Bid Results for procurement of 215 MW Solar Power by UPNEDAHarish Sharma
As per provision in Solar Policy UPNEDA has declared the Bid Results for procurement of
power from Grid Connect Solar PV Power Projects through Tariff Based Competitive Bidding
Process for total 215 MW capacity on the basis of international competitive bidding in
accordance with the Bidding Guidelines.
Jakson is celebrating 7 decades of its existence and with its heritage of engineering expertise it is empowering people around the nation. Read the article here to discover how the group is powering growth-As appeared in "Business for All" Magazine.
<a />http://www.getaheadofthegames.com/best-portal-games</a>
<a />www.getaheadofthegames.com/best-barbie-games</a>
PROFILE: Sameer Gupta, Managing Director- Jakson GroupJaksonGroup
Sameer Gupta, MD-Jakson Group opens his heart with Business India for their Executive Focus section.
The article talks about his career and how he worked his way to make Jakson Group a leading name today.
Bid Results for procurement of 215 MW Solar Power by UPNEDAHarish Sharma
As per provision in Solar Policy UPNEDA has declared the Bid Results for procurement of
power from Grid Connect Solar PV Power Projects through Tariff Based Competitive Bidding
Process for total 215 MW capacity on the basis of international competitive bidding in
accordance with the Bidding Guidelines.
Jakson is celebrating 7 decades of its existence and with its heritage of engineering expertise it is empowering people around the nation. Read the article here to discover how the group is powering growth-As appeared in "Business for All" Magazine.
<a />http://www.getaheadofthegames.com/best-portal-games</a>
<a />www.getaheadofthegames.com/best-barbie-games</a>
PROFILE: Sameer Gupta, Managing Director- Jakson GroupJaksonGroup
Sameer Gupta, MD-Jakson Group opens his heart with Business India for their Executive Focus section.
The article talks about his career and how he worked his way to make Jakson Group a leading name today.
Manufacturing, Exporting, Supplying and Importing of a vast range of electrical equipments. Well established forms of the domestic industry engaged in providing a huge assortment of electrical equipments to the market. Manufactured at par with the set industry standards.
Solar solution Provided by Dayton Power,Dayton power is solar energy solution provider for home and enterprise.our customize product include solar water pump and solar flour mil.
Official Document of the Madhya pradesh solar policy 2012.
This document is not a work of Headway Solar (http://headwaysolar.com/) and it has been released here for the benefit of the general public.
RfP for tariff based competitive bidding by KREDL for the installation of 240...Harish Sharma
GoK had intended to undertake development of 1200 MW (Twelve Hundred MWs) (AC) solar
PV ground mount power plants in Karnataka to be implemented in 60 Taluks. Tender was floated
for the same and 48 bids for 48 Taluks have been received. As no bids were received for 12
Taluks, it is intended to undertake development of 240 MW (Two Hundred and Forty MW) (AC)
solar PV ground mount power plants in Karnataka to be implemented in 12 Taluks (hereinafter
referred to individually as the “Project” implemented in one Taluk and collectively referred as the
“Projects” implemented in multiple Taluks). GoK, through KREDL, has decided to carry out the
bidding process for selection of the Bidders to whom the Project(s) may be awarded.
A Bidder may submit Bids for developing the Project(s) under solar PV technology (Solar PV
ground mount Project). It is pertinent to mention that a Bidder can propose any number of Projects,
but the minimum capacity of the individual Project proposed by the Bidder shall be at least 3 MW
(AC) per Taluk, and the maximum capacity of the individual Project proposed by the Bidder shall
be limited to 20 MW (AC) per Taluk. However, the maximum capacity to be allotted to any Bidder
including its Parent, Group Business Entity (ies) either bidding as Single Bidder or as a Consortium
shall not exceed the aggregate maximum capacity of 240 MW (AC).
Transforum Sitzung Berlin, Juni 2016 - Translators Without BordersChristian Gericke
Sprache rettet Leben:
Ob Ihr Content Leben retten, Produkte verkaufen oder Kunden helfen soll – die Qualität von Texten ist maßgeblich für den Erfolg
Heutzutage sterben mehr Menschen an dem Mangel an Informationen als an fehlender Medikation. Christian Gericke, European Development Manager, referiert über die Bedeutung von Sprache und humanitären Content in Krisensituationen und die Arbeit von Translators without Borders.
Das Transforum ist ein Ort des Meinungsaustauschs von Repräsentanten der Translationspraxis und -lehre. Es hat das Ziel, den Informationsfluß zwischen Praxis und Lehre in beiden Richtungen zu fördern, um die Qualität von Übersetzungs- und Dolmetschleistungen zu optimieren.
