RAILWAY MAINTENANCE 
AT 
SUBMITTED BY : 
SATYAM SINGH 
B.Tech [ME-D] 4th Year 
110106247 
11SETME252
CLASSIFICATION OF COACHING MAINTENANCE DEPOTS 
Serial No. Depot No. of based Coaches 
1 Minor 50 – 100 
2 Medium 100 – 250 
3 Major Above 250
MAINTENANCE SCHEDULE and category 
Washing Line 
1. Trip Schedule : After every trip by primary maintenance depot. 
 Sick Line 
2. Schedule A : Monthly (1 month + 7 days) 
3. Schedule B : Quarterly (3 months + 15 days) 
4. Schedule C : After 180 days or 6 Months 
5. IOH : Every 9 months 
6. POH : Every 18 months
Works carried out in Washing Line 
Inspection 
Cleaning & washing 
Brake testing 
Primary Maintenance 
Secondary Maintenance 
Watering 
Loading of linen 
Maintenance of AC & electrical circuits of coaches
Brake testing in Washing Line 
Brake testing is carried by using RTR (rack test rig). 
Rack testing rig is capable of testing full train (up to 24 coaches) at a time. 
SECONDARY MAINTENANCE 
The trains for the secondary maintenance are given at least 2 hrs on the washing 
line. 
Linen and pantry car provisions 
Washing & cleaning of coaches 
Maintenance of AC of coaches
PRIMARY MAINTENANCE 
The trains for the primary maintenance are given at least 6 hrs at the washing line 
in addition to secondary maintenance 
Oil in hydraulic dash pots 
Wheel profiles are visually examined and gauged 
Pest control treatment 
Axle box is examined for grease oozing 
Brake blocks & piston stroke checked & changed
Sick line 
Sick line is the workshop for the major and periodical maintenance of the coaches. 
Works carried out in sick line 
1. Wheel and Axle Assembly 
2. Bogie Maintenance 
3. Buffer Maintenance 
4. Air Brake System Maintenance 
5. Trolley Maintenance 
6. Lifting of Coaches
Wheel and Axle Assembly 
1. Width of wheel = 127 mm 
2. Wheel Diameter = 915 (new), 825 (condemn) 
Permissible diameter variation in wheel 
Coaching 
a) On same axle – 0.5 mm 
b) On same bogie – 5.0 mm 
c) On same coach – 13.0 mm 
Goods 
a) On same axle – 0.5 mm 
b) On same bogie – 13.0 mm 
c) On same coach – 25.0 mm 
Fig. 1 Wheel profile (all length dimension are in mm)
Wheels are fixed on the axle with the help of bearings. 
Like wheel, it is also made up of steel. 
Brake cylinder are attached to axle. 
Braking discs are fixed on the axle 
Fig. 2 Axle
Buffer height adjustment 
Causes of low buffer height in ICF coaching stock : 
a) excessive wear of wheel 
b) Due to loss of proper stiffness of coil spring 
c) Due to excessive wear on side bearer’s metal & bronze piece. 
Maximum buffer height = 1105 mm [In empty condition] 
Minimum buffer height = 1030 mm [In loaded condition] 
To achieve buffer height a standard size of wooden packing pieces are used which are 
kept below the Dash Pot Flange on axle Box wings of primary suspension. 
Serial N0. Wheel Diameter (mm) Thickness of Wooden Packing (mm) 
1. Below 889 up to 863 13 
2. Below 863 up to 839 26 
3. Below 839 up to 819 38 
4. 819 & below 48
Air brake system maintenance 
Components of Air Brake System 
1. Brake Container 
2. Distributor Valve 
3. Pressure Tanks (125 liters, 6 liters) 
4. B.P. / F.P. coupling and hosts 
5. Emergency Brake Pull Box 
6. Emergency Brake Valve
Trolley Maintenance 
Parts of Trolley 
1. Trolley Frame 
2. Center pivot 
3. Side Bearing 
4. Brake Cylinder 
Fig. 3 Trolley
Lifting of coaches 
Require tools and equipments 
1. With the use of Mechanical Jacks 
2. With the use of Hydraulic Jacks 
3. With the use of Electrical operated Travelling Crane 
4. With the use of Whiting Jacks
PLATFORM TRAIN DUTY 
 Rolling In 
Rolling out 
Axle box feeling 
Brake Power Certificate 
Safe to Run
ROLLING IN/ROLLING OUT 
When train enters in station Examiner staff take up positions on both sides inspect the train 
enters at the speed of 8 Km/hr 
Whistling sound of hot axle boxes. 
 Any hanging part or loose fitting of vehicle. 
Any component or spring suspension bracket loose/broken. 
 Abnormal behaviour of vehicle.
Axle box feeling 
After the train come to halt, all axle boxes are felt within 20 minutes. The temp. of axle is 
checked by touching with hand 
Temp. is found high then it is checked by the temp. gun which gives exact temp. 
If this temp. is found more than 30 degree than atm. temp. then the cause is inspected and 
coach is sent to workshop
BRAKE POWER Certificate 
 This certificate is jointly signed by Guard , Driver, and C&W supervisor. 
 The incoming driver shall handover the brake power certificate to Reliving driver or 
Deposit it the nominated authority, who will give it to the outgoing Driver. 
 The outgoing driver and guard will satisfy themselves from the listed coach numbers that 
the Brake Power Certificate pertains to their train.
Safe to run 
If all of above factors like no hanging parts brakes are working correctly the temp of 
axle box is with in range and the train is in good and safe condition of running then 
the train is announced as safe to run.
THANK YOU ALL FOR YOUR KIND ATTENTION

