial batches of the
final design mix with specified slump at highest and lowest
ambient temperatures anticipated during concrete place-
ments. Adjust color amounts to match Design Reference
Standard and the accepted Field Mockup.
2.2.6 Concrete curing compound shall conform to
ASTM C 309. The cured surface shall match the Design Ref-
erence Standard. Solids content shall be between 14–22 per-
cent. For colored concrete use curing compounds
recommended by pigment or color admixture manufacturer
and accepted by Architect/Engineer.
2.2.7 Sheet materials for concrete curing—Plastic film,
wet burlap or burlap-backed plastic film shall not be used for
curing colored horizontal architectural concrete.
2.3—Execution
2.3.1 Batching, mixing, and transporting
2.3.1.1 Deliver concrete in initially clean equipment
which is exclusively limited to mix and transport the archi-
tectural concrete.
2.3.1.2 Deliver concrete of uniform slump and propor-
tions so the resulting concrete shall match the Field Mockup.
2.3.1.3 Deliver colored concrete in full loads.
2.3.2 Conveying and placement
2.3.2.1 Support runs or gangways for the concrete trans-
porters, pump lines, wheel barrows, other similar equipment
and foot traffic so as not to disturb reinforcement or interfere
with concrete placing operations.
2.3.2.2 Place concrete after forms and reinforcement
have been set and accepted by Architect/Engineer.
2.3.2.3 Schedule arrival of concrete to avoid delays in
placement.
2.3.2.4 Take precautions to minimize mortar splatter on
form faces. Remove accidental mortar splatter from architec-
tural form face.
2.3.2.5 Deposit concrete in the final position without
segregation or loss of material. Do not move concrete hori-
zontally.
2.3.2.6 Place concrete in uniform horizontal layers not
more than 36 in. (0.9 m) high for consolidation.
2.3.2.7 Place concrete continuously without exceeding
rate of placement used in design of forms.
2.3.2.8 Vibrate placed concrete for maximum consoli-
dation of concrete. Overlap the zones of influence a mini-
mum of 50 percent. Withdraw internal vibrators at a rate of
3 in. (75 mm) per second. Keep internal vibrators 2 in.
(50 mm) away from the architectural face.
2.3.2.9 Revibrate the top 6 in. (150 mm) layer of a con-
crete lift during delays of up to a maximum 30 minutes as
long as the vibrator will penetrate of its own weight. After
30 minutes or failure of the vibrator to penetrate of its own
weight, stop placement, level lift and set construction joint.
2.3.3 Curing
2.3.3.1 Mist concrete surface with water before apply-
ing curing compounds. Apply curing compounds at rate rec-
ommended by manufacturer.
2.3.3.2 Maintain complete contact when using cotton
mat curing.
303.1-8 ACI STANDARD
2.3.3.3 Curing during cold weather shall comply with
ACI 306.1.
2.3.4 Repairs and cleanup
2.3.4.1 Repair defects on as-cast architectural surfaces
immediately to conform to that accepted on the Field Mockup.
2.3.4.2 Cure by covering with curing seal or edge-taped
waterproof cover or as accepted by trial on Field Mockup.
2.3.4.3 Finish tie holes as accepted on Field Mockup.
SECTION 3—REINFORCEMENT, TIE WIRE
AND BAR SUPPORTS
3.1—General
3.1.1 Scope—This section specifies the requirements for
all reinforcement and accessories to be used in cast-in-place
architectural concrete having an as-cast or treated surface.
3.1.2 Tolerances—Unless otherwise specified, conform to
ACI 117.
3.2—Products
3.2.1 Reinforcing bars shall conform to ASTM A 615 or
ASTM A 706. Welded wire fabric shall conform to
ASTM A 185 or ASTM A 497.
3.2.2 Epoxy coated reinforcement shall conform to
ASTM A 775 and epoxy-coated welded wire fabric to
ASTM A 884.
3.2.3 Galvanized reinforcement shall conform to ASTM
A 767.
3.2.4 Use plastic coated tie wire for epoxy coated reinforce-
ment. Use soft stainless steel complying with ASTM A 493,
or plastic coated tie wire, for securing other reinforcement.
3.2.5 Bar supports shall be Class 1, as defined in CRSI
MSP-1. Stainless steel for bar supports shall comply with
ASTM A 493.
3.3—Execution
3.3.1 Place reinforcement in accordance with ACI 315.
3.3.2 Provide specified concrete cover over reinforcement
and coated steel embedments. Concrete cover shall be as
specified after removal of rustication strips or face mortar by
further treatment such as sandblasting or bush hammering.
3.3.3 Use bar supports in sufficient number, size and loca-
tion to prevent vertical displacement of the reinforcement
and gouging of the forming. Use bar supports or spacers in
walls and columns to maintain clear distance between rein-
forcement and face of concrete.
3.3.4 Bend back and keep tie wires 11/2 in. (40 mm) from
form face. Remove tie wire clippings from horizontal surfac-
es that will be sandblasted, exposed to view, or weather.
3.3.5 Perform welding or similar heat processes on rein-
forcement or accessories prior to form erection.
SECTION 4—FORMWORK FOR ARCHITECTURAL
CONCRETE
4.1—General
4.1.1 Scope—This section specifies the formwork require-
ments for cast-in-place architectural concrete having an as-
cast or treated surface.
4.1.2 Tolerances—Formwork shall be sized to produce
concrete conforming to ACI 117.
4.1.3 Design criteria
4.1.3.1 Face sheet deflection shall not exceed 1/400 of its
span.
4.1.3.2 Maximum rate of placement assumed for design
of formwork shall be shown on the Layout Drawings.
4.1.3.3 Concrete ties and bolts shall be sized to with-
stand form design pressures.
4.2—Products
4.2.1 Formwork—All formwork shall have a high density,
non-vapor transmitting form face.
4.2.1.1 Overlaid plywood shall meet Federal Specifica-
tion PS1.
4.2.2 Form face, form liner and molds shall produce a con-
crete surface matching the Design Reference Standard and
Field Mockup.
4.2.3 Form ties
4.2.3.1 Provide specified diameter of cones for ties.
4.2.3.2 Washers shall not be used with snap ties for ar-
chitectural concrete.
4.2.4 Rustications—Metal strips shall be fabricated from
same metal as metal form face.
4.2.5 Form release agents—Use only those tested and ap-
proved on Field Mockup.
4.2.6 Miscellaneous
4.2.6.1 Compressible tape shall conform to AAMA
810.185
4.2.6.2 Sealant for form caulking shall conform to
ASTM C 920, Type a, Grade NS, or C 834.
4.3—Execution
4.3.1 Formwork
4.3.1.1 Provide forms as shown on the accepted layout
drawings.
4.3.1.2 Erect forms as shown on the Project Drawings
and accepted layout Drawings.
4.3.2 Rustication strips
4.3.2.1 Provide rustication joints and chamfers as shown
on the Project Drawings and Layout Drawings.
4.3.2.2 Wood strips shall be kerfed on the back side.
4.3.2.3 Provide minimum concrete cover of 11/2 in.
(40 mm) over all reinforcement. Cover shall be measured
from bar reinforcement to the most deeply recessed depth of
rustication or other recess in the concrete surface.
4.3.2.4 Provide closure backing materials when indent-
ed rustication is used over a ribbed form liner. Seal joint be-
tween rustication strip and form with non-absorbent
caulking.
4.3.2.5 Apply impermeable coating to wood rustications
or chamfers.
4.3.3 Form surface preparation
4.3.3.1 Season natural wood grain forms or untreated
wood forms with cement or lime slurry consistent with the
color be used for the architectural concrete.
4.3.3.2 Seal form joints and tie holes by taping or with
non-absorbent caulking. Clean taper ties and she-bolts and
lubricate with a nonstaining grease or form release agent be-
fore each use. Keep form face clean until concrete is placed.
303.1-9CAST-IN-PLACE ARCHITECTURAL CONCRETE
4.3.4 Form stripping
4.3.4.1 Strip formwork completely from vertical architec-
tural concrete surfaces when the concrete has achieved a com-
pressive strength of 1000 psi (7 MPa) or 24 hours after
placement, whichever is later. Schedule formwork stripping to
maintain surface appearance matching accepted Field Mockup.
4.3.4.2 Break off fiberglass ties flush with the surface of
the concrete and texture to match the adjacent concrete sur-
face and color.
4.3.5 Cleaning and storage
4.3.5.1 Clean forms after each use and discard damaged
forms.
4.3.5.2 Store steel forms horizontally and fully supported.
4.3.5.3 Store plastic coated forms and liners horizontal-
ly and under cover.
SECTION 5—ARCHITECTURAL TREATMENTS
5.1—General
5.1.1 Scope—This section specifies the additional require-
ments for cast-in-place architectural concrete where the re-
sulting concrete face is specially treated after form removal.
5.1.2 Acceptance—Receive acceptance of the appearance
of the first day’s aggregate exposure operations before pro-
ceeding further.
5.1.3 Personnel experience—Use personnel experienced
in the specified procedures and trained on the Field Mockup.
5.1.4 Safety plan—Follow submitted safety plan that com-
plies with OSHA requirements.
5.2—Products
5.2.1 Aggregate for exposure shall conform to the Design
Reference Standard and the Field Mockup. Ensure adequate
supply for architectural concrete.
5.2.2 Forms and form liners—Use high density and non-
vapor transmitting materials.
5.2.3 Surface retarders—Use those previously tested and
accepted on the Field Mockup.
5.2.4 Abrasive material—Use that previously tested and ac-
cepted on the Field Mockup for specified texture. Ensure ade-
quate supply to complete total amount of surface specified.
5.2.5 Acid—Use muriatic or phosphoric acid to expose ag-
gregate in locations specified or shown on the Project Draw-
ings. Match accepted Design Reference Standard and Field
Mockup.
5.2.6 Water—for water-blasting shall be free of oil or im-
purities capable of staining the concrete surface and shall be
not more than 20 F [10 C] colder than the concrete surface at
the time of aggregate exposure
5.2.7 Sealers or coatings—Use concrete sealers to match ac-
cepted Design Reference Standard and Field Mockup surface.
5.3—Execution
5.3.1 Aggregate exposed by abrasive blast
5.3.1.1 Aggregate reveal shall be as shown on the Draw-
ings and as specified.
5.3.1.2 Expose aggregate to match accepted Design
Reference Standard and Field Mockup.
5.3.1.3 Begin abrasive blasting to expose aggregate
when the concrete has a minimum compressive strength of
2000 psi (14 MPa) and not less than that required for safe re-
moval of the forms and supports. Blast exposed aggregate ar-
chitectural concrete at the same age for uniform exposure
and color.
5.3.1.4 Wash abrasive blasting debris off the finished
wall surface before drying occurs when abrasive grits con-
tain free water for dust abatement.
5.3.2 Aggregate exposed by removing retarded surface
paste on vertical surfaces
5.3.2.1 Use surface retarder accepted for use and match
accepted Design Reference Standard and Field Mockup.
5.3.2.2 Prevent concrete from washing away retarder
coating from form during placement
5.3.2.3 After form removal, remove the retarded outer lay-
er of cement paste by hand brushing, high pressure water wash-
ing, or light sandblasting. Schedule procedures and adjust
timing for weather conditions to achieve uniform aggregate ex-
posure.
5.3.3 Aggregate exposed by removing retarded surface
paste on horizontal surfaces
5.3.3.1 Retard unformed horizontal surfaces to match
accepted Design Reference Standard and the Field Mockup.
5.3.3.2 Spray retarder on fresh cast horizontal surfaces
after concrete consolidation, seeding of architectural aggre-
gate when specified, and final finishing. Apply retarder in
two perpendicular passes after bleed water has evaporated
from surface.
5.3.3.3 Remove the chemically retarded surface cement
paste after the mortar retaining the aggregate has set suffi-
ciently to prevent dislodgment of the aggregate.
5.3.4 Acid etch
5.3.4.1 Use acid etch for exposure of aggregate on hori-
zontal surfaces only.
5.3.4.2 Acid etch treatment shall match accepted Field
Mockup and comply with OSHA recommended safety pro-
cedures.
5.3.4.3 Defer acid etch until concrete is at least 14 days
old and compressive strength exceeds 4500 psi (30 MPa)
5.3.4.4 Wet concrete thoroughly prior to application of
acid.
5.3.4.5 Continue to apply acid while actively brushing
or spraying until predetermined depth of reveal is obtained.
5.3.4.6 Flush acid and debris from concrete surface im-
mediately after acid action stops by application of water un-
der pressure.
5.3.4.7 Protect adjacent materials, surfaces and finishes
from acid and waste wash water during application and
cleanup.
5.3.4.8 Dispose of waste wash water in accordance with
submitted plan.
5.3.5 Mechanical tooling (bush-hammering)
5.3.5.1 Mechanical tooling shall expose aggregate to
match accepted Design Reference Standard and Field Mockup.
5.3.5.2 Defer mechanical tooling until concrete is at
least 14 days old and compressive strength exceeds 4500 psi
(30 MPa).
5.3.5.3 Multiple bush-hammers used for tooling shall
have equal wear on teeth.
303.1-10 ACI STANDARD
5.3.5.4 Maintain control of concrete chips, dust and de-
bris in each work area. Limit migration of airborne materials
by use of tarpaulins, wind breaks, and similar devices.
5.3.6 Water blast
5.3.6.1 Water blast and expose aggregate to match ac-
cepted Design Reference Standard.
5.3.6.2 Defer water blasting of vertical surfaces until
compressive strength exceeds 4500 psi (30 MPa).
5.3.6.3 Dispose of water used for blasting in accordance
with submitted water blast plan.
5.3.7 Repair
5.3.7.1 Repaired areas shall be subject to final accep-
tance under comparison to Field Mockup repairs.
5.3.7.2 Repair defects as required to match adjacent sur-
face after architectural surface has been treated.
5.3.7.3 Cure repaired areas as specified in Article
2.3.4.2.
5.3.7.4 Finish tie holes to match accepted Field Mockup.
5.3.8 Finishing and final cleanup
5.3.8.1 Protect completed architectural cast-in-place
concrete surfaces from damage, staining or other contami-
nants by subsequent construction.
5.3.8.2 Do not allow laitance from subsequent construc-
tion or repairs to stain or harden on surfaces that have been
finished.
5.3.8.3 Clean concrete surfaces just prior to project sub-
mittal for acceptance.
5.3.8.4 Use cleaning materials and processes that do not
change color or texture of the completed concrete surfaces.
5.3.8.5 Rinse architectural surface thoroughly with
clean water after cleaning.
5.3.8.6 Protect adjacent materials during cleaning
operations.
5.3.9 Final acceptance of architectural concrete
5.3.9.1 Upon completion of architectural concrete, final
acceptance is based upon the matching of the architectural
cast-in-place concrete with the accepted Field Mockups
when viewed at a distance of 20 ft (6 m) in daylight.
5.3.9.2 Only concrete listed in the specifications or iden-
tified on the plans as architectural concrete is to be included
in this final acceptance.
5.3.9.3 Defective work, including repair areas not ac-
cepted, shall be removed and replaced.
SECTION 6—MISCELLANEOUS
6.1—General—Scope
This section specifies the requirements for joint filling,
sealing of the concrete surface and use of coatings.
6.2—Products
6.2.1 Joint sealants in vertical surfaces and horizontal areas
not subject to traffic shall conform to ASTM C 920, Use NT;
joints subject to traffic shall conform to ASTM C 920, Use T.
6.2.2 Concrete sealer—Test compatibility with sealant on
Field Mockup and conform to final color of Design Refer-
ence Standard.
6.3—Execution
6.3.1 Apply concrete joint sealants prior to any application
of concrete sealer.
6.3.2 Apply sealers and sealants in accordance to manu-
facturer’s specifications.
6.3.3 Match accepted Design Reference Standard and
Field Mockup.
This standard was submitted to letter ballot of the
committee and was approved in accordance with
Institute standardization procedures.