03.06.2016 - 04.06.2016
72. Transforum-Sitzung in Berlin
RfS for Selection of “500 MW Grid Connected Solar Power Projects in Maharasht...Harish Sharma
Solar Energy Corporation of India (SECI) invited RfS document for Selection of “500 MW Grid Connected Solar PV Power Projects in Maharashtra under JNNSM Phase-II Batch-III, Tranche-I”. EnvironmentFirst Energy Services (P) Ltd. is providing every critical knowledge to make the bidding success for the clients.
Scheme for Allocation of Solar Power Projects to Land Owning Farmers in PunjabHarish Sharma
As provided in the NRSE Policy-2012 and subsequent amendment, this scheme is introduced for allocation of Solar Power Projects to the land owning farmers of the state of
Punjab. The Government of Punjab endeavors to promote solar energy projects by land owning farmers with a minimum capacity of 1MWp to a maximum capacity of 2.5 MWp (per land owning farmer) in the state for sale of power to Punjab State Power Corporation Ltd (PSPCL)
The Port of San Diego's parks occupy a total of 153 acres of lavish open space that feature stunning views of the harbor. Each carefully maintained facility offers gorgeous landscaping and parking. For the pleasure of walkers, joggers, bicyclists and skaters, the Port of San Diego has created miles of pathways that weave throughout the parks along the water's edge. For anglers, fishing piers are found in five locations. The parks are also ideal for hosting corporate events, weddings or reunions. So relax, enjoy and come out and play on the waterfront in one of the lovely parks of the Port of San Diego.
2014 PV Distribution System Modeling Workshop: The IEA PVPS Task 14 High penetration PV in Electricity Grids, Roland Bruendlinger, AIT Austrian Institute of Technology
Manufacturing, Exporting, Supplying and Importing of a vast range of electrical equipments. Well established forms of the domestic industry engaged in providing a huge assortment of electrical equipments to the market. Manufactured at par with the set industry standards.
Solar solution Provided by Dayton Power,Dayton power is solar energy solution provider for home and enterprise.our customize product include solar water pump and solar flour mil.
Official Document of the Madhya pradesh solar policy 2012.
This document is not a work of Headway Solar (http://headwaysolar.com/) and it has been released here for the benefit of the general public.
RfP for tariff based competitive bidding by KREDL for the installation of 240...Harish Sharma
GoK had intended to undertake development of 1200 MW (Twelve Hundred MWs) (AC) solar
PV ground mount power plants in Karnataka to be implemented in 60 Taluks. Tender was floated
for the same and 48 bids for 48 Taluks have been received. As no bids were received for 12
Taluks, it is intended to undertake development of 240 MW (Two Hundred and Forty MW) (AC)
solar PV ground mount power plants in Karnataka to be implemented in 12 Taluks (hereinafter
referred to individually as the “Project” implemented in one Taluk and collectively referred as the
“Projects” implemented in multiple Taluks). GoK, through KREDL, has decided to carry out the
bidding process for selection of the Bidders to whom the Project(s) may be awarded.
A Bidder may submit Bids for developing the Project(s) under solar PV technology (Solar PV
ground mount Project). It is pertinent to mention that a Bidder can propose any number of Projects,
but the minimum capacity of the individual Project proposed by the Bidder shall be at least 3 MW
(AC) per Taluk, and the maximum capacity of the individual Project proposed by the Bidder shall
be limited to 20 MW (AC) per Taluk. However, the maximum capacity to be allotted to any Bidder
including its Parent, Group Business Entity (ies) either bidding as Single Bidder or as a Consortium
shall not exceed the aggregate maximum capacity of 240 MW (AC).
Transforum Sitzung Berlin, Juni 2016 - Translators Without BordersChristian Gericke
Sprache rettet Leben:
Ob Ihr Content Leben retten, Produkte verkaufen oder Kunden helfen soll – die Qualität von Texten ist maßgeblich für den Erfolg
Heutzutage sterben mehr Menschen an dem Mangel an Informationen als an fehlender Medikation. Christian Gericke, European Development Manager, referiert über die Bedeutung von Sprache und humanitären Content in Krisensituationen und die Arbeit von Translators without Borders.
Das Transforum ist ein Ort des Meinungsaustauschs von Repräsentanten der Translationspraxis und -lehre. Es hat das Ziel, den Informationsfluß zwischen Praxis und Lehre in beiden Richtungen zu fördern, um die Qualität von Übersetzungs- und Dolmetschleistungen zu optimieren.
