CONVENTIONAL SHAFT SINKING BY MANUAL MEANS
 Conventional or ordinary shaft sinking methods are used when the shaft is to pass through
strong, relatively dry rock, when the water in the face can be easily handled by sinking bucket
or pumps and the shaft walls stand well with or without temporary supports
 The conventional shaft sinking operations include the following three different types of work:
 The main work of drilling-blasting loading the muck, supporting the sides and shaft equipping.
 Subsidiary work including hoisting, pumping, ventilation and lighting.
 Services such as power supply, water supply, transport, stores, repairs, housing etc.
Contd.
 The main work at no.1 particularly the loading of muck can either be done manually or by
mechanical methods.
 Manual method of shaft sinking give very low progress (of the order of a foot per day) and can
only be adopted for shallow and small diameter shafts.
 For sinking a shaft of 5.5m finished diameter and 150m depth through normal coal measure
strata the different operations involved and arrangements needed are described below:
PREPARATORY WORK:
 The chosen shaft site to be connected by all weather Road and a network of roads to be
constructed within the site for efficient transport.
 Adequate power supply and water supply to be made available.
 Surface general plan to be prepared showing both permanent and temporary service
and residential structures (temporary structures must be so located as not to interface
with permanent structures to be built later) roads, dump yard etc.
 Fixing the centre of shaft and its axes, bench mark etc. With the help of permanent
survey point at locations where these are /the area not disturbed. Contour plan of /at
1m internal for 250-500m from the shaft.
 The site wherever needed is leveled and temporary structures on surface are erected.
SINKING EQUIPMENTS:
The major items of plant include the following:
 HEADGEAR: With pulleys for winding rope, suspended platform, pumps, power and
lighting cables. Lever operated folding "v" doors built into the structure with chute at 15
to 20 ft. above ground level for facilitating the muck disposal.
 Electric winding engine and mobile crane-1 no. each
 Non-spinning type winding ropes with suspension gear consisting of clivy hook, lifting
cone, detaching hook, capel and rider. Ropes for suspending platforms and other items.
 Bucket or Hoppits of 0.75m3 to 1.0m3
Contd.
 Fabricated platforms:
(a)Working platform with opening for the shaft mouth. The opening is provided with
doors.
(b)Suspended platform: with openings for the buckets to pass is kept suspended in the
shaft with non-spinning ropes 25 to 30 ft. above the shaft bottom. This provides safety to
workmen in the shaft and stage for lining. Its suspension ropes also act as guides for the
bucket.
 Compressor for providing 25cu.m.per.min. Air at 14 kg/per sq.cm. Pressure for drills and
face pump.
 Compressed air drills- 8 nos. and pneumatic picks- 6 nos.
 Compressed air face pumps- 4 nos.
 Electric pumps for stage pumping.
Contd.
 High water gauge (300mm) electric fan which can supply 8,000 cfm.air which is
equivalent to 4m3/s.
 Concrete mixer- 1 no. and shuttering segments for shaft lining
 Ventilation tubes- 450mm in diameter.
 150mm pipes for compressed air, 100mm pipes for dewatering, and 150mm
pipes for concrete transport in the shaft. Flexible ventilation duct reinforced
flexible pipes for concrete placing, rubber hoses for drill machines.
 Trolleys/dump truck for muck disposal on surface. Explosive and store van.
 Cables for power supply, lighting and shot firing. Hanging light clusters.
Transformers, switch gears etc.
Contd.
 Signaling arrangements.
 Slow speed winches for suspending platform and cables in the shaft.
 The main items of consumable stores include the drill rods, explosives, cement and steel
for reinforcement.
Direct Personnel:
Over-men 3
Mining sirdar 3
Face mazdoors including On-setter 36
Winder operator 3
Tanks man 6
Compressor operator 3
Dump yard mazdoor 12
Concreting men & man for misc. jobs 10
Fitter and helper 6
Electrician and helper 6
Substation attendant 3
Total 91
Face supervisors and workmen for face and surface are listed below:-
• Managerial and other personnel needed for administration, office work, stores,
medical and security etc. have not been shown here.
Sinking up to rock and construction of shaft
collar
 The perimeter of the area to excavated (finished diameter plus collar thickness)
is pegged out.
 Loose soil is dug directly, harder ground is broken with pneumatic picks and
light explosives are used in still harder formations. Muck is loaded manually in
buckets and hoisted up with crane. Sides are supported temporarily as
excavations proceeds.
 Shaft collar is built from strong bed-rock with reinforced cement concrete. The
crane can be used up to 30 m depth.
 Installation of winder, head frame, folding door at shaft top, winches for
platform etc. and other plants on surface and suspended platform etc. in the
shaft is completed at this stage for subsequent sinking operations.
Arrangements are shown in fig.1 and fig.2.
Fig.1 SHAFT SINKING ARRANGEMENTS
Fig.2 SURFACE ARRANGEMENTS FOR SINKING SHAFTS
Fig.4 CONCRETE LINING IN SHAFT
Sinking through Lower Strata:
The cycle of operations consists following phrases:
1. Drilling at face.
2. Blasting and defuming.
3. Loading the muck out and disposal at surface.
4. Erection of shaft lining.
1. Drilling:
Holes forming a cone or pyramid cut are drilled in concentric rings with pneumatic drills.
The number of rings is 4 to 7 depending on the shaft diameter. A pattern is shown in fig.3
to provide an excavated shaft diameter of 6.6 m and a pull of about 1.2 m.
The hole density is 2 holes per m2 of shaft face.
2. Blasting and Defuming:
For blasting purposes either gelignite or permitted explosives are used depending upon
whether strata passed through are non-glassy or glassy in nature. Millisecond detonators
are used for firing the successive rings of holes from the centre of the shaft to its
periphery.
Explosive consumption is 1 kg per m3 with gelignite and 1.6 kg per m3 explosives. Consumption of
detonator is 1 no per m3 of rock blasted .Some time is allowed for clearing of the smoke from
inside the shaft before sinking operations are resumed.
3. Loading of muck:
Blasted muck is filled into the buckets at the shaft bottom by hand-shoveling.
On surface, the bucket discharges the muck over the”V” door chute to be loaded
