SlideShare a Scribd company logo
HYDEL POWER
AWARENESS
TRAINING
2016
TROUBLESHOOTING
HYDRO POWER
PLANTS
O&MAND
OF
Faculty: Mr. Manoj Kumar Mishra,
Ex. Director Operations
Odisha Hydro Power Plant
th th
28 - 29 September th st
30 Sept. - 01 October
2016 DELHI 2016 HYDERABAD
since: 1980
training the professionals
R
For Registration: Email us on: info@marcepinc.com or Call on: 022 - 30210100
Register 8 delegates and pay for 5
Register 6 delegates and pay for 4
Register 4 delegates and pay for 3
th
Ends at: 16 September 2016
You spoke, we listened.
Group discount now available!
Introduction
Experience of running hydropower stations in India has shown that even after careful project planning and
good quality control measures from construction to commissioning, unforeseen problems do occur in
service resulting in unplanned outages / low generation and load shedding etc. This causes disruption to
consumers and reduced cash generation for the operator. A contributing factor to these operational
problems is the fact that hydro power equipment and plant is custom built. The equipment cannot be fully
assembled or tested in a factory before sending it to site. Maintenance activities at predetermined time
intervals are necessary to ensure the following:
Quality and reliable operation of equipment in the service environment through planned, periodic
inspection and checking of components and systems. Together with replacement or rectification of parts
wherever required.
Maximum availability of equipment and a minimum of unplanned shut downs by using planned / periodic
shutdowns to inspect all equipment (serviceable and non-servicable).
Eradication of operational problems by a timely analysis of the cause of faults / problems and replacement
of short term solutions by long lasting and permanent ones.
Challenges
Renewable energy is one of the fastest growing sources of electricity. Hydroelectricity, one of the oldest
methods for generating power, will play a signi cant role in the projected growth of worldwide generation.
Hydroelectric plants have long lifecycles, with some facilities still operating after more than 100 years.
Periodic upgrades to equipment, as well as relicensing, allows utilities to extend the life of a hydro facility
so it can continue to produce electricity well into the future. Additionally, effective management of
hydroelectric or pump storage plant operations ensures the ongoing commercial viability of these assets.
Modernizing hydroelectric or pump storage plants, constructing new sites, and retro fitting good control
facilities for efficient power production affords many benefits, but each has their own challenges with cost,
performance, and risk.
Today's biggest O&M issues
Operations and maintenance personnel at hydroelectric facilities face significant issues. Among these is
the fact that these facilities are aging at the same time that technology is changing substantially. In
addition, at many older hydro plants, equipment may be upgraded a piece at a time. Over the years, this
means a facility can contain a mix of old and new equipment, which may have different operational and/or
maintenance requirements.
In addition, the hydroelectric plant workforce is aging, which causes a two-fold problem. First, these older
plants need significant upgrade work at the same time as many experienced personnel are planning their
retirements. Second, retiring employees are taking with them valuable expertise, with little time available to
transfer this experiential learning to the next generation of plant workers.
Course Director: Mr. Miraj Kumar Mishra
He has around 40 years of experience in the field of Hydro Power Projects from O&M, troubleshooting to
Hydro Power Projects from concept to commissioning. He has served as a CGM Electrical to Director of
Operation level at Odisha Hydro Power Corporation Ltd.
O&M and Troubleshooting of
HYDRO POWER PLANTS
HYDEL POWER
AWARENESS
TRAINING
2016
since: 1980
training the professionals
R
th th
28 - 29 September th st
30 Sept. - 01 October
2016 DELHI 2016 HYDERABAD
http://marcepinc.com info@marcepinc.comTel: 022- 30210100 Fax: 022 - 30210103
Energy scenario and reforms in power
sector in India
Modern Concept of Hydro Power Plants
Power Generation Equipments in Hydro
Power Plants
Auxiliaries in Hydro Power Plants
Power Transmission & Switchyards
(India's Energy Production & Resources,
Grim situations, Steps of Reforms, Energy
Conservation Act)
(Hydropower Potential in India, Advantages
of Hydropower, Challenges in Hydropower
Development, Land Acquisition Act, etc)
Forebay and Intake Structures, Head Race
or Intake Conduits, Surge Tank, Turbines
and Generators, Power House, Trail Race
and Draft Tube.
(Turbines and its auxiliaries, Generators
and its auxiliaries, Switchyard Systems,
Lubrication Systems, Drainage Pumps, Air
Compressors, Water Cooling Systems, etc)
Substation, Insulated Switchgear, Circuit
