OFFSHORE DRILLING IN
PETROLEUM
BY:RISHABH TRIPATHI
R080114031
P.E.(II)
CONTENTS
 SOURCE
 DEFINITION
 WHEN IT ALL GOT STARTED
 HOW IT WORKS
 UNCONVENTIONAL METHODS
Search for oil
using a seismic
survey vessel
Is this a good
site for oil?
Make the hole
Drill into casing Cement casing
Blowout
preventer and
marine riser
Drill the rest Extract the oil
SOURCE OF GAS AND OIL
 KEROGEN IN SEDIMENTARY BASIN. Kerogen is the material that
actually has all the hydrocarbons in it in the sedimentary rocks.
DEFINITION
 Drilling is a mechanical process where a wellbore is drilled through the seabed. It is
typically carried out in order to explore for and subsequently extract petroleum which lies
in rock formations beneath the seabed.
WHEN IT ALL GOT STARTED
 Around 1891, the first submerged oil wells were drilled from platforms built on
piles in the fresh waters of the Grand Lake St. Marys (a.k.a. Mercer County
Reservoir) in Ohio.
 One of the oldest subsea wells is the Bibi Eibat well, which came on stream in
1923, Caspain sea.
 In 1937, Pure Oil (now Chevron) and its partner Superior Oil (now ExxonMobil)
used a fixed platform to develop a field 1 mile (1.6 km) offshore of Calcasieu
Parish, Louisiana in 14 feet (4.3 m) of water.
 One of the world's deepest hubs is currently the Perdido in the Gulf of Mexico,
floating in 2,438 meters of water.
 As of June, 2010, there were over 620 mobile offshore drilling rigs (Jackups,
semisubs, drillships, barges) available for service in the competitive rig fleet.
HOW IT
WORKS
 STEP-1
The first step in the oil drilling process is
deciding exactly where to begin drilling. The
oil company will hire an ocean surveyor who
takes a seismic survey vessel out to sea.
This boat scans underneath the ocean floor
and examines the rock and sediment
formations. This is an important process
because it allows the drilling to be precise
and prevents wasting time drilling where
there is not a significant amount of oil.
 STEP-2
After the drilling site is found, the actual drilling
process can begin. Metal tubing with a 36”
diameter, called casing, is forced 300-400 feet into
the ground. This will serve as the main support
system for the well. A drill pipe is used to push the
casing to the ocean floor.
The drill pipes are stored in the derrick (set of
machines used for lifting, drilling, and turning the
drill bit) and are connected in groups of twos and
three to save time on putting the pipes together at
sea. Each pipe is called a joint. All of the joints
together are called a stand.
As the pipes are pushed into the ground, giant
hammers can be used to push them into the
ocean floor. After the pipes reach the correct
depth, the drill pipe is disconnected and pulled
out of the water.
 STEP-3
The drill bit is lowered inside 36” casing into the
seafloor. Once entered, the bit drills 2000-30000” into
the ground. The drill bit is connected to the drill pipe
which runs to the surface of the water to the drill ship.
As the bit rotates in the well bore (hole that is cut into
the ground), high pressure drilling fluids (or mud) is
pumped down the center of the drill pipe and out
through nozzles in the drilling bit. As the drill bit cuts
at the rock formations, the drilling fluid carries the
chipped rock pieces out of the hike to prevent them
from building on the bottom of the well. Once the hole
has reached its designated depth, the drill bit and the
drill pipe is brought back to the surface.
 STEP-4
The 22” casing needs to be set inside the 36”
casing. This is accomplished by cementing
the two in place. Cement is pumped down the
drill pipe and out through a special nozzle on
the end of the pipe. Cement must be mixed
very carefully and it is imperative that the
nozzle is lowered to the correct position inside
the casing. Once the cement has been
pumped down the drill pipe and back up
around the sides of the casing, 4-12 hours are
needed for the cement to harden
 STEP-5(THE MOST IMPORTANT STEP)
The BOP is placed on top of the wellhead (the top of
the well), which is why it is important to make sure the
casing is properly cemented in place. It is connected
to the drilling rig by a marine riser. A marine riser is a
type of offshore drilling tool that is used as a
temporary extension connecting the oil well to the rig.
As drill pipe is lowered down through the marine riser,
through the BOP, into the wellhead, and then further
down into the well, drill fluid or mud (fluid that helps
clear the rock bits or “cuttings” that are being chipped
away when drilled) is pumped back up through the
pipe and out through the drill bit. The mud eventually
circulates around up through the marine riser and
back to the surface of the oil rig.
ENVIRONMENTAL EFFECTS
 While oil is being extracted from the ocean floor,
other chemicals and toxic substances come up
with the oil as well. Chemicals and toxins such as
mercury, lead and arsenic are often released back
into the ocean.
 Also, the seismic waves that the geologists use to
locate oil can harm sea mammals and disorient
whale, for example in Madagascar there were
hundreds of sea whales that beached themselves
because of these seismic waves.
 The main concern for offshore oil drilling is oil spills
after the actual drilling is complete. If oil spills, it
can wash up onto the shore causing pollution and
contamination. An immediate effect is the mass
mortality and contamination of fish and other food
species.
UNCONVENTIONAL DRILLING METHODS
 DIRECTIONAL DRILLING TYPES:
 FISH HOOK DRILLING
 LATERAL DRILLING
 UPSIDE DOWN DRILLING
 FRACKING(method exclusively for shale gas extraction).
THE END OF
PRESENTATION ON OFFSHORE
DRILLING