More Related Content

What's hot

What's hot (20)

Training report on railways (all workshop)
Training report on railways (all workshop)Training report on railways (all workshop)
Training report on railways (all workshop)
 
Air brake system of locomotive
Air brake system of locomotiveAir brake system of locomotive
Air brake system of locomotive
 
Railway coaching depot report
Railway coaching depot reportRailway coaching depot report
Railway coaching depot report
 
Northern railway
Northern railwayNorthern railway
Northern railway
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training report
 
Railway Training Report
Railway Training ReportRailway Training Report
Railway Training Report
 
STUDY OF ICF BOGIE
STUDY OF ICF BOGIESTUDY OF ICF BOGIE
STUDY OF ICF BOGIE
 
South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...
 
coach care complex jaipur ppt
coach care complex jaipur pptcoach care complex jaipur ppt
coach care complex jaipur ppt
 
INTERNSHIP REPORT...LOWERPAREL CARRIAGE WORKSHOP
INTERNSHIP REPORT...LOWERPAREL CARRIAGE WORKSHOPINTERNSHIP REPORT...LOWERPAREL CARRIAGE WORKSHOP
INTERNSHIP REPORT...LOWERPAREL CARRIAGE WORKSHOP
 
Lhb coach documentation
Lhb coach  documentationLhb coach  documentation
Lhb coach documentation
 
Carriage and wagon
Carriage and wagonCarriage and wagon
Carriage and wagon
 
South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...
 
Railway braking system
Railway braking systemRailway braking system
Railway braking system
 
G-97 Manual
G-97 ManualG-97 Manual
G-97 Manual
 
Indian railway report main
Indian railway report mainIndian railway report main
Indian railway report main
 
RAILWAY WORKSHOP TRANING PPT
RAILWAY WORKSHOP TRANING  PPTRAILWAY WORKSHOP TRANING  PPT
RAILWAY WORKSHOP TRANING PPT
 
ICF Bogie Details by Yadvendu
ICF Bogie Details by YadvenduICF Bogie Details by Yadvendu
ICF Bogie Details by Yadvendu
 
LOCO TRAINING REPORT
LOCO TRAINING REPORTLOCO TRAINING REPORT
LOCO TRAINING REPORT
 
Air brake system of locomotives
Air brake system of locomotivesAir brake system of locomotives
Air brake system of locomotives
 

