Call Girls In Prashant Vihar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Ragavendiran's Resume
1. Ragavendiran Kulothungan Shakila
To enrich and enhance the way
SAP systems are used by the
clients to boost their revenue and
strengthen themselves in the
competitive market by
SAP digital transformation and
thereby showcase my skill set to
make the organization stand tall
amidst the competitors.
Career Objective
Skills
Decision Making
Team Work
Problem Solving
Agility
SAP Certified Technology Consultant
Professional Summary
A versatile and highly motivated IT professional with 3+ years of
experience as SAP Basis / S/4HANA Consultant, worked in
challenging business landscapes
Ensure the reliability of businesses by providing deliverables on
time to the clients
Proficient in SAP S/4HANA implementation and conversion, SAP
HANA implementation and migration (DMO), upgrades, OS/DB
migration and SAP operation support
Analyze system requirements for business and enhance the SAP
applications performance in day to day operations
Mumbai, India
+91 8291277292
ragavendiran94@hotmail.com
Certification
SAP S/4HANA Implementation
Scenarios for Architects
SAP S/4HANA Conversion and
SAP System Upgrade
SAP Certified Technology
Associate – SAP HANA 2.0
Software Components
SAP
Application
ECC
EP
SCM
Gateway
GRC
CRM
BI/BO
PI
Cloud
Platform AWS
HANA
Appliance
HP
Dell
TDI
Operating
System
AIX
Linux
Windows
Work
Till Date -
June 2016
SAP S/4HANA conversion and implementation (PoC)
SAP HANA 2.0 SPS03 implementation (TDI) and Suite on HANA
(SoH) migration
SAP NetWeaver 7.40 SP15 upgrade and SAP ASE 16 SPS03
migration
SAP ERP 6.0 EHP 8 on SAP HANA 2.0 SPS00 and SAP Fiori
implementation
SAP HANA Cloud Connector 2.0 implementation
SAP Enterprise Portal Support Pack update
SAP Landscape operation support
Achievements
Software Engineer
Larsen & Toubro Infotech, LTI
Education
June 2011-
April 2015
Bachelor of Engineering - Computer Science and Engineering
Anna University, Chennai
7.91 CGPA
Earned Record of Achievements for many openSAP Courses
Data Migration to SAP S/4HANA
System Conversion to SAP S/4HANA
Understanding SAP Fiori Launchpad
Introduction to SAP HANA Administration
2. Project Name SAP S/4HANA conversion and implementation (PoC)
Team S
Start Date March – 2019 End Date Till Date
Project Description SAP ECC 6.0 EHP 06 to S/4HANA 1809 FPS 02 Conversion with System Replication
Role and Contribution
Pre-check execution in ECC system with R_S4_PRE_Transition_Checks
program SAP notes implementation
Configured and performed SAP S/4HANA readiness check for custom code
migration
Generated stack file using maintenance planner and made sure pre-requisites
are fulfilled
Implemented and configured ATC (ABAP Test Cockpit) framework for remote
code analysis of all SAP systems in the landscape
Performed application specific preparation activities for S/4HANA conversion
such as Add-on uninstallation, client deletion, latest SPAM/SAINT update
Performed SAP ECC 6.0 EHP 06 on HANA to S/4HANA 1809 FPS 02
Conversion using SUM DMO procedure
Configured post configuration steps after conversion to S/4HANA such as Fiori
Task list implementation, output management
Designed and configured system replication and installed SAP S/4HANA 1809
FPS 02 on SAP HANA 2.0 SPS03
Installed and configured SAP HANA Cockpit 2.0 for HANA administration
Technology and Tools
SAP ECC 6.0 EHP06, S/4HANA 1809 FPS 02, SAP HANA 2.0 SPS03, SAP HANA
Cockpit 2.0. SUSE Linux Enterprise Server 12 SP2, SUM, AIX 7.1
Project Name SAP HANA 2.0 SPS03 implementation (TDI) and Suite on HANA (SoH) migration
Team Size
Start Date August – 2018 End Date February - 2019
Project Description SAP ECC 6.0 EHP6 and SAP SCM 7.0 SP03 on Oracle 12c to SAP HANA 2.0 SPS03
Role and Contribution
SAP HANA Sizing on SAP ECC and SAP SCM systems
Hardware check and SAP HANA 2.0 SPS 03 TDI based installation
Creation of SAP HANA tenant databases and configuration
Installation of SAP HANA integrated liveCache and SAP HANA client in all
application servers
System refresh SAP ECC and SAP SCM including liveCache for initial testing
SAP HANA System properties configuration management
Analyzing memory / CPU usage, SQL statements, Experience in alert
management and configuration
LiveCache readiness check during migration
Backup and recovery of SAP HANA database in Cockpit and studio
Troubleshooting errors occurred during SUM DMO execution
Execute Go-live readiness check
Technology and Tools
SAP HANA 2.0 SPS03 , SAP HANA Cockpit 2.0, HANA Studio, SUSE Linux
Enterprise Server 12 SP2, SUM, AIX 7.1
3. Project Name SAP NetWeaver 7.40 SP15 upgrade and SAP ASE 16 SPS03 migration
Team Size
Start Date March – 2018 End Date July - 2018
Project Description
SAP NetWeaver 7.02 SP03 on Oracle 12c to SAP NetWeaver 7.40 SP15 on SAP ASE
16 SPS03
Role and Contribution
Compatibility check using Product Availability Matrix on Operating System,
Database, SAP netweaver release version.