03.06.2016 - 04.06.2016
72. Transforum-Sitzung in Berlin
RfS for Selection of “500 MW Grid Connected Solar Power Projects in Maharasht...Harish Sharma
Solar Energy Corporation of India (SECI) invited RfS document for Selection of “500 MW Grid Connected Solar PV Power Projects in Maharashtra under JNNSM Phase-II Batch-III, Tranche-I”. EnvironmentFirst Energy Services (P) Ltd. is providing every critical knowledge to make the bidding success for the clients.
Scheme for Allocation of Solar Power Projects to Land Owning Farmers in PunjabHarish Sharma
As provided in the NRSE Policy-2012 and subsequent amendment, this scheme is introduced for allocation of Solar Power Projects to the land owning farmers of the state of
Punjab. The Government of Punjab endeavors to promote solar energy projects by land owning farmers with a minimum capacity of 1MWp to a maximum capacity of 2.5 MWp (per land owning farmer) in the state for sale of power to Punjab State Power Corporation Ltd (PSPCL)
The Port of San Diego's parks occupy a total of 153 acres of lavish open space that feature stunning views of the harbor. Each carefully maintained facility offers gorgeous landscaping and parking. For the pleasure of walkers, joggers, bicyclists and skaters, the Port of San Diego has created miles of pathways that weave throughout the parks along the water's edge. For anglers, fishing piers are found in five locations. The parks are also ideal for hosting corporate events, weddings or reunions. So relax, enjoy and come out and play on the waterfront in one of the lovely parks of the Port of San Diego.
2014 PV Distribution System Modeling Workshop: The IEA PVPS Task 14 High penetration PV in Electricity Grids, Roland Bruendlinger, AIT Austrian Institute of Technology
Soltech Equipments is among the pioneers of Solar Power in India over the last three decades. Soltech provides comprehensive EPC and O&M services for multi-MW Power Plants, Rooftop PV and Solar Thermal power solutions to Industrial and Domestic consumers. As the Indian channel partner of Canadian Solar Inc., one among the top five solar panel manufacturers in the world, Soltech delivers high-quality, high-performance solar power systems that ensure superior Returns on Investments (ROI). The guiding principle of the Soltech brand culture is centered on delivering excellence through efficiency and complete customer satisfaction.
150 MW Solar RfP by MPPMCL under reverse biddingHarish Sharma
We at EnvironmentFirst Energy Services (P) Limited are helping interested parties in total process of reverse bidding and EPC consulting. The pre bid meeting is proposed on 20th April 2015. Our Indore office is facilitating the bidding process. The brief can be checked at http://www.environmentfirst.in/mp-power-management-company-mppmcl-releases-rfp-for-150-mw-solar-power-plants-through-reverse-bidding-process/
RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...Harish Sharma
As part of JNNSM Phase-II Batch-III, Tranche-VIII, SECI is inviting proposals for setting up of grid connected Solar PV Projects in Himachal Pradesh, on “Build Own Operate” basis for an aggregate capacity of 50 MW. Projects selected based on this RfS shall be given “Viability Gap Funding” in line with terms and conditions of this RfS. SECI shall enter into Power Purchase Agreement (PPA) with the Bidders selected based on this RfS for purchase of solar power selected for a period of 25 years based on the terms, conditions and provisions of the RfS.
Last Date and Time of Closure of Procurement of Tender Documents is 17 June 2016
RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...Harish Sharma
EnvironmentFirst Energy Services Private Limited is helping its clients to facilitate the bid invited by Punjab Energy Development Agency, the state nodal agency for promotion and development of New and Renewable Energy Projects in the State of Punjab. PEDA invites offers from the interested project developers to participate in the selection process for setting up of Biogas Power / Bio CNG from Biogas Project near Tajpur Dairy Complex, Ludhiana, on Build Operate & Own (BOO) basis
RfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESHHarish Sharma
As part of JNNSM Phase-II Batch-III, Tranche-VII, SECI has invited setting up of grid connected Solar PV Projects in Uttar Pradesh, on “Build Own Operate” basis for an aggregate capacity of 160 MW. Projects selected based on this RfS shall be given “Viability Gap Funding” in line with terms and conditions of this RfS. SECI shall enter into Power Purchase Agreement (PPA) with the Bidders selected based on this RfS for purchase of solar power selected for a period of 25 years based on the terms, conditions and provisions of the RfS.
RfS for 35 MW in Puducherry under NSM Ph-II, Batch-IIIHarish Sharma
As part of JNNSM Phase-II Batch-III, Tranche-IX, SECI wishes to invite proposals for setting up of grid connected Solar PV Projects in Puducherry, on “Build Own Operate” basis for an aggregate capacity of 35 MW. Projects selected based on this RfS shall be given “Viability Gap Funding” in line with terms and conditions of this RfS. SECI shall enter into Power Purchase Agreement (PPA) with the Bidders selected based on this RfS for purchase of solar power selected for a period of 25 years based on the terms, conditions and provisions of the RfS.
