Title: Internship Report of Quarry Operation in ACPL, Hub
Submitted To:
 ISO & Training Center
 Buitems, Quetta
Submitted By:
 Ghulam Mehdi CMS ID: 23101
(mehdishaheen005@gmail.com)
 Syed Ali Muhammad Shah CMS ID: 21465
 Azam Azeem CMS ID: 20996
Affiliation: Department of Mining
Program: BS Mining Engineering (6th Semester)
University: Balochistan University of Information Technology, Engineering & Management
Sciences, Quetta (Buitems)
Address: Takatu Campus, Airport Road, Baleli, Quetta
Date: 04-04-2015
Contents
 Introduction
 Location
 Geology of ACPL Area
 Sections
(i) Limestone Quarry
(ii) Shale/Overburden Quarry
 Mining Method (Drilling, Blasting & Ripping)
 Usage of Explosives
 Equipment Used
 Production & Capacity
 Conclusion
Introduction
ACPL is a member of Pharon Group of Companies Operating in Pakistan. It’s started production
in 1986. The project is Pak Saudi venture. ACPL’s Manufacturing plant is located in Tehsil Hub,
District Lasbella, Balochistan, at a distance of about 45km north west of Karachi. It covers total
area of about 17500acres. The Plant area is about 75 acres. It was the first plant in the country
to be based on the latest suspension, pre-heater/pre-calcination. The Total Capacity of plant is
around 5700 tpd to 6000 tpd and 1,710,000 MT of clinker per annum. The cement
manufactured and being marketed under the “Falcon” brand name is of the highest standard
and truly the market leader. There are two types of cement mostly prepared in ACPL “Ordinary
Port Land Cement” & “Sulphate Resistant Cement”. The Export Zones of ACPL’s cement are
Srilanka, UAE , India , Southafrica etc and also sold in local country market .
Location
It is located in Sakaran, Tehsil Hub, District Lasbella, Province Balochistan, Pakistan. It is situated
at 35 km far from Karachi.
Geology of ACPL Area
The geology of ACPL consists of merely two Geologic structures
 Folded zone
 Faulted zone
Folds are wavy undulations of rock beds. It is formed due to the compressional, tensional and
tectonic forces acting regionally while faults are the fractures along which the blocks of rocks
have been displaced relative to each other. The limestone quarry is majorly faulted zone. These
faulted zones are composed of deposition of limestone layers. They are developed due to
sedimentation. Sedimentation is the process in which the accumulation of sediments occurred.
There are three main factors involved. These are;
 Temperature
 Pressure
 Time
The limestone quarry section has composed of faulted and folded region. While shale/
overburden quarry section has composed of physical weathering and the fragmentation of
shale is transported by wind and water. As a result conglomerates are formed in overburden
quarry. The layers are formed by graded bedding. In graded Bedding the coarser particles tend
to settle down more quickly in comparison to finer ones. The rate of graded bedding may also
depend upon the density of particles. The particles with greater density settle down more
quickly while the less dense particles remain in suspension in longer period of time.
Sections
In ACPL Hub plant there are two main sections of quarry. These are;
 Limestone Quarry
 Overburden Quarry
Limestone Quarry
There are two leases for limestone quarry.
a) Lease area (ML3) = 2802.94 acre
b) Lease area (ML4) = 1861.07 acre
TOTAL AREA = 4664.01 ACRE
There are four areas in which ACPL quarry is divided. Areas A, B, & C a number of benches are
developed which is under use & Area D called Chiroli Platform is under construction.
A = Consumed all Benches
B = 04 Benches
C = 11 Benches
Total Number of Benches = 15
A-area has total reserve of 2.6M/ton which are completely consumed, so Nowadays from A-
area has no production and it has at altitude of 210m from sea level. The B-area has reserve of
28.26M/ton and 1 M/ton is consumed. It is under process and it has at altitude of 410m from
sea level and C-area has reserve of 48.2M/ton and is producing the limestone in these days. The
Chiroli has reserve of 45M/ton and has altitude of 509m and it is future program. The limestone
content of ACPL Quarry is 92%-96%.In the C-area there are 15 benches out of which 3 benches
has consumed. The height of bench is 15m. The maximum height of C-area is approx: 370m
above sea level.
Overburden Quarry
There are two leases for Overburden quarry.
Lease 1 (ML2) = 11410.02 Acre
Lease 2 = 13325.01 Acre
Total = 16 Million Tons
Consumed = 12 Million Tons
Remaining = 04 Million Tons
Mining Method (Drilling, Blasting & Ripping)
There are two mining methods applying in ACPL limestone quarry and overburden quarry.
 Quarrying Method
 Ripping Method
Quarrying Method