Generated stack file using maintenance planner and made sure pre-requisites
are fulfilled
SAP ASE Sizing using Software Provisioning Manager (SWPM)
SAP ASE 16.0 SPS03 installation based on sizing using SWPM
SAP NetWeaver upgrade and SAP ASE migration from Oracle database in one
step using SUM DMO
Executed post upgrade and migration follow up activities.
Configured SAP ASE system properties in accordance using EWA report
Configuration of Automatic Table Maintenance (ATM) in SAP ASE
Troubleshooting errors occurred during SUM DMO execution
Execute Go-live readiness check
Technology and Tools
SAP ASE 16.0.03.05, SWPM,SUM DMO, Oracle 12.1.0.2.0, SYBASE
DBACOCKPIT, AIX 7.1
Project Name SAP ERP 6.0 EHP 8 on SAP HANA 2.0 SPS00 and SAP Fiori implementation
Team Size
Start Date July – 2017 End Date February - 2018
Project Description
SAP ERP 6.0 EHP 8 on SAP HANA 2.0 SPS00 and Centralized SAP Gateway
implementation with Single Sign On Gateway – ECC
Role and Contribution
Generated stack file using maintenance planner and made sure pre-requisites
are fulfilled
Compatibility check using Product Availability Matrix on Operating System,
Database, SAP netweaver release version.
Design and setup of SAP HANA database post initial checks after procuring
from the vendor.
Installation of SAP ERP 6.0 EHP 8 on SAP HANA 2.0 SPS00 using Software
Provisioning Manager (SWPM)
SAP Fiori configuration using automated task list in SAP Gateway system
SAP Fiori Fachsheet configuration and post activities
Single Sign On configuration between SAP Gateway and ECC sytems in
multiple client environment
Configured and enabled SAP Fiori launchpad accessibility on internet
Backup configuration and retention period of backup.
System refresh of SAP HANA using SAP HANA Cockpit and studio
Execute Go-live readiness check
Technology and Tools
Quick Sizer, SWPM, SAP HANA 2.0 SPS00 , SAP HANA Cockpit 2.0, HANA
Studio, SUSE Linux Enterprise Server 12, Windows Server 2012
4. Project Name SAP HANA Cloud Connector 2.0 implementation
End Date
Start Date May – 2017 End Date June - 2017
Project Description SAP ECC on-Prem to SAP HANA Cloud Integration connection establishment
Role and Contribution
Installation of SAP HANA Cloud Connector 2.0
Hardware sizing for Cloud connector installation
Post installation configuration
Exposing On-Premise SAP system to internet
Establishing connection between ECC - Cloud connector - HCI.
Enabling trust between On-Premise & HCI systems
IDOC, Partner profiles, BAPI configuration in On-Premise system.
HANA cloud connector administration tasks
RFC destination to HCI system using reverse proxy
Technology and Tools SAP ECC, Windows Server 2012, SAP HCI, SAP HANA Cloud Connector 2.0
Project Name SAP Landscape operation support
Team Size
Start Date June - 2016 End Date On-going
Project Description
SAP ECC, EP, SCM, CRM, BI, GRC, PI, BO, SolMan 7.2 landscapes day to day
operaition support
Role and Contribution
SAP Security administration
Basis support for all SAP landscape systems
User ID management: Creation/modification of users, roles
Authorization management: Designing new roles creation/modification of roles
Daily operation support for the Development, Testing and Production
environments. EWA Analysis, Extend Tablespace
Background job scheduling and monitoring
Working on projects and supporting the system after Go Live
Apply SAP correction notes (SNOTE)
SAP HANA backup and recovery, alert configuration, performance tuning,
monitoring and error analysis
Generation of Developer key and Object key
SPAM, ST-PI & ST-API Upgrade and Kernel upgrade across entire landscape
System Refresh
Performing transports in the system
Analysis of ABAP dumps, system logs, update error
Dual Stack Splitting
Spool administration
Backup configuration, monitoring and troubleshooting
Printer, STMS and SMTP configuration
Profile maintenance and changing parameters when necessary
All RFC destination creation
Technology and Tools
Oracle 11.2.0.4, Oracle 12.1.0.2.0,SAP HANA 2.0 SPS03 , SAP HANA Cockpit 2.0,
HANA Studio, SUSE Linux Enterprise Server 2008 / 2012, Windows, AIX 7.1