More Related Content

What's hot

Piping Installation and Erection Procedure.pdf
Piping Installation and Erection Procedure.pdfPiping Installation and Erection Procedure.pdf
Piping Installation and Erection Procedure.pdf
MDAbdullah621330
 
Welding Joint Design and Welding Symbols.pptx
Welding Joint Design and Welding Symbols.pptxWelding Joint Design and Welding Symbols.pptx
Welding Joint Design and Welding Symbols.pptx
Shah Nadzri Jasmir
 
fundamentals of Piping engineering
fundamentals of Piping engineeringfundamentals of Piping engineering
fundamentals of Piping engineering
MobinVarghese8
 
Reinforced Cement Concrete and Bar Bending Schedule
Reinforced Cement Concrete and Bar Bending ScheduleReinforced Cement Concrete and Bar Bending Schedule
Reinforced Cement Concrete and Bar Bending Schedule
Kailash Chander
 
Fasteners (2)
Fasteners (2)Fasteners (2)
Fasteners (2)
kalyana sreenivasan
 
PPT ON TYPES OF WELDING JOINTS
PPT ON TYPES OF WELDING JOINTSPPT ON TYPES OF WELDING JOINTS
PPT ON TYPES OF WELDING JOINTS
Himanshu Yadav
 
2.-Introduction-to-Process-Plant-Layout-and-Piping-Design.pptx
2.-Introduction-to-Process-Plant-Layout-and-Piping-Design.pptx2.-Introduction-to-Process-Plant-Layout-and-Piping-Design.pptx
2.-Introduction-to-Process-Plant-Layout-and-Piping-Design.pptx
KarenGedalanga
 
DFM casting.pptx
DFM casting.pptxDFM casting.pptx
DFM casting.pptx
PradeepNB2
 
Introduction to piping design
Introduction to piping designIntroduction to piping design
Introduction to piping design
Ahmad Akileh, PE, PMP
 
Fasteners
FastenersFasteners
Fastenersswapsk
 
BBS Preparation
BBS PreparationBBS Preparation
BBS Preparation
Abhay Gharpure
 
Saes w-011-welding on plot ( process ) piping
Saes w-011-welding on plot ( process ) pipingSaes w-011-welding on plot ( process ) piping
Saes w-011-welding on plot ( process ) piping
abhi10apr
 
WPS & WPQ
WPS & WPQWPS & WPQ
The Mould Design Guide.pdf
The Mould Design Guide.pdfThe Mould Design Guide.pdf
The Mould Design Guide.pdf
AkashDeep135335
 
Some common defects in steel structural erection at site
Some common defects in steel structural erection at site Some common defects in steel structural erection at site
Some common defects in steel structural erection at site
PRABIR DATTA
 
GD&T Fundamentals Training
GD&T Fundamentals TrainingGD&T Fundamentals Training
GD&T Fundamentals Training
BESTSOLUTIONS4
 
Bolts.ppt
Bolts.pptBolts.ppt
Casting Defect and solidification (1).pdf
Casting Defect and solidification (1).pdfCasting Defect and solidification (1).pdf
Casting Defect and solidification (1).pdf
PandurangSureshKumbh
 

What's hot (20)

Piping Installation and Erection Procedure.pdf
Piping Installation and Erection Procedure.pdfPiping Installation and Erection Procedure.pdf
Piping Installation and Erection Procedure.pdf
 