Quarrying method is used in limestone quarry operation. Almost all equipment is used in this
method. Drilling and blasting is the way to mine the rock. In blasting explosive materials are
used, these material are charged in holes through drilling.
In ACPL two types of explosives are used
High Explosives like Gelatin Type and Nitro Glycerin,
Low Explosives like Ammonium Nitrate + Diesel Oil, and other accessories are used like
Detonator, Detonating Card and Safety Fuse.
Quarrying of limestone is accomplished by using explosives to blast the rocks. In blasting
techniques, we make holes through drilling. The hole height is approx. 15m-16m & the
diameter of hole is 105mm. The hole contains three portions, Bottom, Column & the stemming
portion. In Bottom portion, we use 14% -17% high explosives and height of bottom portion is
2m. The height of column portion is 13m and we use 84% - 87% Ammonium Nitrate Fuel Oil
(ANFO) & in stemming portion we used drill hole cuttings for stemming. If we make more than
one holes for blast, the vertical distance between holes is called burden & horizontal distance
between holes is called spacing & the distance between holes of spacing & burden will be
3.5*4m.
After blasting, if the rocks are still in huge size then we use secondary blast or using via
hydraulic breaker for further size reduce.
Usage of Explosive
The most important characteristics of an explosive are:
 Velocity of detonation (VOD)
 Strength
 Detonation stability
 Sensitiveness (Propagation ability)
 Density
 Water resistance
 Sensitivity
 Safety in handling
 Environmental properties
 Resistance to freezing
 Oxygen balance
All these properties are considered closely in ACPL Quarry Operation, Hub.
The explosives used in ACPL Quarry Operation can be classified in to:
 High Explosives
 Low explosives
 Blasting Agents
High explosives:
High Explosives have the susceptibility of initiating to Number 8 detonator and reacts
supersonically. In ACPL Quarry operation these high explosives are used;
Dynamite, Detonator and Milli-second detonator have 25 MS- delay, detonating cord/waboh
cord.
Low Explosives:
Low explosives have the capability of deflagration and reacts sub-sonically. These low
explosives are used in Hub Plant;
Safety Fuse
Blasting Agents:
Blasting Agents are mixtures consisting of a fuel and oxidizer. Blasting agents have to be
initiated by a primer. ANFO is used in this operation.
Equipment Used
Following equipment is used in ACPL Hub plant by department of mining in Quarry operations;
 Crawler Drill Machine
 Air compressor (6-21 Bars Air Pressure)
 Dumper
 Bulldozer D-8K
 Wheal Loader excavator
 Tractor
 Jack Hammer
 Hydraulic Drill Machine
 Pneumatic Drill Machine
 Down the Hole (DTH)
Production & Capacity
The Total Production of the Company is around 5700 metric tons which is achieved through two
Production Lines. Some of the specifications regarding the two lines are given below:
Line - I
 Production: 2400 metric tons
 Origin: Romania
 Crusher Type: Hammer Mill with a capacity of 600 tons/h
 Grinding Mill: Tube mill with a capacity of 170 tons/h
 Cooler type: motor driven grate cooler with capacity of 2000 tons per day.
Line - II
 Production: 3300 metric tons
 Origin: China
 Crusher Type: Hammer Mill with a capacity of 800 tons/h
 Grinding Mill: Vertical Roller Mill with a capacity of 260 tons/h
 Cooler type: Hydraulic Grate cooler with a capacity of 3300 tons/h.
Conclusion
The particular Internship in Quarry Operations Department under the supervision of Senior
Mining Engineers of ACPL helped us to conduct a conceptual practical study towards theoretical
study. We saw different standard machinery according to the need of modern Mining that has
not only saved sufficient time but also labor costs. We learnt about the usage of latest Drilling
technology Including Hydraulic, pneumatic, and Jack hammers.
The Quarry operations lead us towards positive aspects of blasting the horizontal rock shelf
called Benches. ISO and training provided information to standards. Safety precautions and
explosive handling was the main criteria completed.
A brief idea towards the cement plant layout, design, project evaluation was given to us
by TSD (Technical Support and development). They also briefly guided us towards the cement
preparation cycle from quarry to packing.
Drilling, blasting, blast lay out, pattern design, spacing and burden determination,
Primary and Secondary blasting, boulders reduction, base charge, detonating cord
Connecting wires, column charge, stemming and stemming percentage, Aluminum stemming
rods, and other important Mining operations were sophisticatedly seen and understood
through practical means…!!!