into trolleys or dumper for disposal at the dump-yard.
4. Erection of shaft lining:
 Monolithic concrete lining is inserted after every fourth blast i.e. once 4.8 m progress has
been made. On the base prepared at the shaft bottom ring of shuttering consisting .75 m
high segments is erected, leveled and centered.
 Concrete, which is transported down the shaft in steel pipes, is poured behind the
shuttering with the help of flexible pipe from the suspended platform. Further rings are
added to complete casting of the 4.8m length of lining.
 The shaft side, before inserting the concreting lining if need be is supported with steel
rings with lagging planks packed at the back. These are removed gradually when
permanent lining is built.
Subsidiary works in the shaft:-
 Pumping: - small quantity of water is bailed out in the bucket. For large quantities a
combination of compressed air face pump and electric stage pump is used.
 Ventilation: - High water gauge (300mm) fan is installed on surface, which supplied 8000
efm. Air through steel ducts to the face. Flexible duct is used at the end of steel duct
which can be raised up at the time of blasting.
 Lighting: - Cluster of bulbs is connected at the end of cable suspended from the cable
drum on the surface and hung over the shaft bottom to provide flood light at the face.
Fixed lights are also provided at other strategic places in the shaft.
 A separate shot firing cable is hung in the shaft well clear of lighting and power cable.
 The pipes of drainage, ventilation compressed air and concrete are securely supported on
the bun tons fixed in the shaft side at regular intervals or with rag-bolts grouted in the
shaft wall. Extension of these service lines is done from time to time as the sinking of
shaft proceeds.
 Cycle time for 1.2m pull
 Drilling of holes (about 60) charging, blasting and defuming 8 hours
 Loading out muck and miscellaneous activities 48 hours
56 hours
 Time for total progress of 4.8 m 224 hours
 Inserting the lining including erection of shuttering centering
etc. 16 hours
240 hours
 Number of cycles in 25 working days = (25*24)/240 = 2.5 cycles
 Progress in 2.5 cycles= 2.5*4.8=12.0 m
 Average monthly progress would be about 75% of 12.0 m = 9.0 m
DEEPENING OF EXISTING SHAFT
A regular coal winding shaft 6.0 m in diameter has to be deepened to touch the bottom seam 100
m below without affecting normal winding operations. Describe a suitable method.
 Major equipment:
1. Electric winding engines 2
2. Hoisting sheaves 2
3. Sinking buckets 3
4. Single tub cage 1
5. Tubs
6. Jack hammer 6
7. Pneumatic picks 4
8. Pneumatic face pumps 2
9. Electric pump
10. Platform with folding doors for shaft top
11. Shuttering for concreting
12. Pipes, cables, ropes etc
Deepening operations
 Small shaft “A” is sunk near the coal winding pit on the side, away from main haulage level.
Head room is made for installation of winding sheaves of the hoist “E”. The depth should be
enough to reach beyond the sump of old shaft, cross the safety rock plug “p” and allow
sufficient head room for the installation of the sheaves of second hoist is driven.
 Level road way “L” to the position os shaft deepening. The place is widened and heightened
for installation of winding engine “H” its sheaves and other equipment. Additional hoists are
installed for carrying the suspended sinking equipment.
 The shaft centre is marked accurately by correlation through the shaft “A”. The perimeter to
be excavated is marked on the rock surface.
 After deepening the shaft to some depths the platform with folding doors is installed at its
mouth.
 Sinking proceeds in the normal manner. The rock from sinking buckets is dumped into mine
tubs and hauled up through shaft A. The debris can be packed into underground galleries or
hoisted to surface through the main winding shaft for disposal.
 On completion of sinking plug P is removed in sections.
Mechanized shaft sinking
General parameters:
Depth range 150m to 500m
Diameter 5.5m to 7.5m finished
Average progress 25m/month incl. of lining
Thickness of lining 30m thick concrete
lining(approximately)
1. Sinking winder with winding ropes and buckets 1
2. Sinking head frame with bucket tipping arrangement and bunker 1
3. Slow speed winches (electrically operated) 7
4. Platforms:
a)Surface working platforms
b)Movable working platforms
1
1
5. Movable suspended shuttering
for lining
1
6. Grab loaders (compressed air) complete operated 2
7. Pneumatic hammer drills with drill rods of 0.8 m,1.6 m,& 2.4 m
length fit diameter not less than 38 mm
8
8. Compressor station 50 m3/min capacity
9. Electric substation 1. to 1.5 MVA capacity
10. Pipe lines
a)Ventilation pipe line
b)Water pipeline
c)Compressed airline
d)Concreting line
Diameter 700mm
Diameter 150mm
“
“
11. Pumps
a)Face pumps pneumatically operated
b)Electrically operated slow speed
Cable winches survey instruments-
Cap lamps and electric lighting
Fixtures-concrete mixer 1 cu. yard
2
2
Workshop equipment and tools
Dump trucks 2
Trucks 2
Explosive van 1
Light vehicles 4
Contd.
Men
Manager 1
Asst. Manager 1
Over men 5
Mining Sirdars 5
Shaft sinking Mazdoors 56
Winding Eng. Operator 5
Signal men 5
Pump operator 4
E&M engineer, Electricians,
Fitters and workshop crew
57
Survey 7
Compressor station personnel 4
Sub-station personnel 4
Stores personnel 10
Office & administrative personnel 27
Medical & welfare personnel 6
Security & welfare and ward personnel 20
Civil engineers, overseers 4
 2 holes/m2 of shaft, explosive-Ajax G. 1.6 kg/cu. m. Rock 1 kg/m3 for Celignite.
 Detonator: 1 detonator /m3 rock
 Holes in usual ring pattern: milli second delay detonators to be used .
 Firing could be in series or parallel .Parallel firings has given very good results .On wooden
pegs two bare wires are installed at the shaft bottom to form the bus bars. All detonators are
connected to these two bus bars in parallel. The bus bars are connected by blasting cable to
the suspended blasting cum lighting cable .This cable is energized from mains on surface at
440 volts through an apparatus allowing the current to flow for 4 m.s. only .
Cycle time-for 11.5m hole 6hrs
Drilling of holes about (100)
Charging, blasting and
Clearance of smoke
3hrs
Mucking 12hrs
Miscellaneous activities 1hrs
Total: 22hrs
Time for two 1.5m cycles 44hrs
Lining of 3m segment 6hrs
Total: 50hrs
CALCULATIOS:
(25*24)/50=12
Progress in 12 cycles-12*3=36m
Average monthly progress would be about 75% of the above
36*0.75=27m