Welding Joint Design and Welding Symbols.pptx
Welding Joint Design and Welding Symbols.pptxWelding Joint Design and Welding Symbols.pptx
Welding Joint Design and Welding Symbols.pptx
 
fundamentals of Piping engineering
fundamentals of Piping engineeringfundamentals of Piping engineering
fundamentals of Piping engineering
 
Reinforced Cement Concrete and Bar Bending Schedule
Reinforced Cement Concrete and Bar Bending ScheduleReinforced Cement Concrete and Bar Bending Schedule
Reinforced Cement Concrete and Bar Bending Schedule
 
3 foundry
3 foundry3 foundry
3 foundry
 
Fasteners (2)
Fasteners (2)Fasteners (2)
Fasteners (2)
 
PPT ON TYPES OF WELDING JOINTS
PPT ON TYPES OF WELDING JOINTSPPT ON TYPES OF WELDING JOINTS
PPT ON TYPES OF WELDING JOINTS
 
Fasteners Presentation
Fasteners PresentationFasteners Presentation
Fasteners Presentation
 
2.-Introduction-to-Process-Plant-Layout-and-Piping-Design.pptx
2.-Introduction-to-Process-Plant-Layout-and-Piping-Design.pptx2.-Introduction-to-Process-Plant-Layout-and-Piping-Design.pptx
2.-Introduction-to-Process-Plant-Layout-and-Piping-Design.pptx
 
DFM casting.pptx
DFM casting.pptxDFM casting.pptx
DFM casting.pptx
 
Introduction to piping design
Introduction to piping designIntroduction to piping design
Introduction to piping design
 
Fasteners
FastenersFasteners
Fasteners
 
BBS Preparation
BBS PreparationBBS Preparation
BBS Preparation
 
Saes w-011-welding on plot ( process ) piping
Saes w-011-welding on plot ( process ) pipingSaes w-011-welding on plot ( process ) piping
Saes w-011-welding on plot ( process ) piping
 
WPS & WPQ
WPS & WPQWPS & WPQ
WPS & WPQ
 
The Mould Design Guide.pdf
The Mould Design Guide.pdfThe Mould Design Guide.pdf
The Mould Design Guide.pdf
 
Some common defects in steel structural erection at site
Some common defects in steel structural erection at site Some common defects in steel structural erection at site
Some common defects in steel structural erection at site
 
GD&T Fundamentals Training
GD&T Fundamentals TrainingGD&T Fundamentals Training
GD&T Fundamentals Training
 
Bolts.ppt
Bolts.pptBolts.ppt
Bolts.ppt
 
Casting Defect and solidification (1).pdf
Casting Defect and solidification (1).pdfCasting Defect and solidification (1).pdf
Casting Defect and solidification (1).pdf
 

Similar to 303.1 97 standard specification for-cast-in-place architec

308.1 98 sandard specification for curing concrete
308.1 98   sandard specification for curing concrete308.1 98   sandard specification for curing concrete
308.1 98 sandard specification for curing concrete
MOHAMMED SABBAR
 
306.1 90 standard specification for cold weather concretin
306.1 90   standard specification for cold weather concretin306.1 90   standard specification for cold weather concretin
306.1 90 standard specification for cold weather concretin
MOHAMMED SABBAR
 
Aci 309.2 r 98
Aci 309.2 r 98Aci 309.2 r 98
Aci 309.2 r 98
Rizki Prana Antariksa
 
309.2 r 98 - identification and control visible effects of co
309.2 r 98 - identification and control visible effects of co309.2 r 98 - identification and control visible effects of co
309.2 r 98 - identification and control visible effects of co
MOHAMMED SABBAR
 
Is 456 2000 - civilenggforall
Is 456   2000 - civilenggforallIs 456   2000 - civilenggforall
Is 456 2000 - civilenggforall
Mohan Murari
 
Is 456 2000
Is 456 2000Is 456 2000
Is 456 2000
downloadk
 
Plain and-reinforced-concrete(IS 456 2000)
Plain and-reinforced-concrete(IS 456 2000)Plain and-reinforced-concrete(IS 456 2000)
Plain and-reinforced-concrete(IS 456 2000)
Parvez Alam
 
ACI 318 - 02 (Ingles)
ACI 318 - 02 (Ingles)ACI 318 - 02 (Ingles)
ACI 318 - 02 (Ingles)
TheJamez
 
Zb
ZbZb
Comparative Study of Codal Provisions for Pre-Engineered Buildings
Comparative Study of  Codal Provisions for Pre-Engineered BuildingsComparative Study of  Codal Provisions for Pre-Engineered Buildings
Comparative Study of Codal Provisions for Pre-Engineered Buildings
IRJET Journal
 
57985193 concrete-silo-design
57985193 concrete-silo-design57985193 concrete-silo-design
57985193 concrete-silo-design141jdf
 
Spec u kon fsi 2021
Spec u kon fsi 2021Spec u kon fsi 2021
Spec u kon fsi 2021
Blair Davies, P.Eng., M.B.A.
 
211.5 r 96 - guide for submittal of concrete proportions
211.5 r 96 - guide for submittal of concrete proportions211.5 r 96 - guide for submittal of concrete proportions
211.5 r 96 - guide for submittal of concrete proportions
MOHAMMED SABBAR
 
309.3 r 92 - guide to consolidation of concrete in congested
309.3 r 92 - guide to consolidation of concrete in congested 309.3 r 92 - guide to consolidation of concrete in congested
309.3 r 92 - guide to consolidation of concrete in congested
MOHAMMED SABBAR
 
Aci 04 detaling-manual
Aci 04 detaling-manualAci 04 detaling-manual
Aci 04 detaling-manual
Md. Rasal Mia
 
29 JUN-2015 - ACI SP66 (040 RE-BAR DETAILING MANUALl
29 JUN-2015 - ACI SP66 (040 RE-BAR DETAILING MANUALl29 JUN-2015 - ACI SP66 (040 RE-BAR DETAILING MANUALl
29 JUN-2015 - ACI SP66 (040 RE-BAR DETAILING MANUALlpeakpilgrim
 

Similar to 303.1 97 standard specification for-cast-in-place architec (20)

308.1 98 sandard specification for curing concrete
308.1 98   sandard specification for curing concrete308.1 98   sandard specification for curing concrete
308.1 98 sandard specification for curing concrete
 
5062 95
5062 955062 95
5062 95
 
306.1 90 standard specification for cold weather concretin
306.1 90   standard specification for cold weather concretin306.1 90   standard specification for cold weather concretin
306.1 90 standard specification for cold weather concretin
 
Aci 309.2 r 98
Aci 309.2 r 98Aci 309.2 r 98
Aci 309.2 r 98
 
309.2 r 98 - identification and control visible effects of co
309.2 r 98 - identification and control visible effects of co309.2 r 98 - identification and control visible effects of co
309.2 r 98 - identification and control visible effects of co
 
456
456456
456
 
Is 456 2000 - civilenggforall
Is 456   2000 - civilenggforallIs 456   2000 - civilenggforall
Is 456 2000 - civilenggforall
 
Is 456 2000
Is 456 2000Is 456 2000
Is 456 2000
 
Plain and-reinforced-concrete(IS 456 2000)
Plain and-reinforced-concrete(IS 456 2000)Plain and-reinforced-concrete(IS 456 2000)
Plain and-reinforced-concrete(IS 456 2000)
 
ACI 318 - 02 (Ingles)
ACI 318 - 02 (Ingles)ACI 318 - 02 (Ingles)
ACI 318 - 02 (Ingles)
 
Zb
ZbZb
Zb
 
Comparative Study of Codal Provisions for Pre-Engineered Buildings
Comparative Study of  Codal Provisions for Pre-Engineered BuildingsComparative Study of  Codal Provisions for Pre-Engineered Buildings
Comparative Study of Codal Provisions for Pre-Engineered Buildings
 
Irjet v4 i7530
Irjet v4 i7530Irjet v4 i7530
Irjet v4 i7530
 
57985193 concrete-silo-design
57985193 concrete-silo-design57985193 concrete-silo-design
57985193 concrete-silo-design
 
Spec u kon fsi 2021
Spec u kon fsi 2021Spec u kon fsi 2021
Spec u kon fsi 2021
 
211.5 r 96 - guide for submittal of concrete proportions
211.5 r 96 - guide for submittal of concrete proportions211.5 r 96 - guide for submittal of concrete proportions
211.5 r 96 - guide for submittal of concrete proportions
 
ufc_3_110_03-H
ufc_3_110_03-Hufc_3_110_03-H
ufc_3_110_03-H
 
309.3 r 92 - guide to consolidation of concrete in congested
309.3 r 92 - guide to consolidation of concrete in congested 309.3 r 92 - guide to consolidation of concrete in congested
309.3 r 92 - guide to consolidation of concrete in congested
 
Aci 04 detaling-manual
Aci 04 detaling-manualAci 04 detaling-manual
Aci 04 detaling-manual
 
29 JUN-2015 - ACI SP66 (040 RE-BAR DETAILING MANUALl
29 JUN-2015 - ACI SP66 (040 RE-BAR DETAILING MANUALl29 JUN-2015 - ACI SP66 (040 RE-BAR DETAILING MANUALl
29 JUN-2015 - ACI SP66 (040 RE-BAR DETAILING MANUALl
 

More from MOHAMMED SABBAR

309 r 96 - guide for consolidation of concrete
309 r 96 - guide for consolidation of concrete309 r 96 - guide for consolidation of concrete
309 r 96 - guide for consolidation of concrete
MOHAMMED SABBAR
 