Breaker, Surge Arrest, AVR, Earthing
switch, Voltage Transformer, etc)
Protection & Control Systems
Maintenance schedule and Asset
Management
Operation & Maintenance of Hydro Power
Plants
Problems & Troubleshooting of Hydro
Power Plants
Field case discussion
(Control systems, Standards and codes,
Methods of control, Modern Control systems,
Mechanical & Electrical Protection System,
Protective Relay Technology, Digital control
and protective systems, schematics and
detailed wiring drawings)
Bringing plant assets quickly into operation
and keeping them fit during the operation
phase to maintain/improve plant performance
Reducing maintenance cost, e.g. by enabling
efficient, paperless work flows
Increasing plant availability and reliability, e.g.
through diagnostics and optimization of
scheduled events (such as calibrations)
Supporting compliance with standards and
regulations (e.g. for quality management)
(Preventive Maintenance of Hydro Turbine,
Requirement of effective maintenance, Major
maintenance problems of water turbines,
Preventive Maintenance of Hydro
Generators)
(Risk associated with dams, reservoir
induced seismicity, water logging, silting up of
dams, diplomacy over trans boundary rivers,
etc)
(Addressing issues and challenges in
Hydropower Plants)
HYDEL POWER
AWARENESS
TRAINING
2016
DAY - ONE DAY - TWO
COURSE CONTENT:
O&M and Troubleshooting of
HYDRO POWER PLANTS
http://marcepinc.com info@marcepinc.comTel: 022- 30210100 Fax: 022 - 30210103
th th
28 - 29 September th st
30 Sept. - 01 October
2016 DELHI 2016 HYDERABAD
Delegate Registration Form:
Please register the following delegate/s for
(For Additional delegates please photocopy this form)
Organisation Details & Authorization:
I / We Hereby Confirm To The Above And Authorize Our Participants To The Programme. Please Send The Invoice To:
Company Name:
Nominating Authority:
Designation: Email:
Company Postal Address:
Tel No.:
* This Booking is Invalid Without Signature
Signature
Participation Fees Include: Workshop kit Documentation, Refreshment, Luncheon, Certificate Of Participation
NON- RESIDENTIAL PROGRAME
Cell No.:
Marcep Inc. Terms and Conditions
Payment terms - Upon completion and return of the registration form, full payment is required not later
than 5 business days from the date of invoice. Payment must be received prior to the event date. Marcep
Inc. reserves the right to refuse admission to the event if payment has not been received.
Cancellation, postponement and substitution policy - You may substitute delegates at any time by
providing reasonable advance notice to Marcep Inc. In the event that Marcep Inc. postpones an event for
any reason and the delegate is unable to attend on the revised date, you will receive full credit of the
contract fee paid. On mutual agreement, you may use this credit for another Marcep Inc. event which must
occur within one year from the date of postponement. Except as specified above, no credits will be
issued for cancellations. There are no refunds given under any circumstances. Marcep Inc. is not
responsible for any loss or damage as a result of a substitution, alteration or cancellation/ postponement
of an event. Marcep Inc. will not take any liability whatsoever if the event is cancelled, rescheduled or
postponed due to act of God, natural calamities or any other emergencies. Please note that while course
speakers and topics were confirmed at the time of marketing, for circumstances beyond our control, the
organization reserves the right to substitute, alter or cancel the speakers and/or topics Marcep Inc.
reserves the right to alter or modify the speakers and/or topics if necessary without any liability to you
what so ever. Updates on any substitutions or alterations will be provided as soon as possible.
Discounts All 'Early Bird' Discounts require payment at time of registration and before the cut-off date in
order to receive any discount. Offered discounts by Marcep Inc. (including team discounts) must also
require payment at the time of registration. All discount offers will stand cancelled if payment is not
received at the time of registration.
For group nomination reply on:queries
info@marcepinc.com
Payment Terms:
Payment Is Required Within 5 Working Days From the Date
Of Invoice. Account Transfer/Cheque/DD Should Be In Favour
Of “Marcep Inc.” Payable At Par In Mumbai.
Investment fees
01 Delegate - INR: 27,500/- (Base Price)
Additional service tax of 15% is applicable
Sales Hotline No.:
or email: viren@marcepinc.com
09167469140
Marcep Inc.
Campz Landmark Bldg., 103, 1st floor,
Next to Tata Motors Showroom, S.V. Road,
Jogeshwari- West, Mumbai- 400102
Tel: 022- 30210100 Fax: 022- 30210103
info@marcepinc.com
PARTICIPATION DETAILS
Name: Designation: Email: Location:
www.marcepinc.com
since: 1980
R
training the professionals
O&M and Troubleshooting of
HYDRO POWER PLANTS
th th
28 - 29 September th st
30 Sept. - 01 October
2016 DELHI 2016 HYDERABAD

