NORTH WESTERN RAILWAY, JAIPUR
BY
AWANISH KUMAR
13EJAME014
-: CONTENT :-
1. Introduction
2. Organisation Structure
3. North Western Railway
4. Wheels
5. Machine Shop
6. Breaking System
7. Bogie Shop
8. Spring Shop
-: INDIAN RAILWAY :-
First passenger train introduced in India on 16 April 1853 between Mumbai to
Thane (34 km).
Over 10,000 trains daily, transporting over 8,900 million passengers and over
1050 million tones of freight per year.
Indian Railways is the world's ninth largest organisation, by number of
employees, with over 1.4 million employees.
As of 31 March 2013, 23,541 km (36%) of the total 65,000 km route length was
electrified.
The number of zones in Indian Railways increased from six to eight in 1951,
nine in 1952 and sixteen in 2003. Presently there are 17 zones & 84 divisions.
INTRODUCTION
Name Abbr. Headquarters
Central Railway CR Mumbai
Eastern Railway ER Kolkata
East Central Railway ECR Hajipur
East Coast Railway ECoR Bhubaneswar
Konkan Railway KR Panvel
Northern Railway NR Delhi
North Central Railway NCR Allahabad
North Western Railway NWR Jaipur
North Eastern Railway NER Gorakhpur
Northeast Frontier Railway NFR Maligaon(Guwahati)
Southern Railway SR Chennai
South Central Railway SCR Secunderabad
South Eastern Railway SER Kolkata
South East Central Railway SECR Bilaspur, CG
South Western Railway SWR Hubli
Western Railway WR Mumbai
West Central Railway WCR Jabalpur
Kolkata Metro KMR Kolkata
ZONES OF INDIAN RAILWAY
Department Of Indian Railway
Sr.
No.
Name of Department Role And
Function
1. Engineering Department
Maintenance of all
Fixed Assets
2. Mechanical Engineering & power
Department
Maintenance of all
Rolling Stock of the
division
3. Electrical Engineering Department Maintenance of all
electric locomotives
4. Signal & Telecommunication Engg.
Department
Maintenance of the
Signaling &
Telecommunication
5. Operation and Traffic Department Train operations
6. Commercial Department Passenger Ticketing,
Ticket checking,
booking of freight
rakes, collecting fare
Department Of Indian Railway
S.No
.
Name of Department Role And Function
7. Medical Department Providing Medical
Facility to Railway
employee & their
Family too.
8. Safety Department Ensuring safety of
Train operations
9. Store Department Ensuring material
for maintenance of
Trains
10. Account Department Financial
management of the
division
11. Security Department Security of Railway
material, passenger
and passenger
belonging
 Reporting mark : N.W.R
 Founded : 1st Oct. 2002
 Headquarters : Jaipur, Rajasthan
 General Manager : Anil Singhal
 Track Gauge : 1,676mm (5 ft. 6in)- Broad
Gauge
:1000mm(3ft.3 3/8in) – Meter Gauge
 Length : 6559.546
 Station : 578
 Division : 4
 Website :
http://www.nwr.indianrailways.gov.in/
Map Of North Western Railway
IN THIS SHOP, REPAIR WORK OF THE WHEEL AND AXEL IS UNDER
TAKEN. AS IT IS KNOWN THAT, THE WHEEL WEARS THROUGHOUT
ITS LIFE.
WHEEL
Typ
e
Wheel
dia.(mm) Distance b/w journal
center (mm)
Journal
size(mm)
Axel wheel
seat dia. (mm)
ICF 915 2159 120*113.5 172,0.25,0.35
BME
L
915 2210.2 120*179 171,0.45,0.63
The diameter of new wheel is-
( Table 3.1 list of wheels dimension )
Wheel testing & machining
Axial journal testing lathe
In this shop wheel sets are removed from the bogies, the
entire wheel is first inspected for assessing the condition of the
component of wheel such as axel trial wheel disc and
guttering.
The shop consist of-
1. Axel journal testing lathe.
2. Hydraulic wheel press with facility of mounting.
3. Vertical turning lathe.
Hydraulic wheel presses with a facility
of mounting
Vertical turning lathe
External and internal diameter is corrected by this lathe; wheel
is tightened on the rotating clutch. The stationary is carbide tool
cut the wheel to correct diameter.
-: THE MAINTENANCE SCHEDULES AND THE OVERHAULING PERIODS :-
1. Trip schedule- After every trip by primary
maintenance depot.
2. Schedule A - Monthly (1 month )
3. Schedule B - Quarterly (3 months )
4. IOH – 9 months
5. POH – 18 months
Periodic overhauling is the best available process of maintenance of coaches in India. This
generally operated after 18 months after the manufacturing or the previous periodic
overhauling done in any workshop. This undergoes a huge process of lifting the coach,
isolating the all parts, and changing or replacing the necessary or damaged parts. In other
words this is the process of renewing the coaches.
> POH <
-It stands for periodic overhauling.
-POH is allowed in nominated workshops only.
-Painting of whole coach is necessary.
-Profiling of wheel is necessary
-: WHEEL
PROFILE :-
-: DEFECTS :-
Thin Flange :- When the flange thickness reduces from 28.5 mm to 16
mm or less, then the flange is called thin flange.