More Related Content

What's hot

Summer training project on drilling fluid at ongc ppt
Summer training project on drilling fluid at ongc pptSummer training project on drilling fluid at ongc ppt
Summer training project on drilling fluid at ongc pptKeshar Saini
 
Introduction to oil and gas exploration and processing
Introduction to oil and gas exploration and processingIntroduction to oil and gas exploration and processing
Introduction to oil and gas exploration and processingJohn Kingsley
 
Mud balance test (drilling fluid lab test)
Mud  balance test (drilling fluid lab test)Mud  balance test (drilling fluid lab test)
Mud balance test (drilling fluid lab test)Bakhtiar Mahmood
 
Top 36 mining interview questions with answers pdf
Top 36 mining interview questions with answers pdfTop 36 mining interview questions with answers pdf
Top 36 mining interview questions with answers pdfjasminewhite302
 
Software training pipesim
Software training pipesimSoftware training pipesim
Software training pipesimscpg
 
4 1 reservoir-drive_mechanisms
4 1 reservoir-drive_mechanisms4 1 reservoir-drive_mechanisms
4 1 reservoir-drive_mechanismsAtils
 
Fundamentals of Petroleum Engineering Module 5
Fundamentals of Petroleum Engineering Module 5Fundamentals of Petroleum Engineering Module 5
Fundamentals of Petroleum Engineering Module 5Aijaz Ali Mooro
 
Petroleum Engineering
Petroleum EngineeringPetroleum Engineering
Petroleum EngineeringTarek Saati
 
Title: Workover and Production Practices. A Case Study Of Acid Job Workover,...
Title: Workover and Production Practices.  A Case Study Of Acid Job Workover,...Title: Workover and Production Practices.  A Case Study Of Acid Job Workover,...
Title: Workover and Production Practices. A Case Study Of Acid Job Workover,...Karan Maniar
 
Determine PH of Mud (PH meter)
Determine PH of Mud (PH meter)Determine PH of Mud (PH meter)
Determine PH of Mud (PH meter)Bakhtiar Mahmood
 
PetroSync - API 580 & API 581 Risk Based Inspection & Base Resource Document
PetroSync - API 580 & API 581 Risk Based Inspection & Base Resource DocumentPetroSync - API 580 & API 581 Risk Based Inspection & Base Resource Document
PetroSync - API 580 & API 581 Risk Based Inspection & Base Resource DocumentPetroSync
 

What's hot (20)

