Why do we need Project Controls?
• Owner always has limited financial
resources.
• Owner wants to get the most out of the
amounts of capital invested.
• Financial decision to execute a project
implies a given investment completed at a
given time…the classic “return on
investment model.”
• Owner wants to know of problems in such a
time to be able to take appropriate
corrective actions.
• In today’s business climate, “real time”
information is essential to make better
decisions.
Owner’s Perspective Slide 1 of 2
-2 -1 0 1 2 3 n - 1 n
$8m
$7m
$10m
$60m
$80m
$75m
$60m $60m
Capital investment of $25 million
over three year period .
Positive cash flows (revenue
streams) for “n” periods.
Return on Investment Model
Why do we need Project Controls?
• Return of Investment Model becomes
successful when:
– Estimated costs for capital outlays and
future cash flows are accurate.
– NPV (net present value) for future cash
flows is greater than NPV of capital
outlays.
– Project Controls efforts are needed to
ensure the actual capital outlays stay
within the bounds of the estimate used in
the Return on Investment Model. If cost
overruns or schedule delays occurs, it can
erode the financial benefit of the project.
Owner’s Perspective Slide 2 of 2
-2 -1 0 1 2 3 n - 1 n
$8m
$7m
$10m
$60m
$80m
$75m
$60m $60m
Capital investment of $25 million
over three year period .
Positive cash flows (revenue
streams) for “n” periods.
Return on Investment Model
Project Life Cycle
• Kerzner: “Every program, project or product has certain
phases of development known as life-cycle phases.”
• Project Management – A Systems Approach to Planning,
Scheduling and Controlling, Harold Kerzner, PhD, 10th Edition,
pg. 68
• Bennett: “Every project, not just those in construction
industry, goes through a series of identifiable phases,
wherein it is ‘born’, it matures, it carries through ‘old
age’ and it expires.”
• The Management of Construction – A Project Life Cycle
Approach, F. Lawrence Bennett, PE, PhD, pg. 7
Aka Project Management Process
Examples of Project Life Cycles
Oil & Gas Industry
ImplementationDefinitionFeasibilityConceptual01 02 03 04
Choose the right project Develop the project right Deliver the project right
Plan the work 
Start-up/
Close Out05
ExecuteDefinitionSelectAppraise01 02 03 04 Operate05
Work the Plan 
COMPANY A
COMPANY B
Detailed
Design
Comm.Constr.
Examples of Project Life Cycles
Pharma Industry Slide 1 of 2
Basic DesignPre-Justify
Front-end Loading
CAPITAL MANAGEMENT PROCESS
Plan the work 
Close Out
DeliverApproveDevelopAllocation01 02 03 04 Asses05
Work the Plan 
PROJECT MANAGEMENT PROCESS
01 02 03 04 05
Justify
Feasibility /
Concept Design
Examples of Project Life Cycles
Pharma Industry Slide 2 of 2
Feasibility Concept
Gate
(Capital Plan)
Preliminary
Design
Detailed Design
Construction
Startup
Commissioning
Qualification
Validation
Project Turnover
Gate
(Project Close)
Administrative
Close
FRONT-END PLANNING
EXECUTION
PROJECT CLOSURE
Project Planning & Control System
Kerzner Perspective
Source: Project Management – A Systems
Approach to Planning, Scheduling and Controlling,
Harold Kerzner, PhD, 10th Edition, pg. 413
Management
of Change
Management
Decision-making
Strategies, states of nature,
payoff tables
BudgetsSystem Reports
Time, cost, performance,
reliability, maintainability,
effectiveness
Time/Cost/
Performance
Tracking
Feedback
Network Scheduling
PERT/CPM
Goals/Objectives
System and company level
Work Descriptions
Specs, SOW, WBS
Master Detailed
Schedules
Change procedure, review &
approval of changes
Project Controls Process
Hollmann Perspective
Hallmarks of Good Project Controls Process
• Organization of data (structure)
• Ongoing cost and schedule data collection systems that is near “real-time”
• Establish appropriate baselines, with contingency, that considers possible effects of risks
– Project targeting is doable; scope of project is what is needed
• Application of earned value concepts
• Sufficient time for trend analysis and developing forecasts
– Going beyond reporting data, but also suggesting corrective actions
• Effective Reports/Graphics (use of dashboards)
Owner’s Project Control Specialist
View of Distribution of Time
Project Cost Forecasting Process
Theoretical Best Practice
Project
Schedule
Update
Contractor
Progress
Reports
Contractor
Cost
Reports
Project
Accounting
Change
Management
System
Part of Ongoing Project
Controls Function on Project;
Sub-Processes Interlinked
Initial Cost
Baseline
Approved
Change Orders
Current Cost
Baseline
Cost Forecast
Based on
Above Analyses
Vendor Invoices
Contractor Invoices
Payroll (timesheet systems)
Project Purchasing (POs) &
Contract Awards
Resource Use During
Reporting Period
Starting Point
for All Analysis
Deviations that
become trends
Variation
Analysis
Trend
Analysis
Review
Actual Costs
Review
Committed
Costs
Earned
Value
Analysis
THANK YOU
Jerry Klanac
Managing Director
PMA Consultants
info@pmaconsultants.com