Sharp Flange :- When the radius given at the tip of flange is worn out from
14.5mm to 5 mm or less is called Sharp Flange.
Thin Tyre :- If the remaining thickness of tyre is less than 25 mm, it is called
thin tyre.
Hollow Tyre :- If the groove on the wheel tread is up to 5 mm or more, it is
called Hollow tyre.
MACHINE SHOP
Machines are two types…
1. AUTOMATIC.
2. MANUALLY.
There are three types of automatic machine.
• Numerical control.
• Computer numerical control.
• Direct numerical control machine.
Automatic Control
Computer Numerical Control
Manually Operated Machine
Drilling operation is carried out here. A
large for the operation .To complete the
operation faster a few gauge milling
machine are also provides.
All the lathes have four jaws chuck for
better holding centering is done either
manually or with the help of universal
scriber. All kinds of turning are performed
here.
Drilling Section Centre Lathe Section
Manually Operated Machine
The machine is also called horizontal
shaping machine. It works on quick-return
mechanism .The arm of shaper
reciprocating horizontal. The cutting takes
place only in the forward stroke.
The is vertical shaping machine
.The arm reciprocating in the
vertical direction. Most parts are
the same as shaper .
Shaper Slotter
BREAKING SYSTEM
BRAKING SYSTEM
In Air Brake system compressed air is used for operating the brake system. The
locomotive compressor charges the feed pipe and the brake pipes throughout the
length of the train. The feed pipe is connected to the auxiliary reservoirs and the
brake pipe is connected to the brake cylinders through the distributor valve. Brake
application takes place by dropping the pressure in the brake pipe.
-: AXLE :-
It is the main long cylindrical bar on which bogie are fixed with the help of bearings. This
is made of steel as above. Each axle contains 2 wheels, the brake cylinders are also
attached to it and in case of LHB coaches, the braking discs are fixed on to the axle.
The axle mounted brake disc consists of a gray cast iron friction
ring and a cast steel hub, connected by means of radially
arranged elastic resilient sleeves which are secured in the hub by
means of hexagon screws. The friction ring is manufactured as a
solid component or in a split version. In the latter case, the two
halves are held together by two tight –fit screws.
DISC
-: AIR BRAKE SYSTEM
:- The brake system in which compressed air is used in the brake
cylinder for the application of brakes is called air brake system.
MAIN COMPONENTS :-
Control Reservoir 9 liter, 5 kg/cm2 Auxiliary Reservoir
200 liter, 6 kg/cm2
Brake pipe – Dia. 32 mm Feed Pipe – Dia. 25
-: BRAKE SHOE :-
The brake shoe is provided with a brake
pad holder carrying replaceable pads.
The brake shoe consists of the brake pad
holder, the vertical pins and the brake pad.
SHOESDue to BC pressure, the piston moves
forward and strikes against the brake caliper.
The lever arm of the brake caliper presses
onto the disc brake through the brake shoe.
The disc brakes are mounted on the wheel
axle and so rotate along with the wheels.
Due to application of brake shoes, the discs
begin to lose their angular speed.
As a result the axle also begins to slow down
since the two are connected.
Ultimately, the wheels stop rotating as they
are mounted on the same axle.
1.Bogie frame longitudinal component
2. Cross-beam
BOGIE SHOP
The frame is made up of two longitudinal components………
 (1) connected by two cross-beams
(2) which also support the brake units. The various supports which
connect the different bogie components are welded to the frame.
FLOW PROCESS OF A BCNHL WAGON
During welding in a BCNHL wagon various welding techniques are used like flat welding,
horizontal welding, vertical welding,overhead welding, etc. But it is always preferred to weld as flat
welding. So wherever possible, by using manipulators,work piece is so adjusted that it can be
welded as flat or horizontal. It increases the efficiency of worker and it is also safe to do.
(Fig 6.7 fixed manipulator)
-: WINDOW UNITS :-
 The sealed window units consist of 8.4 mm outer glass
and 4 mm inner glass with 6 mm Argon gas filled.
 Argon is an inexpensive, non-toxic,
odorless gas .
 It increase sound proofing
characteristics of the
window.
 Minimizes heat exchange through the
window.
 Argon will not corrode the window
material.
 This type of windows can even block
ultraviolet
rays.
SPRING SHOP
• In this section the helical is prepared. For this purpose there certain machine for
testing, grading and repairing it.
Visual and magnetic crack detection
CAUSE PERCENTAGE OF FAILURE
Free of height 8.93%
Load test 82.08%
Dent mark, corrosion & breakage 08.39%
Thanks For your Support