More Related Content

Similar to O&M and Troubleshooting Hydro Power Plants

"Coal Properties, Boilers & Its Auxiliaries"
"Coal Properties, Boilers & Its Auxiliaries""Coal Properties, Boilers & Its Auxiliaries"
"Coal Properties, Boilers & Its Auxiliaries"
Raj Khanna
 
Manoj resume (1)
Manoj resume (1)Manoj resume (1)
Manoj resume (1)Manoj Kumar
 
resume of sanjay update on 01 -04-2015
resume of sanjay update on 01 -04-2015resume of sanjay update on 01 -04-2015
resume of sanjay update on 01 -04-2015sanjay mahapadi
 
Smart instrumentation for process plants training
Smart instrumentation for process plants trainingSmart instrumentation for process plants training
Smart instrumentation for process plants training
Marcep Inc.
 
Sonu resume 2015
Sonu resume 2015Sonu resume 2015
Sonu resume 2015Sonu Singh
 
Oil Industry Safety Directorate Training
Oil Industry Safety Directorate TrainingOil Industry Safety Directorate Training
Oil Industry Safety Directorate Training
Pharma Garage
 
Process instrumentation retrofitting, maintenance & troubleshooting
Process instrumentation  retrofitting, maintenance & troubleshootingProcess instrumentation  retrofitting, maintenance & troubleshooting
Process instrumentation retrofitting, maintenance & troubleshooting
Marcep Inc.
 
Commissioning, Shutdowns and turnarounds
Commissioning, Shutdowns and turnaroundsCommissioning, Shutdowns and turnarounds
Commissioning, Shutdowns and turnarounds
Marcep Inc.
 

Similar to O&M and Troubleshooting Hydro Power Plants (20)

"Coal Properties, Boilers & Its Auxiliaries"
"Coal Properties, Boilers & Its Auxiliaries""Coal Properties, Boilers & Its Auxiliaries"
"Coal Properties, Boilers & Its Auxiliaries"
 
Manoj resume (1)
Manoj resume (1)Manoj resume (1)
Manoj resume (1)
 
Sanjay Mondal Presentation
Sanjay Mondal PresentationSanjay Mondal Presentation
Sanjay Mondal Presentation
 
resume of sanjay update on 01 -04-2015
resume of sanjay update on 01 -04-2015resume of sanjay update on 01 -04-2015
resume of sanjay update on 01 -04-2015
 
CV bharat new
CV    bharat newCV    bharat new
CV bharat new
 
Smart instrumentation for process plants training
Smart instrumentation for process plants trainingSmart instrumentation for process plants training
Smart instrumentation for process plants training
 
Resume 15 hvac
Resume 15 hvacResume 15 hvac
Resume 15 hvac
 
Sonu resume 2015
Sonu resume 2015Sonu resume 2015
Sonu resume 2015
 
KJVYAS_SCL
KJVYAS_SCLKJVYAS_SCL
KJVYAS_SCL
 
T.Chandramouli _ Resume
T.Chandramouli _ ResumeT.Chandramouli _ Resume
T.Chandramouli _ Resume
 
Oil Industry Safety Directorate Training
Oil Industry Safety Directorate TrainingOil Industry Safety Directorate Training
Oil Industry Safety Directorate Training
 
Process instrumentation retrofitting, maintenance & troubleshooting
Process instrumentation  retrofitting, maintenance & troubleshootingProcess instrumentation  retrofitting, maintenance & troubleshooting
Process instrumentation retrofitting, maintenance & troubleshooting
 
MJ FM hvac
MJ FM hvacMJ FM hvac
MJ FM hvac
 
Maintenance Head
Maintenance  HeadMaintenance  Head
Maintenance Head
 
Commissioning, Shutdowns and turnarounds
Commissioning, Shutdowns and turnaroundsCommissioning, Shutdowns and turnarounds
Commissioning, Shutdowns and turnarounds
 
