1 Siva Dodd_CV_Subsea OIRM Sr. MSV Rep | Reliance Industries Ltd.
CURRICULUM VITAE
SIVA KUMAR DODDI; Sr. Engineer-Subsea, CSWIP 3.4U; MARRIED, 33years – Indian
Residence: KAKINADA – AP – INDIA
E-mail: sivakumar.doddi@gmail.com
Mobile: +91 9849863204
SUBSEA Sr. ENGINEER/CLIENT OFFSHORE REPRESENTATIVE
PROFILE :
A graduate Chemical engineer and CSWIP 3.4U with eleven and half years of experience in up Stream and down
Stream Oil and Gas industry with in-depth knowledge of control room operations and offshore support DP vessels,
subsea structures,ROV tools, ROV interfaces of subsea structures, subsea IRM with hands on experience in a large
scale deep water oil & gas field commissioning. Presently associated with Reliance Industries limited in the role
ofClient Rep on board MSV Island Pride. Being in Reliance Industries in the capacity of MSV Client Rep,I have
worked with project companies and contractors Allseas, Technip, Halliburton, Aker-Kvaerner,Canyon, Olympic,
LOC, AGR, Oceaneering to name a few.
SKILL SET :
Knowledge of project construction and commissioning, Subsea Intervention, Subsea Inspection, ROV tooling,
Subseahardware, ROVinterfaces, ROVoperations and access studies,Sea fastening techniques,Offshore lifting,
DP vessels operations and contract management.
EXPERTISE:
8 years working in Oil & Gas E&P Industry, my career spanned into various disciplines of the deep water oil and
gas industry such as Project Engineering, Subsea construction, Subsea OIRM (Operations, Inspection, Repair and
Maintenance), MSV Client Representative, ROV vessel contract management with responsibilities held for XMT
installation and retrieval, Rigid Spool Installation, Pre-commissioning, ROV interventions, Subsea hook-ups, Tie-
ins, jacket inspections, CP FG survey and field baseline inspection with main involvement has predominantly been
in Subsea OIRM.
Having knowledge and work experience of various ROV interface tooling for subsea intervention such as Tree
running tool, SCM running tool, FLOT, LAOT, Venting stab plates, Torque tools and inspection equipment such as
Profiler, pipe tracker,Bathymetry, sonar etc with working knowledge of Visual soft. Having OIRM experience on
horizontal XMTs 5” and 7”,Manifolds, DWPLEM,Subsea Distribution Assemblies, Infield flow lines and umbilical,
risers, CRP jacket etc. with knowledge of ROV access and interfaces.
Currently associated with Reliance Industries limited in the position of Client Representative/Subsea OIRM Sr.
Client Rep onboard MSVIsland Pride; a DPclass II vesselequipped with 140te AHCcrane and 2 off OI Millennium
Plus 150HP work class ROVs rated up to 3000mtrs water depth. MSV Island Pride is under Reliance charter since
Nov 2015 for OIRM support in D1D3 deep water gas field and MAD6 deep water oil field of KGD6 block located
off east coast of India.
2 Siva Doddi_CV_Subsea OIRM Sr. Engineer | Reliance Industries Ltd.
QUALIFICATIONS:
GRADUATE CHEMICAL ENGINEER, B.Tech – 2004 – Andhra University - INDIA.
CSWIP 3.4U – Aug 2013 – TWI, Chennai - INDIA
PERSONAL DETAILS:
Nationality : Indian
DOB : 15th May’81
Marital Status : Married
Passport : J4348763
Expected Salary : Negotiable
Notice Period : Negotiable
PROFESSIONAL EXPERIENCE:
RELIANCE INDUSTRIES LIMITED E&P – KGD6 Project - INDIA
KGD6 D1D3 Field consisted of 18 gas producing wells at a water depth ranging from 531 m to 1151 m,
tied back to 6 manifolds through 8inch and 10inch pipelines. The 6 manifolds are clustered again to a Deep
water pipeline end module (DWPLEM) at a water depth of 597m. The DWPLEM is connected to 2 off
24inch trunk lines to transport the gasto a Control and riser platform and there on to onshore terminal.Subsea
facilities are controlled from onshore terminal through a multiplexed optical/electro/hydraulic control system
comprising umbilical, UDA, SDA, and SCM located on each well, manifold and on DWPLEM.