More Related Content

What's hot

PPT on Indian railway (LHB coaches)
PPT on Indian  railway (LHB coaches)PPT on Indian  railway (LHB coaches)
PPT on Indian railway (LHB coaches)kalyan kumar
 
Coach care centre new delhi
Coach care centre new delhiCoach care centre new delhi
Coach care centre new delhiHome
 
Presentation on Coach Care Complex
Presentation on Coach Care ComplexPresentation on Coach Care Complex
Presentation on Coach Care ComplexRitikBaghmar
 
South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...haxxo24
 
ICF Bogie Details by Yadvendu
ICF Bogie Details by YadvenduICF Bogie Details by Yadvendu
ICF Bogie Details by YadvenduJogendra Yadvendu
 
Summer training report coach care new Delhi rkgit
Summer training report coach care new Delhi rkgitSummer training report coach care new Delhi rkgit
Summer training report coach care new Delhi rkgitItnesh Kumar
 
Handbook on maintenance of air brake system in lhb coaches (ftil type)
Handbook on maintenance of air brake system in lhb coaches (ftil type)Handbook on maintenance of air brake system in lhb coaches (ftil type)
Handbook on maintenance of air brake system in lhb coaches (ftil type)SrinivasaRao Guduru
 
Air springs of indian railway coaches
Air springs of indian railway coachesAir springs of indian railway coaches
Air springs of indian railway coachesSrinivasaRao Guduru
 
A project on buffer
A project on bufferA project on buffer
A project on bufferRitesh Rohan
 
Lhb coach documentation
Lhb coach  documentationLhb coach  documentation
Lhb coach documentationTURENDARSAHU
 
Gorakhpur mechanical workshop summer training report
Gorakhpur mechanical workshop summer training reportGorakhpur mechanical workshop summer training report
Gorakhpur mechanical workshop summer training reportGALGOTIAS UNIVERSITY
 
report on Industrial training
report on Industrial training report on Industrial training
report on Industrial training hisham munir
 