Similar to Coach care centre new delhi

amitppt_151004200417_lva1_app6891_(1).pptx
amitppt_151004200417_lva1_app6891_(1).pptxamitppt_151004200417_lva1_app6891_(1).pptx
amitppt_151004200417_lva1_app6891_(1).pptx
AryanYadav924184
 
Allison training report
Allison training reportAllison training report
Allison training report
Infosys
 
16 8 2011 drbmc dyno report
16 8 2011 drbmc dyno report16 8 2011 drbmc dyno report
16 8 2011 drbmc dyno report
drbmc
 
Walkie type electric pallet truck cbd20 k(d)
Walkie type electric pallet truck cbd20 k(d)Walkie type electric pallet truck cbd20 k(d)
Walkie type electric pallet truck cbd20 k(d)
Iroye Equipment
 
Walkie type electric pallet truck cbd20 k(d)
Walkie type electric pallet truck cbd20 k(d)Walkie type electric pallet truck cbd20 k(d)
Walkie type electric pallet truck cbd20 k(d)
Amber Dai
 

Similar to Coach care centre new delhi (20)

Itnesh -Persentation on coach care
Itnesh -Persentation on coach care Itnesh -Persentation on coach care
Itnesh -Persentation on coach care
 
amitppt_151004200417_lva1_app6891_(1).pptx
amitppt_151004200417_lva1_app6891_(1).pptxamitppt_151004200417_lva1_app6891_(1).pptx
amitppt_151004200417_lva1_app6891_(1).pptx
 
Amitppt 151004200417-lva1-app6891
Amitppt 151004200417-lva1-app6891Amitppt 151004200417-lva1-app6891
Amitppt 151004200417-lva1-app6891
 
seminar presentation on summer training at indian railway
seminar presentation on summer training at indian railway seminar presentation on summer training at indian railway
seminar presentation on summer training at indian railway
 
south east central railway training
south east central railway trainingsouth east central railway training
south east central railway training
 
Prashant patel
Prashant patelPrashant patel
Prashant patel
 
Project Report
Project Report Project Report
Project Report
 
E1303072935
E1303072935E1303072935
E1303072935
 
Uttarakhand Transport Corporation Training Report.
Uttarakhand Transport Corporation Training Report.Uttarakhand Transport Corporation Training Report.
Uttarakhand Transport Corporation Training Report.
 
Allison training report
Allison training reportAllison training report
Allison training report
 
report on Industrial training
report on Industrial training report on Industrial training
report on Industrial training
 
16 8 2011 drbmc dyno report
16 8 2011 drbmc dyno report16 8 2011 drbmc dyno report
16 8 2011 drbmc dyno report
 
At6702 uw
At6702 uwAt6702 uw
At6702 uw
 
Unit 4 - Vehicle Classification & Systems.pptx
Unit 4 - Vehicle Classification & Systems.pptxUnit 4 - Vehicle Classification & Systems.pptx
Unit 4 - Vehicle Classification & Systems.pptx
 
Loco diesel shed, pulera
Loco diesel shed, puleraLoco diesel shed, pulera
Loco diesel shed, pulera
 
Walkie type electric pallet truck cbd20 k(d)
Walkie type electric pallet truck cbd20 k(d)Walkie type electric pallet truck cbd20 k(d)
Walkie type electric pallet truck cbd20 k(d)
 
Walkie type electric pallet truck cbd20 k(d)
Walkie type electric pallet truck cbd20 k(d)Walkie type electric pallet truck cbd20 k(d)
Walkie type electric pallet truck cbd20 k(d)
 
North Western Indian Railway,Jaipur, Rajasthan 2016
North Western Indian Railway,Jaipur, Rajasthan 2016North Western Indian Railway,Jaipur, Rajasthan 2016
North Western Indian Railway,Jaipur, Rajasthan 2016
 
summertraining at rdso lucknow
summertraining at rdso lucknowsummertraining at rdso lucknow
summertraining at rdso lucknow
 