Introduction to Oil and Gas Industry - Upstream Midstream Downstream
Introduction to Oil and Gas Industry - Upstream Midstream DownstreamIntroduction to Oil and Gas Industry - Upstream Midstream Downstream
Introduction to Oil and Gas Industry - Upstream Midstream Downstream
 
Summer training project on drilling fluid at ongc ppt
Summer training project on drilling fluid at ongc pptSummer training project on drilling fluid at ongc ppt
Summer training project on drilling fluid at ongc ppt
 
Introduction to oil and gas exploration and processing
Introduction to oil and gas exploration and processingIntroduction to oil and gas exploration and processing
Introduction to oil and gas exploration and processing
 
Mud balance test (drilling fluid lab test)
Mud  balance test (drilling fluid lab test)Mud  balance test (drilling fluid lab test)
Mud balance test (drilling fluid lab test)
 
Top 36 mining interview questions with answers pdf
Top 36 mining interview questions with answers pdfTop 36 mining interview questions with answers pdf
Top 36 mining interview questions with answers pdf
 
Software training pipesim
Software training pipesimSoftware training pipesim
Software training pipesim
 
Well Control
Well ControlWell Control
Well Control
 
4 1 reservoir-drive_mechanisms
4 1 reservoir-drive_mechanisms4 1 reservoir-drive_mechanisms
4 1 reservoir-drive_mechanisms
 
Catalyst unloading details
Catalyst unloading detailsCatalyst unloading details
Catalyst unloading details
 
Fundamentals of Petroleum Engineering Module 5
Fundamentals of Petroleum Engineering Module 5Fundamentals of Petroleum Engineering Module 5
Fundamentals of Petroleum Engineering Module 5
 
Drill stem test
Drill stem testDrill stem test
Drill stem test
 
Petroleum Engineering
Petroleum EngineeringPetroleum Engineering
Petroleum Engineering
 
MSc Group Project Presentation
MSc Group Project PresentationMSc Group Project Presentation
MSc Group Project Presentation
 
Offshore drilling in petroleum
Offshore drilling in petroleumOffshore drilling in petroleum
Offshore drilling in petroleum
 
Title: Workover and Production Practices. A Case Study Of Acid Job Workover,...
Title: Workover and Production Practices.  A Case Study Of Acid Job Workover,...Title: Workover and Production Practices.  A Case Study Of Acid Job Workover,...
Title: Workover and Production Practices. A Case Study Of Acid Job Workover,...
 
FINAL REPORT PPT
FINAL REPORT PPTFINAL REPORT PPT
FINAL REPORT PPT
 
Oil and gas industry ppt
Oil and gas industry pptOil and gas industry ppt
Oil and gas industry ppt
 
Determine PH of Mud (PH meter)
Determine PH of Mud (PH meter)Determine PH of Mud (PH meter)
Determine PH of Mud (PH meter)
 
Plt
PltPlt
Plt
 
PetroSync - API 580 & API 581 Risk Based Inspection & Base Resource Document
PetroSync - API 580 & API 581 Risk Based Inspection & Base Resource DocumentPetroSync - API 580 & API 581 Risk Based Inspection & Base Resource Document
PetroSync - API 580 & API 581 Risk Based Inspection & Base Resource Document
 

Similar to Internship report

Coal Mining Technlogy Brief_Low Coal Seam_HOT Mining
Coal Mining Technlogy Brief_Low Coal Seam_HOT MiningCoal Mining Technlogy Brief_Low Coal Seam_HOT Mining
Coal Mining Technlogy Brief_Low Coal Seam_HOT MiningSerena Fu
 
Longwall - China & India
Longwall - China & IndiaLongwall - China & India
Longwall - China & IndiaVR M
 
jha_indian_coal-sector aaaaaaaaaaaaaaaaaaaaaaaaaaa
jha_indian_coal-sector aaaaaaaaaaaaaaaaaaaaaaaaaaajha_indian_coal-sector aaaaaaaaaaaaaaaaaaaaaaaaaaa
jha_indian_coal-sector aaaaaaaaaaaaaaaaaaaaaaaaaaasaifuddinkhan34
 