Training report on railways (all workshop)
Training report on railways (all workshop)Training report on railways (all workshop)
Training report on railways (all workshop)anand prasad
 

What's hot (20)

PPT on Indian railway (LHB coaches)
PPT on Indian  railway (LHB coaches)PPT on Indian  railway (LHB coaches)
PPT on Indian railway (LHB coaches)
 
Coach care centre new delhi
Coach care centre new delhiCoach care centre new delhi
Coach care centre new delhi
 
Presentation on Coach Care Complex
Presentation on Coach Care ComplexPresentation on Coach Care Complex
Presentation on Coach Care Complex
 
South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...
 
railway_plant_layout
railway_plant_layoutrailway_plant_layout
railway_plant_layout
 
Hand book on C&W
Hand book on C&W Hand book on C&W
Hand book on C&W
 
ICF Bogie Details by Yadvendu
ICF Bogie Details by YadvenduICF Bogie Details by Yadvendu
ICF Bogie Details by Yadvendu
 
Summer training report coach care new Delhi rkgit
Summer training report coach care new Delhi rkgitSummer training report coach care new Delhi rkgit
Summer training report coach care new Delhi rkgit
 
Handbook on maintenance of air brake system in lhb coaches (ftil type)
Handbook on maintenance of air brake system in lhb coaches (ftil type)Handbook on maintenance of air brake system in lhb coaches (ftil type)
Handbook on maintenance of air brake system in lhb coaches (ftil type)
 
Casnub Bogies
Casnub BogiesCasnub Bogies
Casnub Bogies
 
Air springs of indian railway coaches
Air springs of indian railway coachesAir springs of indian railway coaches
Air springs of indian railway coaches
 
Maintenace manual for wagons
Maintenace manual for wagonsMaintenace manual for wagons
Maintenace manual for wagons
 
Bogie
BogieBogie
Bogie
 
ICF Bogie
ICF BogieICF Bogie
ICF Bogie
 
G-97 Manual
G-97 ManualG-97 Manual
G-97 Manual
 
A project on buffer
A project on bufferA project on buffer
A project on buffer
 
Lhb coach documentation
Lhb coach  documentationLhb coach  documentation
Lhb coach documentation
 
Gorakhpur mechanical workshop summer training report
Gorakhpur mechanical workshop summer training reportGorakhpur mechanical workshop summer training report
Gorakhpur mechanical workshop summer training report
 
report on Industrial training
report on Industrial training report on Industrial training
report on Industrial training
 
Training report on railways (all workshop)
Training report on railways (all workshop)Training report on railways (all workshop)
Training report on railways (all workshop)
 

Similar to North Western Indian Railway,Jaipur, Rajasthan 2016

Summer training report on electric loco shed
Summer training report on electric loco shedSummer training report on electric loco shed
Summer training report on electric loco shedTarang Mittal
 
Railway Training Report
Railway Training ReportRailway Training Report
Railway Training ReportVishal Singh
 
Indian railway Mechanical workshop Gorakhpur ppt
Indian railway Mechanical workshop  Gorakhpur pptIndian railway Mechanical workshop  Gorakhpur ppt
Indian railway Mechanical workshop Gorakhpur pptSandeep Yadav
 
Indianrailwayppt 161011170055 jamshed alam
Indianrailwayppt 161011170055 jamshed alamIndianrailwayppt 161011170055 jamshed alam
Indianrailwayppt 161011170055 jamshed alamJAMSHED ALAM
 
Summer Internship/Training report at Indian Railway
Summer Internship/Training report at Indian RailwaySummer Internship/Training report at Indian Railway
Summer Internship/Training report at Indian RailwayChirag Jain
 
south east central railway training
south east central railway trainingsouth east central railway training
south east central railway trainingvijay patel
 