More Related Content

What's hot

Fundamentals of Petroleum Engineering Module 3
Fundamentals of Petroleum Engineering Module 3Fundamentals of Petroleum Engineering Module 3
Fundamentals of Petroleum Engineering Module 3Aijaz Ali Mooro
 
Unconventional reservoirs
Unconventional reservoirsUnconventional reservoirs
Unconventional reservoirsHamas Ul Ghani
 
Petroleum Engineering
Petroleum EngineeringPetroleum Engineering
Petroleum EngineeringTarek Saati
 
GEOLOGY OF PETROLUEM
GEOLOGY OF PETROLUEMGEOLOGY OF PETROLUEM
GEOLOGY OF PETROLUEMrabia yasmeen
 
Hydrocarbon Traps & Seals
Hydrocarbon Traps & SealsHydrocarbon Traps & Seals
Hydrocarbon Traps & SealsM.T.H Group
 
Off Shore Oil Drilling Presentation
Off Shore Oil Drilling PresentationOff Shore Oil Drilling Presentation
Off Shore Oil Drilling PresentationChristian Ricchezza
 
Life Cycle of Oil & Gas Wells
Life Cycle of Oil & Gas WellsLife Cycle of Oil & Gas Wells
Life Cycle of Oil & Gas WellsMohamed Elnagar
 
Geophysical Methods of Hydrocarbon Exploration
Geophysical Methods of Hydrocarbon ExplorationGeophysical Methods of Hydrocarbon Exploration
Geophysical Methods of Hydrocarbon ExplorationM.T.H Group
 
Brief Introduction into Oil & Gas Industry by Fidan Aliyeva
Brief Introduction into Oil & Gas Industry by Fidan AliyevaBrief Introduction into Oil & Gas Industry by Fidan Aliyeva
Brief Introduction into Oil & Gas Industry by Fidan AliyevaFidan Aliyeva
 
C. Petroleum Accumulation
C. Petroleum AccumulationC. Petroleum Accumulation
C. Petroleum AccumulationNael Zaino
 
01. introduction to petroleum geology
01. introduction to petroleum geology01. introduction to petroleum geology
01. introduction to petroleum geologySohail Nawab
 
Element of Petroleum System
Element of Petroleum SystemElement of Petroleum System
Element of Petroleum SystemEric HAGENIMANA
 

What's hot (20)

Mud logging
Mud loggingMud logging
Mud logging
 
Fundamentals of Petroleum Engineering Module 3
Fundamentals of Petroleum Engineering Module 3Fundamentals of Petroleum Engineering Module 3
Fundamentals of Petroleum Engineering Module 3
 