309.1 r 93 - behavior of fresh concrete during vibration
309.1 r 93 - behavior of fresh concrete during vibration309.1 r 93 - behavior of fresh concrete during vibration
309.1 r 93 - behavior of fresh concrete during vibration
MOHAMMED SABBAR
 
308 92 standard practice for curing concrete (reapproved 1
308 92   standard practice for curing concrete (reapproved 1308 92   standard practice for curing concrete (reapproved 1
308 92 standard practice for curing concrete (reapproved 1
MOHAMMED SABBAR
 
304 r 89 - guide to measuring, mixing, transporting and placi
304 r 89 - guide to measuring, mixing, transporting and placi304 r 89 - guide to measuring, mixing, transporting and placi
304 r 89 - guide to measuring, mixing, transporting and placi
MOHAMMED SABBAR
 
304.6 r 91 - guide for the use of volumetic-measuring and con
304.6 r 91 - guide for the use of volumetic-measuring and con304.6 r 91 - guide for the use of volumetic-measuring and con
304.6 r 91 - guide for the use of volumetic-measuring and con
MOHAMMED SABBAR
 
304.5 r 91 - batching, mixing, and job control of lightweight
304.5 r 91 - batching, mixing, and job control of lightweight304.5 r 91 - batching, mixing, and job control of lightweight
304.5 r 91 - batching, mixing, and job control of lightweight
MOHAMMED SABBAR
 
304.4 r 95 - placing concrete with belt conveyors
304.4 r 95 - placing concrete with belt conveyors304.4 r 95 - placing concrete with belt conveyors
304.4 r 95 - placing concrete with belt conveyors
MOHAMMED SABBAR
 
304.3 r 96 - heavyweight concrete measuring, mixing, transpor
304.3 r 96 - heavyweight concrete measuring, mixing, transpor304.3 r 96 - heavyweight concrete measuring, mixing, transpor
304.3 r 96 - heavyweight concrete measuring, mixing, transpor
MOHAMMED SABBAR
 
304.2 r 96 - placing concrete by pumping methods
304.2 r 96 - placing concrete by pumping methods304.2 r 96 - placing concrete by pumping methods
304.2 r 96 - placing concrete by pumping methods
MOHAMMED SABBAR
 
303 r 91 - guide to cast-in place architectural concrete prac
303 r 91 - guide to cast-in place architectural concrete prac303 r 91 - guide to cast-in place architectural concrete prac
303 r 91 - guide to cast-in place architectural concrete prac
MOHAMMED SABBAR
 
234 r 96 - guide for the use of silica flume in concrete
234 r 96 - guide for the use of silica flume in concrete234 r 96 - guide for the use of silica flume in concrete
234 r 96 - guide for the use of silica flume in concrete
MOHAMMED SABBAR
 
233 r 95 - ground granulated blast-furnace slag as constituen
233 r 95 - ground granulated blast-furnace slag as constituen233 r 95 - ground granulated blast-furnace slag as constituen
233 r 95 - ground granulated blast-furnace slag as constituen
MOHAMMED SABBAR
 
232.2 r 96 - use of fly ash in concrete
232.2 r 96 - use of fly ash in concrete232.2 r 96 - use of fly ash in concrete
232.2 r 96 - use of fly ash in concrete
MOHAMMED SABBAR
 
224 r 90 - control of cracking in concrete structures
224 r 90 - control of cracking in concrete structures224 r 90 - control of cracking in concrete structures
224 r 90 - control of cracking in concrete structures
MOHAMMED SABBAR
 
224.2 r 92 - cracking of concrete members in direct tension
224.2 r 92 - cracking of concrete members in direct tension224.2 r 92 - cracking of concrete members in direct tension
224.2 r 92 - cracking of concrete members in direct tension
MOHAMMED SABBAR
 
223 98 standard practice for the use of shrinkge-compensat
223 98   standard practice for the use of shrinkge-compensat223 98   standard practice for the use of shrinkge-compensat
223 98 standard practice for the use of shrinkge-compensat
MOHAMMED SABBAR
 
222 r 96 - corrosion of metals in concrete
222 r 96 - corrosion of metals in concrete222 r 96 - corrosion of metals in concrete
222 r 96 - corrosion of metals in concrete
MOHAMMED SABBAR
 
221.1 r 98 - state-of-the-art report on alkali-aggregate reac
221.1 r 98 - state-of-the-art report on alkali-aggregate reac221.1 r 98 - state-of-the-art report on alkali-aggregate reac
221.1 r 98 - state-of-the-art report on alkali-aggregate reac
MOHAMMED SABBAR
 
214 77 recommended practice for evaluation of strength tes
214 77   recommended practice for evaluation of strength tes214 77   recommended practice for evaluation of strength tes
214 77 recommended practice for evaluation of strength tes
MOHAMMED SABBAR
 
214.3 r 88 - simplified version of the recommended practice f
214.3 r 88 - simplified version of the recommended practice f214.3 r 88 - simplified version of the recommended practice f
214.3 r 88 - simplified version of the recommended practice f
MOHAMMED SABBAR
 

More from MOHAMMED SABBAR (20)

309 r 96 - guide for consolidation of concrete
309 r 96 - guide for consolidation of concrete309 r 96 - guide for consolidation of concrete
309 r 96 - guide for consolidation of concrete
 
309.1 r 93 - behavior of fresh concrete during vibration
309.1 r 93 - behavior of fresh concrete during vibration309.1 r 93 - behavior of fresh concrete during vibration
309.1 r 93 - behavior of fresh concrete during vibration
 
308 92 standard practice for curing concrete (reapproved 1
308 92   standard practice for curing concrete (reapproved 1308 92   standard practice for curing concrete (reapproved 1
308 92 standard practice for curing concrete (reapproved 1
 
304 r 89 - guide to measuring, mixing, transporting and placi
304 r 89 - guide to measuring, mixing, transporting and placi304 r 89 - guide to measuring, mixing, transporting and placi
304 r 89 - guide to measuring, mixing, transporting and placi
 
304.6 r 91 - guide for the use of volumetic-measuring and con
304.6 r 91 - guide for the use of volumetic-measuring and con304.6 r 91 - guide for the use of volumetic-measuring and con
304.6 r 91 - guide for the use of volumetic-measuring and con
 
304.5 r 91 - batching, mixing, and job control of lightweight
304.5 r 91 - batching, mixing, and job control of lightweight304.5 r 91 - batching, mixing, and job control of lightweight
304.5 r 91 - batching, mixing, and job control of lightweight
 
304.4 r 95 - placing concrete with belt conveyors
304.4 r 95 - placing concrete with belt conveyors304.4 r 95 - placing concrete with belt conveyors
304.4 r 95 - placing concrete with belt conveyors
 
304.3 r 96 - heavyweight concrete measuring, mixing, transpor
304.3 r 96 - heavyweight concrete measuring, mixing, transpor304.3 r 96 - heavyweight concrete measuring, mixing, transpor
304.3 r 96 - heavyweight concrete measuring, mixing, transpor
 
304.2 r 96 - placing concrete by pumping methods
304.2 r 96 - placing concrete by pumping methods304.2 r 96 - placing concrete by pumping methods
304.2 r 96 - placing concrete by pumping methods
 
303 r 91 - guide to cast-in place architectural concrete prac
303 r 91 - guide to cast-in place architectural concrete prac303 r 91 - guide to cast-in place architectural concrete prac
303 r 91 - guide to cast-in place architectural concrete prac
 
234 r 96 - guide for the use of silica flume in concrete
234 r 96 - guide for the use of silica flume in concrete234 r 96 - guide for the use of silica flume in concrete
234 r 96 - guide for the use of silica flume in concrete
 
233 r 95 - ground granulated blast-furnace slag as constituen
233 r 95 - ground granulated blast-furnace slag as constituen233 r 95 - ground granulated blast-furnace slag as constituen
233 r 95 - ground granulated blast-furnace slag as constituen
 
232.2 r 96 - use of fly ash in concrete
232.2 r 96 - use of fly ash in concrete232.2 r 96 - use of fly ash in concrete
232.2 r 96 - use of fly ash in concrete
 
224 r 90 - control of cracking in concrete structures
224 r 90 - control of cracking in concrete structures224 r 90 - control of cracking in concrete structures
224 r 90 - control of cracking in concrete structures
 
224.2 r 92 - cracking of concrete members in direct tension
224.2 r 92 - cracking of concrete members in direct tension224.2 r 92 - cracking of concrete members in direct tension
224.2 r 92 - cracking of concrete members in direct tension
 
223 98 standard practice for the use of shrinkge-compensat
223 98   standard practice for the use of shrinkge-compensat223 98   standard practice for the use of shrinkge-compensat
223 98 standard practice for the use of shrinkge-compensat
 
222 r 96 - corrosion of metals in concrete
222 r 96 - corrosion of metals in concrete222 r 96 - corrosion of metals in concrete
222 r 96 - corrosion of metals in concrete
 
221.1 r 98 - state-of-the-art report on alkali-aggregate reac
221.1 r 98 - state-of-the-art report on alkali-aggregate reac221.1 r 98 - state-of-the-art report on alkali-aggregate reac
221.1 r 98 - state-of-the-art report on alkali-aggregate reac
 
214 77 recommended practice for evaluation of strength tes
214 77   recommended practice for evaluation of strength tes214 77   recommended practice for evaluation of strength tes
214 77 recommended practice for evaluation of strength tes
 
214.3 r 88 - simplified version of the recommended practice f
214.3 r 88 - simplified version of the recommended practice f214.3 r 88 - simplified version of the recommended practice f
214.3 r 88 - simplified version of the recommended practice f
 

Recently uploaded

Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
AmarGB2
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
ongomchris
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
BrazilAccount1
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
SupreethSP4
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 