IRJET- Analysis of strength Characteristic of Concrete using Vernacular Material
IRJET- Analysis of strength Characteristic of Concrete using Vernacular MaterialIRJET- Analysis of strength Characteristic of Concrete using Vernacular Material
IRJET- Analysis of strength Characteristic of Concrete using Vernacular MaterialIRJET Journal
 
OCL INDIA LIMITED, RAJGANGPUR
OCL INDIA LIMITED, RAJGANGPUROCL INDIA LIMITED, RAJGANGPUR
OCL INDIA LIMITED, RAJGANGPURSudhanshu Shekhar
 
HIGH WALL MINING at SCCL - A Case Study
HIGH WALL MINING at SCCL - A Case StudyHIGH WALL MINING at SCCL - A Case Study
HIGH WALL MINING at SCCL - A Case Studyknowledge stuff
 
Tata steel west bokaro washery #3 report
Tata steel west bokaro washery #3 reportTata steel west bokaro washery #3 report
Tata steel west bokaro washery #3 reportSuchit Sharma
 
Coal Lectures Series Mining Technology Presentation
Coal Lectures Series   Mining Technology PresentationCoal Lectures Series   Mining Technology Presentation
Coal Lectures Series Mining Technology PresentationThames Global Consultants
 
training and excursion
training and excursiontraining and excursion
training and excursionravi8492
 
Conversion of UG to OC
Conversion of UG to OCConversion of UG to OC
Conversion of UG to OCAbdul Mujeeb
 
Conversion of Underground Mine to Open Cast Mine
Conversion of Underground Mine to Open Cast MineConversion of Underground Mine to Open Cast Mine
Conversion of Underground Mine to Open Cast MineAbdul Mujeeb
 

Similar to Internship report (20)

Coal Mining Technlogy Brief_Low Coal Seam_HOT Mining
Coal Mining Technlogy Brief_Low Coal Seam_HOT MiningCoal Mining Technlogy Brief_Low Coal Seam_HOT Mining
Coal Mining Technlogy Brief_Low Coal Seam_HOT Mining
 
Satyajeet
SatyajeetSatyajeet
Satyajeet
 
Longwall - China & India
Longwall - China & IndiaLongwall - China & India
Longwall - China & India
 
Valgma losses
Valgma lossesValgma losses
Valgma losses
 
Valgma losses
Valgma lossesValgma losses
Valgma losses
 
jha_indian_coal-sector aaaaaaaaaaaaaaaaaaaaaaaaaaa
jha_indian_coal-sector aaaaaaaaaaaaaaaaaaaaaaaaaaajha_indian_coal-sector aaaaaaaaaaaaaaaaaaaaaaaaaaa
jha_indian_coal-sector aaaaaaaaaaaaaaaaaaaaaaaaaaa
 
IRJET- Analysis of strength Characteristic of Concrete using Vernacular Material
IRJET- Analysis of strength Characteristic of Concrete using Vernacular MaterialIRJET- Analysis of strength Characteristic of Concrete using Vernacular Material
IRJET- Analysis of strength Characteristic of Concrete using Vernacular Material
 
OCL INDIA LIMITED, RAJGANGPUR
OCL INDIA LIMITED, RAJGANGPUROCL INDIA LIMITED, RAJGANGPUR
OCL INDIA LIMITED, RAJGANGPUR
 
Nitin
NitinNitin
Nitin
 
78218645 hammer-mill-design-mini-project
78218645 hammer-mill-design-mini-project78218645 hammer-mill-design-mini-project
78218645 hammer-mill-design-mini-project
 
HIGH WALL MINING at SCCL - A Case Study
HIGH WALL MINING at SCCL - A Case StudyHIGH WALL MINING at SCCL - A Case Study
HIGH WALL MINING at SCCL - A Case Study
 