More Related Content

What's hot

Method of working of continuous miner in underground coal
Method of working of     continuous miner in underground coalMethod of working of     continuous miner in underground coal
Method of working of continuous miner in underground coalSafdar Ali
 
In pit crushing and conveying in surface mines
In pit crushing and conveying  in surface minesIn pit crushing and conveying  in surface mines
In pit crushing and conveying in surface minesSafdar Ali
 
Wire ropes used in mining
Wire ropes used in miningWire ropes used in mining
Wire ropes used in miningPankaj Kumawat
 
LHD Load haul dump ppt
LHD Load haul dump pptLHD Load haul dump ppt
LHD Load haul dump pptguru brahmam
 
Principles of-rock-drilling
Principles of-rock-drillingPrinciples of-rock-drilling
Principles of-rock-drillingSaurabh Jain
 
Haulage system in Mines
Haulage system in MinesHaulage system in Mines
Haulage system in Minesajeetkm
 
Longwall Mining
Longwall MiningLongwall Mining
Longwall MiningVR M
 
Transportation in underground mines
Transportation  in underground mines Transportation  in underground mines
Transportation in underground mines vanam mareswara rao
 
Distribution and control of mine air standards of ventilation
Distribution and control of mine air standards of ventilationDistribution and control of mine air standards of ventilation
Distribution and control of mine air standards of ventilationSafdar Ali
 
Ripper production
Ripper productionRipper production
Ripper productionVIJAY KUMAR
 
Underground mining methods
Underground mining methodsUnderground mining methods
Underground mining methodsTayyab Anwar
 
2.pressure arch theory (longwall) copy
2.pressure arch theory (longwall)  copy2.pressure arch theory (longwall)  copy
2.pressure arch theory (longwall) copyVinay Chary
 

What's hot (20)

Method of working of continuous miner in underground coal
Method of working of     continuous miner in underground coalMethod of working of     continuous miner in underground coal
Method of working of continuous miner in underground coal
 
Opencast mining machineries
Opencast mining machineriesOpencast mining machineries
Opencast mining machineries
 
In pit crushing and conveying in surface mines
In pit crushing and conveying  in surface minesIn pit crushing and conveying  in surface mines
In pit crushing and conveying in surface mines
 
Wire ropes used in mining
Wire ropes used in miningWire ropes used in mining
Wire ropes used in mining
 
Shaft sinking 2
Shaft  sinking 2Shaft  sinking 2
Shaft sinking 2
 
LHD Load haul dump ppt
LHD Load haul dump pptLHD Load haul dump ppt
LHD Load haul dump ppt
 
Principles of-rock-drilling
Principles of-rock-drillingPrinciples of-rock-drilling
Principles of-rock-drilling
 
Side discharge loader
Side discharge loaderSide discharge loader
Side discharge loader
 
Continuous miner
Continuous minerContinuous miner
Continuous miner
 
depllaring in coal mines
depllaring in coal minesdepllaring in coal mines
depllaring in coal mines
 
