CURRICULUM VITAE
Mohamed Gamal Abdul hameed
►Address: 15 Abdul hameed Hassan St., Mataria, Cairo, Egypt.
►Telephone: (+202) 48583382
►Mobile: (+2) 01123408180
►E-Mail: eng_mohamedgamal87@yahoo.com
►Marital status: Married.
►Military service: Exempted
►Date of birth: 04/03/1987.
OBJECTIVE
Seeking a challenging position where my skills, trainee experience and
academic background can be utilized and developed.
EDUCATION & QUALIFICATIONS
►Certificate: Bachelor of Engineering
►University: Helwan University.
►Department: Mechanical Power.
►Graduation year: 2008.
►Graduation year grade: good.
►Graduation project: "HVAC"
►Graduation project grade: Excellent.
►Cumulative grade: Pass.
INSTITUTE & COMPUTER SKILLS
►Microsoft windows: (Win 2000 -Win Millennium -Win XP(
►Internet: Excellent deal with web applications
►Microsoft® (Word -Power Point – Excel(
►AutoCAD 2D
►Primavera 6
►Microsoft project 07
►PMP (Project Management Professional(
EXPERIENCE
From Jan. 2015 till now
►PROJECT: West Damietta 4*125 MW Simple Cycle Power Plant
►COMPANY: MEGA For construction & Industries
► Main-Contractor: ORASCOM & GE
►CONSULTANT: PGESCO
►SCOPE OF WORK: Fast Track Gas Turbine Project (4 Unit x125
MW) Frame 9 E Mechanical scope & BOP Scope
►Job: Planner & Cost Controller Project
►RESPONSIBILITIES:
 Preparing all Tender Documentation & Reviewing BOQ.
 Preparing all contract invoices of Mobilization, monthly progress,
CCC and TOAC.
 Reviewing Cash-In & Cash-Out of the project and prepare the
monthly cash flow report.
 Monitoring & controlling all subcontractors’ agreement.
 Reviewing & controlling all Progress sheets including “Piping,
Stack, Enclosure, Skid, and BOP”.
Reviewing Man hours rate and compare it with planned Man hours.
From March 2015 till now
►PROJECT: El-Menia Power Plant-Mobile Turbine-TM2500
►COMPANY: MEGA For construction & Industries
► Main-Contractor: El-Sewedy Electric Trading & Distribution & GE
►CONSULTANT: PGESCO
►SCOPE OF WORK: Fast Track Construction & Installation of TM
2500 Mobile Turbines "4 units" Mechanical & Electrical Scope
►Job: Planner & Cost Controller Project
►RESPONSIBILITIES:
 Preparing all Tender Documentation & Reviewing BOQ.
 Preparing all contract invoices of Monthly progress, CCC and
TOAC.
 Reviewing Cash-In & Cash-Out of the project and prepare the
monthly cash flow report.
 Reviewing & controlling all Progress sheets including “Piping, Pipes
support, Mechanical Equipment and Electrical Equipment”.
 Reviewing Man hours rate and compare it with planned Man hours.
From Jan. 2015 till now
►PROJECT: Suez Thermal Power Plant 1*650 MW Gas/Oil fired unit
►COMPANY: MEGA For construction & Industries
► Main-Contractor: ANSALDO
►CONSULTANT: PGESCO
►SCOPE OF WORK: Electrical works for CP-105 including Supply &
Apply
►Job: Planner & Cost Controller Project
►RESPONSIBILITIES:
 Preparing all contract invoices of Mobilization, monthly progress,
CCC and TOAC.
 Reviewing Cash-In & Cash-Out of the project and prepare the
monthly cash flow report.
 Monitoring & controlling all subcontractors’ agreement.
 Reviewing & controlling all Progress sheets including “Cables
Laying, Cables Termination and Electrical Equipment”.
 Reviewing Man hours rate and compare it with planned Man hours.
From March 2014 till Jan. 2015
►PROJECT: Giza North Power Station 750 MW Combined Cycle
►COMPANY: MEGA For construction & Industries
► Main-Contractor: INITEC Energia
►CONSULTANT: PGESCO
►SCOPE OF WORK: Construction of mechanical equipment / piping
for one module (CP-118) “Mechanical & Electrical Scope”
►Job: Planner & Cost Controller Project
►RESPONSIBILITIES:
 Preparing all Tender Documentation & Reviewing BOQ.
 Preparing all contract invoices of monthly progress, CCC and
TOAC.
 Reviewing Cash-In & Cash-Out of the project and prepare the
monthly cash flow report.
 Monitoring & controlling all subcontractors’ agreement.
 Reviewing & controlling all isometrics drawings including
)Field weld, spools no. and material classification.(
 Reviewing & controlling all Progress sheets including “Piping,
Piping Supports, and Mechanical Equipment”.
From Jan. 2013 till March 2014
►PROJECT: Giza North Power Station 1500 MW Combined Cycle
►COMPANY: MEGA For construction & Industries
► Main-Contractor: INITEC Energia
►CONSULTANT: PGESCO
►SCOPE OF WORK: Construction of mechanical equipment / piping
for two modules (CP-118) “Mechanical & Electrical Scope”
►Job: Planner & Cost Controller Project
►RESPONSIBILITIES:
 Preparing all Tender Documentation & Reviewing BOQ.
 Preparing all contract invoices of monthly progress, CCC and
TOAC.
 Reviewing Cash-In & Cash-Out of the project and prepare the
monthly cash flow report.
 Monitoring & controlling all subcontractors’ agreement.
 Reviewing & controlling all isometrics drawings including
)Field weld, spools no. and material classification.(
 Reviewing & controlling all Progress sheets including “Piping,
Piping Supports, and Mechanical Equipment”.
From Aug. 2013 till Feb. 2015
►PROJECT: Gabel Elzeyt Wind Turbine 100 GT 60m
►COMPANY: MEGA For construction & Industries
► Main-Contractor: GAMESA & Wind 1000
►SCOPE OF WORK: Construction of Wind turbines 100 units
Mechanical & Electrical Scope"”
►Job: Planner & Cost Controller Project
►RESPONSIBILITIES:
 Preparing all Tender Documentation & Reviewing BOQ.
 Preparing all contract invoices of monthly progress, CCC and
TOAC.
 Reviewing Cash-In & Cash-Out of the project and prepare the
monthly cash flow report.
 Monitoring & controlling all subcontractors’ agreement.
 Reviewing & controlling Wind Turbine Installation Progress.
From Jun. 2012 till Feb. 2013
►PROJECT: Damietta Power Plant Simple Cycle Gas Turbine
►COMPANY: MEGA For construction & Industries
► Main-Contractor: Kharafi National & GE
►SCOPE OF WORK: DLN Conversion Installation “3 units”
►Job: Planner & Cost Controller Project
►RESPONSIBILITIES:
 Preparing all Tender Documentation & Reviewing BOQ.
 Preparing all contract invoices of monthly progress, CCC and
TOAC.
 Reviewing Cash-In & Cash-Out of the project and prepare the
monthly cash flow report.