Recently uploaded (20)

Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 

303.1 97 standard specification for-cast-in-place architec

  • 1. ACI 303.1-97 became effective September 1, 1997. Copyright © 1998, American Concrete Institute. All rights reserved including rights of reproduction and use in any form or by any means, including the making of copies by any photo process, or by electronic or mechanical device, printed, written, or oral, or recording for sound or visual reproduc- tion or for use in any knowledge or retrieval system or device, unless permission in writing is obtained from the copyright proprietors. 303.1-1 This Standard Specification states requirements for cast-in-place architec- tural concrete. It includes requirements for the materials, forming, concrete placement, curing, additional treatment, and inspection. The requirements are for vertical (walls) and horizontal (flatwork) architectural concrete separate from the requirements for structural concrete. Keywords: abrasive blasting; architectural concrete; as-cast finish, bush- hammering; cements; colored concrete; colors (materials); concrete con- struction; concrete finishes; consolidation; curing; exposed aggregate; plac- ing; repairs; rustications; sealants; sealers; specifications; surface retarders; texture. FOREWORD F1. This foreword is included for explanatory purposes only; it does not form a part of the Standard Specification ACI 303.1. F2. Standard Specification ACI 303.1 is a Reference Stan- dard that the Architect/Engineer may cite in the Project Specifications for project, together with supplementary re- quirements for the specific project. F3. Each technical section of Standard Specification ACI 303.1 is written in the three-part Section Format of the Construction Specifications Institute, as adapted by ACI, modified to ACI requirements, and organized by types of ar- chitectural concrete. The language is generally imperative and terse. F4. Checklists do not form a part of Standard Specification ACI 303.1. Checklists are to assist the Architect/Engineer in properly choosing and specifying Project Specifications. PREFACE TO SPECIFICATION CHECKLIST P1. Standard Specification ACI 303.1 is intended to be used by reference or incorporation in its entirety in the Project Specifications. Individual sections, articles, or para- graphs shall not be copied into the Project Specifications, since taking them out of context may change their meaning. SI equivalents are provided for information only and are not part of this specification. P2. If sections or parts of Standard Specification ACI 303.1 are edited into project specifications or any other document, they shall not be referred to as ACI standards, since the Standard Specification has been altered. P3. Building codes set minimum requirements necessary to protect the public. This Standard Specification may stipu- late requirements more restrictive than the minimum. Ad- justments to the needs of a particular project shall be made by the Architect/Engineer by reviewing each of the items in the Specification Checklist and then including the Architect/ Engineer’s decision on each item as a mandatory require- ment in the Project Specifications. P4. These mandatory requirements designate the specific qualities, procedures, materials, and performance criteria for which the alternates are permitted or for which provisions Standard Specification for Cast-In-Place Architectural Concrete (ACI 303.1-97) ACI 303.1-97 Reported by ACI Committee 303 Robert Nussmeier, Chairman Joseph A. Dobrowolski, Past Chairman Eugene H. Boeke, Jr., Vice Chairman Claude B. Trusty, Secretary Michael Archambault Jerome H. Ford Russell B. Peck George F. Baty Thomas J. Grisinger Alfred D. Perez Jr. Muriel Burns Allan R. Kenney Richard T. Stack Charles M. Dabney David O. Lower Louis Tallarico Daniel P. Dorfmueller Thomas D. Verti
  • 2. 303.1-2 ACI STANDARD were not made in the Standard Specification. Exceptions to the Standard Specification shall be made in the Project Spec- ification, if required. P5. The following statement will serve to make Standard Specification ACI 303.1 a part of Project Specifications: Work on ______(Project Title )________ shall conform to requirements of ACI Standard Specification for Cast- In-Place Architectural Concrete, ACI 303.1, published by the American Concrete Institute, Farmington Hills, Michigan, except as modified by the requirements of these Contract Documents. P6. The Standard Specification Checklist identifies Archi- tect/Engineer choices and alternatives. The checklist identifies the sections, parts, and articles of the Standard Specification and the action required by the Architect/Engineer. SPECIFICATION CHECKLISTS Section/Part/Article Notes to the Architect/Engineer M. MANDATORY REQUIREMENTS Section 1—General Designate whether U.S. Customary or SI units in preface. 1.6—Quality assurance 1.6.1—Quality control plan Specify content and when to submit. Section 2—Concrete for cast-in-place architectural concrete 2.2.1—Cementitious materials Specify type of cement required for the environment. O. OPTIONAL REQUIREMENTS Section 1—General 1.4—Reference standards Revise standards if project outside of U.S. 1.5—Submittals Specify size, quantity and scheduling of product submittals. 1.6—Quality assurance 1.6.2—Field mockup Specify details for field mockup. Allow structure wall as option, if desired. 1.6.3—Qualifications and responsibility 1.6.3.1—Responsibility of contractor Modify responsibility requirements for contract. 1.6.3.2—QC inspector Specify extent of authority of inspector and experience. 1.6.5—Periodic acceptance Delete, if not required. Section 2—Concrete for cast-in-place architectural concrete 2.1—General 2.1.2 —Tolerances Specify tolerances different from ACI 117. 2.2—Products Specify any additional requirements to ACI 301. 2.2.1—Cementitious materials Specify source of cement, if required for color. 2.2.4.6—Admixtures for flowing concrete Specify conditions for use. 2.2.4.7—Mineral admixtures Prohibit if necessary to ensure uniformity of color. 2.2.4.8—Coloring agents Designate coloring agent which matches Design Reference Standard.
  • 3. 303.1-3CAST-IN-PLACE ARCHITECTURAL CONCRETE 2.2.5—Concrete Specify slump, strength and durability requirements beyond ACI 301. 2.2.6—Concrete curing compounds Specify additional requirements beyond ASTM C 309. 2.3—Execution 2.3.4—Repairs Specify whether tie holes are to be filled flush, partially filled or left as cast. Section 3—Reinforcement, tie wire and bar supports 3.2—Products Specify choice of reinforcement, tie wire and class of bar supports. Include pertinent portions from current CRSI, MSP-1, Manual of Standard Practice. Section 4 — Formwork for architectural concrete 4.2—Products 4.2.1—Formwork As there are many types of forms, designate type used on Design Reference Standard and allow equivalent if matching. Include applicable sections from APA Y510, Plywood Design Specification. 4.2.3—Form ties Specify cone diameter or type of form tie material, if required. 4.2.4—Rustication form strips Specify type and size. 4.3.3—Form surface preparation Specify required tape for sealing form joints and around ties using applicable portions of AAMA, 810.185 Specification. 4.3.4—Form stripping Modify minimum time, if required. Section 5—Architectural treatments 5.2—Products 5.2.1—Aggregate Specify source of aggregate to be exposed, if required. 5.2.5—Acid Designate type of acid, if required. 5.3—Execution Specify method of aggregate exposure. 5.3.1—Aggregate exposed by abrasive blast Specify amount of reveal. 5.3.2—Aggregate exposed by removing retarded paste on vertical surfaces Specify amount of reveal. 5.3.3—Aggregate exposed by removing retarded paste on horizontal surfaces Specify amount of reveal. 5.3.6—Water blast Specify amount of reveal. S. SUBMITTALS CHECKLIST Section 1—General 1.5—Submittals Delete submittals which are not required. Specify schedule, size and method of submitting samples. 1.6.5—Periodic review Specify different interval for periodic review of architectural concrete, if desired. SPECIFICATION CHECKLISTS Section/Part/Article Notes to the Architect/Engineer
  • 4. 303.1-4 ACI STANDARD CONTENTS Section 1—General, p. 4 1.1—Scope 1.2—Definitions 1.3—Reference organizations 1.4—Reference standards 1.5—Submittals 1.6—Quality assurance 1.7—Delivery, storage, and handling 1.8—Other general requirements Section 2—Concrete for architectural cast-in-place construction, p. 7 2.1—General 2.2—Products 2.3—Execution Section 3—Reinforcement, tie wire and bar supports, p. 8 3.1—General 3.2—Products 3.3—Execution Section 4—Formwork for architectural concrete, p. 8 4.1—General 4.2—Products 4.3—Execution Section 5—Architectural treatments, p. 9 5.1—General 5.2—Products 5.3—Execution Section 6—Miscellaneous, p. 10 6.1—General—Scope 6.2—Products 6.3—Execution SECTION 1—GENERAL 1.1 —Scope 1.1.1—This Standard Specification covers requirements for the materials and production of cast-in-place architectur- al concrete having as cast or treated surfaces which are listed in the specifications and located on the plans. 1.1.2 The provisions of this Standard Specification shall govern unless otherwise specified in the Contract Docu- ments. 