KGD6 MA Fieldconsistedof 7 wells tied back to production manifold which is connected to a turret moored
FPSO through flexible risers. Oil is separated and stored on FPSO for offloading and Gas is exported to
onshore terminal through export manifold after compression on FPSO.
Principal Responsibilities
 Manage vesselday to day operations in coordination with Subsea Integrity, Intervention, hardware,controls,
operations and Planning Engineer.
 Responsible for execution, supervision and control of all Subsea intervention and inspection tasks under
OIRM Work scope such as inspections of subsea assets, replacement of faulty equipment and subsequent
function testing, annual field integrity inspections, Platform jacket inspections, start up and shut down
activities, periodic partial stroke testing of SSIVs.
 Develop SOPs for subsea intervention and inspection jobs and participate in review and edit Company’s
WIs, procedures.
 Prepare Field Anomaly Reports and advise corrective actions for any identified anomalies
 Develop guideline and execute periodical inspection schedule for subsea pipelines, umbilicals, Debris caps,
well heads, platform jacket, and other subsea structures in conjunction with Integrity engineer
 Maintain valve master data and Master Valve status sheet
3 Siva Doddi_CV_Subsea OIRM Sr. Engineer | Reliance Industries Ltd.
 Plan and co-ordinate preventive maintenance of various ROV tooling in conjunction with Hardware
Engineer and prepare Tooling Anomaly Report for faulty tools
 Identify requirement for tools and equipment and plan, schedule, execute mobilization and demobilization
activities
 Participate in SIT/SAT and ROV access studies
 Evaluate technical and work execution issues on the vessel with Contractor and contribute to their resolution
at the vessel level as and when required
 Review and approve Contractor’s deliverable like daily progress Report, WI reports, Project Field reports,
NCRs, baseline inspection charts etc.
 Verify and ensure that Contractor constantly meet the standards set by COMPANY HSEMS objectives
 Actively participate in Safety observation programme to promote safe work culture on board MSV
 Participate in HSE audit of contracted vessel to ensure certification and correct class are maintained
 Initiate SIMOPS, HAZID, RA and tool box talk meetings with ROV and deck crew onboard prior to
commence any job within the OIRM work scope. Conduct lessons learnt meetings and feed the comments
back to onshore subsea team.
 Prepare monthly Job summary bifurcation and HSE reports and submit on schedule
 Act as single point of contact for onshore team with Contractors
 Mentoring Junior RIL Representatives to keep on succession programme
Experience Details
 Nov 2015/Till Date - KGD6 D1D3 Field & KGD6 MA field - INDIA –Working on board MSVIsland
Pride in the role of Sr. Client Rep (Deep water field) - Reporting to Head Subsea maintenance
 Sep2015/Nov2015-KGD6SubseaO&M-INDIA - Project management – De-hiring and de-mobilization
of MSV Olympic Canyon; Contract Change order, SOW and Mobilization of OI Magnum 78 ROV on
Greatship Dipti, Mobilization and on hiring of MSV Island Pride
 Apr 2010/Sep2015–KGD6D1D3Field& KGD6 MAfiled-INDIA–Working onboardMSVOlympic
Canyon in the role of Client Rep (Deep water field)- Reporting to Head Subsea operations – Supervision
Inspection, Repair, Maintenance and intervention tasks inD1D3 Gas Field and MAD6 Oil field located off
east coast India. Contract management and responsible for the safe and efficient operations of the ROV
vessel, ensuring contractual compliance by the contractor, directing day to day operations and coordinating
RIL resources and services to ensure the vessel meets its scheduled operational obligations of KGD6 deep
water project.
 Apr 2009/ Apr 2010 –KGD6 D1D3 Field & KGD6 MA filed - INDIA –Working on board MSV
Olympic Canyon in the role of Jr. RIL Representative (Deep water field)- Reporting to Client Rep –
4 Siva Doddi_CV_Subsea OIRM Sr. Engineer | Reliance Industries Ltd.
Coordinating Inspections, maintenance repair and intervention tasks inD1D3 Gas Field and MAD6 Oil field
located off east coast India.
 Sep 2008 / Apr 2009 – KGD6 D1D3 Field (Deep water field) - INDIA – Offshore Project Engineer on
board MSV Olympic Canyon – Reporting to Head Subsea – Coordinating installation of 5 inch and 7 inch
horizontal XMTs, supervising pre commissioning activities flooding, gauging and testing of infield flow
lines and commissioning of D1D3 gas field. Core team member in offshore operations team for first gas
from D1D3.