Last Date for the Closure of Procurement of Tender Documents is 14-Jun-2016 14:00:00 RTZ.
RfP FOR 1000 MW SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III TRANCH...Harish Sharma
Bids are invited for the Selection of “1000 MW Grid Connected Solar PV Projects in Karnataka under JNNSM Phase-II Batch-III, Tranche-V” for Setting up of Solar PV Projects in India on “Build Own Operate” basis and selling the Solar Power to Solar Energy Corporation of India Ltd.(SECI)
Last date for the bid submission is 29/03/2016 up to 14:00 Hrs (IST)
RfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IVHarish Sharma
As a part of NSM Phase-II Batch-IV, Tranche-I, SECI invites proposals for setting up of grid connected Solar PV Projects in Gujarat Solar Park at Charanka, on “Build Own Operate” basis for an aggregate capacity of 250 MW. Projects selected based on this RfS shall be given “Viability Gap Funding” in line with terms and conditions of this RfS. SECI shall enter into Power Purchase Agreement (PPA) with the Bidders selected based on this RfS for purchase of solar power selected for a period of 25 years based on the terms, conditions and provisions of the RfS.
Last Date for the submission of BID Documents is 17-May-2016 14:00:00 RTZ
The largest tender by Solar Energy Corporation of India for Floating Solar for 150 MW is up for bidding.
The document is a summary of the tender document and covers the commercial & technical guidelines provided in the tender.
RFP Document for 300 MW Solar Power Plant in Punjab released by PEDA.
This document is not a work of Headway Solar (http://headwaysolar.com/) and it has been released here for the benefit of the general public.
Request for Proposal (RfP) For Installation of 2 MW Canal Top Grid connecte...Harish Sharma
Request for Proposal (RfP/PV/RREC/Canal top) invited by RREC on behalf of
Water Resource Department, GoR/ IGN Board and Discoms of Rajasthan for selection
of developers for setting up of 2MW Grid connected Solar PV Plant on canal top to
be connected on 11kV level at Discoms 33/11kV Substation in Rajasthan under
Rajasthan Solar Energy Policy, 2014 for sale of power to Rajasthan Discoms
through tariff based competitive bidding process. "EnvironmentFirst Energy Services Pvt. Ltd." is facilitating the bid documentation for the successful project allocation. You contact us at info@environmentfirst.in
MYC introduces one window solution to power sector clients including Financial ,Technical & Legal services providing ease and convenience at affordable price.
O&M and Troubleshooting Hydro Power PlantsMarcep Inc.
Today's biggest for Hydro Power Plants O&M issues
Operations and maintenance personnel at hydroelectric facilities face significant issues. Among these is
the fact that these facilities are aging at the same time that technology is changing substantially. In
addition, at many older hydro plants, equipment may be upgraded a piece at a time. Over the years, this
means a facility can contain a mix of old and new equipment, which may have different operational and/or
maintenance requirements.
In addition, the hydroelectric plant workforce is aging, which causes a two-fold problem. First, these older
plants need significant upgrade work at the same time as many experienced personnel are planning their
retirements. Second, retiring employees are taking with them valuable expertise, with little time available to
transfer this experiential learning to the next generation of plant workers.
Similar to 150 MW Solar bid in Madha Pradesh (India) 2015 (20)
MNRE Clarification on the capacity with respect to inverter and eligibility o...Harish Sharma
MNRE Clarification on the eligibility of CFA for rooftop solar plants (with or without net metering/gross metering facility) and for declaring commissioned plant capacity w.r.t installed inverter capacity.
MNRE Guidelines for off-grid and grid connected Solar DC SystemHarish Sharma
Guidelines for off-grid and grid connected Solar DC System installed under programs of Ministry. These guidelines even are advised to be followed by systems which are not being implemented under any ministry scheme.
Future of solar Power Projects in IndiaHarish Sharma
As of 6th April 2017 the country's solar grid had a cumulative capacity of 12.28 gigawatts (GW) compared to 6.76 GW at the end of March 2016. To achieve the targets of year 2022 and 2030 the solar industry would have to grow by leaps and bounds.
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...Harish Sharma
MNRE launched a pilot scheme for promotion of large scale grid-connected roof top solar PV projects and SECI has been designated as implementing agency for this scheme. The generated solar power may be utilized for captive application and the surplus power may be fed to the grid. The scheme aims to reduce the fossil fuel based electricity and make buildings self-sustainable from the point of electricity, to the extent possible.