More Related Content

What's hot

Construction project management
Construction project managementConstruction project management
Construction project managementSenthil Kannan
 
Project control plan_draft
Project control plan_draftProject control plan_draft
Project control plan_draftignitetribes
 
Project Management Process and Its Phases
Project Management Process and Its PhasesProject Management Process and Its Phases
Project Management Process and Its PhasesGaurav Sukhija
 
Mega Project Management In The Oil & Gas Industry
Mega Project Management In The Oil & Gas IndustryMega Project Management In The Oil & Gas Industry
Mega Project Management In The Oil & Gas IndustryStephen_Forster
 
PMI-RMP Exam Prep Presentation
PMI-RMP Exam Prep PresentationPMI-RMP Exam Prep Presentation
PMI-RMP Exam Prep Presentationscottdreynolds
 
Work breakdown structures
Work breakdown structures Work breakdown structures
Work breakdown structures Ian Cammack
 
Challenges Of Project Management
Challenges Of Project ManagementChallenges Of Project Management
Challenges Of Project Managementashutoshsachan
 
Project Monitoring and Control
Project Monitoring and ControlProject Monitoring and Control
Project Monitoring and Controlguy_davis
 
Planning and Scheduling Construction Projects, Part 1: The Planning Process
Planning and Scheduling Construction Projects, Part 1: The Planning ProcessPlanning and Scheduling Construction Projects, Part 1: The Planning Process
Planning and Scheduling Construction Projects, Part 1: The Planning ProcessAlberto Sanchez
 
Project Management Office (PMO)
Project Management Office (PMO)Project Management Office (PMO)
Project Management Office (PMO)Anand Subramaniam
 
4-0 PROJECT EXECUTION AND CONTROL
4-0 PROJECT EXECUTION AND CONTROL4-0 PROJECT EXECUTION AND CONTROL
4-0 PROJECT EXECUTION AND CONTROLpmSPECFramework
 
Baseline schedule review and analysis
Baseline schedule review and analysisBaseline schedule review and analysis
Baseline schedule review and analysisADITYA GHUMARE
 
Primavera P6 manual
Primavera P6 manual Primavera P6 manual
Primavera P6 manual Abbas Tahir
 
How to Implement a Project Management Information System
How to Implement a Project Management Information SystemHow to Implement a Project Management Information System
How to Implement a Project Management Information SystemPMA Consultants
 

What's hot (20)

Construction project management
Construction project managementConstruction project management
Construction project management
 
Project control plan_draft
Project control plan_draftProject control plan_draft
Project control plan_draft
 
Project Schedule Management
Project Schedule ManagementProject Schedule Management
Project Schedule Management
 