From Feb. 2014 till Dec. 2014
►PROJECT: West Damietta Power Plant Simple Cycle Gas Turbine
►COMPANY: MEGA For construction & Industries
► Main-Contractor: Kharafi National & GE
►SCOPE OF WORK: DLN Conversion Installation “4 units”
►Job: Planner & Cost Controller Project
►RESPONSIBILITIES:
 Preparing all Tender Documentation & Reviewing BOQ.
 Preparing all contract invoices of monthly progress, CCC and
TOAC.
 Reviewing Cash-In & Cash-Out of the project and prepare the
monthly cash flow report.
From March 2013 till Feb. 2014
►PROJECT: El-shabab Power Plant Simple Cycle Gas Turbine
►COMPANY: MEGA For construction & Industries
► Main-Contractor: Kharafi National & GE
►SCOPE OF WORK: DLN Conversion Installation “6 units”
►Job: Planner & Cost Controller Project
►RESPONSIBILITIES:
 Preparing all Tender Documentation & Reviewing BOQ.
 Preparing all contract invoices of monthly progress, CCC and
TOAC.
 Reviewing Cash-In & Cash-Out of the project and prepare the
monthly cash flow report.
From May 2012 till Jan. 2013
►PROJECT: Banha Power Station 750 MW Combined Cycle
Combustion Turbine Generators
►COMPANY: MEGA For construction & Industries
► Main-Contractor: SEPCO III Electric Power Construction
Corporation & GE
►CONSULTANT: PGESCO
►SCOPE OF WORK: Construction of mechanical and electrical works
of gas turbine (2 units) CP-101 “Mechanical & Electrical Scope”
►Job: Technical office engineer & Quantity Surveyor
►RESPONSIBILITIES:
 Make a daily , weekly and monthly progress
 Prepare all contract invoices of monthly progress, CCC and TOAC
 Controlling of all documents revision for the project
 Make As built drawings for the work
 Reviewing Cash-In & Cash-Out of the project and prepare the
monthly cash flow report
 Prepare the materials for construction department according to
erection sequence
 Reviewing & controlling all isometrics drawings including
)Field weld, spools no. , material classification(
 Preparing all the Hydro test data package (ISO drawings, P&IDs
drawings, line list, valve list, supports, test limits & all the
documents) belong to technical office
From Jan, 2011till April 2012
►PROJECT: Damietta Simple Cycle Gas Turbine {4 units} (500 MW)
►COMPANY: MEGA For construction & Industries
► Main-Contractor: KHARAFI NATIONAL
►CONSULTANT: PGESCO
►SCOPE OF WORK: Construction of mechanical and electrical work
of gas turbine (4 units) CP-101
►Job: Technical office engineer & Quantity Surveyor
►RESPONSIBILITIES:
 Make a daily , weekly and monthly progress
 Prepare all contract invoices of monthly progress, CCC and TOAC
 Controlling of all documents revision for the project
 Make As built drawings for the work
 Reviewing all the materials delivered to the site and check it with
drawings
 Preparing the materials for construction department according to
erection sequence
 Reviewing & controlling all isometrics drawings including
)Field weld, spools no. , material classification(
 Preparing all the Hydro test data package (ISO drawings, P&IDs
drawings, line list, valve list, supports, test limits & all the
documents) belong to technical office.
From Apr, 2010 till Jan, 2011
►Project: Alexandria East Waste Water Treatment Plant
►Company: PSC (Project Services Company)
►Contractor: Degrémont S.A
►Consultant: AAW
►Scope of Work: Rehabilitation & Extension of Primary Treatment
and Additional Secondary Treatment
►Job: Technical Office Engineer & Material Controller engineer
►RESPONSIBILITIES:
 Make a daily , weekly and monthly reports
 Controlling of all documents revision for the project
 Make As built drawings for Rehabilitation work
 Reviewing all the materials delivered to the site and check it with
drawings
 Preparing the materials for construction department according to
erection sequence
 Reviewing all the isometrics drawings and make follow up for
fabrication and erection by Diameter inch
From Dec, 2008 to Apr, 2010
►PROJECT: SIDI KRIR Power Station Combined Cycle (750 MW)
►COMPANY: PSC (Project Services Company)
► Main-Contractor: NEM
►CONSULTANT: PGESCO
►SCOPE OF WORK: Construction of 2 HRSGs units 750 MW
Combined Cycle (CP-105) “Mechanical Scope”
►Job: Technical office engineer
►RESPONSIBILITIES:
 Erection of Steel Structure (Platforms and Stair case)
 Unloading and Erection of 192 Harps of 2 HRSG Units
 Installation of the internal insulation of 2 HRSG Units
 Controlling all documents revision for the project
 Reviewing & controlling all isometrics drawings including
)Field weld, spools no. , material classification(
 Make all the Daily, Weekly and Monthly reports for main
contractor (NEM) and client (i.e. man power & equipment, erection
schedule, S – Curves, piping progress & critical activity)
 Prepare all the Hydro test data package (ISO drawings, P&IDs
drawings, line list, valve list, supports, test limits & all the
documents) belong to technical office
From June, 2008 to Dec, 2008
►COMPANY: PSC (Project Services Company)
►SCOPE OF WORK: Tendering Engineer
►Job: Tendering Engineer
►RESPONSIBILITIES:
 Make cost estimation of the projects.
 Prepare all the quotations of the projects.
 Reviewing BOQ of all quotations.
LANGUAGE SKILLS
►Arabic: Mother tongue.
►English: Good command of read, written and spoken.
PERSONALITY KEY STRENGTH
►Highly self motivated.
►Excellent self learning ability.
►Excellent ability to work under pressure.
►Open minded to new ideas and new technologies.
►Excellent team worker.
HOBBIES
►Reading.
►Traveling.
►Sports.
REFERENCES
I'd appreciate the chance to meet with you to discuss how I could be a vital
part of your project. You may reach me at the above telephone number or e-
mail address.
A certain degree of mobility is available.
Thank you for your consideration. I look forward to talking to you.
Sincerely,
Mohamed Gamal
Mohamed Gamal