The bidding process under this rooftop scheme is for 250 MWp capacity under PART-A (CAPEX Only); 200 MWp capacity under PART-B (RESCO Only) and 50 MWp under Part C (CAPEX Only), in different States of India. Bidder shall submit bids for the minimum aggregate bid capacity of 500 kWp under PART- A, 5 MWp and under PART-B and 100 kWp under Part C.
BID DUE DATE
The Bidder should submit the Bids so as to reach the address indicated below by 1430 hrs (IST) on or before 03/06/2016.
RfP invited for setting up 1200 MW Solar PV by Jharkhand Renewable Energy Dev...Harish Sharma
Online Bids are invited by Jharkhand Renewable Energy Development Agency (JREDA) from eligible Bidders to participate in the bidding process for Setting up of 1200 MW Grid connected Solar PV projects to be established in the State of Jharkhand by Solar Project Developers and supply of Solar Power at the Delivery Point for a period of 25 years from the Scheduled Commissioning Date in accordance with the terms of the Power Purchase Agreement (PPA) to be entered with JBVNL.
Setting up of Grid Connected Solar PV Projects of Total Capacity 1200 MW as per following Categories:
200 MW for Category - I: 1 - 25 MW size projects
1000 MW for Category – II: 26 - 500 MW size projects
Important Highlights of the Bid Documents are given below
1. Period of downloading of RFP Documents: From 07.12.2015 at 12:00 Noon till 10.01.2016 at 05:00 PM
2. Last date & time for receipt of online bids and submission of hard copies of DD’s & BG: 11.01.2016 upto 05:00 PM (Monday)
3. Technical Bid Opening Date: 12.01.2016 at 03:30 PM (Tuesday)
For more details and bid assistance you can contact us at info@environmentfirst.in
RfP for 1200 MW SOLAR POWER PROJECTS IN KARNATAKAHarish Sharma
RfP under competitive bidding is requested by Karnataka Renewable Energy Development Limited (“KREDL” ) incorporated under the Companies Act, 1956 is a nodal agency of the Government of Karnataka (“GoK”) to facilitate the development of renewable energy in Karnataka.
GoK intends to undertake development of a 1,200 MW (
One thousand and two hundred MW) (AC) solar PV ground mount power plants in Karnataka to be implemented in 60 Taluks (hereinafter referred to individually as the “
Project” implemented in one Taluk and collectively
referred as the “Projects” implemented in multiple Taluks
). GoK, through KREDL, has decided to carry out the bidding process for selection of the Bidders to whom the Project(s) may be awarded.
Solar Power Scheme for Unemployed Youth and Farmers in Himachal Pradesh.Harish Sharma
Himachal Pradesh State Electricity Board Limited to ensure the sustainable growth of Renewal Power is willing to procure solar power from such power producers who wish to install distributed grid connected Solar Projects in the State of Himachal Pradesh with capacities starting 50 kW up to
5 MW.
Rfp for tariff based competitive bidding for upto 170 mw solar power plant by...Harish Sharma
Request for Proposal (hereinafter referred to as RFP) for procurement of power from cumulative
170 MW installed capacity Grid Connect Solar PV Power Projects through Tariff Based
Competitive Bidding Process under Type-I of “Solar Power Policy 2013 of the State of
Uttarakhand”.
On behalf of Uttarakhand Power Corporation Ltd. (UPCL), Dehradun – a Company incorporated
in India and registered under the Companies Act, 1956.
Water Benefit Certificates
(AN OPPORTUNITY FOR INDUSTRIAL, RESIDENTIAL, AGRICULTURE, HORTICULTURE, INSTITUTIONAL WATER EFFICIENT AND WASTE WATER TREATMENT PROJECTS)
The Water Benefit Standard is a results-based finance mechanism to drive funding for water supply, purification and conservation projects. These projects help maintain the water balance within a watershed, encourage local stakeholder engagement and consultation, promote sustainable development, ensure environmental integrity and prepare water users to contend with a world of increasing water scarcity.
Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...Harish Sharma
The Scope of these Guidelines is to provide the necessary policy framework and mechanism for selection and implementation of 2000 MW Grid-connected solar PV power projects with Viability Gap Funding under Phase-II, Batch-III of JNNSM. These guidelines are independent and will have no bearing on the projects already selected under earlier schemes of NSM Phase-I & Phase-II (State Specific Viability gap funding scheme).
Draft scheme for allocation of solar power projects for land owning farmersHarish Sharma
After inviting EOI from land owning farmers for the set up of solar power projects of the tune from 1MW to 2.5MW, PEDA has now formulated draft scheme for allocation of solar power projects in Punjab.