Tata steel west bokaro washery #3 report
Tata steel west bokaro washery #3 reportTata steel west bokaro washery #3 report
Tata steel west bokaro washery #3 report
 
Coal Lectures Series Mining Technology
Coal Lectures Series   Mining TechnologyCoal Lectures Series   Mining Technology
Coal Lectures Series Mining Technology
 
Coal Lectures Series Mining Technology Presentation
Coal Lectures Series   Mining Technology PresentationCoal Lectures Series   Mining Technology Presentation
Coal Lectures Series Mining Technology Presentation
 
Dankuni Coal Complex
Dankuni Coal ComplexDankuni Coal Complex
Dankuni Coal Complex
 
Sourish bhattacharyya
Sourish bhattacharyyaSourish bhattacharyya
Sourish bhattacharyya
 
training and excursion
training and excursiontraining and excursion
training and excursion
 
Summer training
Summer trainingSummer training
Summer training
 
Conversion of UG to OC
Conversion of UG to OCConversion of UG to OC
Conversion of UG to OC
 
Conversion of Underground Mine to Open Cast Mine
Conversion of Underground Mine to Open Cast MineConversion of Underground Mine to Open Cast Mine
Conversion of Underground Mine to Open Cast Mine
 

More from Ghulam Mehdi

More from Ghulam Mehdi (20)

National mineral policy
National mineral policyNational mineral policy
National mineral policy
 
Mine Gas Detections & Monitoring
Mine Gas Detections & MonitoringMine Gas Detections & Monitoring
Mine Gas Detections & Monitoring
 
Engineering Ethics.
Engineering Ethics.Engineering Ethics.
Engineering Ethics.
 
Cash Flow
Cash FlowCash Flow
Cash Flow
 
Mineral Processing
Mineral Processing Mineral Processing
Mineral Processing
 
Essay
EssayEssay
Essay
 
Economics model
Economics modelEconomics model
Economics model
 
Coal act 1969
Coal act 1969Coal act 1969
Coal act 1969
 
Mining law
Mining lawMining law
Mining law
 
Mining law
Mining lawMining law
Mining law
 
Surface mine (2)
Surface mine (2)Surface mine (2)
Surface mine (2)
 
Surface mine (1)
Surface mine (1)Surface mine (1)
Surface mine (1)
 
Drilling lab
Drilling labDrilling lab
Drilling lab
 
Survey Problem.
Survey Problem.Survey Problem.
Survey Problem.
 
Structural Geology some images
Structural Geology some imagesStructural Geology some images
Structural Geology some images
 
Research paper
Research paperResearch paper
Research paper
 
Focus and Epicenter:
Focus and Epicenter:Focus and Epicenter:
Focus and Epicenter:
 
Communication skills
Communication skillsCommunication skills
Communication skills
 
Machines of Material
Machines of MaterialMachines of Material
Machines of Material
 
Job letter
Job letterJob letter
Job letter
 

Recently uploaded

Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 

Recently uploaded (20)

Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 

Internship report

  • 1. Internship Report Title: Internship Report of Quarry Operation in ACPL, Hub Submitted To:  ISO & Training Center  Buitems, Quetta Submitted By:  Ghulam Mehdi CMS ID: 23101 (mehdishaheen005@gmail.com)  Syed Ali Muhammad Shah CMS ID: 21465  Azam Azeem CMS ID: 20996 Affiliation: Department of Mining Program: BS Mining Engineering (6th Semester) University: Balochistan University of Information Technology, Engineering & Management Sciences, Quetta (Buitems) Address: Takatu Campus, Airport Road, Baleli, Quetta Date: 04-04-2015
  • 2. Contents  Introduction  Location  Geology of ACPL Area  Sections (i) Limestone Quarry (ii) Shale/Overburden Quarry  Mining Method (Drilling, Blasting & Ripping)  Usage of Explosives  Equipment Used  Production & Capacity  Conclusion
  • 3. Introduction ACPL is a member of Pharon Group of Companies Operating in Pakistan. It’s started production in 1986. The project is Pak Saudi venture. ACPL’s Manufacturing plant is located in Tehsil Hub, District Lasbella, Balochistan, at a distance of about 45km north west of Karachi. It covers total area of about 17500acres. The Plant area is about 75 acres. It was the first plant in the country to be based on the latest suspension, pre-heater/pre-calcination. The Total Capacity of plant is around 5700 tpd to 6000 tpd and 1,710,000 MT of clinker per annum. The cement manufactured and being marketed under the “Falcon” brand name is of the highest standard and truly the market leader. There are two types of cement mostly prepared in ACPL “Ordinary Port Land Cement” & “Sulphate Resistant Cement”. The Export Zones of ACPL’s cement are Srilanka, UAE , India , Southafrica etc and also sold in local country market . Location It is located in Sakaran, Tehsil Hub, District Lasbella, Province Balochistan, Pakistan. It is situated at 35 km far from Karachi. Geology of ACPL Area The geology of ACPL consists of merely two Geologic structures  Folded zone  Faulted zone Folds are wavy undulations of rock beds. It is formed due to the compressional, tensional and tectonic forces acting regionally while faults are the fractures along which the blocks of rocks have been displaced relative to each other. The limestone quarry is majorly faulted zone. These faulted zones are composed of deposition of limestone layers. They are developed due to sedimentation. Sedimentation is the process in which the accumulation of sediments occurred. There are three main factors involved. These are;  Temperature  Pressure  Time The limestone quarry section has composed of faulted and folded region. While shale/ overburden quarry section has composed of physical weathering and the fragmentation of shale is transported by wind and water. As a result conglomerates are formed in overburden quarry. The layers are formed by graded bedding. In graded Bedding the coarser particles tend to settle down more quickly in comparison to finer ones. The rate of graded bedding may also depend upon the density of particles. The particles with greater density settle down more quickly while the less dense particles remain in suspension in longer period of time. Sections In ACPL Hub plant there are two main sections of quarry. These are;  Limestone Quarry  Overburden Quarry Limestone Quarry There are two leases for limestone quarry. a) Lease area (ML3) = 2802.94 acre b) Lease area (ML4) = 1861.07 acre
  • 4. TOTAL AREA = 4664.01 ACRE There are four areas in which ACPL quarry is divided. Areas A, B, & C a number of benches are developed which is under use & Area D called Chiroli Platform is under construction. A = Consumed all Benches B = 04 Benches C = 11 Benches Total Number of Benches = 15 A-area has total reserve of 2.6M/ton which are completely consumed, so Nowadays from A- area has no production and it has at altitude of 210m from sea level. The B-area has reserve of 28.26M/ton and 1 M/ton is consumed. It is under process and it has at altitude of 410m from sea level and C-area has reserve of 48.2M/ton and is producing the limestone in these days. The Chiroli has reserve of 45M/ton and has altitude of 509m and it is future program. The limestone content of ACPL Quarry is 92%-96%.In the C-area there are 15 benches out of which 3 benches has consumed. The height of bench is 15m. The maximum height of C-area is approx: 370m above sea level. Overburden Quarry There are two leases for Overburden quarry. Lease 1 (ML2) = 11410.02 Acre Lease 2 = 13325.01 Acre Total = 16 Million Tons Consumed = 12 Million Tons Remaining = 04 Million Tons Mining Method (Drilling, Blasting & Ripping) There are two mining methods applying in ACPL limestone quarry and overburden quarry.  