Professional with almost 4+ years of rich experience in Business Development ...
Rajeev Pathak
1. Rajeev Pathak
rajeevpathak1@yahoo.com ; rajeevpathak2@gmail.com
Phone: 09987589805
Permanent Address- Present Address -
K-189, WorldBankColony F-903,Block-3, Alliance Orchid, Kolathur
Barra, Kanpur Chennai-600076
Achievement & Assignments @ EngineeringExcellence-
Professional Summary
o Presently Working @ Sri City Site, 1200 Cr INR Green Field Project, as a Project Techno Lead – MEP & Crumb T Reactor Process
o Strong& Rich Projects , Managerial andTechnical Experienceof more than Twenty Years @ M/SNestle India Ltd, ITC Ltd, GSK CH Ltd,
Cadbury India Ltd of Project / Operation Management Entrepreneur.
o Project Management,Operation Management, Project Design and Well Expertise in Electrical - Automation System - From Concept Till
Successful Commissioning stage.
o Manage an engineeringdesign programme aligned to a product category or technology area, delivering core designs, FEED and Detailed
Engineering Packages for agreed projects on time in full (OTIF)
o Contribution to Delivery ofProject Management Performance metrics like 10 – 20% Optimization in Capex, 6 – 8% Reduction in Operating
Costs , 30% improvement in Speed of Project delivery with 100 % EHS Compliances , 25% Reduction of carbon footprint etc .
o Complete Process & Utilities PFD, PID, FDS, Process Development, HACCP, HAZOP etc. Exposures & Zonal Expertise.
o A Qualified / Experienced B.Tech- REC HBTI in Electrical Engineering 1994 Batch
o Selected thru Campus Interview & Started Career from May-1994, for Green Field Project- Flex Ind., of INR-110 Cr.
o CertificationCourses -
Key Achievements
• Playinga leadRole in CET , In close coordinationwith GET - Leadingproject activities andhandlingthe completecycle ofthe project
management entailingrequirement estimation, Capex building, Executive Summary,designingtill final execution& commercialization
of project – Specially for NorthernCluster
• Maintainingeffective inter-departmental co-ordination to achieve smoothfunctioningof theorganisation with all sites as well as Third
Party coordination COMAN’s & facilitating Value additions , VEA’s , Validation with Technical Partners TCE , LTIES
• Regulatory tracksupport & ensure that designs developedare meetingthe Regulatoryrequirements e.g. CIF, TCP,PCB, SEB, CEI, Fire
safety. Ensuringall therequireddocumentations timely submission& timelyapproval by technically assistingregulatorytrack.
• Creation ofBusiness Proposals by definingScope, Cost & Timeliness as per business requirement followedby timely commercial run.
• Yr -2008 -2010– Completedthe 265Cr INR Project – 7KT Chocolate Bars, 10KT CandyLine & 16KT Moulding line, includingall
Process & Utilities, Gensets.
• Yr 2010-2012– Independent Handled thecomplete Project Management Cycle of –
• 37 Cr INR backwardIntegration ofexistingProcess line In Projects -9.5KT Capacity–Ingredient /WIP forchocolate line
• 41 Cr INR Project forPowder Beverage capacity –TechnologyInnovative Project -11.5 KT.
• As a CompleteTeamwork, achieved1.59 MIO Safe Man-Hrs , as up to 12th
May-12.
• Designing, Selection , Installation & Successful Commissioning of LT BBT’s up to5000amps,Sandwich Electrical Bus Ducts – more
than 5 Km length,for Power Distributionas an Innovative , Clean , Safe , LowOpex solution.
• Successfully Design , Erection,Testing& Commissioning of 66 KVO/H Transmission – 2.5Km line, Switchyard& successful
commissioning on17th
Feb-2010for10 MVA sanction load. Got AppreciationthruCMD onthe same,in March-10
• Innovative & Efficient Technology“IMCC’s & SMART MCC’s Designed, Installed& successfully commissionedwith advance process
controls /features with100% LOTO inbuilt & LowCost Automation& Least Possible Foot Print.
• Yr-2013- Onwards, Western Sites Projects Thane & Indurie Sites handled& successfully commissionedincluding22KVTx Line &
complete Distribution system,NewProcess Line etc.
• Conceptualizedthe newGreen FieldProject workingwith LNTIES, alongwith budgeting, Payback Financials & Market Strategy.
• Successfully Completedthe CorporateProfit –Increase Project onMouldedCategoryProject & Ledthe same as a –Technical Project
Leadin CFT, at all manufacturingsites on moulded Products.
Playinga Vital role on Business Project Management Active Memberin Strategic Planning& Leadership thruPerformance Management and
Development Team& supportingtheGlocal Supply Chain ExpansionTeam.
Lookingforwardfor morestrengthenGoals & Assignments for further development of self & myorganizationwith TeamWorkapproach.
Work Experience:
From July-2008- Till Date Mondelez India Foods Ltd( Cadbury India Ltd) Manager - Projects
From Sept-2007 – July-2008 GSK CH India Ltd-NabhaSite Dy. Mgr - Engineering
From Sep-2006 - Sept-2007 ITC (Indian tobacco Division)-Munger Site Asst Mgr – Engineering
From March-1998 - Sep-2006 Nestle India Ltd.- Samalkha& Moga Sites Sr. Officer Engineering
From Feb-1997 to March-1998 Ushafone-Koshika India Ltd Asst. Engineer
From May-1994toFeb-1997 Flex Industries Ltd Electrical Engineer-ThruCampus
Certifications Course Certifying Ageancy Certifying Yr
Project Management Kraft Foods Europe HQ 2012
Project Risk Management IIM- Ahmedabad 2011
Energy Manager Ministry of Power, Govt. of India & BEE India 2008
Lead Auditor Course Certification- ISO-14001 DNV – Kolkata 2007
Various Cources on Automation , Switchgears , Perosnal Development etc Various OEM's , CII GBC , Professional Cources etc 1994-2005
DOB – 1st Jan-1972