Project Management Process and Its Phases
Project Management Process and Its PhasesProject Management Process and Its Phases
Project Management Process and Its Phases
 
Mega Project Management In The Oil & Gas Industry
Mega Project Management In The Oil & Gas IndustryMega Project Management In The Oil & Gas Industry
Mega Project Management In The Oil & Gas Industry
 
PMI-RMP Exam Prep Presentation
PMI-RMP Exam Prep PresentationPMI-RMP Exam Prep Presentation
PMI-RMP Exam Prep Presentation
 
Work breakdown structures
Work breakdown structures Work breakdown structures
Work breakdown structures
 
Challenges Of Project Management
Challenges Of Project ManagementChallenges Of Project Management
Challenges Of Project Management
 
Project Monitoring and Control
Project Monitoring and ControlProject Monitoring and Control
Project Monitoring and Control
 
Planning and Scheduling Construction Projects, Part 1: The Planning Process
Planning and Scheduling Construction Projects, Part 1: The Planning ProcessPlanning and Scheduling Construction Projects, Part 1: The Planning Process
Planning and Scheduling Construction Projects, Part 1: The Planning Process
 
Project Management Office (PMO)
Project Management Office (PMO)Project Management Office (PMO)
Project Management Office (PMO)
 
Project termination
Project terminationProject termination
Project termination
 
4-0 PROJECT EXECUTION AND CONTROL
4-0 PROJECT EXECUTION AND CONTROL4-0 PROJECT EXECUTION AND CONTROL
4-0 PROJECT EXECUTION AND CONTROL
 
50 Planning Fundamentals V5.0 - procedures only
50 Planning Fundamentals V5.0 - procedures only50 Planning Fundamentals V5.0 - procedures only
50 Planning Fundamentals V5.0 - procedures only
 
Baseline schedule review and analysis
Baseline schedule review and analysisBaseline schedule review and analysis
Baseline schedule review and analysis
 
Project stakeholder Management PMBOK Sixth
Project stakeholder Management PMBOK SixthProject stakeholder Management PMBOK Sixth
Project stakeholder Management PMBOK Sixth
 
Project Control
Project ControlProject Control
Project Control
 
Primavera P6 manual
Primavera P6 manual Primavera P6 manual
Primavera P6 manual
 
How to close a project
How to close a projectHow to close a project
How to close a project
 
How to Implement a Project Management Information System
How to Implement a Project Management Information SystemHow to Implement a Project Management Information System
How to Implement a Project Management Information System
 

Similar to Project Controls Processes

Capitalbudgeting
Capitalbudgeting Capitalbudgeting
Capitalbudgeting Venu Goud
 
4. PAE AcFn621Ch-4a Project Alaysis and Selection.ppt
4. PAE AcFn621Ch-4a Project Alaysis and Selection.ppt4. PAE AcFn621Ch-4a Project Alaysis and Selection.ppt
4. PAE AcFn621Ch-4a Project Alaysis and Selection.pptProfDrAnbalaganChinn
 
Mining Project Management Systems: Driving Predictable Project Outcomes
Mining Project Management Systems: Driving Predictable Project OutcomesMining Project Management Systems: Driving Predictable Project Outcomes
Mining Project Management Systems: Driving Predictable Project OutcomesJamie Morien
 
340Capital BudgetingTechniquesCertainty and Risk.docx
340Capital BudgetingTechniquesCertainty and Risk.docx340Capital BudgetingTechniquesCertainty and Risk.docx
340Capital BudgetingTechniquesCertainty and Risk.docxgilbertkpeters11344
 
LavaCon Best Practices For Multiple Technical Projects V1R2
LavaCon Best Practices For Multiple Technical Projects V1R2LavaCon Best Practices For Multiple Technical Projects V1R2
LavaCon Best Practices For Multiple Technical Projects V1R2Jose Figueroa
 
Capital Budgeting
Capital BudgetingCapital Budgeting
Capital BudgetingDayasagar S
 
