INTRODUCTION:
While BIM is all about the ‘I’ of the Information, BIM or no BIM, when it comes to
Construction Information Management, one issue keeps failing to get enough
attention:
The workflow of producing and managing shop-drawings by numerous
construction participants based on design documentation is STILL done in a
pretty archaic way.
3
Unresolved Issues bypass the Shop-Drawing process
Regardless of the skills and qualifications of the assessors, or even time spent on
these exercises, experience shows, that there is an unfortunately large number of
issues buried within these shop drawings, that do not get unearthed in the
assessment process and end up going to the construction to be resolved on site.
The shop-drawings, that end up used for building off are still, 2D based drawings
(regardless of their origin) and get assessed and approved (or rejected, corrected
and then approved) by client-appointed parties, in a tedious, long-winded way
before they are let to proceed to construction.
4
A Possible SOLUTION:
While a truly functional BIM would probably fix these problems, the strategy
described here is by no means a ‘pure BIM approach’ but rather a ‘hybrid’ one.
5
An Example:
For the example to explain the methodology on, a set of buildings is used, part
of a development completed a couple of years ago, where the number of
shop-drawings created went into thousands.
(in fact close to or OVER 20 thousand! Or was it 35.000+?)
If all the shop-
drawings were
piled up the
paper tower
would be this
high!
6
The Approach:
DIGITAL 2D + 3D PLATFORM
The assessment team (appointed by the client) is expanded from the usual
cocktail of specialist-engineers with a new position, that of the Virtual Assessment
Model Manager.
This person will work closely with all the individual discipline engineers, but also
manage the Platform, the center feature of the Digital Project Environment.
7
The Approach:
DIGITAL 2D + 3D PLATFORM
8
2D + 3D (ghost framework)
At the outset of the project, the Manager sets up the ‘ghost structure’ within the
platform. This structure has the digital equivalents of the key spatial drivers of the
‘real’ project, grids, stories and the positions of section and elevation lines matching
the ones on the drawings.
The main elements of the ghost framework are grids, sub-grids, section-elevation
lines and stories. These combined define the 3 dimensional skeleton of the project. It
is important to understand that these elements are intelligent objects, not just lines,
circles and text.
It is the digital skeleton of the building and it is critical for it to be as accurate as it is
possible.
9
NOT just anywhere!
The next step is to feed onto this Digital Platform the shop-drawings as they become
available. There is no hard rule on the order of imports, but it is logical to follow that
of the construction’s needs, so starting with foundation drawings makes sense. As the
shop drawings arrive, the Model Manager places the sheets within the ‘correct place’
of the Virtual Environment on the Digital Platform.
Plans over the appropriate grids, elevations, sections in the right planes, specific
details in their original positions.
10
While not all drawings can be placed in a specific spatial position (i.e. typical, generic details,
schedules etc) there is always area within the Digital Environment for these to be stored and
referenced from.
The Model Manager, given the correct software has numerous tools to assist the work with
large number of drawings, going into hundred and even thousand, including filters, layers,
views and work spaces.
11
Coordination:
11
The Model and the Digital Platform are continuously available to all
assessors, so they can review these drawings almost as soon as they
have been placed within the Platform.
Drawings from one discipline can be referenced to each other or
against other discipline straight from the beginning of the populating of
the Digital Environment.
12
Problems Get Resolved within the DE
13
Unresolved Design:
! Coloured if fully defined
! Red if subject to any question
13
14
Detailing:
15
Design Changes Tracked
+ 38m solid walls + double the no of fittings
+ 44m2 extra
flooring and
ceiling
+ 7 (9) extra
doors
(light
partitioning
Removed)
16
BOQ Related Issues Identified
17
2D + 3D
Parallel with the placement of received shop-drawings, the Model Manager
creates the virtual model of the building(s) itself on the Platform, constructing
it up in a similar sequence to that of the real construction. This developing
model is another feedback to the accuracy and completeness of the shop-
drawings and provides up-to date information to the assessors to act on in a
timely manner.
The beauty of the Platform is that one can have numerous buildings in one file
or closely referenced to each other as well as it all been centrally located and
updated.
18
2D + 3D
Should there be contractor supplied 3D (shop-drawing) models available as
parts of submittals, the Model Manager has the ability to import them as
well and assesses their integrity against the live model and all the other
shop-drawings.
19
CONCLUSION:
RISK!
SOLUTION!