Resume
ResumeResume
Resume
 
VIPPAN KUMAR RANA - 1
VIPPAN KUMAR RANA - 1VIPPAN KUMAR RANA - 1
VIPPAN KUMAR RANA - 1
 
jai 2016
jai 2016jai 2016
jai 2016
 
SDKCV
SDKCVSDKCV
SDKCV
 
Brajesh Resume
Brajesh ResumeBrajesh Resume
Brajesh Resume
 

More from Marcep Inc.

Troubleshooting of Distillation
Troubleshooting of DistillationTroubleshooting of Distillation
Troubleshooting of Distillation
Marcep Inc.
 
Regulatory requirements and expectations from us, europe, and other regulator...
Regulatory requirements and expectations from us, europe, and other regulator...Regulatory requirements and expectations from us, europe, and other regulator...
Regulatory requirements and expectations from us, europe, and other regulator...
Marcep Inc.
 
Impact of changing technology on strategic procurement
Impact of changing technology on strategic procurementImpact of changing technology on strategic procurement
Impact of changing technology on strategic procurement
Marcep Inc.
 
Troubleshooting chemical plants training - Techniques to Identify and Correct...
Troubleshooting chemical plants training - Techniques to Identify and Correct...Troubleshooting chemical plants training - Techniques to Identify and Correct...
Troubleshooting chemical plants training - Techniques to Identify and Correct...
Marcep Inc.
 
Troubleshooting of Electrical Switchyard & Substation Equipments
Troubleshooting of Electrical Switchyard & Substation EquipmentsTroubleshooting of Electrical Switchyard & Substation Equipments
Troubleshooting of Electrical Switchyard & Substation Equipments
Marcep Inc.
 
Asset corrosion management cui - masterclass 2018
Asset corrosion management   cui - masterclass 2018Asset corrosion management   cui - masterclass 2018
Asset corrosion management cui - masterclass 2018
Marcep Inc.
 
electrical engineering, electrical fire, and safety, electrical safety audits...
electrical engineering, electrical fire, and safety, electrical safety audits...electrical engineering, electrical fire, and safety, electrical safety audits...
electrical engineering, electrical fire, and safety, electrical safety audits...
Marcep Inc.
 
Electrical Fixtures Electrical Fittings
Electrical Fixtures Electrical Fittings Electrical Fixtures Electrical Fittings
Electrical Fixtures Electrical Fittings
Marcep Inc.
 
Electrical Plan Electrical System Electrical Design
Electrical Plan Electrical System Electrical Design Electrical Plan Electrical System Electrical Design
Electrical Plan Electrical System Electrical Design
Marcep Inc.
 
Compressor Master Class
Compressor Master ClassCompressor Master Class
Compressor Master Class
Marcep Inc.
 
Pharmaceutical qualification and validations training
Pharmaceutical qualification and validations trainingPharmaceutical qualification and validations training
Pharmaceutical qualification and validations training
Marcep Inc.
 
Damage mechanism affecting fixed equipments
Damage mechanism affecting fixed equipmentsDamage mechanism affecting fixed equipments
Damage mechanism affecting fixed equipments
Marcep Inc.
 
Data integrity issues in pharma industry in India
Data integrity issues in pharma industry in IndiaData integrity issues in pharma industry in India
Data integrity issues in pharma industry in India
Marcep Inc.
 
Achieving excellence in pharma manufacturing plants
Achieving excellence in pharma manufacturing plantsAchieving excellence in pharma manufacturing plants
Achieving excellence in pharma manufacturing plants
Marcep Inc.
 
Advance maintenance & corrosion engineering
Advance maintenance & corrosion engineeringAdvance maintenance & corrosion engineering
Advance maintenance & corrosion engineering
Marcep Inc.
 
Clean coal technology for power plants
Clean coal technology for power plantsClean coal technology for power plants
Clean coal technology for power plants
Marcep Inc.
 
Maintenance contracting & outsourcing
Maintenance contracting & outsourcingMaintenance contracting & outsourcing
Maintenance contracting & outsourcing
Marcep Inc.
 
Water Chemistry
Water ChemistryWater Chemistry
Water Chemistry
Marcep Inc.
 