 Apr 2008 to Sep 2008 –KGD6 MA Field (Deepwater field) – INDIA –Offshore Project Engineer on
board MSV Olympic Canyon - Reporting to Head Subsea–supervised STP buoy hook-up with FPSO
Dhirubhai1 and pre-commissioning/commissioning activities for MAD6 oil field start-up.
 Mar 2008 – Offshore Project Engineer – DSV Relsagar – Sikka port Jamnagar-India-Reporting to
Head marine projects – Coordinating diving operations for SPM hook up with VLCCs.
 Aug 2006/Feb 2008 – IPCL Gandhar Petrochemical Complex – INDIA – DCS (Distributed Control
System) Control Panel Engineer VCM plant - Reporting to Head of Operations – responsible for the
control room panel operations and coordination of maintenance and field repairs works, controlling plant
operations by using TATA Honeywell TDC 3000 DCS programme, Operating and troubleshooting
experience of Furnace, Distillation columns, pumps, compressors, furnaces,incinerator, boiler and vacuum
systems.
 Apr 2005 to Aug 2006 – Nagarjuna Agrichem Ltd – India – Joined as Graduate Engineer Trainee (GET)
production and has beenconfirmed asShift Engineer Production aftersuccessfulcompletion of probationary
period.
 Aug 2004 to Jan 2005 – Hindustan Zinc limited – India – Graduate Apprentice Trainee (GAT)
ACHIEVEMENTS & KEY PROJECTS HANDLED:
 KGD6-D1/D3 Gas Field –Core Team Member in Installation / Pre-commissioning/
Commissioning/Startup/Steady State Operation. The field is designed for producing 120MMSCMD of gas
with 18 wells in the first phase. The water depth of the wells varies from 800m to 1200m from MSL to sea
bed.
 MA-D6-Oil Field - Core Team Member in Pre-commissioning and Commissioning, The field is designed
for producing 60,000 BOPD of Oil with 7 wells in the first/Second phase including 1 Gas Injection Well
through FPSO.
5 Siva Doddi_CV_Subsea OIRM Sr. Engineer | Reliance Industries Ltd.
 MAD6 – Phase II construction and commissioning – Successfully completed MSV Mobilization for MA-
D6 phase II project on schedule which involved installation of XMT and relocation of UTA from WPF to
XMT on two oil wells.
 Developed various management tools for effective management of the vesselto improve vessel operational
efficiency.
 Team member of XMT Remedial works project: Involved 8” jumper retrieval, UTA relocation to WPF and
XMT retrieval for remedial works on Tubing Hanger and subsequent installation of XMT and re-instate
jumper and Umbilical connections.
 Part of Project team for MA8 (W6) development in MAD6 field which consisted successful completion of
XMT installation, umbilical and flow line Tie in, pressure testing and commissioning of the well.
 Team member of production manifold CIU change out with modified EDB with no production downtime
 Member of Crisis management team for Emergency well control
 Consistently appraised with performance rating “Exceeds Expectation” in last four years
 Significant contribution in trouble shooting and operation of stuck quarter turn gate valves subsea on various
structures
 SDA MEG Bypass project equipment SIT
 Part of Project team for B7 Sub construction and commissioning in D1D3 field which consisted successful
completion of XMT installation, umbilical and Flow Line Jumper Tie in, pressure testing and commissioning
of the well
 MSV Olympic Canyon De hiring and De mobilization
 Greatship Dipti Mobilization with Magnum 78 work class ROV
 MSV Island Pride Mobilization and On hiring for KGD6 OIMR project
Current Projects undertaken:
 Team member of SDA Meg bypass project, representative from MSV in SIT and SRT.
LANGUAGES:
 English (fluent);
 Hindi (native)
 Telugu (native)
TRAINING & CERTIFICATIONS:
 CSWIP 3.4U under water inspection controller
 ROV tooling training
 Flow assurance and well performance trainings
6 Siva Doddi_CV_Subsea OIRM Sr. Engineer | Reliance Industries Ltd.
 Well intervention training (In house)
 IMO level 1 oil pollution response and preparedness at Indian Coast Guard, Chennai
 Helicopter Underwater Egress training (In date)
 Offshore Medical (In date)
REFERENCES:
 Mr. Neil Forbes
Contact details can be provided upon request
 Mr. Eduardo Mello
Contact details can be provided upon request
SIVA KUMAR DODDI

201601 SIVA DODDI_CV_Sr MSV Rep

  • 1.