More Related Content

What's hot

Detailed definition of bim abbreviation
Detailed definition of bim abbreviationDetailed definition of bim abbreviation
Detailed definition of bim abbreviation
Omar Selim
 
Software assignment 1
Software assignment 1Software assignment 1
Software assignment 1
Timun Loh
 
Software application:assignment
Software application:assignmentSoftware application:assignment
Software application:assignment마 이환
 
Software report
Software reportSoftware report
Software report
Arthur Wilson
 
Ppt on design and modelling of residential society
Ppt on design and modelling of residential societyPpt on design and modelling of residential society
Ppt on design and modelling of residential society
GLAU, Mathura, UP, India
 
Software presentation
Software presentationSoftware presentation
Software presentation
Timun Loh
 
BIM Level of Development Explained | LOD 100 200 300 400 500
BIM Level of Development Explained | LOD 100 200 300 400 500BIM Level of Development Explained | LOD 100 200 300 400 500
BIM Level of Development Explained | LOD 100 200 300 400 500
United-BIM
 
Revit glossary terms
Revit glossary termsRevit glossary terms
Revit glossary terms
Sandya Devarajan
 
2011.05.04 BIM Presentation - Next Level
2011.05.04   BIM Presentation - Next Level2011.05.04   BIM Presentation - Next Level
2011.05.04 BIM Presentation - Next LevelAntman1963
 
Software applications-presentation
Software applications-presentationSoftware applications-presentation
Software applications-presentation
Syafiq Zariful
 
Software application finalized group report
Software application finalized group reportSoftware application finalized group report
Software application finalized group report
Syafiq Zariful
 
Green Intl Broucher for upcoming training outlines
Green Intl Broucher for upcoming training outlinesGreen Intl Broucher for upcoming training outlines
Green Intl Broucher for upcoming training outlines
shajiya shajju
 
Software app present (QS)
Software app present (QS)Software app present (QS)
Software app present (QS)
Hasif Alias
 
Software Application Group Assignment
Software Application Group AssignmentSoftware Application Group Assignment
Software Application Group Assignment
Haziq1511
 
Software application (QS)
Software application (QS)Software application (QS)
Software application (QS)
Hasif Alias
 
Bridging Building Information Modeling and Parametric Design
Bridging Building Information Modeling and Parametric DesignBridging Building Information Modeling and Parametric Design
Bridging Building Information Modeling and Parametric Design
Stefan Boeykens
 
What are BIM MEP Drawings? - Tejjy Inc.
What are BIM MEP Drawings? - Tejjy Inc.What are BIM MEP Drawings? - Tejjy Inc.
What are BIM MEP Drawings? - Tejjy Inc.
Shubham Bhatnagar
 
Software assignment
Software assignmentSoftware assignment
Software assignment
Syafiq Zariful
 
Vico Software: 4D and 5D perspectives on BIM
Vico Software: 4D and 5D perspectives on BIMVico Software: 4D and 5D perspectives on BIM
Vico Software: 4D and 5D perspectives on BIM
Be2camp Admin
 

What's hot (19)

Detailed definition of bim abbreviation
Detailed definition of bim abbreviationDetailed definition of bim abbreviation
Detailed definition of bim abbreviation
 
Software assignment 1
Software assignment 1Software assignment 1
Software assignment 1
 
Software application:assignment
Software application:assignmentSoftware application:assignment
Software application:assignment
 
Software report
Software reportSoftware report
Software report
 
Ppt on design and modelling of residential society
Ppt on design and modelling of residential societyPpt on design and modelling of residential society
Ppt on design and modelling of residential society
 