Haulage system in Mines
Haulage system in MinesHaulage system in Mines
Haulage system in Mines
 
Drilling and blasting
Drilling and blastingDrilling and blasting
Drilling and blasting
 
Longwall Mining
Longwall MiningLongwall Mining
Longwall Mining
 
Oc mechanical excavation
Oc mechanical excavationOc mechanical excavation
Oc mechanical excavation
 
Transportation in underground mines
Transportation  in underground mines Transportation  in underground mines
Transportation in underground mines
 
Distribution and control of mine air standards of ventilation
Distribution and control of mine air standards of ventilationDistribution and control of mine air standards of ventilation
Distribution and control of mine air standards of ventilation
 
Ripper production
Ripper productionRipper production
Ripper production
 
Underground mining methods
Underground mining methodsUnderground mining methods
Underground mining methods
 
Highwall mining
Highwall miningHighwall mining
Highwall mining
 
2.pressure arch theory (longwall) copy
2.pressure arch theory (longwall)  copy2.pressure arch theory (longwall)  copy
2.pressure arch theory (longwall) copy
 

Similar to Conventional shaft sinking by manual means

Nhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAM
Nhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAMNhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAM
Nhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAMIshant Gautam.
 
7. TUNNEL ENGINEERING
7. TUNNEL ENGINEERING7. TUNNEL ENGINEERING
7. TUNNEL ENGINEERINGVATSAL PATEL
 
Drilling Rig Operation & Fire Protection Facility I Gaurav Singh Rajput
Drilling Rig Operation & Fire Protection Facility I Gaurav Singh RajputDrilling Rig Operation & Fire Protection Facility I Gaurav Singh Rajput
Drilling Rig Operation & Fire Protection Facility I Gaurav Singh RajputGaurav Singh Rajput
 
Trenchless technology
Trenchless technologyTrenchless technology
Trenchless technologykumarrajagp
 
Drilling and producing well
Drilling and  producing wellDrilling and  producing well
Drilling and producing wellRaja Rosenani
 
Engineering Final Year Project Report on "Electrical Safety and Protection of...
Engineering Final Year Project Report on "Electrical Safety and Protection of...Engineering Final Year Project Report on "Electrical Safety and Protection of...
Engineering Final Year Project Report on "Electrical Safety and Protection of...Pratap Bhunia
 
Traps and manhole aditya kumar barn1 ar14002
Traps and manhole aditya kumar barn1 ar14002Traps and manhole aditya kumar barn1 ar14002
Traps and manhole aditya kumar barn1 ar14002Aditya kumar
 
Transmission tower
Transmission towerTransmission tower
Transmission towerKiran Hadiya
 
Module 1 - Jacking techniques.pptx
Module 1 - Jacking techniques.pptxModule 1 - Jacking techniques.pptx
Module 1 - Jacking techniques.pptxChinnuNinan
 
Bridge Construction Methods
Bridge Construction MethodsBridge Construction Methods
Bridge Construction MethodsDavid H Moloney
 

Similar to Conventional shaft sinking by manual means (20)

Nhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAM
Nhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAMNhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAM
Nhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAM
 
7. TUNNEL ENGINEERING
7. TUNNEL ENGINEERING7. TUNNEL ENGINEERING
7. TUNNEL ENGINEERING
 
Trenchless Technologies for New Pipe Installations
Trenchless Technologies for New Pipe InstallationsTrenchless Technologies for New Pipe Installations
Trenchless Technologies for New Pipe Installations
 
Drilling Rig Operation & Fire Protection Facility I Gaurav Singh Rajput
Drilling Rig Operation & Fire Protection Facility I Gaurav Singh RajputDrilling Rig Operation & Fire Protection Facility I Gaurav Singh Rajput
Drilling Rig Operation & Fire Protection Facility I Gaurav Singh Rajput
 
Trenchless technology
Trenchless technologyTrenchless technology
Trenchless technology
 
Tunnel engineering
  Tunnel engineering  Tunnel engineering
Tunnel engineering
 
Drilling - Qazma English
Drilling - Qazma EnglishDrilling - Qazma English
Drilling - Qazma English
 
Drilling and producing well
Drilling and  producing wellDrilling and  producing well
Drilling and producing well
 
Hydel Generation and Types Of Turbines
Hydel Generation and Types Of TurbinesHydel Generation and Types Of Turbines
Hydel Generation and Types Of Turbines
 
Engineering Final Year Project Report on "Electrical Safety and Protection of...
Engineering Final Year Project Report on "Electrical Safety and Protection of...Engineering Final Year Project Report on "Electrical Safety and Protection of...
Engineering Final Year Project Report on "Electrical Safety and Protection of...
 