1.2—Definitions The following definitions have been used in writing the provisions of this specification. Accepted—Accepted by or acceptable to the Architect/En- gineer. Architect/Engineer—The architect, engineer, architectural firm, engineering firm, or architectural and engineering firm issuing Project Drawings and Specifications, or ad- ministering the work under the Contract Documents. As-cast architectural concrete—Architectural concrete that requires no further surface treatment after stripping of the forms, except for possible repairs. Coloring admixture/agent—A blended mixture of color oxides, water-reducing agent and a plasticizer. Contractor—The person, firm, or corporation with whom the Owner enters in an agreement for construction of the Work. Contract documents—Documents including Project Draw- ings, Specifications, Addendums, Bulletins and Change Orders covering the required Work. Day—24 consecutive hours. Design Reference Standard—Sample prepared under the Architect/Engineer’s direction to be used by reference for bidding purposes and construction of the Field Mockup; having a minimum size of 18 × 18 in. (460 × 460 mm) by 2 in. (50 mm) thick, exhibiting the acceptable surfaces, color and texture; and listing the sources and proportions of materials used. Excessive contrast—Degree of architectural concrete con- struction blemish determined unacceptable by comparison to the field mockup and remedial work or repair is re- quired. Field Mockup—A sample, which may be specified as to size, constructed in the field by the Contractor incorporat- ing the forming, materials, and procedures proposed for the architectural concrete, which is to be used for compar- ison during periodic and final acceptance. Upon approval of the Architect/Engineer, this sample may be a portion of a wall not scheduled for architectural treatment, such as a basement wall, which can be preserved for viewing until the final acceptance of the architectural concrete. Kerf—A saw cut placed on the backside of a wood rustica- tion strip to allow for expansion due to possible water ab- sorption. Layout drawings—Drawings showing forming details for construction of formwork in the field. Overlaid plywood—A plywood coated with a factory ap- plied paper overlay that is impregnated with phenolic res- ins. MDO is a Medium Density Overlay containing 35–45 percent phenolic resin by weight of the overlay. HDO is a High Density Overlay containing 45–65 percent phenolic resin by weight of the overlay. Finnish birch has an over- lay which contains a minimum of 65 percent phenolic res- in overlay by weight of the overlay. Owner—The corporation, association, partnership, individ- ual, or public body or authority with whom the Contractor enters into an agreement and for whom the Work is pro- vided. Project drawings—The drawings that, along with the Project Specifications, complete the descriptive informa- tion for constructing the Work required or referred to in the Contract Documents. Project specifications—The written documents that specify requirements for a project in accordance with the service parameters and other specific criteria established by the Owner. Reference standards—Standards of a technical society, or- ganization, or association, including the codes of local or state authorities. Required—Required by this Specification or the Contract Documents.
  • 5. 303.1-5CAST-IN-PLACE ARCHITECTURAL CONCRETE Reveal—Projection of the aggregate from the mortar after completion of exposure operations. Amount of reveal is specified as brush—sufficient to dull surface sheen but not have any reveal, light—a maximum 1/16 in. (2 mm) reveal, medium—a maximum reveal of 1 /4 in. (6 mm) or heavy— a maximum reveal of 1/3 of the large aggregate diameter. Submitted—Submitted to the Architect/Engineer for review. Zones of influence—Surface area of concrete visibly affect- ed by internal vibration. Size of area will vary with the size and type of internal vibrator used and concrete mixture characteristics and proportions. Work—The entire construction required or separately iden- tifiable parts thereof that are required to be furnished un- der the Contract Documents. Work is the result of performing services, furnishing labor, and furnishing and incorporating materials and equipment into the construc- tion, as required by the Contract Documents. 1.3— Reference organizations American Concrete Institute (ACI) P.O. Box 9094 Farmington Hills, MI 48333 American Architectural Manufacturer’s Association (AAMA) 2700 River Road, Suite 118 Des Plaines, IL 60018 American Plywood Association (APA) P.O. Box 11700 Tacoma, WA 98411 American Society for Testing and Materials (ASTM) 100 Barr Harbor Drive West Conshohocken, PA 19428 U.S. Department of Commerce publications available from: U.S. Government Printing Office Washington DC 20402 1.4—Reference standards 1.4.1 General—Standards of the organizations referred to in this specification are listed below with their serial desig- nations including year of adoption or revision, and are de- clared to be a part of this specification as if fully set forth herein. 1.4.2 American Concrete Institute (ACI) 117-90 Specifications for Tolerances for Concrete Construction and Materials 301-96 Specifications for Structural Concrete for Buildings 315-80 (Revised 1986; Reapproved 1991) Details and Detailing of Concrete Reinforcement 306.1-90 Specification for Cold Weather Concreting 318-95 Building Code Requirements for Reinforced Concrete 1.4.3 American Society for Testing and Materials (ASTM) A185-94a Specification for Steel Welded Wire Fabric, Plain, for Concrete Reinforcement A493-92 Specification for Stainless and Heat Resisting Steel for Cold Heading and Cold Forging Bar and Wire A497-94a Specification for Steel Welded Wire Fabric, Deformed, for Concrete Reinforcement. A615-94 Specification for Deformed and Plain Billet Steel Bars for Concrete Reinforcement A706-93 Specification for Low-Alloy Steel Deformed Bars for Concrete Reinforcement A767-90 Specification for Zinc-Coated (Galvanized) Bars for Concrete Reinforcement A775-95 Specification for Epoxy-Coated Reinforcement Steel Bars A884-94a Specification for Epoxy-Coated Steel Wire and Welded Wire Fabric for Concrete Reinforcement C33-93 Specification for Concrete Aggregates C94-95 Specification for Ready-Mixed Concrete C144-93 Specification for Aggregate for Masonry Mortar C150-94 Specification for Portland Cement C156-93 Specification for Water Retention by Concrete Curing Materials C171-95 Specification for Sheet Materials for Curing Concrete C260-95 Specification for Air-Entraining Admixtures for Concrete C309-95 Specification for Liquid Membrane Forming Compounds for Curing Concrete C330-89 Specification for Lightweight Aggregates for Structural Concrete C494-92 Specification for Chemical Admixtures C595-94a Specification for Blended Hydraulic Cements C618-95 Specification for Fly Ash and Raw or Calcined Natural Pozzolan for Use as a Mineral Admixture in Portland Cement Concrete C834-91 Specification for Latex Sealants C845-90 Specification for Expansive Hydraulic Cement C920-87 Specification for Elastomeric Joint Sealants C957-87 Specification for High Solids Content Cold Liquid-Applied Elastomeric Waterproofing Membrane with Integral Wearing Surface C979-82(93) Specification for Pigments for Integrally Colored Concrete C989-93 Specification for Ground Granulated Blast- Furnace Slag for Use in Concrete and Mortar C1017-92 Specification for Chemical Admixtures for Use in Producing Flowing Admixtures
  • 6. 303.1-6 ACI STANDARD C1077-95b Practice for Laboratories Testing Concrete and Concrete Aggregates for use in Construction and Criteria for Laboratory Evaluation C1157-94a Performance Specification for Blended Hydraulic Cements C1193-91 Guide for use of Elastomeric Joint Sealants C1240-93 Specification for Silica Fume for Use In Hydraulic-Cement Concrete and Mortar 1.4.4 U.S. Department of Commerce Federal Specification PS1-83: Construction and Industrial Plywood 1.5—Submittals 1.6.1 Quality control plan—To be submitted by Contrac- tor prior to commencing construction of architectural con- crete. 1.6.2 Field Mockup—Upon completion, to be reviewed for acceptance by Architect/Engineer by comparison to De- sign Reference Standard and prior to ordering forming. 1.6.2.1 Layout drawings for Field Mockup—For review prior to constructing architectural concrete formwork. 1.6.5 Periodic review—For review of architectural con- crete completed to date to determine uniformity. 2.2.1 Cement—Sample for information and review of Cer- tificates of Compliance. 2.2.3 Aggregates—Samples for information and review. 2.2.4 Admixtures—Samples for information and review. 2.2.4.8 Coloring admixture—Samples for information and review. 2.2.5 Concrete mix design—For review. 2.2.6 Concrete curing compound—For review. 2.2.7 Sheet materials for concrete curing—For review. 3.2 Reinforcement, tie wire and bar supports—Certificates of compliance. 4.2.1 Formwork—For information. 4.2.2 Form face, form liner and molds—For information. 4.2.3 Form ties—For information. 4.2.5 Form release agents—For information. 4.2.6 Miscellaneous 4.2.6.1 Compressible tape—For information. 4.2.6.2 Form joint caulking—For information. 5.1.4 Safety plan—For record. 5.2.5 Sealers or coatings—Certificates of Compliance. 5.3.6.3 Acid wash and water-blasting waste water dis- posal plan—For record. 6.2.1 Joint sealants—For review. 1.6—Quality assurance 1.6.1 Quality control plan—Submit quality control plan as outlined in Section 1.5 for acceptance prior to commencing any construction of architectural concrete. 1.6.2 Field Mockup 1.6.2.1 Construct Field Mockups using procedures, equipment, materials, simulated repairs and quality control plan submitted for production of cast-in-place architectural concrete. Begin fabrication of architectural forms for construction of Field Mockup upon acceptance of layout drawings. Upon acceptance of the completed Field Mock- up, begin fabrication of the architectural concrete forms. Maintain and protect Field Mockups on the jobsite until fi- nal acceptance of architectural concrete. Construct field mockup sample to match accepted Design Reference Stan- dard in color and texture. 1.6.2.2 For walls, include vertical, horizontal and rusti- cation joints, demonstrate methods of repair, curing, aggre- gate exposure, sealers and coating. Construct mockup to include a minimum of two lifts having heights planned for placement of the architectural concrete. 1.6.2.3 For flatwork, construct a 10 × 10 ft (3 m × 3 m) sample for acceptance with the same materials and methods as planned for the production concrete. 