Project Execution in Changing Times - Focus on the Essentials
Project Execution in Changing Times - Focus on the EssentialsProject Execution in Changing Times - Focus on the Essentials
Project Execution in Changing Times - Focus on the EssentialsEndeavor Management
 
Project Costs, Budgeting and Appraisal
Project Costs, Budgeting and AppraisalProject Costs, Budgeting and Appraisal
Project Costs, Budgeting and AppraisalJude Iheanacho
 
Project management- Operation Management
Project management- Operation ManagementProject management- Operation Management
Project management- Operation ManagementVikram Singh
 
Practitioner’s Guide Building and Sustaining an Effective IT Demand Managemen...
Practitioner’s Guide Building and Sustaining an Effective IT Demand Managemen...Practitioner’s Guide Building and Sustaining an Effective IT Demand Managemen...
Practitioner’s Guide Building and Sustaining an Effective IT Demand Managemen...Walgreens Boots Alliance, Inc.
 
This task contains portions of material that were originally submi.docx
This task contains portions of material that were originally submi.docxThis task contains portions of material that were originally submi.docx
This task contains portions of material that were originally submi.docxherthalearmont
 
Online PMP Training Material for PMP Exam - Cost Management Knowledge Area
Online PMP Training Material for PMP Exam - Cost Management Knowledge AreaOnline PMP Training Material for PMP Exam - Cost Management Knowledge Area
Online PMP Training Material for PMP Exam - Cost Management Knowledge AreaGlobalSkillup
 

Similar to Project Controls Processes (20)

Capitalbudgeting
Capitalbudgeting Capitalbudgeting
Capitalbudgeting
 
4. PAE AcFn621Ch-4a Project Alaysis and Selection.ppt
4. PAE AcFn621Ch-4a Project Alaysis and Selection.ppt4. PAE AcFn621Ch-4a Project Alaysis and Selection.ppt
4. PAE AcFn621Ch-4a Project Alaysis and Selection.ppt
 
Project Mgt.- (Mod)..ppt
Project Mgt.- (Mod)..pptProject Mgt.- (Mod)..ppt
Project Mgt.- (Mod)..ppt
 
Capital Budgeting
Capital BudgetingCapital Budgeting
Capital Budgeting
 
Mining Project Management Systems: Driving Predictable Project Outcomes
Mining Project Management Systems: Driving Predictable Project OutcomesMining Project Management Systems: Driving Predictable Project Outcomes
Mining Project Management Systems: Driving Predictable Project Outcomes
 
L 12 capital budgeting
L 12 capital budgetingL 12 capital budgeting
L 12 capital budgeting
 
Project Intro
Project IntroProject Intro
Project Intro
 
340Capital BudgetingTechniquesCertainty and Risk.docx
340Capital BudgetingTechniquesCertainty and Risk.docx340Capital BudgetingTechniquesCertainty and Risk.docx
340Capital BudgetingTechniquesCertainty and Risk.docx
 
LavaCon Best Practices For Multiple Technical Projects V1R2
LavaCon Best Practices For Multiple Technical Projects V1R2LavaCon Best Practices For Multiple Technical Projects V1R2
LavaCon Best Practices For Multiple Technical Projects V1R2
 
Chapter iii capital budget
Chapter iii capital budgetChapter iii capital budget
Chapter iii capital budget
 
Capital Budgeting
Capital BudgetingCapital Budgeting
Capital Budgeting
 
Capital budgeting
Capital budgetingCapital budgeting
Capital budgeting
 
Project Execution in Changing Times - Focus on the Essentials
Project Execution in Changing Times - Focus on the EssentialsProject Execution in Changing Times - Focus on the Essentials
Project Execution in Changing Times - Focus on the Essentials
 
02_lecture 8.ppt
02_lecture 8.ppt02_lecture 8.ppt
02_lecture 8.ppt
 
Value chain analysis 4
Value chain analysis 4Value chain analysis 4
Value chain analysis 4
 
Project Costs, Budgeting and Appraisal
Project Costs, Budgeting and AppraisalProject Costs, Budgeting and Appraisal
Project Costs, Budgeting and Appraisal
 
Project management- Operation Management
Project management- Operation ManagementProject management- Operation Management
Project management- Operation Management
 
Practitioner’s Guide Building and Sustaining an Effective IT Demand Managemen...
Practitioner’s Guide Building and Sustaining an Effective IT Demand Managemen...Practitioner’s Guide Building and Sustaining an Effective IT Demand Managemen...
Practitioner’s Guide Building and Sustaining an Effective IT Demand Managemen...
 