More Related Content

What's hot

Lead HRSG Commissioning TFA
Lead HRSG Commissioning TFALead HRSG Commissioning TFA
Lead HRSG Commissioning TFA
AhmedAttia136
 
Tony_Van_Grembergen
Tony_Van_GrembergenTony_Van_Grembergen
Tony_Van_Grembergen
Tony Van Grembergen
 
Mohamed khairy CV
Mohamed khairy CVMohamed khairy CV
Mohamed khairy CV
Mohamed Khairy M. Hussein
 
amrocvEN1-updated 15
amrocvEN1-updated 15amrocvEN1-updated 15
amrocvEN1-updated 15
Amro Ali Ali
 
MAHMOUD CV
MAHMOUD CVMAHMOUD CV
MAHMOUD CV
mahmoud lazam
 
KEE_RESUME_New_CV16 - Copy (8)
KEE_RESUME_New_CV16 - Copy (8)KEE_RESUME_New_CV16 - Copy (8)
KEE_RESUME_New_CV16 - Copy (8)
Kee M
 
my_cv_WP
my_cv_WPmy_cv_WP
my_cv_WP
Muhammad Yaseen
 
Al Qasr Mall presentation
Al Qasr Mall presentationAl Qasr Mall presentation
Al Qasr Mall presentation
Mamdouh Attia
 
Rathiesh Rajakrishnan-CV (2) (1) (1)
Rathiesh Rajakrishnan-CV (2) (1) (1)Rathiesh Rajakrishnan-CV (2) (1) (1)
Rathiesh Rajakrishnan-CV (2) (1) (1)
Rathiesh Rajakrishnan
 
sami haider 5
sami haider 5sami haider 5
sami haider 5
Sami Haider
 
CV Sheren
CV SherenCV Sheren
CV Sheren
Sherien medhat
 
M Halsey CV
M Halsey CVM Halsey CV
M Halsey CV
Mike Halsey
 
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
amr mahrous
 
Kamal ahmed cv
Kamal ahmed cvKamal ahmed cv
Kamal ahmed cv
Kamal Ahmad
 
Ahmed Gameel_CV
Ahmed Gameel_CVAhmed Gameel_CV
Ahmed Gameel_CV
Ahmed Gameel
 
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
Mujahid Ali Akhtar
 
Resume Built Using Primavera P6
Resume Built Using Primavera P6Resume Built Using Primavera P6
Resume Built Using Primavera P6
Mujahid Ali Akhtar
 