INTERNSHIP REPORT...LOWERPAREL CARRIAGE WORKSHOP
INTERNSHIP REPORT...LOWERPAREL CARRIAGE WORKSHOPINTERNSHIP REPORT...LOWERPAREL CARRIAGE WORKSHOP
INTERNSHIP REPORT...LOWERPAREL CARRIAGE WORKSHOPdineshmirjolkar
 
South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...haxxo24
 
CTU Industrial Training Report
CTU Industrial Training ReportCTU Industrial Training Report
CTU Industrial Training ReportNEERAJ KUMAR
 
Indian railway report main
Indian railway report mainIndian railway report main
Indian railway report mainVicky Gupta
 
Abes engineering college ghaziabad
Abes engineering college  ghaziabadAbes engineering college  ghaziabad
Abes engineering college ghaziabadPalash Awasthi
 
abes engineering college ghaziabad
abes engineering college  ghaziabadabes engineering college  ghaziabad
abes engineering college ghaziabadPalash Awasthi
 

Similar to North Western Indian Railway,Jaipur, Rajasthan 2016 (20)

Indianrailway 131124014609-phpapp02
Indianrailway 131124014609-phpapp02Indianrailway 131124014609-phpapp02
Indianrailway 131124014609-phpapp02
 
Summer training report on electric loco shed
Summer training report on electric loco shedSummer training report on electric loco shed
Summer training report on electric loco shed
 
Prashant patel
Prashant patelPrashant patel
Prashant patel
 
Railway Training Report
Railway Training ReportRailway Training Report
Railway Training Report
 
Indian railway Mechanical workshop Gorakhpur ppt
Indian railway Mechanical workshop  Gorakhpur pptIndian railway Mechanical workshop  Gorakhpur ppt
Indian railway Mechanical workshop Gorakhpur ppt
 
Indianrailwayppt 161011170055 jamshed alam
Indianrailwayppt 161011170055 jamshed alamIndianrailwayppt 161011170055 jamshed alam
Indianrailwayppt 161011170055 jamshed alam
 
Summer Internship/Training report at Indian Railway
Summer Internship/Training report at Indian RailwaySummer Internship/Training report at Indian Railway
Summer Internship/Training report at Indian Railway
 
Main report
Main reportMain report
Main report
 
south east central railway training
south east central railway trainingsouth east central railway training
south east central railway training
 
Training report
Training reportTraining report
Training report
 
INTERNSHIP REPORT...LOWERPAREL CARRIAGE WORKSHOP
INTERNSHIP REPORT...LOWERPAREL CARRIAGE WORKSHOPINTERNSHIP REPORT...LOWERPAREL CARRIAGE WORKSHOP
INTERNSHIP REPORT...LOWERPAREL CARRIAGE WORKSHOP
 
Dlw training session
Dlw training sessionDlw training session
Dlw training session
 
MFI Group-V.pptx
MFI Group-V.pptxMFI Group-V.pptx
MFI Group-V.pptx
 
South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...
 
CTU Industrial Training Report
CTU Industrial Training ReportCTU Industrial Training Report
CTU Industrial Training Report
 
indutrial training report
indutrial training reportindutrial training report
indutrial training report
 
Indian railway report main
Indian railway report mainIndian railway report main
Indian railway report main
 
Abes engineering college ghaziabad
Abes engineering college  ghaziabadAbes engineering college  ghaziabad
Abes engineering college ghaziabad
 
abes engineering college ghaziabad
abes engineering college  ghaziabadabes engineering college  ghaziabad
abes engineering college ghaziabad
 
diesel shed izzatnagar report part 2
diesel shed izzatnagar report part 2diesel shed izzatnagar report part 2
diesel shed izzatnagar report part 2
 

Recently uploaded

Crushers to screens in aggregate production
Crushers to screens in aggregate productionCrushers to screens in aggregate production
Crushers to screens in aggregate productionChinnuNinan
 