This task contains portions of material that were originally submi.docx
This task contains portions of material that were originally submi.docxThis task contains portions of material that were originally submi.docx
This task contains portions of material that were originally submi.docx
 
Online PMP Training Material for PMP Exam - Cost Management Knowledge Area
Online PMP Training Material for PMP Exam - Cost Management Knowledge AreaOnline PMP Training Material for PMP Exam - Cost Management Knowledge Area
Online PMP Training Material for PMP Exam - Cost Management Knowledge Area
 

More from PMA Consultants

Practical Application of Value Engineering in Capital Projects
Practical Application of Value Engineering in Capital ProjectsPractical Application of Value Engineering in Capital Projects
Practical Application of Value Engineering in Capital ProjectsPMA Consultants
 
Project Cost & Schedule Integration Lessons Learnt
Project Cost & Schedule Integration Lessons LearntProject Cost & Schedule Integration Lessons Learnt
Project Cost & Schedule Integration Lessons LearntPMA Consultants
 
PANDEMIC RESILIENTSCHOOLS
PANDEMIC RESILIENTSCHOOLSPANDEMIC RESILIENTSCHOOLS
PANDEMIC RESILIENTSCHOOLSPMA Consultants
 
BioPharma Projects: Essentials in Project Controls
BioPharma Projects: Essentials in Project ControlsBioPharma Projects: Essentials in Project Controls
BioPharma Projects: Essentials in Project ControlsPMA Consultants
 
Top Five Metrics for Measuring Schedule Reliability
Top Five Metrics for Measuring Schedule ReliabilityTop Five Metrics for Measuring Schedule Reliability
Top Five Metrics for Measuring Schedule ReliabilityPMA Consultants
 
What are the disadvantages of Gantt charts?
What are the disadvantages of Gantt charts?What are the disadvantages of Gantt charts?
What are the disadvantages of Gantt charts?PMA Consultants
 
BIM and VDC for Megaproject Construction Projects
BIM and VDC for Megaproject Construction ProjectsBIM and VDC for Megaproject Construction Projects
BIM and VDC for Megaproject Construction ProjectsPMA Consultants
 
Setting up Filters & Layouts in P6
Setting up Filters & Layouts in P6Setting up Filters & Layouts in P6
Setting up Filters & Layouts in P6PMA Consultants
 
How to Choose a Project Delivery Method
How to Choose a Project Delivery MethodHow to Choose a Project Delivery Method
How to Choose a Project Delivery MethodPMA Consultants
 
Risk Management Processes from Jerry Klanac
Risk Management Processes from Jerry KlanacRisk Management Processes from Jerry Klanac
Risk Management Processes from Jerry KlanacPMA Consultants
 
Work Breakdown Structure Planning in NetPoint
Work Breakdown Structure Planning in NetPointWork Breakdown Structure Planning in NetPoint
Work Breakdown Structure Planning in NetPointPMA Consultants
 
How to Import/Export a Schedule between NetPoint and Microsft Excel
How to Import/Export a Schedule between NetPoint and Microsft ExcelHow to Import/Export a Schedule between NetPoint and Microsft Excel
How to Import/Export a Schedule between NetPoint and Microsft ExcelPMA Consultants
 
Smarter Planning with Microsoft Excel
Smarter Planning with Microsoft ExcelSmarter Planning with Microsoft Excel
Smarter Planning with Microsoft ExcelPMA Consultants
 