CV_Muhammad Iqbal
CV_Muhammad IqbalCV_Muhammad Iqbal
CV_Muhammad Iqbal
Muhammad Iqbal
 
EZZAT SHAHEEN CV.compressed
EZZAT SHAHEEN  CV.compressedEZZAT SHAHEEN  CV.compressed
EZZAT SHAHEEN CV.compressed
Ezzat Aljourdi
 
Job role desired
Job role desiredJob role desired
Job role desired
Magdy Nofal
 

What's hot (20)

Lead HRSG Commissioning TFA
Lead HRSG Commissioning TFALead HRSG Commissioning TFA
Lead HRSG Commissioning TFA
 
Tony_Van_Grembergen
Tony_Van_GrembergenTony_Van_Grembergen
Tony_Van_Grembergen
 
Mohamed khairy CV
Mohamed khairy CVMohamed khairy CV
Mohamed khairy CV
 
amrocvEN1-updated 15
amrocvEN1-updated 15amrocvEN1-updated 15
amrocvEN1-updated 15
 
MAHMOUD CV
MAHMOUD CVMAHMOUD CV
MAHMOUD CV
 
KEE_RESUME_New_CV16 - Copy (8)
KEE_RESUME_New_CV16 - Copy (8)KEE_RESUME_New_CV16 - Copy (8)
KEE_RESUME_New_CV16 - Copy (8)
 
my_cv_WP
my_cv_WPmy_cv_WP
my_cv_WP
 
Al Qasr Mall presentation
Al Qasr Mall presentationAl Qasr Mall presentation
Al Qasr Mall presentation
 
Rathiesh Rajakrishnan-CV (2) (1) (1)
Rathiesh Rajakrishnan-CV (2) (1) (1)Rathiesh Rajakrishnan-CV (2) (1) (1)
Rathiesh Rajakrishnan-CV (2) (1) (1)
 
sami haider 5
sami haider 5sami haider 5
sami haider 5
 
CV Sheren
CV SherenCV Sheren
CV Sheren
 
M Halsey CV
M Halsey CVM Halsey CV
M Halsey CV
 
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
 
Kamal ahmed cv
Kamal ahmed cvKamal ahmed cv
Kamal ahmed cv
 
Ahmed Gameel_CV
Ahmed Gameel_CVAhmed Gameel_CV
Ahmed Gameel_CV
 
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
 
Resume Built Using Primavera P6
Resume Built Using Primavera P6Resume Built Using Primavera P6
Resume Built Using Primavera P6
 
CV_Muhammad Iqbal
CV_Muhammad IqbalCV_Muhammad Iqbal
CV_Muhammad Iqbal
 
EZZAT SHAHEEN CV.compressed
EZZAT SHAHEEN  CV.compressedEZZAT SHAHEEN  CV.compressed
EZZAT SHAHEEN CV.compressed
 
Job role desired
Job role desiredJob role desired
Job role desired
 

Viewers also liked

Ahmed ali
Ahmed ali Ahmed ali
Ahmed ali
materialali
 
DANIAL Retirement Letter At June ,2016
DANIAL Retirement Letter At June ,2016DANIAL Retirement Letter At June ,2016
DANIAL Retirement Letter At June ,2016Goubran Danial
 
Fouad, Mohd. CV
Fouad, Mohd. CVFouad, Mohd. CV
Fouad, Mohd. CV
Mohamed Fouad
 
construction manager 2015
construction manager 2015construction manager 2015
construction manager 2015
Hassan gariesh
 
Hosny Elkady C.V
Hosny Elkady C.VHosny Elkady C.V
Hosny Elkady C.V
hosny elkady
 
RCREEE-enerMENA_pgesco profile-rcree
RCREEE-enerMENA_pgesco profile-rcreeRCREEE-enerMENA_pgesco profile-rcree
RCREEE-enerMENA_pgesco profile-rcree
RCREEE
 
PGESCo C.V
PGESCo  C.VPGESCo  C.V
PGESCo C.V
Ahmed Ghoneim
 
Antar Mustafa CV
Antar Mustafa CVAntar Mustafa CV
Antar Mustafa CV
Antar Salama
 
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
ramiz reyad
 
Marwan Assar CV
Marwan Assar CVMarwan Assar CV
Marwan Assar CV
Marwan Assar
 
Sr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical EngineerSr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical Engineer
ahmedsgs
 

Viewers also liked (11)

Ahmed ali
Ahmed ali Ahmed ali
Ahmed ali
 
DANIAL Retirement Letter At June ,2016
DANIAL Retirement Letter At June ,2016DANIAL Retirement Letter At June ,2016
DANIAL Retirement Letter At June ,2016
 