Mining india Forum 2016
Mining india Forum 2016Mining india Forum 2016
Mining india Forum 2016
Marcep Inc.
 
Public Private Partnership India 2016 Training
Public Private Partnership India 2016 TrainingPublic Private Partnership India 2016 Training
Public Private Partnership India 2016 Training
Marcep Inc.
 

More from Marcep Inc. (20)

Troubleshooting of Distillation
Troubleshooting of DistillationTroubleshooting of Distillation
Troubleshooting of Distillation
 
Regulatory requirements and expectations from us, europe, and other regulator...
Regulatory requirements and expectations from us, europe, and other regulator...Regulatory requirements and expectations from us, europe, and other regulator...
Regulatory requirements and expectations from us, europe, and other regulator...
 
Impact of changing technology on strategic procurement
Impact of changing technology on strategic procurementImpact of changing technology on strategic procurement
Impact of changing technology on strategic procurement
 
Troubleshooting chemical plants training - Techniques to Identify and Correct...
Troubleshooting chemical plants training - Techniques to Identify and Correct...Troubleshooting chemical plants training - Techniques to Identify and Correct...
Troubleshooting chemical plants training - Techniques to Identify and Correct...
 
Troubleshooting of Electrical Switchyard & Substation Equipments
Troubleshooting of Electrical Switchyard & Substation EquipmentsTroubleshooting of Electrical Switchyard & Substation Equipments
Troubleshooting of Electrical Switchyard & Substation Equipments
 
Asset corrosion management cui - masterclass 2018
Asset corrosion management   cui - masterclass 2018Asset corrosion management   cui - masterclass 2018
Asset corrosion management cui - masterclass 2018
 
electrical engineering, electrical fire, and safety, electrical safety audits...
electrical engineering, electrical fire, and safety, electrical safety audits...electrical engineering, electrical fire, and safety, electrical safety audits...
electrical engineering, electrical fire, and safety, electrical safety audits...
 
Electrical Fixtures Electrical Fittings
Electrical Fixtures Electrical Fittings Electrical Fixtures Electrical Fittings
Electrical Fixtures Electrical Fittings
 
Electrical Plan Electrical System Electrical Design
Electrical Plan Electrical System Electrical Design Electrical Plan Electrical System Electrical Design
Electrical Plan Electrical System Electrical Design
 
Compressor Master Class
Compressor Master ClassCompressor Master Class
Compressor Master Class
 
Pharmaceutical qualification and validations training
Pharmaceutical qualification and validations trainingPharmaceutical qualification and validations training
Pharmaceutical qualification and validations training
 
Damage mechanism affecting fixed equipments
Damage mechanism affecting fixed equipmentsDamage mechanism affecting fixed equipments
Damage mechanism affecting fixed equipments
 
Data integrity issues in pharma industry in India
Data integrity issues in pharma industry in IndiaData integrity issues in pharma industry in India
Data integrity issues in pharma industry in India
 
Achieving excellence in pharma manufacturing plants
Achieving excellence in pharma manufacturing plantsAchieving excellence in pharma manufacturing plants
Achieving excellence in pharma manufacturing plants
 
Advance maintenance & corrosion engineering
Advance maintenance & corrosion engineeringAdvance maintenance & corrosion engineering
Advance maintenance & corrosion engineering
 
Clean coal technology for power plants
Clean coal technology for power plantsClean coal technology for power plants
Clean coal technology for power plants
 
Maintenance contracting & outsourcing
Maintenance contracting & outsourcingMaintenance contracting & outsourcing
Maintenance contracting & outsourcing
 
Water Chemistry
Water ChemistryWater Chemistry
Water Chemistry
 
Mining india Forum 2016
Mining india Forum 2016Mining india Forum 2016
Mining india Forum 2016
 
Public Private Partnership India 2016 Training
Public Private Partnership India 2016 TrainingPublic Private Partnership India 2016 Training
Public Private Partnership India 2016 Training
 

Recently uploaded

一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
SupreethSP4
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
BrazilAccount1
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
ongomchris
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
AmarGB2
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 

Recently uploaded (20)