Python Programming for basic beginners.pptx
Python Programming for basic beginners.pptxPython Programming for basic beginners.pptx
Python Programming for basic beginners.pptxmohitesoham12
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Coursebim.edu.pl
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptMadan Karki
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdfCaalaaAbdulkerim
 
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Sumanth A
 
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Erbil Polytechnic University
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
DM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in projectDM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in projectssuserb6619e
 
Cooling Tower SERD pH drop issue (11 April 2024) .pptx
Cooling Tower SERD pH drop issue (11 April 2024) .pptxCooling Tower SERD pH drop issue (11 April 2024) .pptx
Cooling Tower SERD pH drop issue (11 April 2024) .pptxmamansuratman0253
 
National Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfNational Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfRajuKanojiya4
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating SystemRashmi Bhat
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxsiddharthjain2303
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substationstephanwindworld
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm Systemirfanmechengr
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating SystemRashmi Bhat
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgsaravananr517913
 

Recently uploaded (20)

Crushers to screens in aggregate production
Crushers to screens in aggregate productionCrushers to screens in aggregate production
Crushers to screens in aggregate production
 
Python Programming for basic beginners.pptx
Python Programming for basic beginners.pptxPython Programming for basic beginners.pptx
Python Programming for basic beginners.pptx
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Course
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.ppt
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdf
 
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
 
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
 
Designing pile caps according to ACI 318-19.pptx
Designing pile caps according to ACI 318-19.pptxDesigning pile caps according to ACI 318-19.pptx
Designing pile caps according to ACI 318-19.pptx
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
DM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in projectDM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in project
 
Cooling Tower SERD pH drop issue (11 April 2024) .pptx
Cooling Tower SERD pH drop issue (11 April 2024) .pptxCooling Tower SERD pH drop issue (11 April 2024) .pptx
Cooling Tower SERD pH drop issue (11 April 2024) .pptx
 
National Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfNational Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdf
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating System
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptx
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substation
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm System
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating System
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 