“REVIVAL OF THE OPERATIONS OF EXISTING BIOMASS POWER & SMALL HYDRO POWER PROJECTS AFFECTED DUE TO UNFORSEEN CIRCUMSTANCES” The scheme aims to revive the operations of the existing Biomass Power & Small Hydro Power projects by bringing down the cost of funds for these projects by providing refinance at concessional rates of interest, with funds sourced from the National Clean Energy Fund (NCEF).
LOAN SCHEME FOR FINANCING GRID CONNECTED ROOFTOP SOLAR PV POWER PROJECTS Harish Sharma
IREDA Loan scheme is for all Solar rooftop power projects having minimum aggregate/Individual installed capacity 1000 kWp. Finance is available upto 75% of project cost with very Low interest rates range from 9.9% to 10.75%.
Net metering requirements in punjab for grid interactive rooftop SPV Power PlantHarish Sharma
All the consumers of the State Distribution licensee or PSPCL who intend to encourage solar energy and set up solar PV plants at available places on roof-tops of Individual households, industries, Government or Semi-Government or Local Body offices, commercial establishments, institutions, residential complexes shall be eligible with project capacity ranging from minimum 1 KWp upto 1MWp (AC side) with or without battery back-up support. Consumers may generate solar power for self consumption and may feed excess power into the grid to be adjusted.
Hierarchical Digital Twin of a Naval Power SystemKerry Sado
A hierarchical digital twin of a Naval DC power system has been developed and experimentally verified. Similar to other state-of-the-art digital twins, this technology creates a digital replica of the physical system executed in real-time or faster, which can modify hardware controls. However, its advantage stems from distributing computational efforts by utilizing a hierarchical structure composed of lower-level digital twin blocks and a higher-level system digital twin. Each digital twin block is associated with a physical subsystem of the hardware and communicates with a singular system digital twin, which creates a system-level response. By extracting information from each level of the hierarchy, power system controls of the hardware were reconfigured autonomously. This hierarchical digital twin development offers several advantages over other digital twins, particularly in the field of naval power systems. The hierarchical structure allows for greater computational efficiency and scalability while the ability to autonomously reconfigure hardware controls offers increased flexibility and responsiveness. The hierarchical decomposition and models utilized were well aligned with the physical twin, as indicated by the maximum deviations between the developed digital twin hierarchy and the hardware.
HEAP SORT ILLUSTRATED WITH HEAPIFY, BUILD HEAP FOR DYNAMIC ARRAYS.
Heap sort is a comparison-based sorting technique based on Binary Heap data structure. It is similar to the selection sort where we first find the minimum element and place the minimum element at the beginning. Repeat the same process for the remaining elements.
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...ssuser7dcef0
Power plants release a large amount of water vapor into the
atmosphere through the stack. The flue gas can be a potential
source for obtaining much needed cooling water for a power
plant. If a power plant could recover and reuse a portion of this
moisture, it could reduce its total cooling water intake
requirement. One of the most practical way to recover water
from flue gas is to use a condensing heat exchanger. The power
plant could also recover latent heat due to condensation as well
as sensible heat due to lowering the flue gas exit temperature.
Additionally, harmful acids released from the stack can be
reduced in a condensing heat exchanger by acid condensation. reduced in a condensing heat exchanger by acid condensation.
Condensation of vapors in flue gas is a complicated
phenomenon since heat and mass transfer of water vapor and
various acids simultaneously occur in the presence of noncondensable
gases such as nitrogen and oxygen. Design of a
condenser depends on the knowledge and understanding of the
heat and mass transfer processes. A computer program for
numerical simulations of water (H2O) and sulfuric acid (H2SO4)
condensation in a flue gas condensing heat exchanger was
developed using MATLAB. Governing equations based on
mass and energy balances for the system were derived to
predict variables such as flue gas exit temperature, cooling
water outlet temperature, mole fraction and condensation rates
of water and sulfuric acid vapors. The equations were solved
using an iterative solution technique with calculations of heat
and mass transfer coefficients and physical properties.
Welcome to WIPAC Monthly the magazine brought to you by the LinkedIn Group Water Industry Process Automation & Control.
In this month's edition, along with this month's industry news to celebrate the 13 years since the group was created we have articles including
A case study of the used of Advanced Process Control at the Wastewater Treatment works at Lleida in Spain
A look back on an article on smart wastewater networks in order to see how the industry has measured up in the interim around the adoption of Digital Transformation in the Water Industry.
Overview of the fundamental roles in Hydropower generation and the components involved in wider Electrical Engineering.
This paper presents the design and construction of hydroelectric dams from the hydrologist’s survey of the valley before construction, all aspects and involved disciplines, fluid dynamics, structural engineering, generation and mains frequency regulation to the very transmission of power through the network in the United Kingdom.