In Pursuit of Reliable Schedules
In Pursuit of Reliable SchedulesIn Pursuit of Reliable Schedules
In Pursuit of Reliable SchedulesPMA Consultants
 
Leveraging NetPoint & Excel for Template-Based Project Planning
Leveraging NetPoint & Excel for Template-Based Project PlanningLeveraging NetPoint & Excel for Template-Based Project Planning
Leveraging NetPoint & Excel for Template-Based Project PlanningPMA Consultants
 
Risk 2196 Removing the Early-Dates Bias in CPM Risk Analysis
Risk 2196 Removing the Early-Dates Bias in CPM Risk AnalysisRisk 2196 Removing the Early-Dates Bias in CPM Risk Analysis
Risk 2196 Removing the Early-Dates Bias in CPM Risk AnalysisPMA Consultants
 
The Value of Project Risk Management
The Value of Project Risk ManagementThe Value of Project Risk Management
The Value of Project Risk ManagementPMA Consultants
 
Risk Modeling and Analysis (Mitigating the Planning Fallacy)
Risk Modeling and Analysis (Mitigating the Planning Fallacy)Risk Modeling and Analysis (Mitigating the Planning Fallacy)
Risk Modeling and Analysis (Mitigating the Planning Fallacy)PMA Consultants
 
Schedule levels-as-presented 02-may11
Schedule levels-as-presented  02-may11Schedule levels-as-presented  02-may11
Schedule levels-as-presented 02-may11PMA Consultants
 

More from PMA Consultants (20)

Practical Application of Value Engineering in Capital Projects
Practical Application of Value Engineering in Capital ProjectsPractical Application of Value Engineering in Capital Projects
Practical Application of Value Engineering in Capital Projects
 
Project Cost & Schedule Integration Lessons Learnt
Project Cost & Schedule Integration Lessons LearntProject Cost & Schedule Integration Lessons Learnt
Project Cost & Schedule Integration Lessons Learnt
 
PANDEMIC RESILIENTSCHOOLS
PANDEMIC RESILIENTSCHOOLSPANDEMIC RESILIENTSCHOOLS
PANDEMIC RESILIENTSCHOOLS
 
BioPharma Projects: Essentials in Project Controls
BioPharma Projects: Essentials in Project ControlsBioPharma Projects: Essentials in Project Controls
BioPharma Projects: Essentials in Project Controls
 
Top Five Metrics for Measuring Schedule Reliability
Top Five Metrics for Measuring Schedule ReliabilityTop Five Metrics for Measuring Schedule Reliability
Top Five Metrics for Measuring Schedule Reliability
 
What are the disadvantages of Gantt charts?
What are the disadvantages of Gantt charts?What are the disadvantages of Gantt charts?
What are the disadvantages of Gantt charts?
 
BIM and VDC for Megaproject Construction Projects
BIM and VDC for Megaproject Construction ProjectsBIM and VDC for Megaproject Construction Projects
BIM and VDC for Megaproject Construction Projects
 
Setting up Filters & Layouts in P6
Setting up Filters & Layouts in P6Setting up Filters & Layouts in P6
Setting up Filters & Layouts in P6
 
How to Choose a Project Delivery Method
How to Choose a Project Delivery MethodHow to Choose a Project Delivery Method
How to Choose a Project Delivery Method
 
Risk Management Processes from Jerry Klanac
Risk Management Processes from Jerry KlanacRisk Management Processes from Jerry Klanac
Risk Management Processes from Jerry Klanac
 
Work Breakdown Structure Planning in NetPoint
Work Breakdown Structure Planning in NetPointWork Breakdown Structure Planning in NetPoint
Work Breakdown Structure Planning in NetPoint
 
How to Import/Export a Schedule between NetPoint and Microsft Excel
How to Import/Export a Schedule between NetPoint and Microsft ExcelHow to Import/Export a Schedule between NetPoint and Microsft Excel
How to Import/Export a Schedule between NetPoint and Microsft Excel
 