    1 Siva Dodd_CV_SubseaOIRM Sr. MSV Rep | Reliance Industries Ltd. CURRICULUM VITAE SIVA KUMAR DODDI; Sr. Engineer-Subsea, CSWIP 3.4U; MARRIED, 33years – Indian Residence: KAKINADA – AP – INDIA E-mail: sivakumar.doddi@gmail.com Mobile: +91 9849863204 SUBSEA Sr. ENGINEER/CLIENT OFFSHORE REPRESENTATIVE PROFILE : A graduate Chemical engineer and CSWIP 3.4U with eleven and half years of experience in up Stream and down Stream Oil and Gas industry with in-depth knowledge of control room operations and offshore support DP vessels, subsea structures,ROV tools, ROV interfaces of subsea structures, subsea IRM with hands on experience in a large scale deep water oil & gas field commissioning. Presently associated with Reliance Industries limited in the role ofClient Rep on board MSV Island Pride. Being in Reliance Industries in the capacity of MSV Client Rep,I have worked with project companies and contractors Allseas, Technip, Halliburton, Aker-Kvaerner,Canyon, Olympic, LOC, AGR, Oceaneering to name a few. SKILL SET : Knowledge of project construction and commissioning, Subsea Intervention, Subsea Inspection, ROV tooling, Subseahardware, ROVinterfaces, ROVoperations and access studies,Sea fastening techniques,Offshore lifting, DP vessels operations and contract management. EXPERTISE: 8 years working in Oil & Gas E&P Industry, my career spanned into various disciplines of the deep water oil and gas industry such as Project Engineering, Subsea construction, Subsea OIRM (Operations, Inspection, Repair and Maintenance), MSV Client Representative, ROV vessel contract management with responsibilities held for XMT installation and retrieval, Rigid Spool Installation, Pre-commissioning, ROV interventions, Subsea hook-ups, Tie- ins, jacket inspections, CP FG survey and field baseline inspection with main involvement has predominantly been in Subsea OIRM. Having knowledge and work experience of various ROV interface tooling for subsea intervention such as Tree running tool, SCM running tool, FLOT, LAOT, Venting stab plates, Torque tools and inspection equipment such as Profiler, pipe tracker,Bathymetry, sonar etc with working knowledge of Visual soft. Having OIRM experience on horizontal XMTs 5” and 7”,Manifolds, DWPLEM,Subsea Distribution Assemblies, Infield flow lines and umbilical, risers, CRP jacket etc. with knowledge of ROV access and interfaces. Currently associated with Reliance Industries limited in the position of Client Representative/Subsea OIRM Sr. Client Rep onboard MSVIsland Pride; a DPclass II vesselequipped with 140te AHCcrane and 2 off OI Millennium Plus 150HP work class ROVs rated up to 3000mtrs water depth. MSV Island Pride is under Reliance charter since Nov 2015 for OIRM support in D1D3 deep water gas field and MAD6 deep water oil field of KGD6 block located off east coast of India.
  • 2.
    2 Siva Doddi_CV_SubseaOIRM Sr. Engineer | Reliance Industries Ltd. QUALIFICATIONS: GRADUATE CHEMICAL ENGINEER, B.Tech – 2004 – Andhra University - INDIA. CSWIP 3.4U – Aug 2013 – TWI, Chennai - INDIA PERSONAL DETAILS: Nationality : Indian DOB : 15th May’81 Marital Status : Married Passport : J4348763 Expected Salary : Negotiable Notice Period : Negotiable PROFESSIONAL EXPERIENCE: RELIANCE INDUSTRIES LIMITED E&P – KGD6 Project - INDIA KGD6 D1D3 Field consisted of 18 gas producing wells at a water depth ranging from 531 m to 1151 m, tied back to 6 manifolds through 8inch and 10inch pipelines. The 6 manifolds are clustered again to a Deep water pipeline end module (DWPLEM) at a water depth of 597m. The DWPLEM is connected to 2 off 24inch trunk lines to transport the gasto a Control and riser platform and there on to onshore terminal.Subsea facilities are controlled from onshore terminal through a multiplexed optical/electro/hydraulic control system comprising umbilical, UDA, SDA, and SCM located on each well, manifold and on DWPLEM. KGD6 MA Fieldconsistedof 7 wells tied back to production manifold which is connected to a turret moored FPSO through flexible risers. Oil is separated and stored on FPSO for offloading and Gas is exported to onshore terminal through export manifold after compression on FPSO. Principal Responsibilities  Manage vesselday to day operations in coordination with Subsea Integrity, Intervention, hardware,controls, operations and Planning Engineer.  Responsible for execution, supervision and control of all Subsea intervention and inspection tasks under OIRM Work scope such as inspections of subsea assets, replacement of faulty equipment and subsequent function testing, annual field integrity inspections, Platform jacket inspections, start up and shut down activities, periodic partial stroke testing of SSIVs.  Develop SOPs for subsea intervention and inspection jobs and participate in review and edit Company’s WIs, procedures.  Prepare Field Anomaly Reports and advise corrective actions for any identified anomalies  Develop guideline and execute periodical inspection schedule for subsea pipelines, umbilicals, Debris caps, well heads, platform jacket, and other subsea structures in conjunction with Integrity engineer  Maintain valve master data and Master Valve status sheet
  • 3.