Author: Robbie Edward Sayers
Collaborators and co editors: Charlie Sims and Connor Healey.
(C) 2024 Robbie E. Sayers
Cosmetic shop management system project report.pdfKamal Acharya
Buying new cosmetic products is difficult. It can even be scary for those who have sensitive skin and are prone to skin trouble. The information needed to alleviate this problem is on the back of each product, but it's thought to interpret those ingredient lists unless you have a background in chemistry.
Instead of buying and hoping for the best, we can use data science to help us predict which products may be good fits for us. It includes various function programs to do the above mentioned tasks.
Data file handling has been effectively used in the program.
The automated cosmetic shop management system should deal with the automation of general workflow and administration process of the shop. The main processes of the system focus on customer's request where the system is able to search the most appropriate products and deliver it to the customers. It should help the employees to quickly identify the list of cosmetic product that have reached the minimum quantity and also keep a track of expired date for each cosmetic product. It should help the employees to find the rack number in which the product is placed.It is also Faster and more efficient way.
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERSveerababupersonal22
It consists of cw radar and fmcw radar ,range measurement,if amplifier and fmcw altimeterThe CW radar operates using continuous wave transmission, while the FMCW radar employs frequency-modulated continuous wave technology. Range measurement is a crucial aspect of radar systems, providing information about the distance to a target. The IF amplifier plays a key role in signal processing, amplifying intermediate frequency signals for further analysis. The FMCW altimeter utilizes frequency-modulated continuous wave technology to accurately measure altitude above a reference point.
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Dr.Costas Sachpazis
Terzaghi's soil bearing capacity theory, developed by Karl Terzaghi, is a fundamental principle in geotechnical engineering used to determine the bearing capacity of shallow foundations. This theory provides a method to calculate the ultimate bearing capacity of soil, which is the maximum load per unit area that the soil can support without undergoing shear failure. The Calculation HTML Code included.
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
150 MW Solar bid in Madha Pradesh (India) 2015
1. EnvironmentFirst
“Let the Environment be your first Inspiration”
Registered Office: Environmentfirst Energy Services (P) Ltd.; Prakrati Corporate, 405 – Block A; Y N Road, Indore – 452001 (M.P.)
info@environmentfirst.in +91 731 6007860 www.environmentfirst.in
Our Locations: Mumbai, Chennai, Ahmedabad, Jaipur, Panchkula Page 1
COMPETITIVE BIDDING BY MP POWER MANAGEMENT COMPANY LIMITED FOR
INSTALLATION OF 150 MW SOLAR POWER PROJECT IN MADHYA PRADESH
Summary
Bid Inviting Company MP power Management Company Ltd
Contract Period 25 Years
Total Capacity of The Bid 150 MW
Project awarding Method Bidding
Maximum Capacity to Bid 150 MW
Minimum Capacity to Bid 2 MW
Commissioning Deadline Up to 25 MW, 12 months and above 25 MW,
18 months
Submission Date 11.05.2015, Time: 15.00 Hrs
Amount of Bid Bond INR 20 Lakh/ MW in the Form of Bank
Guarantee
Cost Of Bid Document Rs. 25,000 or USD 500, in the form of a
demand draft / pay order
Bid Processing Fee Rs. 1,00,000 or USD 2000 per Generating
Source, in the form of a demand draft / pay
order
2. EnvironmentFirst
“Let the Environment be your first Inspiration”
Registered Office: Environmentfirst Energy Services (P) Ltd.; Prakrati Corporate, 405 – Block A; Y N Road, Indore – 452001 (M.P.)
info@environmentfirst.in +91 731 6007860 www.environmentfirst.in
Our Locations: Mumbai, Chennai, Ahmedabad, Jaipur, Panchkula Page 2
Bidding Process Expenses
Bid Document Fee Rs. 25,000 or USD 500, in the form of Demand
Draft, MP Power Management Co. Ltd.” Payable at
“Jabalpur”. Taxes if any shall be borne by the
Bidder.
Bid Processing fee Rs. 1, 00,000 or USD 2000, in the form of Demand
Draft, MP Power Management Co. Ltd.” Payable at
“Jabalpur”. Taxes if any, shall be borne by the
Bidder.