Smarter Planning with Microsoft Excel
Smarter Planning with Microsoft ExcelSmarter Planning with Microsoft Excel
Smarter Planning with Microsoft Excel
 
In Pursuit of Reliable Schedules
In Pursuit of Reliable SchedulesIn Pursuit of Reliable Schedules
In Pursuit of Reliable Schedules
 
Leveraging NetPoint & Excel for Template-Based Project Planning
Leveraging NetPoint & Excel for Template-Based Project PlanningLeveraging NetPoint & Excel for Template-Based Project Planning
Leveraging NetPoint & Excel for Template-Based Project Planning
 
Risk 2196 Removing the Early-Dates Bias in CPM Risk Analysis
Risk 2196 Removing the Early-Dates Bias in CPM Risk AnalysisRisk 2196 Removing the Early-Dates Bias in CPM Risk Analysis
Risk 2196 Removing the Early-Dates Bias in CPM Risk Analysis
 
The Value of Project Risk Management
The Value of Project Risk ManagementThe Value of Project Risk Management
The Value of Project Risk Management
 
Risk Modeling and Analysis (Mitigating the Planning Fallacy)
Risk Modeling and Analysis (Mitigating the Planning Fallacy)Risk Modeling and Analysis (Mitigating the Planning Fallacy)
Risk Modeling and Analysis (Mitigating the Planning Fallacy)
 
P6 tips tricks-client
P6 tips tricks-clientP6 tips tricks-client
P6 tips tricks-client
 
Schedule levels-as-presented 02-may11
Schedule levels-as-presented  02-may11Schedule levels-as-presented  02-may11
Schedule levels-as-presented 02-may11
 

Recently uploaded

Introduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-EngineeringIntroduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-Engineeringthomas851723
 
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramBeyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramCIToolkit
 
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...AgileNetwork
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixCIToolkit
 
LPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations ReviewLPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations Reviewthomas851723
 
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Roomdivyansh0kumar0
 
Board Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch PresentationBoard Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch Presentationcraig524401
 
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingCIToolkit
 
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...Pooja Nehwal
 
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证jdkhjh
 
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)jennyeacort
 
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchFarmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchRashtriya Kisan Manch
 
Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insightWayne Abrahams
 
LPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business SectorLPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business Sectorthomas851723
 
Measuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsMeasuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsCIToolkit
 
Fifteenth Finance Commission Presentation
Fifteenth Finance Commission PresentationFifteenth Finance Commission Presentation
Fifteenth Finance Commission Presentationmintusiprd
 

Recently uploaded (17)

Introduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-EngineeringIntroduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-Engineering
 
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramBeyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
 
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
 
LPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations ReviewLPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations Review
 
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Servicesauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
 
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
 
Board Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch PresentationBoard Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch Presentation
 
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
 
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
 
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
 
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
 
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchFarmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
 
Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insight
 
LPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business SectorLPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business Sector
 
Measuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsMeasuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield Metrics
 
Fifteenth Finance Commission Presentation
Fifteenth Finance Commission PresentationFifteenth Finance Commission Presentation
Fifteenth Finance Commission Presentation
 