一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 

O&M and Troubleshooting Hydro Power Plants

  • 1. HYDEL POWER AWARENESS TRAINING 2016 TROUBLESHOOTING HYDRO POWER PLANTS O&MAND OF Faculty: Mr. Manoj Kumar Mishra, Ex. Director Operations Odisha Hydro Power Plant th th 28 - 29 September th st 30 Sept. - 01 October 2016 DELHI 2016 HYDERABAD since: 1980 training the professionals R For Registration: Email us on: info@marcepinc.com or Call on: 022 - 30210100 Register 8 delegates and pay for 5 Register 6 delegates and pay for 4 Register 4 delegates and pay for 3 th Ends at: 16 September 2016 You spoke, we listened. Group discount now available!
  • 2. Introduction Experience of running hydropower stations in India has shown that even after careful project planning and good quality control measures from construction to commissioning, unforeseen problems do occur in service resulting in unplanned outages / low generation and load shedding etc. This causes disruption to consumers and reduced cash generation for the operator. A contributing factor to these operational problems is the fact that hydro power equipment and plant is custom built. The equipment cannot be fully assembled or tested in a factory before sending it to site. Maintenance activities at predetermined time intervals are necessary to ensure the following: Quality and reliable operation of equipment in the service environment through planned, periodic inspection and checking of components and systems. Together with replacement or rectification of parts wherever required. Maximum availability of equipment and a minimum of unplanned shut downs by using planned / periodic shutdowns to inspect all equipment (serviceable and non-servicable). Eradication of operational problems by a timely analysis of the cause of faults / problems and replacement of short term solutions by long lasting and permanent ones. Challenges Renewable energy is one of the fastest growing sources of electricity. Hydroelectricity, one of the oldest methods for generating power, will play a signi cant role in the projected growth of worldwide generation. Hydroelectric plants have long lifecycles, with some facilities still operating after more than 100 years. Periodic upgrades to equipment, as well as relicensing, allows utilities to extend the life of a hydro facility so it can continue to produce electricity well into the future. Additionally, effective management of hydroelectric or pump storage plant operations ensures the ongoing commercial viability of these assets. Modernizing hydroelectric or pump storage plants, constructing new sites, and retro fitting good control facilities for efficient power production affords many benefits, but each has their own challenges with cost, performance, and risk. Today's biggest O&M issues Operations and maintenance personnel at hydroelectric facilities face significant issues. Among these is the fact that these facilities are aging at the same time that technology is changing substantially. In addition, at many older hydro plants, equipment may be upgraded a piece at a time. Over the years, this means a facility can contain a mix of old and new equipment, which may have different operational and/or maintenance requirements. In addition, the hydroelectric plant workforce is aging, which causes a two-fold problem. First, these older plants need significant upgrade work at the same time as many experienced personnel are planning their retirements. Second, retiring employees are taking with them valuable expertise, with little time available to transfer this experiential learning to the next generation of plant workers. Course Director: Mr. Miraj Kumar Mishra He has around 40 years of experience in the field of Hydro Power Projects from O&M, troubleshooting to Hydro Power Projects from concept to commissioning. He has served as a CGM Electrical to Director of Operation level at Odisha Hydro Power Corporation Ltd. O&M and Troubleshooting of HYDRO POWER PLANTS HYDEL POWER AWARENESS TRAINING 2016 since: 1980 training the professionals R th th 28 - 29 September th st 30 Sept. - 01 October 2016 DELHI 2016 HYDERABAD http://marcepinc.com info@marcepinc.comTel: 022- 30210100 Fax: 022 - 30210103
  • 3. Energy scenario and reforms in power sector in India Modern Concept of Hydro Power Plants Power Generation Equipments in Hydro Power Plants Auxiliaries in Hydro Power Plants Power Transmission & Switchyards (India's Energy Production & Resources, Grim situations, Steps of Reforms, Energy Conservation Act) (Hydropower Potential in India, Advantages of Hydropower, Challenges in Hydropower Development, Land Acquisition Act, etc) Forebay and Intake Structures, Head Race or Intake Conduits, Surge Tank, Turbines and Generators, Power House, Trail Race and Draft Tube. (Turbines and its auxiliaries, Generators and its auxiliaries, Switchyard Systems, Lubrication Systems, Drainage Pumps, Air Compressors, Water Cooling Systems, etc) Substation, Insulated