iPad 9:02 AM R Question Completion Status: 1 2 345 6 7 89 10 Focus on resolving the larger model conflicts first. QUESTION 4 What is a BIM pit? O a Where old BIM models are sent to die, using BIMPIT 360 O b. Where multiple monitors are arranged in a small circle, so that the user can effectively visualize themselves in OC Where all the major project team members from different companies have office space to work in the same O d. A virtual space where everyone shares BIM model data the 3D space location QUESTION 5 To verify installed materials in the field, all of the following methods work efficiently, as discussed in the chapter, except: Oa Photographs taken with a drone and stitched together with software Ob. Taking project progress photos over a period of time Oc3D laser scans to create a point cloud OdUsing total stations to provide accurate layout QUESTION 6 In relation to scheduling, a sequencing simulation can be used as a coordination tool. What is a sequencing A 3D spatial illustration of detected clashes Ob.A 3D animation of the building being built from start to finish ° C. The initial project plan to arrange the site coordination O d. The process of doing BIM clash detection in scheduled order Click Save and Submit to save and submit, Click Save All Answers to save all anseers Save All Answers Close Wind Solution Answer:- (4) (b) where multiple monitors are arranged in a small circle, so that the user can effectively visualize themselves in the 3 D space. (5) Answer:- (b) Taking project progress photos over a period of time. (6) Answer:- (d) The process of doing BIM clash detection in scheduled order..