Software presentation
Software presentationSoftware presentation
Software presentation
 
BIM Level of Development Explained | LOD 100 200 300 400 500
BIM Level of Development Explained | LOD 100 200 300 400 500BIM Level of Development Explained | LOD 100 200 300 400 500
BIM Level of Development Explained | LOD 100 200 300 400 500
 
Revit glossary terms
Revit glossary termsRevit glossary terms
Revit glossary terms
 
2011.05.04 BIM Presentation - Next Level
2011.05.04   BIM Presentation - Next Level2011.05.04   BIM Presentation - Next Level
2011.05.04 BIM Presentation - Next Level
 
Software applications-presentation
Software applications-presentationSoftware applications-presentation
Software applications-presentation
 
Software application finalized group report
Software application finalized group reportSoftware application finalized group report
Software application finalized group report
 
Green Intl Broucher for upcoming training outlines
Green Intl Broucher for upcoming training outlinesGreen Intl Broucher for upcoming training outlines
Green Intl Broucher for upcoming training outlines
 
Software app present (QS)
Software app present (QS)Software app present (QS)
Software app present (QS)
 
Software Application Group Assignment
Software Application Group AssignmentSoftware Application Group Assignment
Software Application Group Assignment
 
Software application (QS)
Software application (QS)Software application (QS)
Software application (QS)
 
Bridging Building Information Modeling and Parametric Design
Bridging Building Information Modeling and Parametric DesignBridging Building Information Modeling and Parametric Design
Bridging Building Information Modeling and Parametric Design
 
What are BIM MEP Drawings? - Tejjy Inc.
What are BIM MEP Drawings? - Tejjy Inc.What are BIM MEP Drawings? - Tejjy Inc.
What are BIM MEP Drawings? - Tejjy Inc.
 
Software assignment
Software assignmentSoftware assignment
Software assignment
 
Vico Software: 4D and 5D perspectives on BIM
Vico Software: 4D and 5D perspectives on BIMVico Software: 4D and 5D perspectives on BIM
Vico Software: 4D and 5D perspectives on BIM
 

Viewers also liked

Castellano.abril
Castellano.abrilCastellano.abril
Castellano.abril
Daniel González Uhlending
 
El Primer Mundo Cigars- Exclusive Handrolled Boutique Cigars
El Primer Mundo Cigars- Exclusive Handrolled Boutique CigarsEl Primer Mundo Cigars- Exclusive Handrolled Boutique Cigars
El Primer Mundo Cigars- Exclusive Handrolled Boutique Cigars
Sean Williams
 
4.2 ariketa praktikoa
4.2 ariketa praktikoa4.2 ariketa praktikoa
4.2 ariketa praktikoa
ansorregi
 
C Slebzak Climate Change in Indigenous Communities
C Slebzak Climate Change in Indigenous CommunitiesC Slebzak Climate Change in Indigenous Communities
C Slebzak Climate Change in Indigenous Communities
Colleen Slebzak
 
General Technique of Third Molar Removal
General Technique of Third Molar RemovalGeneral Technique of Third Molar Removal
General Technique of Third Molar Removal
Andres Cardona
 
Membrana hialina
Membrana hialinaMembrana hialina
الإعاقة لبصرية
الإعاقة لبصريةالإعاقة لبصرية
الإعاقة لبصرية
03442457
 

Viewers also liked (8)

Castellano.abril
Castellano.abrilCastellano.abril
Castellano.abril
 
El Primer Mundo Cigars- Exclusive Handrolled Boutique Cigars
El Primer Mundo Cigars- Exclusive Handrolled Boutique CigarsEl Primer Mundo Cigars- Exclusive Handrolled Boutique Cigars
El Primer Mundo Cigars- Exclusive Handrolled Boutique Cigars
 
4.2 ariketa praktikoa
4.2 ariketa praktikoa4.2 ariketa praktikoa
4.2 ariketa praktikoa
 