Switchgear, Circuit Breaker, Surge Arrest, AVR, Earthing switch, Voltage Transformer, etc) Protection & Control Systems Maintenance schedule and Asset Management Operation & Maintenance of Hydro Power Plants Problems & Troubleshooting of Hydro Power Plants Field case discussion (Control systems, Standards and codes, Methods of control, Modern Control systems, Mechanical & Electrical Protection System, Protective Relay Technology, Digital control and protective systems, schematics and detailed wiring drawings) Bringing plant assets quickly into operation and keeping them fit during the operation phase to maintain/improve plant performance Reducing maintenance cost, e.g. by enabling efficient, paperless work flows Increasing plant availability and reliability, e.g. through diagnostics and optimization of scheduled events (such as calibrations) Supporting compliance with standards and regulations (e.g. for quality management) (Preventive Maintenance of Hydro Turbine, Requirement of effective maintenance, Major maintenance problems of water turbines, Preventive Maintenance of Hydro Generators) (Risk associated with dams, reservoir induced seismicity, water logging, silting up of dams, diplomacy over trans boundary rivers, etc) (Addressing issues and challenges in Hydropower Plants) HYDEL POWER AWARENESS TRAINING 2016 DAY - ONE DAY - TWO COURSE CONTENT: O&M and Troubleshooting of HYDRO POWER PLANTS http://marcepinc.com info@marcepinc.comTel: 022- 30210100 Fax: 022 - 30210103 th th 28 - 29 September th st 30 Sept. - 01 October 2016 DELHI 2016 HYDERABAD
  • 4. Delegate Registration Form: Please register the following delegate/s for (For Additional delegates please photocopy this form) Organisation Details & Authorization: I / We Hereby Confirm To The Above And Authorize Our Participants To The Programme. Please Send The Invoice To: Company Name: Nominating Authority: Designation: Email: Company Postal Address: Tel No.: * This Booking is Invalid Without Signature Signature Participation Fees Include: Workshop kit Documentation, Refreshment, Luncheon, Certificate Of Participation NON- RESIDENTIAL PROGRAME Cell No.: Marcep Inc. Terms and Conditions Payment terms - Upon completion and return of the registration form, full payment is required not later than 5 business days from the date of invoice. Payment must be received prior to the event date. Marcep Inc. reserves the right to refuse admission to the event if payment has not been received. Cancellation, postponement and substitution policy - You may substitute delegates at any time by providing reasonable advance notice to Marcep Inc. In the event that Marcep Inc. postpones an event for any reason and the delegate is unable to attend on the revised date, you will receive full credit of the contract fee paid. On mutual agreement, you may use this credit for another Marcep Inc. event which must occur within one year from the date of postponement. Except as specified above, no credits will be issued for cancellations. There are no refunds given under any circumstances. Marcep Inc. is not responsible for any loss or damage as a result of a substitution, alteration or cancellation/ postponement of an event. Marcep Inc. will not take any liability whatsoever if the event is cancelled, rescheduled or postponed due to act of God, natural calamities or any other emergencies. Please note that while course speakers and topics were confirmed at the time of marketing, for circumstances beyond our control, the organization reserves the right to substitute, alter or cancel the speakers and/or topics Marcep Inc. reserves the right to alter or modify the speakers and/or topics if necessary without any liability to you what so ever. Updates on any substitutions or alterations will be provided as soon as possible. Discounts All 'Early Bird' Discounts require payment at time of registration and before the cut-off date in order to receive any discount. Offered discounts by Marcep Inc. (including team discounts) must also require payment at the time of registration. All discount offers will stand cancelled if payment is not received at the time of registration. For group nomination reply on:queries info@marcepinc.com Payment Terms: Payment Is Required Within 5 Working Days From the Date Of Invoice. Account Transfer/Cheque/DD Should Be In Favour Of “Marcep Inc.” Payable At Par In Mumbai. Investment fees 01 Delegate - INR: 27,500/- (Base Price) Additional service tax of 15% is applicable Sales Hotline No.: or email: viren@marcepinc.com 09167469140 Marcep Inc. Campz Landmark Bldg., 103, 1st floor, Next to Tata Motors Showroom, S.V. Road, Jogeshwari- West, Mumbai- 400102 Tel: 022- 30210100 Fax: 022- 30210103 info@marcepinc.com PARTICIPATION DETAILS Name: Designation: Email: Location: www.marcepinc.com since: 1980 R training the professionals O&M and Troubleshooting of HYDRO POWER PLANTS th th 28 - 29 September th st 30 Sept. - 01 October 2016 DELHI 2016 HYDERABAD