Unconventional reservoirs
Unconventional reservoirsUnconventional reservoirs
Unconventional reservoirs
 
Petroleum Engineering
Petroleum EngineeringPetroleum Engineering
Petroleum Engineering
 
Sand control
Sand controlSand control
Sand control
 
Basics of petroleum geology
Basics of petroleum geologyBasics of petroleum geology
Basics of petroleum geology
 
Type of rig
Type of rigType of rig
Type of rig
 
GEOLOGY OF PETROLUEM
GEOLOGY OF PETROLUEMGEOLOGY OF PETROLUEM
GEOLOGY OF PETROLUEM
 
tight Gas reservoir
 tight Gas reservoir tight Gas reservoir
tight Gas reservoir
 
Production logging tools
Production logging tools Production logging tools
Production logging tools
 
Hydrocarbon Traps & Seals
Hydrocarbon Traps & SealsHydrocarbon Traps & Seals
Hydrocarbon Traps & Seals
 
Off Shore Oil Drilling Presentation
Off Shore Oil Drilling PresentationOff Shore Oil Drilling Presentation
Off Shore Oil Drilling Presentation
 
Oil and Gas Reservoir Engineering
Oil and Gas Reservoir EngineeringOil and Gas Reservoir Engineering
Oil and Gas Reservoir Engineering
 
Life Cycle of Oil & Gas Wells
Life Cycle of Oil & Gas WellsLife Cycle of Oil & Gas Wells
Life Cycle of Oil & Gas Wells
 
Geophysical Methods of Hydrocarbon Exploration
Geophysical Methods of Hydrocarbon ExplorationGeophysical Methods of Hydrocarbon Exploration
Geophysical Methods of Hydrocarbon Exploration
 
Brief Introduction into Oil & Gas Industry by Fidan Aliyeva
Brief Introduction into Oil & Gas Industry by Fidan AliyevaBrief Introduction into Oil & Gas Industry by Fidan Aliyeva
Brief Introduction into Oil & Gas Industry by Fidan Aliyeva
 
C. Petroleum Accumulation
C. Petroleum AccumulationC. Petroleum Accumulation
C. Petroleum Accumulation
 
01. introduction to petroleum geology
01. introduction to petroleum geology01. introduction to petroleum geology
01. introduction to petroleum geology
 
Introduction to drilling
Introduction to drillingIntroduction to drilling
Introduction to drilling
 
Element of Petroleum System
Element of Petroleum SystemElement of Petroleum System
Element of Petroleum System
 

Viewers also liked (14)

Offshore ppt e&p
Offshore ppt   e&pOffshore ppt   e&p
Offshore ppt e&p
 
Principles of stratigraphy
Principles of stratigraphyPrinciples of stratigraphy
Principles of stratigraphy
 
Principle of Stratigraphic
Principle of StratigraphicPrinciple of Stratigraphic
Principle of Stratigraphic
 
INTRODUCTION TO OFFSHORE DRILLING AND PRODUCTION FACILITIES
INTRODUCTION TO OFFSHORE DRILLING AND PRODUCTION FACILITIESINTRODUCTION TO OFFSHORE DRILLING AND PRODUCTION FACILITIES
INTRODUCTION TO OFFSHORE DRILLING AND PRODUCTION FACILITIES
 
Introduction to Sequence Stratigraphy Powerpoint
Introduction to Sequence Stratigraphy Powerpoint Introduction to Sequence Stratigraphy Powerpoint
Introduction to Sequence Stratigraphy Powerpoint
 
Sequence stratigraphy concepts and applications
Sequence stratigraphy concepts and applicationsSequence stratigraphy concepts and applications
Sequence stratigraphy concepts and applications
 
Sequence Stratigraphy
Sequence StratigraphySequence Stratigraphy
Sequence Stratigraphy
 
Well completion
Well completionWell completion
Well completion
 
LGC field course in the Book Cliffs, UT: Presentation 1 of 14 (Principles of ...
LGC field course in the Book Cliffs, UT: Presentation 1 of 14 (Principles of ...LGC field course in the Book Cliffs, UT: Presentation 1 of 14 (Principles of ...
LGC field course in the Book Cliffs, UT: Presentation 1 of 14 (Principles of ...
 