Fouad, Mohd. CV
Fouad, Mohd. CVFouad, Mohd. CV
Fouad, Mohd. CV
 
construction manager 2015
construction manager 2015construction manager 2015
construction manager 2015
 
Hosny Elkady C.V
Hosny Elkady C.VHosny Elkady C.V
Hosny Elkady C.V
 
RCREEE-enerMENA_pgesco profile-rcree
RCREEE-enerMENA_pgesco profile-rcreeRCREEE-enerMENA_pgesco profile-rcree
RCREEE-enerMENA_pgesco profile-rcree
 
PGESCo C.V
PGESCo  C.VPGESCo  C.V
PGESCo C.V
 
Antar Mustafa CV
Antar Mustafa CVAntar Mustafa CV
Antar Mustafa CV
 
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
 
Marwan Assar CV
Marwan Assar CVMarwan Assar CV
Marwan Assar CV
 
Sr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical EngineerSr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical Engineer
 

Similar to محمد جمال

Ramy Emad C.V Project Engineer
Ramy Emad C.V Project EngineerRamy Emad C.V Project Engineer
Ramy Emad C.V Project Engineer
Ramy Emad
 
Hossam CV-FEB2016
Hossam CV-FEB2016Hossam CV-FEB2016
Hossam CV-FEB2016
Hossam Rabie
 
eng.msotafa cv[Conflict] (1)
eng.msotafa cv[Conflict] (1)eng.msotafa cv[Conflict] (1)
eng.msotafa cv[Conflict] (1)
Mostafa Kamal batroukha
 
Sr. Estimation engineer
Sr. Estimation engineerSr. Estimation engineer
Sr. Estimation engineer
Abdallah Bayoumi
 
CV OF AHMED AHMED ELSAED 27 OCT 2015
CV OF AHMED AHMED ELSAED 27 OCT 2015CV OF AHMED AHMED ELSAED 27 OCT 2015
CV OF AHMED AHMED ELSAED 27 OCT 2015
ahmed elsyed
 
Mohamed kamal cv2018
Mohamed kamal cv2018Mohamed kamal cv2018
Mohamed kamal cv2018
MOHAMED KAMAL
 
CV_WALEED
CV_WALEEDCV_WALEED
CV_WALEED
waleed thabet
 
Hisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.MHisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.M
Hesham Fathy, PMP
 
Ahmed El- Kholy CV
Ahmed El- Kholy CVAhmed El- Kholy CV
Ahmed El- Kholy CV
AHMED EL-KHOLY
 
C.V.-Mohamed Alsharkawy-2016
C.V.-Mohamed Alsharkawy-2016 C.V.-Mohamed Alsharkawy-2016
C.V.-Mohamed Alsharkawy-2016
Mohammed Salah El-Sharkawy
 
cv amr
cv amrcv amr
CV Amr Zaki - PMP®
CV Amr Zaki - PMP®CV Amr Zaki - PMP®
CV Amr Zaki - PMP®
Amr Zaki - PMP®
 
CV. Mechincal Engineer
CV. Mechincal EngineerCV. Mechincal Engineer
CV. Mechincal Engineer
Ahmad Hassan
 
Mohamed mustafa mohamed el anwar .general lifting supervisor & lifting pl...
Mohamed mustafa mohamed el anwar .general lifting supervisor & lifting pl...Mohamed mustafa mohamed el anwar .general lifting supervisor & lifting pl...
Mohamed mustafa mohamed el anwar .general lifting supervisor & lifting pl...
Mohamed El-Anwar
 
CV Ahmed1
CV Ahmed1CV Ahmed1
CV Ahmed1
ahmed omar
 
Mechanical Hvac INMA 3117
Mechanical Hvac INMA 3117Mechanical Hvac INMA 3117
Mechanical Hvac INMA 3117
Jehanzaib Maqsood
 
Mohamed Behiry CV
Mohamed Behiry CVMohamed Behiry CV
Mohamed Behiry CV
mohamed behiry
 
Mechanical Hvac INMA 3117
Mechanical Hvac INMA 3117Mechanical Hvac INMA 3117
Mechanical Hvac INMA 3117
Jehanzaib Maqsood
 
CV Asif Rashid
CV Asif Rashid CV Asif Rashid
CV Asif Rashid
ASIF RASHID
 
Ahmad-Adnan cv
Ahmad-Adnan cvAhmad-Adnan cv
Ahmad-Adnan cv
Ahmed adnan
 

Similar to محمد جمال (20)

Ramy Emad C.V Project Engineer
Ramy Emad C.V Project EngineerRamy Emad C.V Project Engineer
Ramy Emad C.V Project Engineer
 
Hossam CV-FEB2016
Hossam CV-FEB2016Hossam CV-FEB2016
Hossam CV-FEB2016
 
eng.msotafa cv[Conflict] (1)
eng.msotafa cv[Conflict] (1)eng.msotafa cv[Conflict] (1)
eng.msotafa cv[Conflict] (1)
 
Sr. Estimation engineer
Sr. Estimation engineerSr. Estimation engineer
Sr. Estimation engineer
 