    3 Siva Doddi_CV_SubseaOIRM Sr. Engineer | Reliance Industries Ltd.  Plan and co-ordinate preventive maintenance of various ROV tooling in conjunction with Hardware Engineer and prepare Tooling Anomaly Report for faulty tools  Identify requirement for tools and equipment and plan, schedule, execute mobilization and demobilization activities  Participate in SIT/SAT and ROV access studies  Evaluate technical and work execution issues on the vessel with Contractor and contribute to their resolution at the vessel level as and when required  Review and approve Contractor’s deliverable like daily progress Report, WI reports, Project Field reports, NCRs, baseline inspection charts etc.  Verify and ensure that Contractor constantly meet the standards set by COMPANY HSEMS objectives  Actively participate in Safety observation programme to promote safe work culture on board MSV  Participate in HSE audit of contracted vessel to ensure certification and correct class are maintained  Initiate SIMOPS, HAZID, RA and tool box talk meetings with ROV and deck crew onboard prior to commence any job within the OIRM work scope. Conduct lessons learnt meetings and feed the comments back to onshore subsea team.  Prepare monthly Job summary bifurcation and HSE reports and submit on schedule  Act as single point of contact for onshore team with Contractors  Mentoring Junior RIL Representatives to keep on succession programme Experience Details  Nov 2015/Till Date - KGD6 D1D3 Field & KGD6 MA field - INDIA –Working on board MSVIsland Pride in the role of Sr. Client Rep (Deep water field) - Reporting to Head Subsea maintenance  Sep2015/Nov2015-KGD6SubseaO&M-INDIA - Project management – De-hiring and de-mobilization of MSV Olympic Canyon; Contract Change order, SOW and Mobilization of OI Magnum 78 ROV on Greatship Dipti, Mobilization and on hiring of MSV Island Pride  Apr 2010/Sep2015–KGD6D1D3Field& KGD6 MAfiled-INDIA–Working onboardMSVOlympic Canyon in the role of Client Rep (Deep water field)- Reporting to Head Subsea operations – Supervision Inspection, Repair, Maintenance and intervention tasks inD1D3 Gas Field and MAD6 Oil field located off east coast India. Contract management and responsible for the safe and efficient operations of the ROV vessel, ensuring contractual compliance by the contractor, directing day to day operations and coordinating RIL resources and services to ensure the vessel meets its scheduled operational obligations of KGD6 deep water project.  Apr 2009/ Apr 2010 –KGD6 D1D3 Field & KGD6 MA filed - INDIA –Working on board MSV Olympic Canyon in the role of Jr. RIL Representative (Deep water field)- Reporting to Client Rep –
  • 4.