Offshore operation
Offshore operationOffshore operation
Offshore operation
 
Facies Models
Facies ModelsFacies Models
Facies Models
 
Stratigraphy
StratigraphyStratigraphy
Stratigraphy
 
math in daily life
math in daily lifemath in daily life
math in daily life
 
Sequence Stratigraphy - Principles
Sequence Stratigraphy - PrinciplesSequence Stratigraphy - Principles
Sequence Stratigraphy - Principles
 

Similar to Offshore drilling in petroleum

Basics for oil riggers
Basics for oil riggersBasics for oil riggers
Basics for oil riggersEjaz Bhatti
 
OIL EXPLORATION | Offshore Drilling Operation| Deilling Rig operation | Types
OIL EXPLORATION | Offshore Drilling Operation| Deilling Rig operation | TypesOIL EXPLORATION | Offshore Drilling Operation| Deilling Rig operation | Types
OIL EXPLORATION | Offshore Drilling Operation| Deilling Rig operation | TypesGaurav Singh Rajput
 
Presentation222222222
Presentation222222222Presentation222222222
Presentation222222222Jacob Ngang
 
Wel Planing
Wel PlaningWel Planing
Wel Planingsaqib129
 
Overview of the oil and natural gas industry. different process and methods ...
 Overview of the oil and natural gas industry. different process and methods ... Overview of the oil and natural gas industry. different process and methods ...
Overview of the oil and natural gas industry. different process and methods ...MANMOHAN GOYAL
 
Exploratory Drilling
Exploratory Drilling Exploratory Drilling
Exploratory Drilling BIT Sindri
 
Copy of open pit mining
Copy of open pit miningCopy of open pit mining
Copy of open pit miningiAppreciateYou
 
Percussion drilling
Percussion drillingPercussion drilling
Percussion drillingshaxee ali
 
Drilling Rig Operation & Fire Protection Facility I Gaurav Singh Rajput
Drilling Rig Operation & Fire Protection Facility I Gaurav Singh RajputDrilling Rig Operation & Fire Protection Facility I Gaurav Singh Rajput
Drilling Rig Operation & Fire Protection Facility I Gaurav Singh RajputGaurav Singh Rajput
 
Open Pit Mining and Quarry
Open Pit Mining and QuarryOpen Pit Mining and Quarry
Open Pit Mining and QuarryRajkumarGhosh14
 
Drilling rigs main compnents
Drilling rigs main compnentsDrilling rigs main compnents
Drilling rigs main compnentsRIZWAN KHAN
 
37. If the material below the sandstone of problem 26 is a shale with.pdf
37. If the material below the sandstone of problem 26 is a shale with.pdf37. If the material below the sandstone of problem 26 is a shale with.pdf
37. If the material below the sandstone of problem 26 is a shale with.pdfnitinarora01
 
Offshore mining
Offshore miningOffshore mining
Offshore miningAbhiRam152
 
Deepwater Horizon Oil Spill-signed
Deepwater Horizon Oil Spill-signedDeepwater Horizon Oil Spill-signed
Deepwater Horizon Oil Spill-signedNoel Moitra
 

Similar to Offshore drilling in petroleum (20)

Basics for oil riggers
Basics for oil riggersBasics for oil riggers
Basics for oil riggers
 
OIL EXPLORATION | Offshore Drilling Operation| Deilling Rig operation | Types
OIL EXPLORATION | Offshore Drilling Operation| Deilling Rig operation | TypesOIL EXPLORATION | Offshore Drilling Operation| Deilling Rig operation | Types
OIL EXPLORATION | Offshore Drilling Operation| Deilling Rig operation | Types
 