Presentation on Highwall Mining
Presentation on Highwall MiningPresentation on Highwall Mining
Presentation on Highwall Mining
 
Drilling - Qazma English
Drilling - Qazma English Drilling - Qazma English
Drilling - Qazma English
 
NATM ppt sumit
NATM ppt sumitNATM ppt sumit
NATM ppt sumit
 
Eurasia tunnel1
Eurasia tunnel1Eurasia tunnel1
Eurasia tunnel1
 
Traps and manhole aditya kumar barn1 ar14002
Traps and manhole aditya kumar barn1 ar14002Traps and manhole aditya kumar barn1 ar14002
Traps and manhole aditya kumar barn1 ar14002
 
Transmission tower
Transmission towerTransmission tower
Transmission tower
 
Sewer Appurtenances
Sewer AppurtenancesSewer Appurtenances
Sewer Appurtenances
 
Module 1 - Jacking techniques.pptx
Module 1 - Jacking techniques.pptxModule 1 - Jacking techniques.pptx
Module 1 - Jacking techniques.pptx
 
Bridge Construction Methods
Bridge Construction MethodsBridge Construction Methods
Bridge Construction Methods
 
Tube expansion
Tube expansionTube expansion
Tube expansion
 

More from Safdar Ali

Safety in mines
Safety in minesSafety in mines
Safety in minesSafdar Ali
 
Explosives and accesories
Explosives and accesoriesExplosives and accesories
Explosives and accesoriesSafdar Ali
 
Role of management information systems in a mine.
Role of management information systems in a mine.Role of management information systems in a mine.
Role of management information systems in a mine.Safdar Ali
 
Pre requisites of marine operations
Pre requisites of marine operationsPre requisites of marine operations
Pre requisites of marine operationsSafdar Ali
 
Nuclear devices for mining
Nuclear devices for miningNuclear devices for mining
Nuclear devices for miningSafdar Ali
 
Mining of manganese nodules from sea floor
Mining of manganese nodules from sea floorMining of manganese nodules from sea floor
Mining of manganese nodules from sea floorSafdar Ali
 
Mine water risk in open pit slope stability
Mine water risk in open pit slope stabilityMine water risk in open pit slope stability
Mine water risk in open pit slope stabilitySafdar Ali
 
Innovations and trend in metal mining & tunnellng
Innovations and trend in metal mining & tunnellngInnovations and trend in metal mining & tunnellng
Innovations and trend in metal mining & tunnellngSafdar Ali
 
Lighting terminlologyand their units
Lighting terminlologyand their unitsLighting terminlologyand their units
Lighting terminlologyand their unitsSafdar Ali
 
Evaluation of slope stability for waste rock dumps in a mine
Evaluation of slope stability for waste rock dumps in a mineEvaluation of slope stability for waste rock dumps in a mine
Evaluation of slope stability for waste rock dumps in a mineSafdar Ali
 
Final grouting freezing
Final grouting freezingFinal grouting freezing
Final grouting freezingSafdar Ali
 
Digitization and 3d modelling of a mine plan
Digitization and 3d modelling of a mine planDigitization and 3d modelling of a mine plan
Digitization and 3d modelling of a mine planSafdar Ali
 
Variety of mine plans and sections & second schedule
Variety of mine plans and sections & second scheduleVariety of mine plans and sections & second schedule
Variety of mine plans and sections & second scheduleSafdar Ali
 
Statutory provisions for the preaparation of mine plans and sections
Statutory provisions for the preaparation of mine plans and sectionsStatutory provisions for the preaparation of mine plans and sections
Statutory provisions for the preaparation of mine plans and sectionsSafdar Ali
 
Gps & its applications in opencast mine surveying
Gps & its applications in opencast mine surveyingGps & its applications in opencast mine surveying
Gps & its applications in opencast mine surveyingSafdar Ali
 
Laser and its mining applications
Laser and its mining applicationsLaser and its mining applications
Laser and its mining applicationsSafdar Ali
 
Gyrotheodolite
GyrotheodoliteGyrotheodolite
GyrotheodoliteSafdar Ali
 

More from Safdar Ali (20)

Safety in mines
Safety in minesSafety in mines
Safety in mines
 
Tunneling
TunnelingTunneling
Tunneling
 
Explosives and accesories
Explosives and accesoriesExplosives and accesories
Explosives and accesories
 
Role of management information systems in a mine.
Role of management information systems in a mine.Role of management information systems in a mine.
Role of management information systems in a mine.
 
Basting
BastingBasting
Basting
 
Pre requisites of marine operations
Pre requisites of marine operationsPre requisites of marine operations
Pre requisites of marine operations
 
Nuclear devices for mining
Nuclear devices for miningNuclear devices for mining
Nuclear devices for mining
 
Mining of manganese nodules from sea floor
Mining of manganese nodules from sea floorMining of manganese nodules from sea floor
Mining of manganese nodules from sea floor
 
Mine water risk in open pit slope stability
Mine water risk in open pit slope stabilityMine water risk in open pit slope stability
Mine water risk in open pit slope stability
 
Innovations and trend in metal mining & tunnellng
Innovations and trend in metal mining & tunnellngInnovations and trend in metal mining & tunnellng
Innovations and trend in metal mining & tunnellng
 
Lighting terminlologyand their units
Lighting terminlologyand their unitsLighting terminlologyand their units
Lighting terminlologyand their units
 
Evaluation of slope stability for waste rock dumps in a mine
Evaluation of slope stability for waste rock dumps in a mineEvaluation of slope stability for waste rock dumps in a mine
Evaluation of slope stability for waste rock dumps in a mine
 
Final grouting freezing
Final grouting freezingFinal grouting freezing
Final grouting freezing
 