1.6.3 Qualifications and responsibilities 1.6.3.1 Responsibility of the Contractor—Contractor shall obtain a project superintendent and forming and con- crete subcontractors who are experienced in the construction of architectural concrete. 1.6.3.2 Qualification of QC inspector—The QC inspec- tor shall be trained for inspection of cast-in-place architec- tural concrete and have a minimum ACI Certification as a Level II Concrete Construction Inspector or equivalent. Equivalent certification programs shall include the policies and procedures conforming to ACI Publication CP-20. 1.6.4 Reports 1.6.4.1 Maintain logs of concrete placements. Record date, location and quantities of concrete placement, air tem- perature, and location and identification of material and ar- chitectural concrete sampling. Maintain file of architectural concrete delivery tickets. 1.6.4.2 Report any proposed changes from procedures and materials used in the original Field Mockup. Submit new sample having the same dimensions and texture as the origi- nal Design Reference Sample for review. Upon acceptance construct another Field Mockup with the new materials and procedures for acceptance prior to proceeding further with construction of the architectural concrete. Further construc- tion with the new materials shall be planned so as to mini- mize contrast with previously placed architectural concrete. 1.6.5 Periodic acceptance—Failure of the completed ar- chitectural concrete to receive acceptance during a semi- monthly periodic review requires the submittal of a plan of remedial repair and proposed revisions to methods of con- struction for acceptance before proceeding with additional architectural concrete construction. 1.6.6 Final acceptance—Protect accepted architectural concrete from damage after completion of the architectural concrete construction until completion of project. 1.7—Delivery, storage, and handling 1.7.1 Deliver materials to jobsite in manufacturer’s origi- nal containers. 1.7.2 Store materials in a clean dry location. Maintain method of storage and temperature of materials as required by manufacturer.
  • 7. 303.1-7CAST-IN-PLACE ARCHITECTURAL CONCRETE 1.8—Other general requirements 1.8.1 Adhere to local ordinances requiring restrictions on sound, dust and work hours during construction of architec- tural concrete. SECTION 2—CONCRETE FOR ARCHITECTURAL CAST-IN-PLACE CONSTRUCTION 2.1—General 2.1.1 Scope—This section specifies requirements for cast- in-place architectural concrete having as-cast surfaces or treated surfaces which are listed in the specifications. 2.1.2 Tolerances—Tolerances shall conform to ACI-117. 2.2—Products 2.2.1 Cement shall conform to ASTM C 150, C 595, C 845, or C 1157. 2.2.1.1 Use only one source, type and brand for the project architectural concrete. 2.2.1.2 Ensure adequate supply of specified special ce- ments for construction of architectural concrete. 2.2.2 Water 2.2.2.1 Concrete mix water shall conform to ASTM C 94. 2.2.2.2 Temperature of water for curing shall be not more than 20 F (10 C) lower than the concrete surface tem- perature. 2.2.3 Aggregates shall have a satisfactory service record nonstaining and not being disruptively reactive with cement alkalis 2.2.3.1 Coarse aggregate shall meet the requirements of ASTM C 33 or C 330 2.2.3.2 Fine aggregate shall meet the requirements of ASTM C 33, C 330 or C 144. 2.2.4 Admixtures—Calcium chloride, or any admixture containing calcium chloride, shall not be used. 2.2.4.1 Air-entraining agents shall meet ASTM C 260. 2.2.4.2 Water-reducing admixtures shall meet ASTM C494, Type A 2.2.4.3 Water-reducing and retarding admixtures shall meet ASTM C 494, Type D. 2.2.4.4 High-range water reducers (superplasticizers) shall meet ASTM C 494, Types F or G 2.2.4.5 Accelerating admixtures shall meet ASTM C 494, Types C and E 2.2.4.6 Admixtures for flowing concrete shall meet ASTM C 1017, Type I or II 2.2.4.7 Mineral admixtures fly ash shall meet ASTM C618, ground granulated blast-furnace slag shall meet ASTM C989, and silica fume shall meet ASTM C1240. Mineral admixtures shall be compatible with other admix- tures. 2.2.4.8 Coloring admixture/agents shall meet ASTM C979 and ASTM C494. 2.2.5 Concrete 2.2.5.1 Slump, strength and durability requirements shall be as shown in the Contract Documents. 2.2.5.2 Concrete shall match color and surface of the Design Reference Standard and the accepted Field Mockup. 2.2.5.3 Concrete shall comply with Section 6 of ACI 301. 2.2.5.4 For colored concrete, prepare trial batches of the final design mix with specified slump at highest and lowest ambient temperatures anticipated during concrete place- ments. Adjust color amounts to match Design Reference Standard and the accepted Field Mockup. 2.2.6 Concrete curing compound shall conform to ASTM C 309. The cured surface shall match the Design Ref- erence Standard. Solids content shall be between 14–22 per- cent. For colored concrete use curing compounds recommended by pigment or color admixture manufacturer and accepted by Architect/Engineer. 2.2.7 Sheet materials for concrete curing—Plastic film, wet burlap or burlap-backed plastic film shall not be used for curing colored horizontal architectural concrete. 2.3—Execution 2.3.1 Batching, mixing, and transporting 2.3.1.1 Deliver concrete in initially clean equipment which is exclusively limited to mix and transport the archi- tectural concrete. 2.3.1.2 Deliver concrete of uniform slump and propor- tions so the resulting concrete shall match the Field Mockup. 2.3.1.3 Deliver colored concrete in full loads. 2.3.2 Conveying and placement 2.3.2.1 Support runs or gangways for the concrete trans- porters, pump lines, wheel barrows, other similar equipment and foot traffic so as not to disturb reinforcement or interfere with concrete placing operations. 2.3.2.2 Place concrete after forms and reinforcement have been set and accepted by Architect/Engineer. 2.3.2.3 Schedule arrival of concrete to avoid delays in placement. 2.3.2.4 Take precautions to minimize mortar splatter on form faces. Remove accidental mortar splatter from architec- tural form face. 2.3.2.5 Deposit concrete in the final position without segregation or loss of material. Do not move concrete hori- zontally. 2.3.2.6 Place concrete in uniform horizontal layers not more than 36 in. (0.9 m) high for consolidation. 2.3.2.7 Place concrete continuously without exceeding rate of placement used in design of forms. 2.3.2.8 Vibrate placed concrete for maximum consoli- dation of concrete. Overlap the zones of influence a mini- mum of 50 percent. Withdraw internal vibrators at a rate of 3 in. (75 mm) per second. Keep internal vibrators 2 in. (50 mm) away from the architectural face. 2.3.2.9 Revibrate the top 6 in. (150 mm) layer of a con- crete lift during delays of up to a maximum 30 minutes as long as the vibrator will penetrate of its own weight. After 30 minutes or failure of the vibrator to penetrate of its own weight, stop placement, level lift and set construction joint. 2.3.3 Curing 2.3.3.1 Mist concrete surface with water before apply- ing curing compounds. Apply curing compounds at rate rec- ommended by manufacturer. 2.3.3.2 Maintain complete contact when using cotton mat curing.
  • 8. 303.1-8 ACI STANDARD 2.3.3.3 Curing during cold weather shall comply with ACI 306.1. 2.3.4 Repairs and cleanup 2.3.4.1 Repair defects on as-cast architectural surfaces immediately to conform to that accepted on the Field Mockup. 2.3.4.2 Cure by covering with curing seal or edge-taped waterproof cover or as accepted by trial on Field Mockup. 2.3.4.3 Finish tie holes as accepted on Field Mockup. SECTION 3—REINFORCEMENT, TIE WIRE AND BAR SUPPORTS 3.1—General 3.1.1 Scope—This section specifies the requirements for all reinforcement and accessories to be used in cast-in-place architectural concrete having an as-cast or treated surface. 3.1.2 Tolerances—Unless otherwise specified, conform to ACI 117. 3.2—Products 3.2.1 Reinforcing bars shall conform to ASTM A 615 or ASTM A 706. Welded wire fabric shall conform to ASTM A 185 or ASTM A 497. 3.2.2 Epoxy coated reinforcement shall conform to ASTM A 775 and epoxy-coated welded wire fabric to ASTM A 884. 3.2.3 Galvanized reinforcement shall conform to ASTM A 767. 3.2.4 Use plastic coated tie wire for epoxy coated reinforce- ment. Use soft stainless steel complying with ASTM A 493, or plastic coated tie wire, for securing other reinforcement. 3.2.5 Bar supports shall be Class 1, as defined in CRSI MSP-1. Stainless steel for bar supports shall comply with ASTM A 493. 3.3—Execution 3.3.1 Place reinforcement in accordance with ACI 315. 3.3.2 Provide specified concrete cover over reinforcement and coated steel embedments. Concrete cover shall be as specified after removal of rustication strips or face mortar by further treatment such as sandblasting or bush hammering. 3.3.3 Use bar supports in sufficient number, size and loca- tion to prevent vertical displacement of the reinforcement and gouging of the forming. Use bar supports or spacers in walls and columns to maintain clear distance between rein- forcement and face of concrete. 3.3.4 Bend back and keep tie wires 11/2 in. (40 mm) from form face. Remove tie wire clippings from horizontal surfac- es that will be sandblasted, exposed to view, or weather. 3.3.5 Perform welding or similar heat processes on rein- forcement or accessories prior to form erection. SECTION 4—FORMWORK FOR ARCHITECTURAL CONCRETE 4.1—General 4.1.1 Scope—This section specifies the formwork require- ments for cast-in-place architectural concrete having an as- cast or treated surface. 4.1.2 Tolerances—Formwork shall be sized to produce concrete conforming to ACI 117. 4.1.3 Design criteria 4.1.3.1 Face sheet deflection shall not exceed 1/400 of its span. 4.1.3.2 Maximum rate of placement assumed for design of formwork shall be shown on the Layout Drawings. 4.1.3.3 Concrete ties and bolts shall be sized to with- stand form design pressures. 4.2—Products 4.2.1 Formwork—All formwork shall have a high density, non-vapor transmitting form face. 4.2.1.1 Overlaid plywood shall meet Federal Specifica- tion PS1. 