Team Finland: Luoteis-Venäjän teollisuuspuistojen esittelytilaisuus Pietarissa 23.4.2014
Team Finland: презентация индустриальных парков в Санкт-Петербурге 23.4.2014
2. Part of the CONSTRUCTOR GROUP - one of the largest sales and technical
support organization in Europe, which has factory in Finland.
CONSTRUCTOR RUS is today a full scale supplier of storage and logistic
solutions for the industry and trade – stationary, mobile archive , machines and
many other variety of storage solutions.
3. • 2008 – Setting up a company CONSTRUCTOR RUS; Acquisition
of the premises in Kirovsk (Leningradskaya obl.)
• 2009 – Launch of the Factory; Pallet racking P90 production
started: uprights, painted beams
• 2010 – Shelves profiling line put into operation
• 2011 – Brace profiling line put into operation
• 2012 – Combi uprights profiling line put into operation
• 2013 – Opening of a branch office in Moscow, Krasnodar and
Nigniy Novgorod
• 2014-nowadays – Investment development -New powder painting
system implementation
4. Factory was put into operation within 1
year after the purchase. This was achieved
due to parallel and timely provisions for:
Construction (modernization project),
requires approval from authorities,
Building work,
Project for production (requires approval
from authorities),
Import of machinery,
Recruitment,
Assembly and installation of equipment.
5. Location – Kirovsk, L.O. Despite of
remoteness from Saint-Petersburg, there is an
opportunity to gain to the Factory by public
transport (bus 565). It takes up over 25-30
minutes to be there from metro station “Ulitsa
Dybenko”.
Today CORU is a high developing
manufacturing company with its own
production, logistics, sales
department and etc.
Labour supply – over 100 workers
6. Raw
Materi
als
ware-
house
Beams prof. line
Uprights prof. line
Degreasing zone
Factory floor space – 12 000 m²
Inner Yard – 3 000 m²
Painting zoneWelding stations Painting:
loading
Drying tunnel
Curing oven
Painting:
unloading &
packing
Finished products
& goods warehouse
Shelving linewarehouse
Braces line
Office
INNER
YARD
A90-uprights line
7. Resource utilities (average)
Resource
1 Electricity
Electric power consumption 86 262 kWhe/month
Price 3,25 RUR per kWhe
2 Water
Water consumption 68,66 cum/month
Price 115 RUR per cum
3 Sewage
Discharge 58,2 cum/month
Price 282 RUR per cum
4 Gas
Gas consumption 19 925 cum/month
Price 5 044,73 RUR per cum
5 Heat power
Heat power consumption 344,37 Gcal/month
Price 1 547,52 RUR per Gcal
Nowadays, the Factory is provided by all necessary
resources to operate on maximum capacity.