Digitization and 3d modelling of a mine plan
Digitization and 3d modelling of a mine planDigitization and 3d modelling of a mine plan
Digitization and 3d modelling of a mine plan
 
Variety of mine plans and sections & second schedule
Variety of mine plans and sections & second scheduleVariety of mine plans and sections & second schedule
Variety of mine plans and sections & second schedule
 
Statutory provisions for the preaparation of mine plans and sections
Statutory provisions for the preaparation of mine plans and sectionsStatutory provisions for the preaparation of mine plans and sections
Statutory provisions for the preaparation of mine plans and sections
 
Gps & its applications in opencast mine surveying
Gps & its applications in opencast mine surveyingGps & its applications in opencast mine surveying
Gps & its applications in opencast mine surveying
 
Laser and its mining applications
Laser and its mining applicationsLaser and its mining applications
Laser and its mining applications
 
Gyrotheodolite
GyrotheodoliteGyrotheodolite
Gyrotheodolite
 
Gps2
Gps2Gps2
Gps2
 

Recently uploaded

Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Celine George
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfFraming an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfUjwalaBharambe
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfMr Bounab Samir
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for BeginnersSabitha Banu
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfphamnguyenenglishnb
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatYousafMalik24
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptxSherlyMaeNeri
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPCeline George
 
Quarter 4 Peace-education.pptx Catch Up Friday
Quarter 4 Peace-education.pptx Catch Up FridayQuarter 4 Peace-education.pptx Catch Up Friday
Quarter 4 Peace-education.pptx Catch Up FridayMakMakNepo
 
Planning a health career 4th Quarter.pptx
Planning a health career 4th Quarter.pptxPlanning a health career 4th Quarter.pptx
Planning a health career 4th Quarter.pptxLigayaBacuel1
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementmkooblal
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxiammrhaywood
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Mark Reed
 

Recently uploaded (20)

TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17
 
9953330565 Low Rate Call Girls In Rohini Delhi NCR
9953330565 Low Rate Call Girls In Rohini  Delhi NCR9953330565 Low Rate Call Girls In Rohini  Delhi NCR
9953330565 Low Rate Call Girls In Rohini Delhi NCR
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfFraming an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for Beginners
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice great
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptx
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERP
 
Quarter 4 Peace-education.pptx Catch Up Friday
Quarter 4 Peace-education.pptx Catch Up FridayQuarter 4 Peace-education.pptx Catch Up Friday
Quarter 4 Peace-education.pptx Catch Up Friday
 
Planning a health career 4th Quarter.pptx
Planning a health career 4th Quarter.pptxPlanning a health career 4th Quarter.pptx
Planning a health career 4th Quarter.pptx
 
Raw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptxRaw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptx
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 
OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...
 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of management
 
Rapple "Scholarly Communications and the Sustainable Development Goals"
Rapple "Scholarly Communications and the Sustainable Development Goals"Rapple "Scholarly Communications and the Sustainable Development Goals"
Rapple "Scholarly Communications and the Sustainable Development Goals"
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)
 