Bid Bond Rs. 2O Lakh/ MW to be submitted along with the
bid in the form of the bank guarantee. (Valid for
210 days from the bid deadline)
Contract Performance Guarantee Rs. 3O Lakh/ MW within 30 Days of award of LOI
Bid Submission address Chief General Manager (IPC)
MP Power Management Company Limited,
Block No 11, 1st Floor, Shakti Bhawan, Rampur,
Jabalpur, Madhya Pradesh (M.P), India- Pin 482008
Phone No. : +91-761-2667511, 2702400, 2702402
Fax No. : +91-761-2667511, 2661245, 2664653,
Email: rakesh.saxena@mppmcl.com
3. EnvironmentFirst
“Let the Environment be your first Inspiration”
Registered Office: Environmentfirst Energy Services (P) Ltd.; Prakrati Corporate, 405 – Block A; Y N Road, Indore – 452001 (M.P.)
info@environmentfirst.in +91 731 6007860 www.environmentfirst.in
Our Locations: Mumbai, Chennai, Ahmedabad, Jaipur, Panchkula Page 3
Eligibility
Net Worth Registered Company, 2 Crore per MW
For Capacity >5MW, pas experience into solar
is mandatory
Penalties
Delay In Commissioning Delay from 0-3 months: 1% per week, and,
thereafter,
Delay from 3-6 months: 2% per week, and,
thereafter.
Delay of more than 6 months: 3% per week.
From the Bank Guarantee amount
In case of financial closure not achieved in
180 days from PPA
Delay from 0-3 months – 1% per week, and,
thereafter,
Delay from 3-6 months - 2% per week, and,
thereafter,
Delay of more than 6 months – 3% per week.
From the Bank Guarantee amount
4. EnvironmentFirst
“Let the Environment be your first Inspiration”
Registered Office: Environmentfirst Energy Services (P) Ltd.; Prakrati Corporate, 405 – Block A; Y N Road, Indore – 452001 (M.P.)
info@environmentfirst.in +91 731 6007860 www.environmentfirst.in
Our Locations: Mumbai, Chennai, Ahmedabad, Jaipur, Panchkula Page 4
Due Dates
Date of issue of RFP T0 (March 30, 2015)
Submission of written clarification/
amendments if any, on the RFP/RFP
Documents by the Bidders.
T0 +18 Days
Pre-Bid Meeting(s) (if required) T0 +20 Days
Revision of RFP and RFP Documents (if
required) and issuance of revised RFP
and RFP Documents
T0 +35 Days
Bid submission and opening of Non
Financial Bid (Bid Deadline)
T0 + 60 days (T1) before 15:00 hrs &
opening 15.30 hrs
Short listing of Successful Bidder(s) and
issue of LOI
T1 +30 Days
Signing of RFP Documents T1 +60 Days
Method of Submission
Bids are to be submitted in a single closed cover envelope (as mentioned in Clause 2.10.2)
containing Envelope I (Non-Financial Bid) and Envelope II (Financial Bid) each one duly closed
separately. Envelope I (Non-Financial Bid) and Envelope II (Financial Bid) should be transcript in
the following way;
Envelope I (Non-Financial Bid)
RFP for procurement of Solar power for long term MP Power Management Company Limited
Superscript - “Request for proposal for procurement of 150 MW power from grid connected
solar energy sources for long term under tariff based competitive bidding process”
Name of the Bidder:
______________________
Due for Opening on:
______________________
5. EnvironmentFirst
“Let the Environment be your first Inspiration”
Registered Office: Environmentfirst Energy Services (P) Ltd.; Prakrati Corporate, 405 – Block A; Y N Road, Indore – 452001 (M.P.)
info@environmentfirst.in +91 731 6007860 www.environmentfirst.in
Our Locations: Mumbai, Chennai, Ahmedabad, Jaipur, Panchkula Page 5
Envelope I (Non-Financial Bid)”
Envelope II (Financial Bid)
Superscript -
“Request for proposal for procurement of 150 MW power from grid connected solar energy
sources for long term under tariff based competitive bidding process”
Name of the Bidder:
______________________
Due for Opening on:
______________________
Envelope II (Financial Bid)”
Other Provisions
1. Seller(s) shall be responsible for arranging transmission access from their Project to
the Delivery Point. Such arrangement shall be as per the regulations specified by the
MPERC, as amended from time to time.
2. The developer shall be responsible to arrange 33kV or above transmission line from
the Power Plant Generating Substation to nearest 132/33 kV or 220/132kV or
400/220/132kV CTU/STU Grid Sub Station. Cost of Transmission line will be borne by
developer.
3. The CDM benefit should be shared, on a gross basis, in proportion to the Contracted
Capacity from the Project, starting from 100% to developers in the first year after
commissioning and thereafter reducing by 10% every year till the sharing becomes
equal (50:50) between the developers and the licensees/consumers in the sixth year.
Thereafter, the sharing of CDM benefits should remain equal till the time that benefits
accrue. The developer shall disclose CDM benefits availed by them in the month of
March each year to the concerned Distribution Licensee.
4. Though No Ceiling has been mentioned in Tender, The Max Quote cannot be more
than 7.46 per kWh as per MPERC Order