Project Controls Processes

  • 2. Why do we need Project Controls? • Owner always has limited financial resources. • Owner wants to get the most out of the amounts of capital invested. • Financial decision to execute a project implies a given investment completed at a given time…the classic “return on investment model.” • Owner wants to know of problems in such a time to be able to take appropriate corrective actions. • In today’s business climate, “real time” information is essential to make better decisions. Owner’s Perspective Slide 1 of 2 -2 -1 0 1 2 3 n - 1 n $8m $7m $10m $60m $80m $75m $60m $60m Capital investment of $25 million over three year period . Positive cash flows (revenue streams) for “n” periods. Return on Investment Model
  • 3. Why do we need Project Controls? • Return of Investment Model becomes successful when: – Estimated costs for capital outlays and future cash flows are accurate. – NPV (net present value) for future cash flows is greater than NPV of capital outlays. – Project Controls efforts are needed to ensure the actual capital outlays stay within the bounds of the estimate used in the Return on Investment Model. If cost overruns or schedule delays occurs, it can erode the financial benefit of the project. Owner’s Perspective Slide 2 of 2 -2 -1 0 1 2 3 n - 1 n $8m $7m $10m $60m $80m $75m $60m $60m Capital investment of $25 million over three year period . Positive cash flows (revenue streams) for “n” periods. Return on Investment Model
  • 4. Project Life Cycle • Kerzner: “Every program, project or product has certain phases of development known as life-cycle phases.” • Project Management – A Systems Approach to Planning, Scheduling and Controlling, Harold Kerzner, PhD, 10th Edition, pg. 68 • Bennett: “Every project, not just those in construction industry, goes through a series of identifiable phases, wherein it is ‘born’, it matures, it carries through ‘old age’ and it expires.” • The Management of Construction – A Project Life Cycle Approach, F. Lawrence Bennett, PE, PhD, pg. 7 Aka Project Management Process
  • 5. Examples of Project Life Cycles Oil & Gas Industry ImplementationDefinitionFeasibilityConceptual01 02 03 04 Choose the right project Develop the project right Deliver the project right Plan the work  Start-up/ Close Out05 ExecuteDefinitionSelectAppraise01 02 03 04 Operate05 Work the Plan  COMPANY A COMPANY B
  • 6. Detailed Design Comm.Constr. Examples of Project Life Cycles Pharma Industry Slide 1 of 2 Basic DesignPre-Justify Front-end Loading CAPITAL MANAGEMENT PROCESS Plan the work  Close Out DeliverApproveDevelopAllocation01 02 03 04 Asses05 Work the Plan  PROJECT MANAGEMENT PROCESS 01 02 03 04 05 Justify Feasibility / Concept Design
  • 7. Examples of Project Life Cycles Pharma Industry Slide 2 of 2 Feasibility Concept Gate (Capital Plan) Preliminary Design Detailed Design Construction Startup Commissioning Qualification Validation Project Turnover Gate (Project Close) Administrative Close FRONT-END PLANNING EXECUTION PROJECT CLOSURE
  • 8. Project Planning & Control System Kerzner Perspective Source: Project Management – A Systems Approach to Planning, Scheduling and Controlling, Harold Kerzner, PhD, 10th Edition, pg. 413 Management of Change Management Decision-making Strategies, states of nature, payoff tables BudgetsSystem Reports Time, cost, performance, reliability, maintainability, effectiveness Time/Cost/ Performance Tracking Feedback Network Scheduling PERT/CPM Goals/Objectives System and company level Work Descriptions Specs, SOW, WBS Master Detailed Schedules Change procedure, review & approval of changes
  • 10. Hallmarks of Good Project Controls Process • Organization of data (structure) • Ongoing cost and schedule data collection systems that is near “real-time” • Establish appropriate baselines, with contingency, that considers possible effects of risks – Project targeting is doable; scope of project is what is needed • Application of earned value concepts • Sufficient time for trend analysis and developing forecasts – Going beyond reporting data, but also suggesting corrective actions • Effective Reports/Graphics (use of dashboards)
  • 11. Owner’s Project Control Specialist View of Distribution of Time
  • 12. Project Cost Forecasting Process Theoretical Best Practice Project Schedule Update Contractor Progress Reports Contractor Cost Reports Project Accounting Change Management System Part of Ongoing Project Controls Function on Project; Sub-Processes Interlinked Initial Cost Baseline Approved Change Orders Current Cost Baseline Cost Forecast Based on Above Analyses Vendor Invoices Contractor Invoices Payroll (timesheet systems) Project Purchasing (POs) & Contract Awards Resource Use During Reporting Period Starting Point for All Analysis Deviations that become trends Variation Analysis Trend Analysis Review Actual Costs Review Committed Costs Earned Value Analysis
  • 13. THANK YOU Jerry Klanac Managing Director PMA Consultants info@pmaconsultants.com