Conventional shaft sinking by manual means

  • 1.
  • 2. CONVENTIONAL SHAFT SINKING BY MANUAL MEANS  Conventional or ordinary shaft sinking methods are used when the shaft is to pass through strong, relatively dry rock, when the water in the face can be easily handled by sinking bucket or pumps and the shaft walls stand well with or without temporary supports  The conventional shaft sinking operations include the following three different types of work:  The main work of drilling-blasting loading the muck, supporting the sides and shaft equipping.  Subsidiary work including hoisting, pumping, ventilation and lighting.  Services such as power supply, water supply, transport, stores, repairs, housing etc.
  • 3. Contd.  The main work at no.1 particularly the loading of muck can either be done manually or by mechanical methods.  Manual method of shaft sinking give very low progress (of the order of a foot per day) and can only be adopted for shallow and small diameter shafts.  For sinking a shaft of 5.5m finished diameter and 150m depth through normal coal measure strata the different operations involved and arrangements needed are described below:
  • 4. PREPARATORY WORK:  The chosen shaft site to be connected by all weather Road and a network of roads to be constructed within the site for efficient transport.  Adequate power supply and water supply to be made available.  Surface general plan to be prepared showing both permanent and temporary service and residential structures (temporary structures must be so located as not to interface with permanent structures to be built later) roads, dump yard etc.  Fixing the centre of shaft and its axes, bench mark etc. With the help of permanent survey point at locations where these are /the area not disturbed. Contour plan of /at 1m internal for 250-500m from the shaft.  The site wherever needed is leveled and temporary structures on surface are erected.
  • 5. SINKING EQUIPMENTS: The major items of plant include the following:  HEADGEAR: With pulleys for winding rope, suspended platform, pumps, power and lighting cables. Lever operated folding "v" doors built into the structure with chute at 15 to 20 ft. above ground level for facilitating the muck disposal.  Electric winding engine and mobile crane-1 no. each  Non-spinning type winding ropes with suspension gear consisting of clivy hook, lifting cone, detaching hook, capel and rider. Ropes for suspending platforms and other items.  Bucket or Hoppits of 0.75m3 to 1.0m3
  • 6. Contd.  Fabricated platforms: (a)Working platform with opening for the shaft mouth. The opening is provided with doors. (b)Suspended platform: with openings for the buckets to pass is kept suspended in the shaft with non-spinning ropes 25 to 30 ft. above the shaft bottom. This provides safety to workmen in the shaft and stage for lining. Its suspension ropes also act as guides for the bucket.  Compressor for providing 25cu.m.per.min. Air at 14 kg/per sq.cm. Pressure for drills and face pump.  Compressed air drills- 8 nos. and pneumatic picks- 6 nos.  Compressed air face pumps- 4 nos.  Electric pumps for stage pumping.
  • 7. Contd.  High water gauge (300mm) electric fan which can supply 8,000 cfm.air which is equivalent to 4m3/s.  Concrete mixer- 1 no. and shuttering segments for shaft lining  Ventilation tubes- 450mm in diameter.  150mm pipes for compressed air, 100mm pipes for dewatering, and 150mm pipes for concrete transport in the shaft. Flexible ventilation duct reinforced flexible pipes for concrete placing, rubber hoses for drill machines.  Trolleys/dump truck for muck disposal on surface. Explosive and store van.  Cables for power supply, lighting and shot firing. Hanging light clusters. Transformers, switch gears etc.
  • 8. Contd.  Signaling arrangements.  Slow speed winches for suspending platform and cables in the shaft.  The main items of consumable stores include the drill rods, explosives, cement and steel for reinforcement.
  • 9. Direct Personnel: Over-men 3 Mining sirdar 3 Face mazdoors including On-setter 36 Winder operator 3 Tanks man 6 Compressor operator 3 Dump yard mazdoor 12 Concreting men & man for misc. jobs 10 Fitter and helper 6 Electrician and helper 6 Substation attendant 3 Total 91 Face supervisors and workmen for face and surface are listed below:- • Managerial and other personnel needed for administration, office work, stores, medical and security etc. have not been shown here.
  • 10. Sinking up to rock and construction of shaft collar  The perimeter of the area to excavated (finished diameter plus collar thickness) is pegged out.  Loose soil is dug directly, harder ground is broken with pneumatic picks and light explosives are used in still harder formations. Muck is loaded manually in buckets and hoisted up with crane. Sides are supported temporarily as excavations proceeds.  Shaft collar is built from strong bed-rock with reinforced cement concrete. The crane can be used up to 30 m depth.  Installation of winder, head frame, folding door at shaft top, winches for platform etc. and other plants on surface and suspended platform etc. in the shaft is completed at this stage for subsequent sinking operations. Arrangements are shown in fig.1 and fig.2.
  • 11. Fig.1 SHAFT SINKING ARRANGEMENTS
  • 12. Fig.2 SURFACE ARRANGEMENTS FOR SINKING SHAFTS
  • 13.
  • 15. Sinking through Lower Strata: The cycle of operations consists following phrases: 1. Drilling at face. 2. Blasting and defuming. 3. Loading the muck out and disposal at surface. 4. Erection of shaft lining. 1. Drilling: Holes forming a cone or pyramid cut are drilled in concentric rings with pneumatic drills. The number of rings is 4 to 7 depending on the shaft diameter. A pattern is shown in fig.3 to provide an excavated shaft diameter of 6.6 m and a pull of about 1.2 m. The hole density is 2 holes per m2 of shaft face. 2. Blasting and Defuming: For blasting purposes either gelignite or permitted explosives are used depending upon whether strata passed through are non-glassy or glassy in nature. Millisecond detonators are used for firing the successive rings of holes from the centre of the shaft to its periphery.
  • 16. Explosive consumption is 1 kg per m3 with gelignite and 1.6 kg per m3 explosives. Consumption of detonator is 1 no per m3 of rock blasted .Some time is allowed for clearing of the smoke from inside the shaft before sinking operations are resumed. 3. Loading of muck: Blasted muck is filled into the buckets at the shaft bottom by hand-shoveling. On surface, the bucket discharges the muck over the”V” door chute to be loaded into trolleys or dumper for disposal at the dump-yard.