C Slebzak Climate Change in Indigenous Communities
C Slebzak Climate Change in Indigenous CommunitiesC Slebzak Climate Change in Indigenous Communities
C Slebzak Climate Change in Indigenous Communities
 
All
AllAll
All
 
General Technique of Third Molar Removal
General Technique of Third Molar RemovalGeneral Technique of Third Molar Removal
General Technique of Third Molar Removal
 
Membrana hialina
Membrana hialinaMembrana hialina
Membrana hialina
 
الإعاقة لبصرية
الإعاقة لبصريةالإعاقة لبصرية
الإعاقة لبصرية
 

Similar to 3 dplus2d rev2

BIM workflow for construction
BIM workflow for constructionBIM workflow for construction
BIM workflow for construction
Cesare Caoduro
 
BIM training
BIM training BIM training
BIM training
Sandya Devarajan
 
3 d modeling using bim ppt
3 d modeling using bim ppt3 d modeling using bim ppt
3 d modeling using bim ppt
VEMANA INSTITUTE OF TECHNOLOGY, VTU
 
Cscm group assignment
Cscm group assignmentCscm group assignment
Cscm group assignment
jk tan
 
Difference between cad and bim
Difference between cad and bimDifference between cad and bim
Difference between cad and bim
mariem badr
 
Implementing Building Information Modelling in Construction
Implementing Building Information Modelling in ConstructionImplementing Building Information Modelling in Construction
Implementing Building Information Modelling in Construction
Veetil Digital Service
 
Bim&revit
Bim&revitBim&revit
Bim&revit
Omar Selim
 
CadPros Services - Broucher
CadPros Services - BroucherCadPros Services - Broucher
CadPros Services - Broucher
Aliana Oberoi
 
Revit software - the best tool for an architect
Revit software - the best tool for an architectRevit software - the best tool for an architect
Revit software - the best tool for an architect
NetCom Learning
 
Revit Online Training courses-BES.pdf
Revit Online Training courses-BES.pdfRevit Online Training courses-BES.pdf
Revit Online Training courses-BES.pdf
irfanakram32
 
Bim4T: Building Information Modelling for Tender in the construction industry.
Bim4T: Building Information Modelling for Tender in the construction industry.Bim4T: Building Information Modelling for Tender in the construction industry.
Bim4T: Building Information Modelling for Tender in the construction industry.
carlobughi
 
Software Assignment
Software AssignmentSoftware Assignment
Software Assignment
ashleyyeap
 
Bim beyond construction project management
Bim beyond construction project managementBim beyond construction project management
Bim beyond construction project management
nibtedu
 
CodeBook at the Conferences
CodeBook at the ConferencesCodeBook at the Conferences
CodeBook at the Conferences
CodeBookUserGroup
 
BIM Modeling in Detailed with Different Levels of Details.pdf
BIM Modeling in Detailed with Different Levels of Details.pdfBIM Modeling in Detailed with Different Levels of Details.pdf
BIM Modeling in Detailed with Different Levels of Details.pdf
Chudasama Outsourcing | AutoCAD Drawing and Drafting Services
 
What does bim mean to you
What does bim mean to youWhat does bim mean to you
What does bim mean to you
Onyema Udeze
 
Software
SoftwareSoftware
Software
Pui Chun Shian
 
5 Benefits of BIM Implementation
5 Benefits of BIM Implementation5 Benefits of BIM Implementation
5 Benefits of BIM Implementation
United-BIM
 
Cv6594 Grounded Collaboration
Cv6594 Grounded CollaborationCv6594 Grounded Collaboration
Cv6594 Grounded Collaboration
Donnie Gladfelter
 
DII p2
DII p2DII p2
DII p2
VitaKrasulya
 

Similar to 3 dplus2d rev2 (20)

BIM workflow for construction
BIM workflow for constructionBIM workflow for construction
BIM workflow for construction
 
BIM training
BIM training BIM training
BIM training
 
3 d modeling using bim ppt
3 d modeling using bim ppt3 d modeling using bim ppt
3 d modeling using bim ppt
 