North Western Indian Railway,Jaipur, Rajasthan 2016

  • 1. NORTH WESTERN RAILWAY, JAIPUR BY AWANISH KUMAR 13EJAME014
  • 2. -: CONTENT :- 1. Introduction 2. Organisation Structure 3. North Western Railway 4. Wheels 5. Machine Shop 6. Breaking System 7. Bogie Shop 8. Spring Shop
  • 3. -: INDIAN RAILWAY :- First passenger train introduced in India on 16 April 1853 between Mumbai to Thane (34 km). Over 10,000 trains daily, transporting over 8,900 million passengers and over 1050 million tones of freight per year. Indian Railways is the world's ninth largest organisation, by number of employees, with over 1.4 million employees. As of 31 March 2013, 23,541 km (36%) of the total 65,000 km route length was electrified. The number of zones in Indian Railways increased from six to eight in 1951, nine in 1952 and sixteen in 2003. Presently there are 17 zones & 84 divisions. INTRODUCTION
  • 4. Name Abbr. Headquarters Central Railway CR Mumbai Eastern Railway ER Kolkata East Central Railway ECR Hajipur East Coast Railway ECoR Bhubaneswar Konkan Railway KR Panvel Northern Railway NR Delhi North Central Railway NCR Allahabad North Western Railway NWR Jaipur North Eastern Railway NER Gorakhpur Northeast Frontier Railway NFR Maligaon(Guwahati) Southern Railway SR Chennai South Central Railway SCR Secunderabad South Eastern Railway SER Kolkata South East Central Railway SECR Bilaspur, CG South Western Railway SWR Hubli Western Railway WR Mumbai West Central Railway WCR Jabalpur Kolkata Metro KMR Kolkata ZONES OF INDIAN RAILWAY
  • 5. Department Of Indian Railway Sr. No. Name of Department Role And Function 1. Engineering Department Maintenance of all Fixed Assets 2. Mechanical Engineering & power Department Maintenance of all Rolling Stock of the division 3. Electrical Engineering Department Maintenance of all electric locomotives 4. Signal & Telecommunication Engg. Department Maintenance of the Signaling & Telecommunication 5. Operation and Traffic Department Train operations 6. Commercial Department Passenger Ticketing, Ticket checking, booking of freight rakes, collecting fare
  • 6. Department Of Indian Railway S.No . Name of Department Role And Function 7. Medical Department Providing Medical Facility to Railway employee & their Family too. 8. Safety Department Ensuring safety of Train operations 9. Store Department Ensuring material for maintenance of Trains 10. Account Department Financial management of the division 11. Security Department Security of Railway material, passenger and passenger belonging
  • 7.  Reporting mark : N.W.R  Founded : 1st Oct. 2002  Headquarters : Jaipur, Rajasthan  General Manager : Anil Singhal  Track Gauge : 1,676mm (5 ft. 6in)- Broad Gauge :1000mm(3ft.3 3/8in) – Meter Gauge  Length : 6559.546  Station : 578  Division : 4  Website : http://www.nwr.indianrailways.gov.in/
  • 8. Map Of North Western Railway
  • 9. IN THIS SHOP, REPAIR WORK OF THE WHEEL AND AXEL IS UNDER TAKEN. AS IT IS KNOWN THAT, THE WHEEL WEARS THROUGHOUT ITS LIFE. WHEEL Typ e Wheel dia.(mm) Distance b/w journal center (mm) Journal size(mm) Axel wheel seat dia. (mm) ICF 915 2159 120*113.5 172,0.25,0.35 BME L 915 2210.2 120*179 171,0.45,0.63 The diameter of new wheel is- ( Table 3.1 list of wheels dimension )
  • 10. Wheel testing & machining Axial journal testing lathe In this shop wheel sets are removed from the bogies, the entire wheel is first inspected for assessing the condition of the component of wheel such as axel trial wheel disc and guttering. The shop consist of- 1. Axel journal testing lathe. 2. Hydraulic wheel press with facility of mounting. 3. Vertical turning lathe. Hydraulic wheel presses with a facility of mounting
  • 11. Vertical turning lathe External and internal diameter is corrected by this lathe; wheel is tightened on the rotating clutch. The stationary is carbide tool cut the wheel to correct diameter.
  • 12. -: THE MAINTENANCE SCHEDULES AND THE OVERHAULING PERIODS :- 1. Trip schedule- After every trip by primary maintenance depot. 2. Schedule A - Monthly (1 month ) 3. Schedule B - Quarterly (3 months ) 4. IOH – 9 months 5. POH – 18 months Periodic overhauling is the best available process of maintenance of coaches in India. This generally operated after 18 months after the manufacturing or the previous periodic overhauling done in any workshop. This undergoes a huge process of lifting the coach, isolating the all parts, and changing or replacing the necessary or damaged parts. In other words this is the process of renewing the coaches. > POH < -It stands for periodic overhauling. -POH is allowed in nominated workshops only. -Painting of whole coach is necessary. -Profiling of wheel is necessary