CV OF AHMED AHMED ELSAED 27 OCT 2015
CV OF AHMED AHMED ELSAED 27 OCT 2015CV OF AHMED AHMED ELSAED 27 OCT 2015
CV OF AHMED AHMED ELSAED 27 OCT 2015
 
Mohamed kamal cv2018
Mohamed kamal cv2018Mohamed kamal cv2018
Mohamed kamal cv2018
 
CV_WALEED
CV_WALEEDCV_WALEED
CV_WALEED
 
Hisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.MHisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.M
 
Ahmed El- Kholy CV
Ahmed El- Kholy CVAhmed El- Kholy CV
Ahmed El- Kholy CV
 
C.V.-Mohamed Alsharkawy-2016
C.V.-Mohamed Alsharkawy-2016 C.V.-Mohamed Alsharkawy-2016
C.V.-Mohamed Alsharkawy-2016
 
cv amr
cv amrcv amr
cv amr
 
CV Amr Zaki - PMP®
CV Amr Zaki - PMP®CV Amr Zaki - PMP®
CV Amr Zaki - PMP®
 
CV. Mechincal Engineer
CV. Mechincal EngineerCV. Mechincal Engineer
CV. Mechincal Engineer
 
Mohamed mustafa mohamed el anwar .general lifting supervisor & lifting pl...
Mohamed mustafa mohamed el anwar .general lifting supervisor & lifting pl...Mohamed mustafa mohamed el anwar .general lifting supervisor & lifting pl...
Mohamed mustafa mohamed el anwar .general lifting supervisor & lifting pl...
 
CV Ahmed1
CV Ahmed1CV Ahmed1
CV Ahmed1
 
Mechanical Hvac INMA 3117
Mechanical Hvac INMA 3117Mechanical Hvac INMA 3117
Mechanical Hvac INMA 3117
 
Mohamed Behiry CV
Mohamed Behiry CVMohamed Behiry CV
Mohamed Behiry CV
 
Mechanical Hvac INMA 3117
Mechanical Hvac INMA 3117Mechanical Hvac INMA 3117
Mechanical Hvac INMA 3117
 