The Inner Workings of an Oil Drill
The Inner Workings of an Oil DrillThe Inner Workings of an Oil Drill
The Inner Workings of an Oil Drill
 
2 mining
2 mining2 mining
2 mining
 
Presentation222222222
Presentation222222222Presentation222222222
Presentation222222222
 
Wel Planing
Wel PlaningWel Planing
Wel Planing
 
2 geology
2  geology2  geology
2 geology
 
Introduction to E&P
Introduction to E&PIntroduction to E&P
Introduction to E&P
 
Overview of the oil and natural gas industry. different process and methods ...
 Overview of the oil and natural gas industry. different process and methods ... Overview of the oil and natural gas industry. different process and methods ...
Overview of the oil and natural gas industry. different process and methods ...
 
Exploratory Drilling
Exploratory Drilling Exploratory Drilling
Exploratory Drilling
 
Copy of open pit mining
Copy of open pit miningCopy of open pit mining
Copy of open pit mining
 
Percussion drilling
Percussion drillingPercussion drilling
Percussion drilling
 
Bp oil spill
Bp oil spillBp oil spill
Bp oil spill
 
Drilling Rig Operation & Fire Protection Facility I Gaurav Singh Rajput
Drilling Rig Operation & Fire Protection Facility I Gaurav Singh RajputDrilling Rig Operation & Fire Protection Facility I Gaurav Singh Rajput
Drilling Rig Operation & Fire Protection Facility I Gaurav Singh Rajput
 
Open Pit Mining and Quarry
Open Pit Mining and QuarryOpen Pit Mining and Quarry
Open Pit Mining and Quarry
 
Drilling rigs main compnents
Drilling rigs main compnentsDrilling rigs main compnents
Drilling rigs main compnents
 
37. If the material below the sandstone of problem 26 is a shale with.pdf
37. If the material below the sandstone of problem 26 is a shale with.pdf37. If the material below the sandstone of problem 26 is a shale with.pdf
37. If the material below the sandstone of problem 26 is a shale with.pdf
 
Offshore mining
Offshore miningOffshore mining
Offshore mining
 
Drilling
Drilling Drilling
Drilling
 
Deepwater Horizon Oil Spill-signed
Deepwater Horizon Oil Spill-signedDeepwater Horizon Oil Spill-signed
Deepwater Horizon Oil Spill-signed
 

Recently uploaded

Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARKOUSTAV SARKAR
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadhamedmustafa094
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersMairaAshraf6
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Servicemeghakumariji156
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesRAJNEESHKUMAR341697
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdfKamal Acharya
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilVinayVitekari
 

Recently uploaded (20)

Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 

Offshore drilling in petroleum

  • 1. OFFSHORE DRILLING IN PETROLEUM BY:RISHABH TRIPATHI R080114031 P.E.(II)
  • 2. CONTENTS  SOURCE  DEFINITION  WHEN IT ALL GOT STARTED  HOW IT WORKS  UNCONVENTIONAL METHODS Search for oil using a seismic survey vessel Is this a good site for oil? Make the hole Drill into casing Cement casing Blowout preventer and marine riser Drill the rest Extract the oil
  • 3. SOURCE OF GAS AND OIL  KEROGEN IN SEDIMENTARY BASIN. Kerogen is the material that actually has all the hydrocarbons in it in the sedimentary rocks.
  • 4. DEFINITION  Drilling is a mechanical process where a wellbore is drilled through the seabed. It is typically carried out in order to explore for and subsequently extract petroleum which lies in rock formations beneath the seabed.
  • 5. WHEN IT ALL GOT STARTED  Around 1891, the first submerged oil wells were drilled from platforms built on piles in the fresh waters of the Grand Lake St. Marys (a.k.a. Mercer County Reservoir) in Ohio.  One of the oldest subsea wells is the Bibi Eibat well, which came on stream in 1923, Caspain sea.  In 1937, Pure Oil (now Chevron) and its partner Superior Oil (now ExxonMobil) used a fixed platform to develop a field 1 mile (1.6 km) offshore of Calcasieu Parish, Louisiana in 14 feet (4.3 m) of water.  One of the world's deepest hubs is currently the Perdido in the Gulf of Mexico, floating in 2,438 meters of water.  As of June, 2010, there were over 620 mobile offshore drilling rigs (Jackups, semisubs, drillships, barges) available for service in the competitive rig fleet.
  • 6. HOW IT WORKS  STEP-1 The first step in the oil drilling process is deciding exactly where to begin drilling. The oil company will hire an ocean surveyor who takes a seismic survey vessel out to sea. This boat scans underneath the ocean floor and examines the rock and sediment formations. This is an important process because it allows the drilling to be precise and prevents wasting time drilling where there is not a significant amount of oil.
  • 7.  STEP-2 After the drilling site is found, the actual drilling process can begin. Metal tubing with a 36” diameter, called casing, is forced 300-400 feet into the ground. This will serve as the main support system for the well. A drill pipe is used to push the casing to the ocean floor. The drill pipes are stored in the derrick (set of machines used for lifting, drilling, and turning the drill bit) and are connected in groups of twos and three to save time on putting the pipes together at sea. Each pipe is called a joint. All of the joints together are called a stand. As the pipes are pushed into the ground, giant hammers can be used to push them into the ocean floor. After the pipes reach the correct depth, the drill pipe is disconnected and pulled out of the water.
  • 8.  STEP-3 The drill bit is lowered inside 36” casing into the seafloor. Once entered, the bit drills 2000-30000” into the ground. The drill bit is connected to the drill pipe which runs to the surface of the water to the drill ship. As the bit rotates in the well bore (hole that is cut into the ground), high pressure drilling fluids (or mud) is pumped down the center of the drill pipe and out through nozzles in the drilling bit. As the drill bit cuts at the rock formations, the drilling fluid carries the chipped rock pieces out of the hike to prevent them from building on the bottom of the well. Once the hole has reached its designated depth, the drill bit and the drill pipe is brought back to the surface.
  • 9.  STEP-4 The 22” casing needs to be set inside the 36” casing. This is accomplished by cementing the two in place. Cement is pumped down the drill pipe and out through a special nozzle on the end of the pipe. Cement must be mixed very carefully and it is imperative that the nozzle is lowered to the correct position inside the casing. Once the cement has been pumped down the drill pipe and back up around the sides of the casing, 4-12 hours are needed for the cement to harden
  • 10.  STEP-5(THE MOST IMPORTANT STEP) The BOP is placed on top of the wellhead (the top of the well), which is why it is important to make sure the casing is properly cemented in place. It is connected to the drilling rig by a marine riser. A marine riser is a type of offshore drilling tool that is used as a temporary extension connecting the oil well to the rig. As drill pipe is lowered down through the marine riser, through the BOP, into the wellhead, and then further down into the well, drill fluid or mud (fluid that helps clear the rock bits or “cuttings” that are being chipped away when drilled) is pumped back up through the pipe and out through the drill bit. The mud eventually circulates around up through the marine riser and back to the surface of the oil rig.
  • 11. ENVIRONMENTAL EFFECTS  While oil is being extracted from the ocean floor, other chemicals and toxic substances come up with the oil as well. Chemicals and toxins such as mercury, lead and arsenic are often released back into the ocean.  Also, the seismic waves that the geologists use to locate oil can harm sea mammals and disorient whale, for example in Madagascar there were hundreds of sea whales that beached themselves because of these seismic waves.  The main concern for offshore oil drilling is oil spills after the actual drilling is complete. If oil spills, it can wash up onto the shore causing pollution and contamination. An immediate effect is the mass mortality and contamination of fish and other food species.
  • 12. UNCONVENTIONAL DRILLING METHODS  DIRECTIONAL DRILLING TYPES:  FISH HOOK DRILLING  LATERAL DRILLING  UPSIDE DOWN DRILLING  FRACKING(method exclusively for shale gas extraction).
  • 13. THE END OF PRESENTATION ON OFFSHORE DRILLING