4.2.2 Form face, form liner and molds shall produce a con- crete surface matching the Design Reference Standard and Field Mockup. 4.2.3 Form ties 4.2.3.1 Provide specified diameter of cones for ties. 4.2.3.2 Washers shall not be used with snap ties for ar- chitectural concrete. 4.2.4 Rustications—Metal strips shall be fabricated from same metal as metal form face. 4.2.5 Form release agents—Use only those tested and ap- proved on Field Mockup. 4.2.6 Miscellaneous 4.2.6.1 Compressible tape shall conform to AAMA 810.185 4.2.6.2 Sealant for form caulking shall conform to ASTM C 920, Type a, Grade NS, or C 834. 4.3—Execution 4.3.1 Formwork 4.3.1.1 Provide forms as shown on the accepted layout drawings. 4.3.1.2 Erect forms as shown on the Project Drawings and accepted layout Drawings. 4.3.2 Rustication strips 4.3.2.1 Provide rustication joints and chamfers as shown on the Project Drawings and Layout Drawings. 4.3.2.2 Wood strips shall be kerfed on the back side. 4.3.2.3 Provide minimum concrete cover of 11/2 in. (40 mm) over all reinforcement. Cover shall be measured from bar reinforcement to the most deeply recessed depth of rustication or other recess in the concrete surface. 4.3.2.4 Provide closure backing materials when indent- ed rustication is used over a ribbed form liner. Seal joint be- tween rustication strip and form with non-absorbent caulking. 4.3.2.5 Apply impermeable coating to wood rustications or chamfers. 4.3.3 Form surface preparation 4.3.3.1 Season natural wood grain forms or untreated wood forms with cement or lime slurry consistent with the color be used for the architectural concrete. 4.3.3.2 Seal form joints and tie holes by taping or with non-absorbent caulking. Clean taper ties and she-bolts and lubricate with a nonstaining grease or form release agent be- fore each use. Keep form face clean until concrete is placed.
  • 9. 303.1-9CAST-IN-PLACE ARCHITECTURAL CONCRETE 4.3.4 Form stripping 4.3.4.1 Strip formwork completely from vertical architec- tural concrete surfaces when the concrete has achieved a com- pressive strength of 1000 psi (7 MPa) or 24 hours after placement, whichever is later. Schedule formwork stripping to maintain surface appearance matching accepted Field Mockup. 4.3.4.2 Break off fiberglass ties flush with the surface of the concrete and texture to match the adjacent concrete sur- face and color. 4.3.5 Cleaning and storage 4.3.5.1 Clean forms after each use and discard damaged forms. 4.3.5.2 Store steel forms horizontally and fully supported. 4.3.5.3 Store plastic coated forms and liners horizontal- ly and under cover. SECTION 5—ARCHITECTURAL TREATMENTS 5.1—General 5.1.1 Scope—This section specifies the additional require- ments for cast-in-place architectural concrete where the re- sulting concrete face is specially treated after form removal. 5.1.2 Acceptance—Receive acceptance of the appearance of the first day’s aggregate exposure operations before pro- ceeding further. 5.1.3 Personnel experience—Use personnel experienced in the specified procedures and trained on the Field Mockup. 5.1.4 Safety plan—Follow submitted safety plan that com- plies with OSHA requirements. 5.2—Products 5.2.1 Aggregate for exposure shall conform to the Design Reference Standard and the Field Mockup. Ensure adequate supply for architectural concrete. 5.2.2 Forms and form liners—Use high density and non- vapor transmitting materials. 5.2.3 Surface retarders—Use those previously tested and accepted on the Field Mockup. 5.2.4 Abrasive material—Use that previously tested and ac- cepted on the Field Mockup for specified texture. Ensure ade- quate supply to complete total amount of surface specified. 5.2.5 Acid—Use muriatic or phosphoric acid to expose ag- gregate in locations specified or shown on the Project Draw- ings. Match accepted Design Reference Standard and Field Mockup. 5.2.6 Water—for water-blasting shall be free of oil or im- purities capable of staining the concrete surface and shall be not more than 20 F [10 C] colder than the concrete surface at the time of aggregate exposure 5.2.7 Sealers or coatings—Use concrete sealers to match ac- cepted Design Reference Standard and Field Mockup surface. 5.3—Execution 5.3.1 Aggregate exposed by abrasive blast 5.3.1.1 Aggregate reveal shall be as shown on the Draw- ings and as specified. 5.3.1.2 Expose aggregate to match accepted Design Reference Standard and Field Mockup. 5.3.1.3 Begin abrasive blasting to expose aggregate when the concrete has a minimum compressive strength of 2000 psi (14 MPa) and not less than that required for safe re- moval of the forms and supports. Blast exposed aggregate ar- chitectural concrete at the same age for uniform exposure and color. 5.3.1.4 Wash abrasive blasting debris off the finished wall surface before drying occurs when abrasive grits con- tain free water for dust abatement. 5.3.2 Aggregate exposed by removing retarded surface paste on vertical surfaces 5.3.2.1 Use surface retarder accepted for use and match accepted Design Reference Standard and Field Mockup. 5.3.2.2 Prevent concrete from washing away retarder coating from form during placement 5.3.2.3 After form removal, remove the retarded outer lay- er of cement paste by hand brushing, high pressure water wash- ing, or light sandblasting. Schedule procedures and adjust timing for weather conditions to achieve uniform aggregate ex- posure. 5.3.3 Aggregate exposed by removing retarded surface paste on horizontal surfaces 5.3.3.1 Retard unformed horizontal surfaces to match accepted Design Reference Standard and the Field Mockup. 5.3.3.2 Spray retarder on fresh cast horizontal surfaces after concrete consolidation, seeding of architectural aggre- gate when specified, and final finishing. Apply retarder in two perpendicular passes after bleed water has evaporated from surface. 5.3.3.3 Remove the chemically retarded surface cement paste after the mortar retaining the aggregate has set suffi- ciently to prevent dislodgment of the aggregate. 5.3.4 Acid etch 5.3.4.1 Use acid etch for exposure of aggregate on hori- zontal surfaces only. 5.3.4.2 Acid etch treatment shall match accepted Field Mockup and comply with OSHA recommended safety pro- cedures. 5.3.4.3 Defer acid etch until concrete is at least 14 days old and compressive strength exceeds 4500 psi (30 MPa) 5.3.4.4 Wet concrete thoroughly prior to application of acid. 5.3.4.5 Continue to apply acid while actively brushing or spraying until predetermined depth of reveal is obtained. 5.3.4.6 Flush acid and debris from concrete surface im- mediately after acid action stops by application of water un- der pressure. 5.3.4.7 Protect adjacent materials, surfaces and finishes from acid and waste wash water during application and cleanup. 5.3.4.8 Dispose of waste wash water in accordance with submitted plan. 5.3.5 Mechanical tooling (bush-hammering) 5.3.5.1 Mechanical tooling shall expose aggregate to match accepted Design Reference Standard and Field Mockup. 5.3.5.2 Defer mechanical tooling until concrete is at least 14 days old and compressive strength exceeds 4500 psi (30 MPa). 5.3.5.3 Multiple bush-hammers used for tooling shall have equal wear on teeth.
  • 10. 303.1-10 ACI STANDARD 5.3.5.4 Maintain control of concrete chips, dust and de- bris in each work area. Limit migration of airborne materials by use of tarpaulins, wind breaks, and similar devices. 5.3.6 Water blast 5.3.6.1 Water blast and expose aggregate to match ac- cepted Design Reference Standard. 5.3.6.2 Defer water blasting of vertical surfaces until compressive strength exceeds 4500 psi (30 MPa). 5.3.6.3 Dispose of water used for blasting in accordance with submitted water blast plan. 5.3.7 Repair 5.3.7.1 Repaired areas shall be subject to final accep- tance under comparison to Field Mockup repairs. 5.3.7.2 Repair defects as required to match adjacent sur- face after architectural surface has been treated. 5.3.7.3 Cure repaired areas as specified in Article 2.3.4.2. 5.3.7.4 Finish tie holes to match accepted Field Mockup. 5.3.8 Finishing and final cleanup 5.3.8.1 Protect completed architectural cast-in-place concrete surfaces from damage, staining or other contami- nants by subsequent construction. 5.3.8.2 Do not allow laitance from subsequent construc- tion or repairs to stain or harden on surfaces that have been finished. 5.3.8.3 Clean concrete surfaces just prior to project sub- mittal for acceptance. 5.3.8.4 Use cleaning materials and processes that do not change color or texture of the completed concrete surfaces. 5.3.8.5 Rinse architectural surface thoroughly with clean water after cleaning. 5.3.8.6 Protect adjacent materials during cleaning operations. 5.3.9 Final acceptance of architectural concrete 5.3.9.1 Upon completion of architectural concrete, final acceptance is based upon the matching of the architectural cast-in-place concrete with the accepted Field Mockups when viewed at a distance of 20 ft (6 m) in daylight. 5.3.9.2 Only concrete listed in the specifications or iden- tified on the plans as architectural concrete is to be included in this final acceptance. 5.3.9.3 Defective work, including repair areas not ac- cepted, shall be removed and replaced. SECTION 6—MISCELLANEOUS 6.1—General—Scope This section specifies the requirements for joint filling, sealing of the concrete surface and use of coatings. 6.2—Products 6.2.1 Joint sealants in vertical surfaces and horizontal areas not subject to traffic shall conform to ASTM C 920, Use NT; joints subject to traffic shall conform to ASTM C 920, Use T. 6.2.2 Concrete sealer—Test compatibility with sealant on Field Mockup and conform to final color of Design Refer- ence Standard. 6.3—Execution 6.3.1 Apply concrete joint sealants prior to any application of concrete sealer. 6.3.2 Apply sealers and sealants in accordance to manu- facturer’s specifications. 6.3.3 Match accepted Design Reference Standard and Field Mockup. This standard was submitted to letter ballot of the committee and was approved in accordance with Institute standardization procedures.