CV Asif Rashid
CV Asif Rashid CV Asif Rashid
CV Asif Rashid
 
Ahmad-Adnan cv
Ahmad-Adnan cvAhmad-Adnan cv
Ahmad-Adnan cv
 

محمد جمال

  • 1. CURRICULUM VITAE Mohamed Gamal Abdul hameed ►Address: 15 Abdul hameed Hassan St., Mataria, Cairo, Egypt. ►Telephone: (+202) 48583382 ►Mobile: (+2) 01123408180 ►E-Mail: eng_mohamedgamal87@yahoo.com ►Marital status: Married. ►Military service: Exempted ►Date of birth: 04/03/1987. OBJECTIVE Seeking a challenging position where my skills, trainee experience and academic background can be utilized and developed. EDUCATION & QUALIFICATIONS ►Certificate: Bachelor of Engineering ►University: Helwan University. ►Department: Mechanical Power. ►Graduation year: 2008. ►Graduation year grade: good. ►Graduation project: "HVAC" ►Graduation project grade: Excellent. ►Cumulative grade: Pass. INSTITUTE & COMPUTER SKILLS ►Microsoft windows: (Win 2000 -Win Millennium -Win XP( ►Internet: Excellent deal with web applications ►Microsoft® (Word -Power Point – Excel( ►AutoCAD 2D ►Primavera 6 ►Microsoft project 07 ►PMP (Project Management Professional(
  • 2. EXPERIENCE From Jan. 2015 till now ►PROJECT: West Damietta 4*125 MW Simple Cycle Power Plant ►COMPANY: MEGA For construction & Industries ► Main-Contractor: ORASCOM & GE ►CONSULTANT: PGESCO ►SCOPE OF WORK: Fast Track Gas Turbine Project (4 Unit x125 MW) Frame 9 E Mechanical scope & BOP Scope ►Job: Planner & Cost Controller Project ►RESPONSIBILITIES:  Preparing all Tender Documentation & Reviewing BOQ.  Preparing all contract invoices of Mobilization, monthly progress, CCC and TOAC.  Reviewing Cash-In & Cash-Out of the project and prepare the monthly cash flow report.  Monitoring & controlling all subcontractors’ agreement.  Reviewing & controlling all Progress sheets including “Piping, Stack, Enclosure, Skid, and BOP”. Reviewing Man hours rate and compare it with planned Man hours. From March 2015 till now ►PROJECT: El-Menia Power Plant-Mobile Turbine-TM2500 ►COMPANY: MEGA For construction & Industries ► Main-Contractor: El-Sewedy Electric Trading & Distribution & GE ►CONSULTANT: PGESCO ►SCOPE OF WORK: Fast Track Construction & Installation of TM 2500 Mobile Turbines "4 units" Mechanical & Electrical Scope ►Job: Planner & Cost Controller Project ►RESPONSIBILITIES:  Preparing all Tender Documentation & Reviewing BOQ.  Preparing all contract invoices of Monthly progress, CCC and TOAC.  Reviewing Cash-In & Cash-Out of the project and prepare the monthly cash flow report.  Reviewing & controlling all Progress sheets including “Piping, Pipes support, Mechanical Equipment and Electrical Equipment”.  Reviewing Man hours rate and compare it with planned Man hours.
  • 3. From Jan. 2015 till now ►PROJECT: Suez Thermal Power Plant 1*650 MW Gas/Oil fired unit ►COMPANY: MEGA For construction & Industries ► Main-Contractor: ANSALDO ►CONSULTANT: PGESCO ►SCOPE OF WORK: Electrical works for CP-105 including Supply & Apply ►Job: Planner & Cost Controller Project ►RESPONSIBILITIES:  Preparing all contract invoices of Mobilization, monthly progress, CCC and TOAC.  Reviewing Cash-In & Cash-Out of the project and prepare the monthly cash flow report.  Monitoring & controlling all subcontractors’ agreement.  Reviewing & controlling all Progress sheets including “Cables Laying, Cables Termination and Electrical Equipment”.  Reviewing Man hours rate and compare it with planned Man hours. From March 2014 till Jan. 2015 ►PROJECT: Giza North Power Station 750 MW Combined Cycle ►COMPANY: MEGA For construction & Industries ► Main-Contractor: INITEC Energia ►CONSULTANT: PGESCO ►SCOPE OF WORK: Construction of mechanical equipment / piping for one module (CP-118) “Mechanical & Electrical Scope” ►Job: Planner & Cost Controller Project ►RESPONSIBILITIES:  Preparing all Tender Documentation & Reviewing BOQ.  Preparing all contract invoices of monthly progress, CCC and TOAC.  Reviewing Cash-In & Cash-Out of the project and prepare the monthly cash flow report.  Monitoring & controlling all subcontractors’ agreement.  Reviewing & controlling all isometrics drawings including )Field weld, spools no. and material classification.(  Reviewing & controlling all Progress sheets including “Piping, Piping Supports, and Mechanical Equipment”.
  • 4. From Jan. 2013 till March 2014 ►PROJECT: Giza North Power Station 1500 MW Combined Cycle ►COMPANY: MEGA For construction & Industries ► Main-Contractor: INITEC Energia ►CONSULTANT: PGESCO ►SCOPE OF WORK: Construction of mechanical equipment / piping for two modules (CP-118) “Mechanical & Electrical Scope” ►Job: Planner & Cost Controller Project ►RESPONSIBILITIES:  Preparing all Tender Documentation & Reviewing BOQ.  Preparing all contract invoices of monthly progress, CCC and TOAC.  Reviewing Cash-In & Cash-Out of the project and prepare the monthly cash flow report.  Monitoring & controlling all subcontractors’ agreement.  Reviewing & controlling all isometrics drawings including )Field weld, spools no. and material classification.(  Reviewing & controlling all Progress sheets including “Piping, Piping Supports, and Mechanical Equipment”. From Aug. 2013 till Feb. 2015 ►PROJECT: Gabel Elzeyt Wind Turbine 100 GT 60m ►COMPANY: MEGA For construction & Industries ► Main-Contractor: GAMESA & Wind 1000 ►SCOPE OF WORK: Construction of Wind turbines 100 units Mechanical & Electrical Scope"” ►Job: Planner & Cost Controller Project ►RESPONSIBILITIES:  Preparing all Tender Documentation & Reviewing BOQ.  Preparing all contract invoices of monthly progress, CCC and TOAC.  Reviewing Cash-In & Cash-Out of the project and prepare the monthly cash flow report.  Monitoring & controlling all subcontractors’ agreement.  Reviewing & controlling Wind Turbine Installation Progress. From Jun. 2012 till Feb. 2013 ►PROJECT: Damietta Power Plant Simple Cycle Gas Turbine ►COMPANY: MEGA For construction & Industries ► Main-Contractor: Kharafi National & GE ►SCOPE OF WORK: DLN Conversion Installation “3 units”