Types of PANTOGRAPH
Types of PANTOGRAPHTypes of PANTOGRAPH
Types of PANTOGRAPH
 

More from Home

More from Home (20)

Concurrent engineering
Concurrent engineeringConcurrent engineering
Concurrent engineering
 
Diesel locomotive workshop
Diesel locomotive workshopDiesel locomotive workshop
Diesel locomotive workshop
 
Vehicle diagnosis and solutions
Vehicle diagnosis and solutionsVehicle diagnosis and solutions
Vehicle diagnosis and solutions
 
Udaipur cement industries limited
Udaipur cement industries limitedUdaipur cement industries limited
Udaipur cement industries limited
 
Tata steel
Tata steelTata steel
Tata steel
 
Suzuki
SuzukiSuzuki
Suzuki
 
Study of pipe line system in ac
Study of pipe line system in acStudy of pipe line system in ac
Study of pipe line system in ac
 
Steel production at compact strip pellet mill
Steel production at compact strip pellet millSteel production at compact strip pellet mill
Steel production at compact strip pellet mill
 
Shaft and axle
Shaft and axleShaft and axle
Shaft and axle
 
Micromax
MicromaxMicromax
Micromax
 
Machinary shop
Machinary shopMachinary shop
Machinary shop
 
Industrial robotics
Industrial roboticsIndustrial robotics
Industrial robotics
 
India yamaha motors
India yamaha motorsIndia yamaha motors
India yamaha motors
 
Construction and manufacturing of steam turbine
Construction and manufacturing of steam turbineConstruction and manufacturing of steam turbine
Construction and manufacturing of steam turbine
 
Chumey technical training institute bumthang bhutan
Chumey technical training institute bumthang  bhutanChumey technical training institute bumthang  bhutan
Chumey technical training institute bumthang bhutan
 
Bosch
BoschBosch
Bosch
 
Bonfiglioli
BonfiglioliBonfiglioli
Bonfiglioli
 
Bhel
BhelBhel
Bhel
 
Bhel steam turbine manufacturing
Bhel steam turbine manufacturingBhel steam turbine manufacturing
Bhel steam turbine manufacturing
 
Agriculture machinery centre
Agriculture machinery centreAgriculture machinery centre
Agriculture machinery centre
 

Recently uploaded

scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
HenryBriggs2
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
AldoGarca30
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 

Recently uploaded (20)

scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 

Coach care centre new delhi

  • 1. RAILWAY MAINTENANCE AT SUBMITTED BY : SATYAM SINGH B.Tech [ME-D] 4th Year 110106247 11SETME252
  • 2. CLASSIFICATION OF COACHING MAINTENANCE DEPOTS Serial No. Depot No. of based Coaches 1 Minor 50 – 100 2 Medium 100 – 250 3 Major Above 250
  • 3. MAINTENANCE SCHEDULE and category Washing Line 1. Trip Schedule : After every trip by primary maintenance depot.  Sick Line 2. Schedule A : Monthly (1 month + 7 days) 3. Schedule B : Quarterly (3 months + 15 days) 4. Schedule C : After 180 days or 6 Months 5. IOH : Every 9 months 6. POH : Every 18 months
  • 4. Works carried out in Washing Line Inspection Cleaning & washing Brake testing Primary Maintenance Secondary Maintenance Watering Loading of linen Maintenance of AC & electrical circuits of coaches
  • 5. Brake testing in Washing Line Brake testing is carried by using RTR (rack test rig). Rack testing rig is capable of testing full train (up to 24 coaches) at a time. SECONDARY MAINTENANCE The trains for the secondary maintenance are given at least 2 hrs on the washing line. Linen and pantry car provisions Washing & cleaning of coaches Maintenance of AC of coaches
  • 6. PRIMARY MAINTENANCE The trains for the primary maintenance are given at least 6 hrs at the washing line in addition to secondary maintenance Oil in hydraulic dash pots Wheel profiles are visually examined and gauged Pest control treatment Axle box is examined for grease oozing Brake blocks & piston stroke checked & changed
  • 7. Sick line Sick line is the workshop for the major and periodical maintenance of the coaches. Works carried out in sick line 1. Wheel and Axle Assembly 2. Bogie Maintenance 3. Buffer Maintenance 4. Air Brake System Maintenance 5. Trolley Maintenance 6. Lifting of Coaches
  • 8. Wheel and Axle Assembly 1. Width of wheel = 127 mm 2. Wheel Diameter = 915 (new), 825 (condemn) Permissible diameter variation in wheel Coaching a) On same axle – 0.5 mm b) On same bogie – 5.0 mm c) On same coach – 13.0 mm Goods a) On same axle – 0.5 mm b) On same bogie – 13.0 mm c) On same coach – 25.0 mm Fig. 1 Wheel profile (all length dimension are in mm)
  • 9. Wheels are fixed on the axle with the help of bearings. Like wheel, it is also made up of steel. Brake cylinder are attached to axle. Braking discs are fixed on the axle Fig. 2 Axle
  • 10. Buffer height adjustment Causes of low buffer height in ICF coaching stock : a) excessive wear of wheel b) Due to loss of proper stiffness of coil spring c) Due to excessive wear on side bearer’s metal & bronze piece. Maximum buffer height = 1105 mm [In empty condition] Minimum buffer height = 1030 mm [In loaded condition] To achieve buffer height a standard size of wooden packing pieces are used which are kept below the Dash Pot Flange on axle Box wings of primary suspension. Serial N0. Wheel Diameter (mm) Thickness of Wooden Packing (mm) 1. Below 889 up to 863 13 2. Below 863 up to 839 26 3. Below 839 up to 819 38 4. 819 & below 48
  • 11. Air brake system maintenance Components of Air Brake System 1. Brake Container 2. Distributor Valve 3. Pressure Tanks (125 liters, 6 liters) 4. B.P. / F.P. coupling and hosts 5. Emergency Brake Pull Box 6. Emergency Brake Valve
  • 12. Trolley Maintenance Parts of Trolley 1. Trolley Frame 2. Center pivot 3. Side Bearing 4. Brake Cylinder Fig. 3 Trolley
  • 13. Lifting of coaches Require tools and equipments 1. With the use of Mechanical Jacks 2. With the use of Hydraulic Jacks 3. With the use of Electrical operated Travelling Crane 4. With the use of Whiting Jacks
  • 14. PLATFORM TRAIN DUTY  Rolling In Rolling out Axle box feeling Brake Power Certificate Safe to Run
  • 15. ROLLING IN/ROLLING OUT When train enters in station Examiner staff take up positions on both sides inspect the train enters at the speed of 8 Km/hr Whistling sound of hot axle boxes.  Any hanging part or loose fitting of vehicle. Any component or spring suspension bracket loose/broken.  Abnormal behaviour of vehicle.
  • 16. Axle box feeling After the train come to halt, all axle boxes are felt within 20 minutes. The temp. of axle is checked by touching with hand Temp. is found high then it is checked by the temp. gun which gives exact temp. If this temp. is found more than 30 degree than atm. temp. then the cause is inspected and coach is sent to workshop
  • 17. BRAKE POWER Certificate  This certificate is jointly signed by Guard , Driver, and C&W supervisor.  The incoming driver shall handover the brake power certificate to Reliving driver or Deposit it the nominated authority, who will give it to the outgoing Driver.  The outgoing driver and guard will satisfy themselves from the listed coach numbers that the Brake Power Certificate pertains to their train.
  • 18. Safe to run If all of above factors like no hanging parts brakes are working correctly the temp of axle box is with in range and the train is in good and safe condition of running then the train is announced as safe to run.
  • 19. THANK YOU ALL FOR YOUR KIND ATTENTION