Quarrying Method  Ripping Method Quarrying Method Quarrying method is used in limestone quarry operation. Almost all equipment is used in this method. Drilling and blasting is the way to mine the rock. In blasting explosive materials are used, these material are charged in holes through drilling. In ACPL two types of explosives are used High Explosives like Gelatin Type and Nitro Glycerin, Low Explosives like Ammonium Nitrate + Diesel Oil, and other accessories are used like Detonator, Detonating Card and Safety Fuse. Quarrying of limestone is accomplished by using explosives to blast the rocks. In blasting techniques, we make holes through drilling. The hole height is approx. 15m-16m & the diameter of hole is 105mm. The hole contains three portions, Bottom, Column & the stemming portion. In Bottom portion, we use 14% -17% high explosives and height of bottom portion is 2m. The height of column portion is 13m and we use 84% - 87% Ammonium Nitrate Fuel Oil (ANFO) & in stemming portion we used drill hole cuttings for stemming. If we make more than one holes for blast, the vertical distance between holes is called burden & horizontal distance between holes is called spacing & the distance between holes of spacing & burden will be 3.5*4m.
  • 5. After blasting, if the rocks are still in huge size then we use secondary blast or using via hydraulic breaker for further size reduce. Usage of Explosive The most important characteristics of an explosive are:  Velocity of detonation (VOD)  Strength  Detonation stability  Sensitiveness (Propagation ability)  Density  Water resistance  Sensitivity  Safety in handling  Environmental properties  Resistance to freezing  Oxygen balance All these properties are considered closely in ACPL Quarry Operation, Hub. The explosives used in ACPL Quarry Operation can be classified in to:  High Explosives  Low explosives  Blasting Agents High explosives: High Explosives have the susceptibility of initiating to Number 8 detonator and reacts supersonically. In ACPL Quarry operation these high explosives are used; Dynamite, Detonator and Milli-second detonator have 25 MS- delay, detonating cord/waboh cord. Low Explosives: Low explosives have the capability of deflagration and reacts sub-sonically. These low explosives are used in Hub Plant; Safety Fuse Blasting Agents: Blasting Agents are mixtures consisting of a fuel and oxidizer. Blasting agents have to be initiated by a primer. ANFO is used in this operation. Equipment Used Following equipment is used in ACPL Hub plant by department of mining in Quarry operations;  Crawler Drill Machine  Air compressor (6-21 Bars Air Pressure)  Dumper  Bulldozer D-8K  Wheal Loader excavator  Tractor  Jack Hammer  Hydraulic Drill Machine  Pneumatic Drill Machine
  • 6.  Down the Hole (DTH) Production & Capacity The Total Production of the Company is around 5700 metric tons which is achieved through two Production Lines. Some of the specifications regarding the two lines are given below: Line - I  Production: 2400 metric tons  Origin: Romania  Crusher Type: Hammer Mill with a capacity of 600 tons/h  Grinding Mill: Tube mill with a capacity of 170 tons/h  Cooler type: motor driven grate cooler with capacity of 2000 tons per day. Line - II  Production: 3300 metric tons  Origin: China  Crusher Type: Hammer Mill with a capacity of 800 tons/h  Grinding Mill: Vertical Roller Mill with a capacity of 260 tons/h  Cooler type: Hydraulic Grate cooler with a capacity of 3300 tons/h. Conclusion The particular Internship in Quarry Operations Department under the supervision of Senior Mining Engineers of ACPL helped us to conduct a conceptual practical study towards theoretical study. We saw different standard machinery according to the need of modern Mining that has not only saved sufficient time but also labor costs. We learnt about the usage of latest Drilling technology Including Hydraulic, pneumatic, and Jack hammers. The Quarry operations lead us towards positive aspects of blasting the horizontal rock shelf called Benches. ISO and training provided information to standards. Safety precautions and explosive handling was the main criteria completed. A brief idea towards the cement plant layout, design, project evaluation was given to us by TSD (Technical Support and development). They also briefly guided us towards the cement preparation cycle from quarry to packing. Drilling, blasting, blast lay out, pattern design, spacing and burden determination, Primary and Secondary blasting, boulders reduction, base charge, detonating cord Connecting wires, column charge, stemming and stemming percentage, Aluminum stemming rods, and other important Mining operations were sophisticatedly seen and understood through practical means…!!!