  • 5. ►Job: Planner & Cost Controller Project ►RESPONSIBILITIES:  Preparing all Tender Documentation & Reviewing BOQ.  Preparing all contract invoices of monthly progress, CCC and TOAC.  Reviewing Cash-In & Cash-Out of the project and prepare the monthly cash flow report.  From Feb. 2014 till Dec. 2014 ►PROJECT: West Damietta Power Plant Simple Cycle Gas Turbine ►COMPANY: MEGA For construction & Industries ► Main-Contractor: Kharafi National & GE ►SCOPE OF WORK: DLN Conversion Installation “4 units” ►Job: Planner & Cost Controller Project ►RESPONSIBILITIES:  Preparing all Tender Documentation & Reviewing BOQ.  Preparing all contract invoices of monthly progress, CCC and TOAC.  Reviewing Cash-In & Cash-Out of the project and prepare the monthly cash flow report. From March 2013 till Feb. 2014 ►PROJECT: El-shabab Power Plant Simple Cycle Gas Turbine ►COMPANY: MEGA For construction & Industries ► Main-Contractor: Kharafi National & GE ►SCOPE OF WORK: DLN Conversion Installation “6 units” ►Job: Planner & Cost Controller Project ►RESPONSIBILITIES:  Preparing all Tender Documentation & Reviewing BOQ.  Preparing all contract invoices of monthly progress, CCC and TOAC.  Reviewing Cash-In & Cash-Out of the project and prepare the monthly cash flow report. From May 2012 till Jan. 2013 ►PROJECT: Banha Power Station 750 MW Combined Cycle Combustion Turbine Generators ►COMPANY: MEGA For construction & Industries ► Main-Contractor: SEPCO III Electric Power Construction Corporation & GE ►CONSULTANT: PGESCO
  • 6. ►SCOPE OF WORK: Construction of mechanical and electrical works of gas turbine (2 units) CP-101 “Mechanical & Electrical Scope” ►Job: Technical office engineer & Quantity Surveyor ►RESPONSIBILITIES:  Make a daily , weekly and monthly progress  Prepare all contract invoices of monthly progress, CCC and TOAC  Controlling of all documents revision for the project  Make As built drawings for the work  Reviewing Cash-In & Cash-Out of the project and prepare the monthly cash flow report  Prepare the materials for construction department according to erection sequence  Reviewing & controlling all isometrics drawings including )Field weld, spools no. , material classification(  Preparing all the Hydro test data package (ISO drawings, P&IDs drawings, line list, valve list, supports, test limits & all the documents) belong to technical office From Jan, 2011till April 2012 ►PROJECT: Damietta Simple Cycle Gas Turbine {4 units} (500 MW) ►COMPANY: MEGA For construction & Industries ► Main-Contractor: KHARAFI NATIONAL ►CONSULTANT: PGESCO ►SCOPE OF WORK: Construction of mechanical and electrical work of gas turbine (4 units) CP-101 ►Job: Technical office engineer & Quantity Surveyor ►RESPONSIBILITIES:  Make a daily , weekly and monthly progress  Prepare all contract invoices of monthly progress, CCC and TOAC  Controlling of all documents revision for the project  Make As built drawings for the work  Reviewing all the materials delivered to the site and check it with drawings  Preparing the materials for construction department according to erection sequence  Reviewing & controlling all isometrics drawings including )Field weld, spools no. , material classification(  Preparing all the Hydro test data package (ISO drawings, P&IDs drawings, line list, valve list, supports, test limits & all the documents) belong to technical office.
  • 7. From Apr, 2010 till Jan, 2011 ►Project: Alexandria East Waste Water Treatment Plant ►Company: PSC (Project Services Company) ►Contractor: Degrémont S.A ►Consultant: AAW ►Scope of Work: Rehabilitation & Extension of Primary Treatment and Additional Secondary Treatment ►Job: Technical Office Engineer & Material Controller engineer ►RESPONSIBILITIES:  Make a daily , weekly and monthly reports  Controlling of all documents revision for the project  Make As built drawings for Rehabilitation work  Reviewing all the materials delivered to the site and check it with drawings  Preparing the materials for construction department according to erection sequence  Reviewing all the isometrics drawings and make follow up for fabrication and erection by Diameter inch From Dec, 2008 to Apr, 2010 ►PROJECT: SIDI KRIR Power Station Combined Cycle (750 MW) ►COMPANY: PSC (Project Services Company) ► Main-Contractor: NEM ►CONSULTANT: PGESCO ►SCOPE OF WORK: Construction of 2 HRSGs units 750 MW Combined Cycle (CP-105) “Mechanical Scope” ►Job: Technical office engineer ►RESPONSIBILITIES:  Erection of Steel Structure (Platforms and Stair case)  Unloading and Erection of 192 Harps of 2 HRSG Units  Installation of the internal insulation of 2 HRSG Units  Controlling all documents revision for the project  Reviewing & controlling all isometrics drawings including )Field weld, spools no. , material classification(  Make all the Daily, Weekly and Monthly reports for main contractor (NEM) and client (i.e. man power & equipment, erection schedule, S – Curves, piping progress & critical activity)  Prepare all the Hydro test data package (ISO drawings, P&IDs drawings, line list, valve list, supports, test limits & all the documents) belong to technical office
  • 8. From June, 2008 to Dec, 2008 ►COMPANY: PSC (Project Services Company) ►SCOPE OF WORK: Tendering Engineer ►Job: Tendering Engineer ►RESPONSIBILITIES:  Make cost estimation of the projects.  Prepare all the quotations of the projects.  Reviewing BOQ of all quotations. LANGUAGE SKILLS ►Arabic: Mother tongue. ►English: Good command of read, written and spoken. PERSONALITY KEY STRENGTH ►Highly self motivated. ►Excellent self learning ability. ►Excellent ability to work under pressure. ►Open minded to new ideas and new technologies. ►Excellent team worker. HOBBIES ►Reading. ►Traveling. ►Sports. REFERENCES I'd appreciate the chance to meet with you to discuss how I could be a vital part of your project. You may reach me at the above telephone number or e- mail address. A certain degree of mobility is available. Thank you for your consideration. I look forward to talking to you. Sincerely,