Cscm group assignment
Cscm group assignmentCscm group assignment
Cscm group assignment
 
Difference between cad and bim
Difference between cad and bimDifference between cad and bim
Difference between cad and bim
 
Implementing Building Information Modelling in Construction
Implementing Building Information Modelling in ConstructionImplementing Building Information Modelling in Construction
Implementing Building Information Modelling in Construction
 
Bim&revit
Bim&revitBim&revit
Bim&revit
 
CadPros Services - Broucher
CadPros Services - BroucherCadPros Services - Broucher
CadPros Services - Broucher
 
Revit software - the best tool for an architect
Revit software - the best tool for an architectRevit software - the best tool for an architect
Revit software - the best tool for an architect
 
Revit Online Training courses-BES.pdf
Revit Online Training courses-BES.pdfRevit Online Training courses-BES.pdf
Revit Online Training courses-BES.pdf
 
Bim4T: Building Information Modelling for Tender in the construction industry.
Bim4T: Building Information Modelling for Tender in the construction industry.Bim4T: Building Information Modelling for Tender in the construction industry.
Bim4T: Building Information Modelling for Tender in the construction industry.
 
Software Assignment
Software AssignmentSoftware Assignment
Software Assignment
 
Bim beyond construction project management
Bim beyond construction project managementBim beyond construction project management
Bim beyond construction project management
 
CodeBook at the Conferences
CodeBook at the ConferencesCodeBook at the Conferences
CodeBook at the Conferences
 
BIM Modeling in Detailed with Different Levels of Details.pdf
BIM Modeling in Detailed with Different Levels of Details.pdfBIM Modeling in Detailed with Different Levels of Details.pdf
BIM Modeling in Detailed with Different Levels of Details.pdf
 
What does bim mean to you
What does bim mean to youWhat does bim mean to you
What does bim mean to you
 
Software
SoftwareSoftware
Software
 
5 Benefits of BIM Implementation
5 Benefits of BIM Implementation5 Benefits of BIM Implementation
5 Benefits of BIM Implementation
 
Cv6594 Grounded Collaboration
Cv6594 Grounded CollaborationCv6594 Grounded Collaboration
Cv6594 Grounded Collaboration
 
DII p2
DII p2DII p2
DII p2
 

More from Zolna Murray

Bam ref
Bam refBam ref
Bam ref
Zolna Murray
 
Zolna murray cu prezi 20
Zolna murray cu prezi  20Zolna murray cu prezi  20
Zolna murray cu prezi 20
Zolna Murray
 
Twinkle little star ven jup parade rev 2
Twinkle little star ven jup parade rev 2Twinkle little star ven jup parade rev 2
Twinkle little star ven jup parade rev 2Zolna Murray
 
Twinkle little star ven jup parade
Twinkle little star ven jup paradeTwinkle little star ven jup parade
Twinkle little star ven jup paradeZolna Murray
 
References to article ozbim 20131215 v2
References to article ozbim 20131215 v2References to article ozbim 20131215 v2
References to article ozbim 20131215 v2Zolna Murray
 
Zolna murray nov 2013 latest portfolio bim
Zolna murray nov 2013 latest portfolio bimZolna murray nov 2013 latest portfolio bim
Zolna murray nov 2013 latest portfolio bimZolna Murray
 
Zolna murray nov 2013 latest portfolio
Zolna murray nov 2013 latest portfolioZolna murray nov 2013 latest portfolio
Zolna murray nov 2013 latest portfolioZolna Murray
 
Zolna murray nov 2013 v2
Zolna murray nov 2013 v2Zolna murray nov 2013 v2
Zolna murray nov 2013 v2Zolna Murray
 
References to article 20131110
References to article 20131110References to article 20131110
References to article 20131110Zolna Murray
 
References to article novotel 3
References to article novotel 3References to article novotel 3
References to article novotel 3Zolna Murray
 
References to article novotel2
References to article novotel2References to article novotel2
References to article novotel2Zolna Murray
 