    4 Siva Doddi_CV_SubseaOIRM Sr. Engineer | Reliance Industries Ltd. Coordinating Inspections, maintenance repair and intervention tasks inD1D3 Gas Field and MAD6 Oil field located off east coast India.  Sep 2008 / Apr 2009 – KGD6 D1D3 Field (Deep water field) - INDIA – Offshore Project Engineer on board MSV Olympic Canyon – Reporting to Head Subsea – Coordinating installation of 5 inch and 7 inch horizontal XMTs, supervising pre commissioning activities flooding, gauging and testing of infield flow lines and commissioning of D1D3 gas field. Core team member in offshore operations team for first gas from D1D3.  Apr 2008 to Sep 2008 –KGD6 MA Field (Deepwater field) – INDIA –Offshore Project Engineer on board MSV Olympic Canyon - Reporting to Head Subsea–supervised STP buoy hook-up with FPSO Dhirubhai1 and pre-commissioning/commissioning activities for MAD6 oil field start-up.  Mar 2008 – Offshore Project Engineer – DSV Relsagar – Sikka port Jamnagar-India-Reporting to Head marine projects – Coordinating diving operations for SPM hook up with VLCCs.  Aug 2006/Feb 2008 – IPCL Gandhar Petrochemical Complex – INDIA – DCS (Distributed Control System) Control Panel Engineer VCM plant - Reporting to Head of Operations – responsible for the control room panel operations and coordination of maintenance and field repairs works, controlling plant operations by using TATA Honeywell TDC 3000 DCS programme, Operating and troubleshooting experience of Furnace, Distillation columns, pumps, compressors, furnaces,incinerator, boiler and vacuum systems.  Apr 2005 to Aug 2006 – Nagarjuna Agrichem Ltd – India – Joined as Graduate Engineer Trainee (GET) production and has beenconfirmed asShift Engineer Production aftersuccessfulcompletion of probationary period.  Aug 2004 to Jan 2005 – Hindustan Zinc limited – India – Graduate Apprentice Trainee (GAT) ACHIEVEMENTS & KEY PROJECTS HANDLED:  KGD6-D1/D3 Gas Field –Core Team Member in Installation / Pre-commissioning/ Commissioning/Startup/Steady State Operation. The field is designed for producing 120MMSCMD of gas with 18 wells in the first phase. The water depth of the wells varies from 800m to 1200m from MSL to sea bed.  MA-D6-Oil Field - Core Team Member in Pre-commissioning and Commissioning, The field is designed for producing 60,000 BOPD of Oil with 7 wells in the first/Second phase including 1 Gas Injection Well through FPSO.
  • 5.
    5 Siva Doddi_CV_SubseaOIRM Sr. Engineer | Reliance Industries Ltd.  MAD6 – Phase II construction and commissioning – Successfully completed MSV Mobilization for MA- D6 phase II project on schedule which involved installation of XMT and relocation of UTA from WPF to XMT on two oil wells.  Developed various management tools for effective management of the vesselto improve vessel operational efficiency.  Team member of XMT Remedial works project: Involved 8” jumper retrieval, UTA relocation to WPF and XMT retrieval for remedial works on Tubing Hanger and subsequent installation of XMT and re-instate jumper and Umbilical connections.  Part of Project team for MA8 (W6) development in MAD6 field which consisted successful completion of XMT installation, umbilical and flow line Tie in, pressure testing and commissioning of the well.  Team member of production manifold CIU change out with modified EDB with no production downtime  Member of Crisis management team for Emergency well control  Consistently appraised with performance rating “Exceeds Expectation” in last four years  Significant contribution in trouble shooting and operation of stuck quarter turn gate valves subsea on various structures  SDA MEG Bypass project equipment SIT  Part of Project team for B7 Sub construction and commissioning in D1D3 field which consisted successful completion of XMT installation, umbilical and Flow Line Jumper Tie in, pressure testing and commissioning of the well  MSV Olympic Canyon De hiring and De mobilization  Greatship Dipti Mobilization with Magnum 78 work class ROV  MSV Island Pride Mobilization and On hiring for KGD6 OIMR project Current Projects undertaken:  Team member of SDA Meg bypass project, representative from MSV in SIT and SRT. LANGUAGES:  English (fluent);  Hindi (native)  Telugu (native) TRAINING & CERTIFICATIONS:  CSWIP 3.4U under water inspection controller  ROV tooling training  Flow assurance and well performance trainings
  • 6.
    6 Siva Doddi_CV_SubseaOIRM Sr. Engineer | Reliance Industries Ltd.  Well intervention training (In house)  IMO level 1 oil pollution response and preparedness at Indian Coast Guard, Chennai  Helicopter Underwater Egress training (In date)  Offshore Medical (In date) REFERENCES:  Mr. Neil Forbes Contact details can be provided upon request  Mr. Eduardo Mello Contact details can be provided upon request SIVA KUMAR DODDI