  • 17. 4. Erection of shaft lining:  Monolithic concrete lining is inserted after every fourth blast i.e. once 4.8 m progress has been made. On the base prepared at the shaft bottom ring of shuttering consisting .75 m high segments is erected, leveled and centered.  Concrete, which is transported down the shaft in steel pipes, is poured behind the shuttering with the help of flexible pipe from the suspended platform. Further rings are added to complete casting of the 4.8m length of lining.  The shaft side, before inserting the concreting lining if need be is supported with steel rings with lagging planks packed at the back. These are removed gradually when permanent lining is built.
  • 18. Subsidiary works in the shaft:-  Pumping: - small quantity of water is bailed out in the bucket. For large quantities a combination of compressed air face pump and electric stage pump is used.  Ventilation: - High water gauge (300mm) fan is installed on surface, which supplied 8000 efm. Air through steel ducts to the face. Flexible duct is used at the end of steel duct which can be raised up at the time of blasting.  Lighting: - Cluster of bulbs is connected at the end of cable suspended from the cable drum on the surface and hung over the shaft bottom to provide flood light at the face. Fixed lights are also provided at other strategic places in the shaft.  A separate shot firing cable is hung in the shaft well clear of lighting and power cable.  The pipes of drainage, ventilation compressed air and concrete are securely supported on the bun tons fixed in the shaft side at regular intervals or with rag-bolts grouted in the shaft wall. Extension of these service lines is done from time to time as the sinking of shaft proceeds.
  • 19.  Cycle time for 1.2m pull  Drilling of holes (about 60) charging, blasting and defuming 8 hours  Loading out muck and miscellaneous activities 48 hours 56 hours  Time for total progress of 4.8 m 224 hours  Inserting the lining including erection of shuttering centering etc. 16 hours 240 hours  Number of cycles in 25 working days = (25*24)/240 = 2.5 cycles  Progress in 2.5 cycles= 2.5*4.8=12.0 m  Average monthly progress would be about 75% of 12.0 m = 9.0 m
  • 20. DEEPENING OF EXISTING SHAFT A regular coal winding shaft 6.0 m in diameter has to be deepened to touch the bottom seam 100 m below without affecting normal winding operations. Describe a suitable method.  Major equipment: 1. Electric winding engines 2 2. Hoisting sheaves 2 3. Sinking buckets 3 4. Single tub cage 1 5. Tubs 6. Jack hammer 6 7. Pneumatic picks 4 8. Pneumatic face pumps 2 9. Electric pump 10. Platform with folding doors for shaft top 11. Shuttering for concreting 12. Pipes, cables, ropes etc
  • 21. Deepening operations  Small shaft “A” is sunk near the coal winding pit on the side, away from main haulage level. Head room is made for installation of winding sheaves of the hoist “E”. The depth should be enough to reach beyond the sump of old shaft, cross the safety rock plug “p” and allow sufficient head room for the installation of the sheaves of second hoist is driven.  Level road way “L” to the position os shaft deepening. The place is widened and heightened for installation of winding engine “H” its sheaves and other equipment. Additional hoists are installed for carrying the suspended sinking equipment.  The shaft centre is marked accurately by correlation through the shaft “A”. The perimeter to be excavated is marked on the rock surface.  After deepening the shaft to some depths the platform with folding doors is installed at its mouth.  Sinking proceeds in the normal manner. The rock from sinking buckets is dumped into mine tubs and hauled up through shaft A. The debris can be packed into underground galleries or hoisted to surface through the main winding shaft for disposal.  On completion of sinking plug P is removed in sections.
  • 22. Mechanized shaft sinking General parameters: Depth range 150m to 500m Diameter 5.5m to 7.5m finished Average progress 25m/month incl. of lining Thickness of lining 30m thick concrete lining(approximately) 1. Sinking winder with winding ropes and buckets 1 2. Sinking head frame with bucket tipping arrangement and bunker 1 3. Slow speed winches (electrically operated) 7 4. Platforms: a)Surface working platforms b)Movable working platforms 1 1 5. Movable suspended shuttering for lining 1 6. Grab loaders (compressed air) complete operated 2 7. Pneumatic hammer drills with drill rods of 0.8 m,1.6 m,& 2.4 m length fit diameter not less than 38 mm 8
  • 23. 8. Compressor station 50 m3/min capacity 9. Electric substation 1. to 1.5 MVA capacity 10. Pipe lines a)Ventilation pipe line b)Water pipeline c)Compressed airline d)Concreting line Diameter 700mm Diameter 150mm “ “ 11. Pumps a)Face pumps pneumatically operated b)Electrically operated slow speed Cable winches survey instruments- Cap lamps and electric lighting Fixtures-concrete mixer 1 cu. yard 2 2 Workshop equipment and tools Dump trucks 2 Trucks 2 Explosive van 1 Light vehicles 4 Contd.
  • 24. Men Manager 1 Asst. Manager 1 Over men 5 Mining Sirdars 5 Shaft sinking Mazdoors 56 Winding Eng. Operator 5 Signal men 5 Pump operator 4 E&M engineer, Electricians, Fitters and workshop crew 57 Survey 7 Compressor station personnel 4 Sub-station personnel 4 Stores personnel 10 Office & administrative personnel 27 Medical & welfare personnel 6 Security & welfare and ward personnel 20 Civil engineers, overseers 4
  • 25.  2 holes/m2 of shaft, explosive-Ajax G. 1.6 kg/cu. m. Rock 1 kg/m3 for Celignite.  Detonator: 1 detonator /m3 rock  Holes in usual ring pattern: milli second delay detonators to be used .  Firing could be in series or parallel .Parallel firings has given very good results .On wooden pegs two bare wires are installed at the shaft bottom to form the bus bars. All detonators are connected to these two bus bars in parallel. The bus bars are connected by blasting cable to the suspended blasting cum lighting cable .This cable is energized from mains on surface at 440 volts through an apparatus allowing the current to flow for 4 m.s. only . Cycle time-for 11.5m hole 6hrs Drilling of holes about (100) Charging, blasting and Clearance of smoke 3hrs Mucking 12hrs Miscellaneous activities 1hrs Total: 22hrs
  • 26. Time for two 1.5m cycles 44hrs Lining of 3m segment 6hrs Total: 50hrs CALCULATIOS: (25*24)/50=12 Progress in 12 cycles-12*3=36m Average monthly progress would be about 75% of the above 36*0.75=27m