Adib november 2012 on c
Adib november 2012 on cAdib november 2012 on c
Adib november 2012 on cZolna Murray
 
References to article legal
References to article legalReferences to article legal
References to article legalZolna Murray
 
References to article conference sponsorship
References to article conference sponsorshipReferences to article conference sponsorship
References to article conference sponsorshipZolna Murray
 
Losefacetosavebutt swire2
Losefacetosavebutt swire2Losefacetosavebutt swire2
Losefacetosavebutt swire2Zolna Murray
 
Losefacetosavebutt swire
Losefacetosavebutt swireLosefacetosavebutt swire
Losefacetosavebutt swireZolna Murray
 
References to article hl gvs afh
References to article hl gvs afhReferences to article hl gvs afh
References to article hl gvs afhZolna Murray
 
Mma intro v2 20130909
Mma intro v2 20130909Mma intro v2 20130909
Mma intro v2 20130909Zolna Murray
 
The alternative bim triangle
The alternative bim triangleThe alternative bim triangle
The alternative bim triangleZolna Murray
 

More from Zolna Murray (20)

Bam ref
Bam refBam ref
Bam ref
 
Zolna murray cu prezi 20
Zolna murray cu prezi  20Zolna murray cu prezi  20
Zolna murray cu prezi 20
 
Twinkle little star ven jup parade rev 2
Twinkle little star ven jup parade rev 2Twinkle little star ven jup parade rev 2
Twinkle little star ven jup parade rev 2
 
Twinkle little star ven jup parade
Twinkle little star ven jup paradeTwinkle little star ven jup parade
Twinkle little star ven jup parade
 
Project tpo 2
Project tpo 2Project tpo 2
Project tpo 2
 
References to article ozbim 20131215 v2
References to article ozbim 20131215 v2References to article ozbim 20131215 v2
References to article ozbim 20131215 v2
 
Zolna murray nov 2013 latest portfolio bim
Zolna murray nov 2013 latest portfolio bimZolna murray nov 2013 latest portfolio bim
Zolna murray nov 2013 latest portfolio bim
 
Zolna murray nov 2013 latest portfolio
Zolna murray nov 2013 latest portfolioZolna murray nov 2013 latest portfolio
Zolna murray nov 2013 latest portfolio
 
Zolna murray nov 2013 v2
Zolna murray nov 2013 v2Zolna murray nov 2013 v2
Zolna murray nov 2013 v2
 
References to article 20131110
References to article 20131110References to article 20131110
References to article 20131110
 
References to article novotel 3
References to article novotel 3References to article novotel 3
References to article novotel 3
 
References to article novotel2
References to article novotel2References to article novotel2
References to article novotel2
 
Adib november 2012 on c
Adib november 2012 on cAdib november 2012 on c
Adib november 2012 on c
 
References to article legal
References to article legalReferences to article legal
References to article legal
 
References to article conference sponsorship
References to article conference sponsorshipReferences to article conference sponsorship
References to article conference sponsorship
 
Losefacetosavebutt swire2
Losefacetosavebutt swire2Losefacetosavebutt swire2
Losefacetosavebutt swire2
 
Losefacetosavebutt swire
Losefacetosavebutt swireLosefacetosavebutt swire
Losefacetosavebutt swire
 
References to article hl gvs afh
References to article hl gvs afhReferences to article hl gvs afh
References to article hl gvs afh
 
Mma intro v2 20130909
Mma intro v2 20130909Mma intro v2 20130909
Mma intro v2 20130909
 
The alternative bim triangle
The alternative bim triangleThe alternative bim triangle
The alternative bim triangle
 

Recently uploaded

COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
MuhammadTufail242431
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
Kamal Acharya
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
abh.arya
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 

Recently uploaded (20)

COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 

3 dplus2d rev2

  • 1. 1 Digital Platform Based Shop Drawing Management 2D 3D+ = 5Dx (much more)
  • 2. 2 INTRODUCTION: While BIM is all about the ‘I’ of the Information, BIM or no BIM, when it comes to Construction Information Management, one issue keeps failing to get enough attention: The workflow of producing and managing shop-drawings by numerous construction participants based on design documentation is STILL done in a pretty archaic way.
  • 3. 3 Unresolved Issues bypass the Shop-Drawing process Regardless of the skills and qualifications of the assessors, or even time spent on these exercises, experience shows, that there is an unfortunately large number of issues buried within these shop drawings, that do not get unearthed in the assessment process and end up going to the construction to be resolved on site. The shop-drawings, that end up used for building off are still, 2D based drawings (regardless of their origin) and get assessed and approved (or rejected, corrected and then approved) by client-appointed parties, in a tedious, long-winded way before they are let to proceed to construction.
  • 4. 4 A Possible SOLUTION: While a truly functional BIM would probably fix these problems, the strategy described here is by no means a ‘pure BIM approach’ but rather a ‘hybrid’ one.
  • 5. 5 An Example: For the example to explain the methodology on, a set of buildings is used, part of a development completed a couple of years ago, where the number of shop-drawings created went into thousands. (in fact close to or OVER 20 thousand! Or was it 35.000+?) If all the shop- drawings were piled up the paper tower would be this high!
  • 6. 6 The Approach: DIGITAL 2D + 3D PLATFORM The assessment team (appointed by the client) is expanded from the usual cocktail of specialist-engineers with a new position, that of the Virtual Assessment Model Manager. This person will work closely with all the individual discipline engineers, but also manage the Platform, the center feature of the Digital Project Environment.
  • 8. 8 2D + 3D (ghost framework) At the outset of the project, the Manager sets up the ‘ghost structure’ within the platform. This structure has the digital equivalents of the key spatial drivers of the ‘real’ project, grids, stories and the positions of section and elevation lines matching the ones on the drawings. The main elements of the ghost framework are grids, sub-grids, section-elevation lines and stories. These combined define the 3 dimensional skeleton of the project. It is important to understand that these elements are intelligent objects, not just lines, circles and text. It is the digital skeleton of the building and it is critical for it to be as accurate as it is possible.
  • 9. 9 NOT just anywhere! The next step is to feed onto this Digital Platform the shop-drawings as they become available. There is no hard rule on the order of imports, but it is logical to follow that of the construction’s needs, so starting with foundation drawings makes sense. As the shop drawings arrive, the Model Manager places the sheets within the ‘correct place’ of the Virtual Environment on the Digital Platform. Plans over the appropriate grids, elevations, sections in the right planes, specific details in their original positions.
  • 10. 10 While not all drawings can be placed in a specific spatial position (i.e. typical, generic details, schedules etc) there is always area within the Digital Environment for these to be stored and referenced from. The Model Manager, given the correct software has numerous tools to assist the work with large number of drawings, going into hundred and even thousand, including filters, layers, views and work spaces.
  • 11. 11 Coordination: 11 The Model and the Digital Platform are continuously available to all assessors, so they can review these drawings almost as soon as they have been placed within the Platform. Drawings from one discipline can be referenced to each other or against other discipline straight from the beginning of the populating of the Digital Environment.
  • 12. 12 Problems Get Resolved within the DE
  • 13. 13 Unresolved Design: ! Coloured if fully defined ! Red if subject to any question 13
  • 15. 15 Design Changes Tracked + 38m solid walls + double the no of fittings + 44m2 extra flooring and ceiling + 7 (9) extra doors (light partitioning Removed)
  • 16. 16 BOQ Related Issues Identified
  • 17. 17 2D + 3D Parallel with the placement of received shop-drawings, the Model Manager creates the virtual model of the building(s) itself on the Platform, constructing it up in a similar sequence to that of the real construction. This developing model is another feedback to the accuracy and completeness of the shop- drawings and provides up-to date information to the assessors to act on in a timely manner. The beauty of the Platform is that one can have numerous buildings in one file or closely referenced to each other as well as it all been centrally located and updated.