  • 13. -: WHEEL PROFILE :- -: DEFECTS :- Thin Flange :- When the flange thickness reduces from 28.5 mm to 16 mm or less, then the flange is called thin flange. Sharp Flange :- When the radius given at the tip of flange is worn out from 14.5mm to 5 mm or less is called Sharp Flange. Thin Tyre :- If the remaining thickness of tyre is less than 25 mm, it is called thin tyre. Hollow Tyre :- If the groove on the wheel tread is up to 5 mm or more, it is called Hollow tyre.
  • 14. MACHINE SHOP Machines are two types… 1. AUTOMATIC. 2. MANUALLY. There are three types of automatic machine. • Numerical control. • Computer numerical control. • Direct numerical control machine.
  • 16. Manually Operated Machine Drilling operation is carried out here. A large for the operation .To complete the operation faster a few gauge milling machine are also provides. All the lathes have four jaws chuck for better holding centering is done either manually or with the help of universal scriber. All kinds of turning are performed here. Drilling Section Centre Lathe Section
  • 17. Manually Operated Machine The machine is also called horizontal shaping machine. It works on quick-return mechanism .The arm of shaper reciprocating horizontal. The cutting takes place only in the forward stroke. The is vertical shaping machine .The arm reciprocating in the vertical direction. Most parts are the same as shaper . Shaper Slotter
  • 18. BREAKING SYSTEM BRAKING SYSTEM In Air Brake system compressed air is used for operating the brake system. The locomotive compressor charges the feed pipe and the brake pipes throughout the length of the train. The feed pipe is connected to the auxiliary reservoirs and the brake pipe is connected to the brake cylinders through the distributor valve. Brake application takes place by dropping the pressure in the brake pipe.
  • 19. -: AXLE :- It is the main long cylindrical bar on which bogie are fixed with the help of bearings. This is made of steel as above. Each axle contains 2 wheels, the brake cylinders are also attached to it and in case of LHB coaches, the braking discs are fixed on to the axle. The axle mounted brake disc consists of a gray cast iron friction ring and a cast steel hub, connected by means of radially arranged elastic resilient sleeves which are secured in the hub by means of hexagon screws. The friction ring is manufactured as a solid component or in a split version. In the latter case, the two halves are held together by two tight –fit screws. DISC
  • 20. -: AIR BRAKE SYSTEM :- The brake system in which compressed air is used in the brake cylinder for the application of brakes is called air brake system. MAIN COMPONENTS :- Control Reservoir 9 liter, 5 kg/cm2 Auxiliary Reservoir 200 liter, 6 kg/cm2 Brake pipe – Dia. 32 mm Feed Pipe – Dia. 25
  • 21. -: BRAKE SHOE :- The brake shoe is provided with a brake pad holder carrying replaceable pads. The brake shoe consists of the brake pad holder, the vertical pins and the brake pad. SHOESDue to BC pressure, the piston moves forward and strikes against the brake caliper. The lever arm of the brake caliper presses onto the disc brake through the brake shoe. The disc brakes are mounted on the wheel axle and so rotate along with the wheels. Due to application of brake shoes, the discs begin to lose their angular speed. As a result the axle also begins to slow down since the two are connected. Ultimately, the wheels stop rotating as they are mounted on the same axle.
  • 22. 1.Bogie frame longitudinal component 2. Cross-beam BOGIE SHOP The frame is made up of two longitudinal components………  (1) connected by two cross-beams (2) which also support the brake units. The various supports which connect the different bogie components are welded to the frame.
  • 23. FLOW PROCESS OF A BCNHL WAGON
  • 24. During welding in a BCNHL wagon various welding techniques are used like flat welding, horizontal welding, vertical welding,overhead welding, etc. But it is always preferred to weld as flat welding. So wherever possible, by using manipulators,work piece is so adjusted that it can be welded as flat or horizontal. It increases the efficiency of worker and it is also safe to do. (Fig 6.7 fixed manipulator)
  • 25. -: WINDOW UNITS :-  The sealed window units consist of 8.4 mm outer glass and 4 mm inner glass with 6 mm Argon gas filled.  Argon is an inexpensive, non-toxic, odorless gas .  It increase sound proofing characteristics of the window.  Minimizes heat exchange through the window.  Argon will not corrode the window material.  This type of windows can even block ultraviolet rays.
  • 26. SPRING SHOP • In this section the helical is prepared. For this purpose there certain machine for testing, grading and repairing it. Visual and magnetic crack detection CAUSE PERCENTAGE OF FAILURE Free of height 8.93% Load test 82.08% Dent mark, corrosion & breakage 08.39%
  • 27. Thanks For your Support